This document is a project presentation slide for the Montgomery Park Streetcar Extension, a public transportation infrastructure initiative. The project encompasses the design and implementation of a streetcar extension serving the Montgomery Park area, with a key component involving the procurement of up to 12 hybrid off-wire capable vehicles to support operations on the extended line. The presentation outlines several critical project elements including budgeting, funding sources, and an implementation timeline. The document references FTA (Federal Transit Administration) milestones and NEPA (National Environmental Policy Act) requirements, indicating federal involvement in the project planning and environmental review process.

The project is structured around multiple phases including vehicle procurement, federal milestone achievement, and subsequent next steps toward full implementation. The presentation format suggests this document was used for stakeholder communication or project status updates, covering project funding mechanisms, the timeline for completion, and the regulatory framework governing the extension's development. Specific budget amounts, detailed funding sources, procurement timelines, and award dates are referenced but not fully detailed within the slide content provided.

View the file

Other files

File Type Posted
Addendum 03 Attachment 1 Dimensional Consistency Drawings.pdf PDF
Addendum 08 RFP00002649 Question and Answer (2).pdf PDF
Addendum 03 RFP00002649 Question and Answer (2).pdf PDF
Thurman Floorplan.pdf PDF
Portland Stcar Loop IFB Vol 1 shts 10-115.pdf PDF
Anticlimber drawing 0000471 Rev A.pdf PDF
USC layout drawings.pdf PDF
Addendum 05 RFP00002649 - Note to File (number skipped in sequence).txt TXT text file
Addendum 07 RFP00002649 Question and Answer (2).pdf PDF
00002742 Exhibit D - GS RFP 00002649 Streetcar Vehicles Parts and Tools.pdf PDF
South Bldg - Selected As-Built Drawings.pdf PDF
USC Vehicle Dynamic Envelope.pdf PDF
Inekon TRIO Vehicle dynamic envelope.pdf PDF
Addendum 09 RFP00002649 Extend Close Date (2).pdf PDF
Addendum 06 RFP00002649 Question and Answer (2).pdf PDF
Streetcar Facility Site Plan -May 2012.pdf PDF
Yard track entry and transfer.pdf PDF
Pages from 15B Tilikum Crossing - Volume 1.pdf PDF
Gibbs extension track profiles.pdf PDF
Original 2001 track profiles.pdf PDF
00002742 QBS-RFP Streetcar Replacement Project Support.pdf PDF
Coupler SP1520157VEN-02.pdf PDF
Addendum 02 RFP00002649 RFP Clarifications (2).pdf PDF
Addendum 01 RFP00002649 Update Pre-Proposal Information (2).pdf PDF
Addendum 04 RFP00002649 Update Documents and QA (2).pdf PDF
North Bldg - Selected As-Built Drawings.pdf PDF
Riverplace extension track profiles.pdf PDF
Eastside expansion - trackwork.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Also Includes The purchase of up to 12 hybrid off-wire capable vehicles

Slide Number 1
Slide Number 2
Slide Number 3
Project Elements
Budget Funding
Project Timeline
Vehicle Procurement
FTA Milestones
NEPA
Project Next Steps
Status Update