Bronx Windows Phase 1 FINAL-Set2.pdf

PDF 10 MB Posted

Attached to
Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1 Federal contract opportunity
Solicitation number
36C24221B0069
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document provides details on a federal contract solicitation for replacing exterior windows at the James J. Peters Veterans Affairs Medical Center in Bronx, New York. The solicitation number is 36C24221B0069 and has a Service-Disabled Veteran Owned Small Business set-aside with an estimated value between $5 million to $10 million. The scope of work involves replacing existing exterior windows to create a more energy efficient and environmentally-friendly facility utilizing LEED standards. The construction services will include fall protection, installing side light windows and specific window types. The contract duration is 726 calendar days from notice to proceed. Interested SDVOSBs must submit capability statements by the response due date, which will be included in the solicitation to be posted on December 31, 2021 on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1, newest first.
File Type Posted
36C24221B0069 0005.docx DOCX document
36C24221B0069 0004.docx DOCX document
Copy of Equipments to be moved list Responses for RFI No. 1 and Related Questions to PreBid RFIs for 526-18-103.xlsx XLSX spreadsheet
Hazardous Material Survey Report Bronx Windows Phase 1 Nov 2020.pdf PDF
36C24221B0069 0003.docx DOCX document
099100 Painting Specification.pdf PDF
COVID Language.docx DOCX document
36C24221B0069 0002.docx DOCX document
36C24221B0069 0001.docx DOCX document
Final Design Site Investigation-Window Survey Nov 2020.pdf PDF
Bronx Windows Phase 1 FINAL-Set1.pdf PDF
Bronx Windows Phase 1 FINAL-Set4.pdf PDF
Bronx Windows Phase 1 FINAL-Set6.pdf PDF
Bronx Windows Phase 1 FINAL-Set3.pdf PDF
Prebid Attendance Sheet for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Bronx Windows Phase 1 FINAL-Set5.pdf PDF
Pages 1 to 20 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Pages 21 to 45 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
36C24221B0069_1.docx DOCX document
Pages 46 to 62 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Specification for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bronx, New York

NOVEMBER 2020

Office of Facility Management Service

526-18-103 Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Project Title

OfDwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

ASBESTOS ABATEMENT

GENERAL NOTES + EXISTING CONDITIONS

HA001

11TRGSHF

Bronx, New York

NOVEMBER 2020

Office of Facility Management Service

526-18-103 Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Project Title

OfDwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

INFECTION CONTROL DETAILS

HA002

12TRGSHF

1 INFECTION CONTROL PLAN - TYP.

1/2" = 1'-0"

2 INFECTION CONTROL ELEVATION - TYP.

1/2" = 1'-0"

3 INFECTION CONTROL SECTION - TYP.

1/2" = 1'-0"

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

FIRST FLOOR

OVERALL PLAN

AS011

JMA

SD

FIRST FLOOR

OVERALL PLAN

SCALE: NOT TO SCALE

AS011

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO START OF WORK. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF SAFETY PLAN FROM CO/COR A

MINIMUM OF 72 HOURS PRIOR TO START OF WORK.

W6

W6

W6

W6

W6

W6

W6

W6

W7

W6

W6

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W12

W11

W11

W11

W12

W12

W7

W6

W6

W7

W7

W6

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval Location

Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

PARTIAL FIRST FLOOR PLAN

EAST SIDE - SOUTH END

AS012

JMA

SD

AS012

SCALE: 1/8" = 1'-0"

AS012

SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR PLAN -

EAST SIDE - SOUTH END

PARTIAL FIRST FLOOR PLAN -

EAST SIDE - SOUTH END

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

FROM DAMAGE.

9. FIRE EXITS AT GRADE LEVEL SHALL NOT BE BLOCKED DURING CONSTRUCTION.

W11

W11

W11

W12

W12

W12

W8

W8

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W8

W8

W8

W8

W8

W8

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval Location

Drawing Number

Building Number

Project Title

Of

DrawnChecked

Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL FIRST FLOOR PLAN

EAST SIDE - NORTH END

AS013

JMASD

AS013

AS013

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR PLAN -

EAST SIDE - NORTH END

SCALE: 1/8" = 1'-0"

PARTIAL FIRST FLOOR PLAN -

EAST SIDE - NORTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

SECOND FLOOR

OVERALL PLAN

AS021

JMA

SD

SECOND FLOOR

OVERALL PLAN

SCALE: NOT TO SCALE

AS021

F

D E

A

G

BC

GENERAL NOTES

1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND

EXTERIOR ACCESS IN AND AROUND THE FACILITY.

2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO

DEMOLITION AND NEW WORK PLANS.

3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR

APPROVAL PRIOR TO START OF WORK.

4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE

FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF

EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO START OF WORK. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF SAFETY PLAN FROM CO/COR A

MINIMUM OF 72 HOURS PRIOR TO START OF WORK.

W7

W2

W2

W1

W1

W5

W4

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W6

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W7

W10

W5

W5

W4

W4

W2

W2

W2

W2

W2

W2

W1

W1

W1

W1

W1

W1

W10

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval

Location Drawing Number

Building Number

Project Title

Of

DrawnChecked Date

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

KEY PLAN

PARTIAL SECOND FLOOR PLAN

EAST SIDE - SOUTH END

AS022

JMA

SD

AS022

SCALE: 1/8" = 1'-0"

AS022

SCALE: 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN -

EAST SIDE - SOUTH END

PARTIAL SECOND FLOOR PLAN -

EAST SIDE - SOUTH END

LEGEND

WINDOW TAG (SEE SHEET AS401

FOR ADDITIONAL INFORMATION)

INTERIOR FINISH TAG (SEE SHEET GI002 FOR

ADDITIONAL INFORMATION)

KEY NOTE TAG

F

D E

A

G

BC

GENERAL NOTES

1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE

NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.

RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS

IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND

INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.

4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO

MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.

5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF

THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.

6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED

BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.

7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY

TRADES SKILLED IN FINISH WORK.

8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE

GI002-GIO02X.pdf
Sheets and Views
GIO02

File details come from the government source that posted it. Updated .