Pages 21 to 45 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf

PDF 9 MB Posted

Attached to
Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1 Federal contract opportunity
Solicitation number
36C24221B0069
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This notice is for Solicitation Number 36C24221B0069 to replace exterior windows at the James J. Peters VA Medical Center in Bronx, New York. The project has a cost estimate between $5-10 million and is set aside for Service-Disabled Veteran Owned Small Businesses. The scope of work involves replacing windows to create an energy efficient and environmentally friendly design in compliance with LEED standards. Construction services will include fall protection, side light windows, and various styles of windows identified as W1-W5. The contractor must inspect all work areas and re-verify drawings and information. If existing equipment requires removal and reinstallation for window replacement, the contractor must handle this at no cost to the VA. The contract duration is 726 calendar days from the notice to proceed date. Responses are due by the date specified in the forthcoming solicitation to be released on or around December 31, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1, newest first.
File Type Posted
36C24221B0069 0005.docx DOCX document
36C24221B0069 0004.docx DOCX document
Copy of Equipments to be moved list Responses for RFI No. 1 and Related Questions to PreBid RFIs for 526-18-103.xlsx XLSX spreadsheet
36C24221B0069 0003.docx DOCX document
099100 Painting Specification.pdf PDF
COVID Language.docx DOCX document
Hazardous Material Survey Report Bronx Windows Phase 1 Nov 2020.pdf PDF
36C24221B0069 0002.docx DOCX document
Final Design Site Investigation-Window Survey Nov 2020.pdf PDF
Bronx Windows Phase 1 FINAL-Set1.pdf PDF
Bronx Windows Phase 1 FINAL-Set4.pdf PDF
Bronx Windows Phase 1 FINAL-Set6.pdf PDF
Bronx Windows Phase 1 FINAL-Set2.pdf PDF
36C24221B0069 0001.docx DOCX document
Prebid Attendance Sheet for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Bronx Windows Phase 1 FINAL-Set5.pdf PDF
Bronx Windows Phase 1 FINAL-Set3.pdf PDF
Pages 1 to 20 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Pages 46 to 62 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Specification for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
36C24221B0069_1.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W2

W1

W10

W4

W4

W4

W5

W5

W5

W3

W3

W3

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL THIRD FLOOR PLAN

EAST SIDE - NORTH END

AS033

JMA

SD

AS033

SCALE: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

FROM DAMAGE.

9. FIRE EXITS AT GRADE LEVEL SHALL NOT BE BLOCKED DURING CONSTRUCTION.

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

FOURTH FLOOR

OVERALL PLAN

AS041

JMA

SD

FOURTH FLOOR OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS041

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO START OF WORK. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF SAFETY PLAN FROM CO/COR A

MINIMUM OF 72 HOURS PRIOR TO START OF WORK.

W2

W2

W2

W3

W3

W5

W4

W4

W4

W5

W5

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W3W2

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL FOURTH FLOOR PLAN

EAST SIDE - SOUTH END

AS042

JMA

SD

AS042

SCALE: 1/8" = 1'-0"

PARTIAL FOURTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W5

W5

W4

W4

W4

W5

W3

W3

W3

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL FOURTH FLOOR PLAN

EAST SIDE - NORTH END

AS043

JMA

SD

AS043

SCALE: 1/8" = 1'-0"

PARTIAL FOURTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

FIFTH FLOOR

OVERALL PLAN

AS051

JMA

SD

FIFTH FLOOR OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS051

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO

W3

W3

W5

W4

W5

W5

W4

W4

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2 W3

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL FIFTH FLOOR PLAN

EAST SIDE - SOUTH END

AS052

JMA

SD

AS052

SCALE: 1/8" = 1'-0"

PARTIAL FIFTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W5

W4

W4

W4

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W3

W3

W3

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL FIFTH FLOOR PLAN

EAST SIDE - NORTH END

AS053

JMA

SD

AS053

SCALE: 1/8" = 1'-0"

PARTIAL FIFTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

SIXTH FLOOR

OVERALL PLAN

AS061

JMA

SD

SIXTH FLOOR

OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS061

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO

W10

W4-A

W4-A

W4-A

W5-A

W5-A

W5-A

W2-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1-A

W1

W1

W1

W1

W3

W3

W3

W2-A

W2-A

W2-A

W2-A

W2-A

W2-A

W2-A

W2-A

W2

W2

W2

W2

W2

W2

W2

W2

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL SIXTH FLOOR PLAN

EAST SIDE - SOUTH END

AS062

JMA

SD

AS062

SCALE: 1/8" = 1'-0"

PARTIAL SIXTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W3

W3

W5

W4

W4

W4

W5

W5

W3

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL SIXTH FLOOR PLAN

EAST SIDE - NORTH END

AS063

JMA

SD

AS062

SCALE: 1/8" = 1'-0"

PARTIAL SIXTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

AS063

SCALE: 1/8" = 1'-0"

PARTIAL SIXTH FLOOR PLAN -

EAST SIDE - NORTH END

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

SEVENTH FLOOR

OVERALL PLAN

AS071

JMASD

SEVENTH FLOOR

OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS071

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO

W3

W3

W5

W4

W10

W4

W4

W5

W5

W3

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL SEVENTH FLOOR PLAN

EAST SIDE - SOUTH END

AS072

JMA

SD

AS072

SCALE: 1/8" = 1'-0"

PARTIAL SEVENTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W10

W4

W4

W4

W5

W5

W5

W3

W3

W3

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL SEVENTH FLOOR PLAN

EAST SIDE - NORTH END

AS073

JMA

SD

AS073

SCALE: 1/8" = 1'-0"

PARTIAL SEVENTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

EIGHTH FLOOR

OVERALL PLAN

AS081

JMA

SD

EIGHTH FLOOR

OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS081

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO

W2

W2

W1

W4

W5

W4

W5

W5

W4

W4

W10

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL EIGHTH FLOOR PLAN

EAST SIDE - SOUTH END

AS082

JMA

SD

AS082

SCALE: 1/8" = 1'-0"

PARTIAL EIGHTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W2W4

W4

W4

W4

W5

W5

W5

W10

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL EIGHTH FLOOR PLAN

EAST SIDE - NORTH END

AS083

JMA

SD

AS083

SCALE: 1/8" = 1'-0"

PARTIAL EIGHTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

NINTH FLOOR

OVERALL PLAN

AS091

JMA

SD

NINTH FLOOR

OVERALL PLAN

SCALE: 1/16" = 1'-0"

AS091

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO

W3

W3

W5

W4

W4

W4

W5

W5

W3

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL NINTH FLOOR PLAN

EAST SIDE - SOUTH END

AS092

JMA

SD

AS092

SCALE: 1/8" = 1'-0"

PARTIAL NINTH FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

W2W3

W5

W4

W5

W5

W4

W4

W3

W3

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL NINTH FLOOR PLAN

EAST SIDE - NORTH END

AS093

JMA

SD

AS093

SCALE: 1/8" = 1'-0"

PARTIAL NINTH FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

Bronx Windows Phase 1 FINAL-Set1.pdf
GI002-GIO02X.pdf
Sheets and Views
GIO02
Bronx Windows Phase 1 FINAL-Set2.pdf
Bronx Windows Phase 1 FINAL-Set3.pdf
Bronx Windows Phase 1 FINAL-Set4.pdf
Bronx Windows Phase 1 FINAL-Set5.pdf
Bronx Windows Phase 1 FINAL-Set6.pdf

File details come from the government source that posted it. Updated .