Bronx Windows Phase 1 FINAL-Set2.pdf
PDF 10 MB Posted
- Attached to
- Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1 Federal contract opportunity
- Solicitation number
- 36C24221B0069
About this file
This document provides details on a federal contract solicitation for replacing exterior windows at the James J. Peters Veterans Affairs Medical Center in Bronx, New York. The solicitation number is 36C24221B0069 and has a Service-Disabled Veteran Owned Small Business set-aside with an estimated value between $5 million to $10 million. The scope of work involves replacing existing exterior windows to create a more energy efficient and environmentally-friendly facility utilizing LEED standards. The construction services will include fall protection, installing side light windows and specific window types. The contract duration is 726 calendar days from notice to proceed. Interested SDVOSBs must submit capability statements by the response due date, which will be included in the solicitation to be posted on December 31, 2021 on SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bronx, New York
NOVEMBER 2020
Office of Facility Management Service
526-18-103 Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval
Project Title
OfDwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
ASBESTOS ABATEMENT
GENERAL NOTES + EXISTING CONDITIONS
HA001
11TRGSHF
Bronx, New York
NOVEMBER 2020
Office of Facility Management Service
526-18-103 Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval
Project Title
OfDwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
INFECTION CONTROL DETAILS
HA002
12TRGSHF
1 INFECTION CONTROL PLAN - TYP.
1/2" = 1'-0"
2 INFECTION CONTROL ELEVATION - TYP.
1/2" = 1'-0"
3 INFECTION CONTROL SECTION - TYP.
1/2" = 1'-0"
HOLIHAN ASSOCIATES LLC
FINAL SUBMISSION
Bronx, New York
NOVEMBER 2020
Office of
Facility
Management
Service
REPLACE EXTERIOR WINDOWS PHASE 1
JAMES J. PETERS MEDICAL CENTER
BRONX, NEW YORK
526-18-103
Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval
Location Drawing Number
Building Number
Project Title
Of
DrawnChecked Date
Project Number
Dwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
311 FELS AVE. FAIRHOPE, AL 36532
KEY PLAN
FIRST FLOOR
OVERALL PLAN
AS011
JMA
SD
FIRST FLOOR
OVERALL PLAN
SCALE: NOT TO SCALE
AS011
F
D E
A
G
BC
GENERAL NOTES
1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND
EXTERIOR ACCESS IN AND AROUND THE FACILITY.
2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO
DEMOLITION AND NEW WORK PLANS.
3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR
APPROVAL PRIOR TO START OF WORK.
4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE
FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF
EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO START OF WORK. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF SAFETY PLAN FROM CO/COR A
MINIMUM OF 72 HOURS PRIOR TO START OF WORK.
W6
W6
W6
W6
W6
W6
W6
W6
W7
W6
W6
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W12
W11
W11
W11
W12
W12
W7
W6
W6
W7
W7
W6
HOLIHAN ASSOCIATES LLC
FINAL SUBMISSION
Bronx, New York
NOVEMBER 2020
Office of
Facility
Management
Service
REPLACE EXTERIOR WINDOWS PHASE 1
JAMES J. PETERS MEDICAL CENTER
BRONX, NEW YORK
526-18-103
Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval Location
Drawing Number
Building Number
Project Title
Of
DrawnChecked Date
Project Number
Dwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
311 FELS AVE. FAIRHOPE, AL 36532
KEY PLAN
LEGEND
WINDOW TAG (SEE SHEET AS401
FOR ADDITIONAL INFORMATION)
INTERIOR FINISH TAG (SEE SHEET GI002 FOR
ADDITIONAL INFORMATION)
KEY NOTE TAG
PARTIAL FIRST FLOOR PLAN
EAST SIDE - SOUTH END
AS012
JMA
SD
AS012
SCALE: 1/8" = 1'-0"
AS012
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN -
EAST SIDE - SOUTH END
PARTIAL FIRST FLOOR PLAN -
EAST SIDE - SOUTH END
F
D E
A
G
BC
GENERAL NOTES
1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE
NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.
2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.
RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS
IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.
3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND
INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.
4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO
MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.
5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF
THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.
6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED
BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.
7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY
TRADES SKILLED IN FINISH WORK.
8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE
FROM DAMAGE.
9. FIRE EXITS AT GRADE LEVEL SHALL NOT BE BLOCKED DURING CONSTRUCTION.
W11
W11
W11
W12
W12
W12
W8
W8
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W8
W8
W8
W8
W8
W8
W10
HOLIHAN ASSOCIATES LLC
FINAL SUBMISSION
Bronx, New York
NOVEMBER 2020
Office of
Facility
Management
Service
REPLACE EXTERIOR WINDOWS PHASE 1
JAMES J. PETERS MEDICAL CENTER
BRONX, NEW YORK
526-18-103
Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval Location
Drawing Number
Building Number
Project Title
Of
DrawnChecked
Date
Project Number
Dwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
311 FELS AVE. FAIRHOPE, AL 36532
KEY PLAN
PARTIAL FIRST FLOOR PLAN
EAST SIDE - NORTH END
AS013
JMASD
AS013
AS013
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN -
EAST SIDE - NORTH END
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN -
EAST SIDE - NORTH END
LEGEND
WINDOW TAG (SEE SHEET AS401
FOR ADDITIONAL INFORMATION)
INTERIOR FINISH TAG (SEE SHEET GI002 FOR
ADDITIONAL INFORMATION)
KEY NOTE TAG
F
D E
A
G
BC
GENERAL NOTES
1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE
NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.
2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.
RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS
IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.
3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND
INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.
4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO
MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.
5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF
THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.
6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED
BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.
7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY
TRADES SKILLED IN FINISH WORK.
8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE
HOLIHAN ASSOCIATES LLC
FINAL SUBMISSION
Bronx, New York
NOVEMBER 2020
Office of
Facility
Management
Service
REPLACE EXTERIOR WINDOWS PHASE 1
JAMES J. PETERS MEDICAL CENTER
BRONX, NEW YORK
526-18-103
Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval
Location Drawing Number
Building Number
Project Title
Of
DrawnChecked Date
Project Number
Dwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
311 FELS AVE. FAIRHOPE, AL 36532
KEY PLAN
SECOND FLOOR
OVERALL PLAN
AS021
JMA
SD
SECOND FLOOR
OVERALL PLAN
SCALE: NOT TO SCALE
AS021
F
D E
A
G
BC
GENERAL NOTES
1. OVERALL FLOOR PLAN HAS BEEN PROVIDED FOR REFERENCE USE TO DETERMINE INTERIOR AND
EXTERIOR ACCESS IN AND AROUND THE FACILITY.
2. REFER TO ENLARGED FLOOR PLANS AS REFERENCED FOR ADDITIONAL INFORMATION RELATED TO
DEMOLITION AND NEW WORK PLANS.
3. SUBMIT CONSTRUCTION ACCESS ROUTES, LAY DOWN AND STAGING AREA PLANS TO CO/COR FOR
APPROVAL PRIOR TO START OF WORK.
4. CONSTRUCTION ACTIVITIES IN SOME PHASES MAY AFFECT MEANS OF EGRESS FROM PORTIONS OF THE
FACILITY. CONTRACTOR SHALL COORDINATE ANY TEMPORARY BLOCKAGE OR REROUTING OF
EMERGENCY EGRESS DURING CONSTRUCTION WITH THE FACILITY SAFETY OFFICER PRIOR TO ANY DISRUPTION. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE CO/COR FOR APPROVAL PRIOR TO START OF WORK. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF SAFETY PLAN FROM CO/COR A
MINIMUM OF 72 HOURS PRIOR TO START OF WORK.
W7
W2
W2
W1
W1
W5
W4
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W6
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W7
W10
W5
W5
W4
W4
W2
W2
W2
W2
W2
W2
W1
W1
W1
W1
W1
W1
W10
HOLIHAN ASSOCIATES LLC
FINAL SUBMISSION
Bronx, New York
NOVEMBER 2020
Office of
Facility
Management
Service
REPLACE EXTERIOR WINDOWS PHASE 1
JAMES J. PETERS MEDICAL CENTER
BRONX, NEW YORK
526-18-103
Drawing TitleMedical Center Director Approval
Associate Director Approval
PCC Director Approval
Chief Engineer Approval
Safety Manager Approval
Chief Nurse Executive / Chief of Staff Approval
Location Drawing Number
Building Number
Project Title
Of
DrawnChecked Date
Project Number
Dwg.
DESIGN CHANGE APPROVED
DESCRIPTION DATE
CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM
311 FELS AVE. FAIRHOPE, AL 36532
KEY PLAN
PARTIAL SECOND FLOOR PLAN
EAST SIDE - SOUTH END
AS022
JMA
SD
AS022
SCALE: 1/8" = 1'-0"
AS022
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN -
EAST SIDE - SOUTH END
PARTIAL SECOND FLOOR PLAN -
EAST SIDE - SOUTH END
LEGEND
WINDOW TAG (SEE SHEET AS401
FOR ADDITIONAL INFORMATION)
INTERIOR FINISH TAG (SEE SHEET GI002 FOR
ADDITIONAL INFORMATION)
KEY NOTE TAG
F
D E
A
G
BC
GENERAL NOTES
1. ALL DEMOLITION WORK AND NEW WORK REQUIRED FOR THIS PROJECT SHALL BE COMPLETED IN PHASES. EACH PHASE SHALL BE COMPLETED AND ACCEPTED BY THE OWNER BEFORE MOVING TO THE
NEXT PHASE. REFER TO DRAWINGS GI003 & GI004 FOR ADDITIONAL INFORMATION.
2. ALL EXISTING WINDOWS INDICATED WITH A WINDOW TAG SHALL BE DEMOLISHED COMPLETELY.
RECYCLE ALL DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE NEW WINDOWS
IN EXISTING OPENINGS AS INDICATED ON WINDOW SCHEDULE SHEET AS401.
3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BARRICADES, ENVIRONMENTAL CONTROLS AND
INFECTIOUS CONTROL MEASURES WITHIN EACH ROOM PRIOR TO START OF DEMOLITION WORK IN ROOM.
4. INTERIOR FINISHES ARE INDICATED IN ROOMS INCLUDED IN THE SCOPE OF WORK. PROTECT EXISTING INTERIOR FINISHES FROM DAMAGE DURING THE WORK. REFER TO SHEET GI002 FOR INTERIOR FINISH SCHEDULE. ANY DAMAGE TO THE EXISTING FINISHES BY THE CONTRACTOR SHALL BE REPAIRED TO
MATCH THE EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE OWNER.
5. CONTRACTOR SHALL COORDINATE SCHEDULES AND SEQUENCE OF WORK WITH CONTRACTING OFFICER PRIOR TO BEGINNING WORK. CONDUCT ALL WORK TO MINIMIZE IMPACT ON THE DAILY OPERATIONS OF
THE FACILITY. DO NOT BLOCK EXISTING MEANS OF EGRESS.
6. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT, MEASURE AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS. VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS NECESSITATED
BY FIELD CONDITIONS TO THE ATTENTION OF THE VA.
7. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. ALL REPAIRS AND NEW FINISHES SHALL BE BY
TRADES SKILLED IN FINISH WORK.
8. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO THE POINT OF BENEFICIAL OCCUPANCY BY OWNER), THE CONTRACTOR SHALL PROTECT ALL MATERIALS TO REMAIN FOR REUSE
| GI002-GIO02X.pdf |
| Sheets and Views |
| GIO02 |
File details come from the government source that posted it. Updated .