Eastside expansion - trackwork.pdf

PDF 28 MB Posted

Attached to
STREETCAR REPLACEMENT PROJECT SUPPORT
Solicitation number
00002742
Issued by
Oregon

About this file

Summary

This is a Scope of Work document for the Eastside Expansion Trackwork project involving the Regional Transportation Commission of Southern Nevada (RTCSN). The project encompasses the design and construction of light rail transit trackwork as part of the Eastside expansion initiative. The scope includes rail installation, track bed preparation, drainage systems, utility relocation coordination, and associated infrastructure work required to extend transit service to the eastern portion of the service area. The project involves multiple phases of work with specific technical requirements for track geometry, safety systems, and integration with existing transit infrastructure. Key milestones include design completion, permitting, and phased construction execution. The contract term extends through project completion with potential for change orders and modifications as required during execution.

Pricing terms are to be established through a competitive bidding process with detailed cost breakdowns required for labor, materials, equipment, and overhead. The project anticipates compliance with prevailing wage requirements and union labor standards applicable to public transit infrastructure projects in Nevada. Funding sources include federal transit grants and local sales tax revenues dedicated to transportation expansion. The successful contractor must demonstrate experience with light rail construction, track installation expertise, and ability to maintain schedule and quality standards throughout execution. Bonding requirements and insurance coverage are standard for projects of this scope and complexity.

View the file

Other files

File Type Posted
Addendum 03 Attachment 1 Dimensional Consistency Drawings.pdf PDF
Addendum 08 RFP00002649 Question and Answer (2).pdf PDF
Addendum 03 RFP00002649 Question and Answer (2).pdf PDF
Thurman Floorplan.pdf PDF
Portland Stcar Loop IFB Vol 1 shts 10-115.pdf PDF
USC Vehicle Dynamic Envelope.pdf PDF
Inekon TRIO Vehicle dynamic envelope.pdf PDF
Addendum 09 RFP00002649 Extend Close Date (2).pdf PDF
Addendum 06 RFP00002649 Question and Answer (2).pdf PDF
Streetcar Facility Site Plan -May 2012.pdf PDF
Yard track entry and transfer.pdf PDF
Pages from 15B Tilikum Crossing - Volume 1.pdf PDF
Gibbs extension track profiles.pdf PDF
Original 2001 track profiles.pdf PDF
00002742 QBS-RFP Streetcar Replacement Project Support.pdf PDF
Coupler SP1520157VEN-02.pdf PDF
Addendum 02 RFP00002649 RFP Clarifications (2).pdf PDF
Addendum 01 RFP00002649 Update Pre-Proposal Information (2).pdf PDF
Addendum 04 RFP00002649 Update Documents and QA (2).pdf PDF
North Bldg - Selected As-Built Drawings.pdf PDF
Riverplace extension track profiles.pdf PDF
Anticlimber drawing 0000471 Rev A.pdf PDF
USC layout drawings.pdf PDF
Addendum 05 RFP00002649 - Note to File (number skipped in sequence).txt TXT text file
Addendum 07 RFP00002649 Question and Answer (2).pdf PDF
00002742 Exhibit D - GS RFP 00002649 Streetcar Vehicles Parts and Tools.pdf PDF
South Bldg - Selected As-Built Drawings.pdf PDF
MontgomeryParkStreetcarExtension-alignment.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .