Bronx Windows Phase 1 FINAL-Set1.pdf

PDF 9 MB Posted

Attached to
Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1 Federal contract opportunity
Solicitation number
36C24221B0069
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This notice provides details for a solicitation seeking construction services to replace exterior windows at the James J. Peters VA Medical Center in Bronx, New York. The solicitation number is 36C24221B0069 with a project number of 526-18-103, and has an estimated cost between $5-10 million. The opportunity is set aside for Service-Disabled Veteran Owned Small Businesses, with a response due date to be specified in the solicitation releasing on or around December 31, 2021. Scope of work includes removal and replacement of exterior windows, fall protection, and relocation or reinstallation of any medical equipment impacted. The contract duration is 726 calendar days from notice to proceed. Interested parties must be registered in SAM, D&B, and VIP databases and verified as an SDVOSB. This notice provides advance information and instructs interested SDVOSBs to submit capability statements by the presolicitation due date.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Project Number 526-18-103 Replace Exterior Windows, Phase 1, newest first.
File Type Posted
36C24221B0069 0005.docx DOCX document
36C24221B0069 0004.docx DOCX document
Copy of Equipments to be moved list Responses for RFI No. 1 and Related Questions to PreBid RFIs for 526-18-103.xlsx XLSX spreadsheet
36C24221B0069 0003.docx DOCX document
099100 Painting Specification.pdf PDF
COVID Language.docx DOCX document
Hazardous Material Survey Report Bronx Windows Phase 1 Nov 2020.pdf PDF
36C24221B0069 0002.docx DOCX document
Bronx Windows Phase 1 FINAL-Set2.pdf PDF
36C24221B0069 0001.docx DOCX document
Prebid Attendance Sheet for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Bronx Windows Phase 1 FINAL-Set5.pdf PDF
Final Design Site Investigation-Window Survey Nov 2020.pdf PDF
Bronx Windows Phase 1 FINAL-Set4.pdf PDF
Bronx Windows Phase 1 FINAL-Set6.pdf PDF
Bronx Windows Phase 1 FINAL-Set3.pdf PDF
Pages 1 to 20 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Pages 46 to 62 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Specification for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
Pages 21 to 45 Drawings for 526-18-103 Replace Exterior Windows Phase 1.pdf PDF
36C24221B0069_1.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JAMES J. PETERS VA MEDICAL CENTER

BRONX, NEW YORK

PROJECT NO. 526-18-103

INDEX OF DRAWINGS

DRAWING NO. DRAWING TITLE

GENERAL

GI001 COVER SHEET

DETAIL MAP

GI002 LEGENDS, SYMBOLS AND ABBREVIATIONS

REPLACE EXTERIOR WINDOWS

PHASE 1

INDEX OF DRAWINGS

DRAWING TITLE

AS011

ARCHITECTURAL

AS012

AS013

FIRST FLOOR OVERALL PLAN

AS021

AS022

AS023

AS031

AS042

AS041

AS033

AS043

AS051

AS032

AS052

AS053

AS061

AS062

AS073

AS072

AS071

GI003 PHASING PLAN

SECOND FLOOR OVERALL PLAN

THIRD FLOOR OVERALL PLAN

FOURTH FLOOR OVERALL PLAN

FIFTH FLOOR OVERALL PLAN

SIXTH FLOOR OVERALL PLAN

SEVENTH FLOOR OVERALL PLAN

PARTIAL FIRST FLOOR PLAN EAST SIDE - SOUTH END

AS091

AS092

AS301

AS201

AS101

AS401

AS093

NINTH FLOOR OVERALL PLAN

PARTIAL EXTERIOR ELEVATIONS - EAST

WINDOW SCHEDULE & DETAILS

BUILDING DETAILS EXISTING CONDITIONS

AS102 PARTIAL EXTERIOR ELEVATIONS - EAST

AS103 PARTIAL EXTERIOR ELEVATIONS - EAST

AS104

AS105

EXTERIOR ELEVATION - NORTH END

GI004 PHASING PLAN

GI005 CONSTRUCTION SAFETY PLAN

ARCHITECTURAL (CONTINUED)

SHEET NO.

SHEET NO.

HAZMAT

HA001 ASBESTOS ABATEMENT GENERAL NOTES & EXISTING CONDITIONS

AS081

AS082

AS083

EIGHTH FLOOR OVERALL PLAN

AS202

AS203

AS204

VICINITY MAP

GI006

GI007

GI008 SHEDDING DETAILS

HA002

AS402 PSYCHIATRIC WINDOW DETAILS

SITE

SITE

BUILDING SECTIONS

AS403 WINDOW ELEVATION & DETAILS

EXTERIOR ELEVATION - SOUTH END

CONSTRUCTION SAFETY PLAN

CONSTRUCTION SAFETY PLAN

AS404 WINDOW DETAILS

9GI009 ROOF PLAN - SUSPENDED SCAFFOLDING PHASING

BUILDING SECTIONS

BUILDING SECTIONS

BUILDING SECTIONS

INFECTION CONTROL DETAILS

AS405 WINDOW DETAILS54

AS406 WINDOW DETAILS55

AS407 WINDOW DETAILS56

AS408 WINDOW DETAILS

DRAWING NO.

10GI010 GROUND FLOOR PLAN - SCAFFOLDING PHASING

PARTIAL FIRST FLOOR PLAN EAST SIDE - NORTH END

PARTIAL SECOND FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL SECOND FLOOR PLAN EAST SIDE - NORTH END

PARTIAL THIRD FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL THIRD FLOOR PLAN EAST SIDE - NORTH END

PARTIAL FOURTH FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL FOURTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL FIFTH FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL FIFTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL SIXTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL SEVENTH FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL SEVENTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL EIGHTH FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL EIGHTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL NINTH FLOOR PLAN EAST SIDE - SOUTH END

PARTIAL NINTH FLOOR PLAN EAST SIDE - NORTH END

PARTIAL SIXTH FLOOR PLAN EAST SIDE - SOUTH END

AS063

AS409 58

AS410 59

AS411 60

AS412 61

NOT TO SCALE

NOT TO SCALE

AS413 62 NON-IMPACT RATED WINDOW HARDWARE DETAILS

IMPACT RATED WINDOW HARDWARE DETAILS

IMPACT RATED WINDOW HARDWARE DETAILS

IMPACT RATED WINDOW HARDWARE DETAILS

IMPACT RATED WINDOW HARDWARE DETAILS

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval Location

Drawing Number

Building Number

Project Title

Of

DrawnCheckedDate

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

COVER SHEET

GI001

JLLSD

KEY PLAN

N

NTS

F

D E

A

G

BC

BID ALTERNATES

ALTERNATE 1 - DELETE W10 WINDOWS.

ALTERNATE 2 - DELETE W8 WINDOWS.

ALTERNATE 3 - DELETE W6 & W7 WINDOWS, EAST SIDE OF WING G.

ALTERNATE 4 - DELETE W1 & W2 WINDOWS, EAST SIDE OF WING F.

ALTERNATE 5 - DELETE W4 & W12 WINDOWS, SOUTH END OF WING F

AND NORTH END OF WING G.

130 W. KINGSBRIDGE RD.,

BRONX, NY 10468

BUILDING CODES AND STANDARDS

SYMBOLS LEGEND

STANDARD ABBREVIATIONS

A

A.C. AIR CONDITIONED

AFF ABOVE FINISHED FLOOR

A.H.U. AIR HANDLING UNIT

ALT. ALTERNATIVE

ALUM. ALUMINUM

A.O. ACCESS OPENING

APPROX. APPROXIMATELY

ARCH. ARCHITECTURAL

ACMU ARCHITECTURAL CONC. MASONRY UNIT

ACT ACOUSTIC CEILING TILE

AV AUDIO VISUAL

AFF ABOVE FINISHED FLOOR

B

BD. BOARD

BLDG. BUILDING

BM. BEAM

BOT. BOTTOM

BRG. BEARING

BOC BOTTOM OF CURB (ELEVATION)

C

CABT. CABINET

CAP. CAPACITY

CCTV CLOSED CIRCUIT TV

C.D. CEILING DIFFUSER

CEM. CEMENT

CIRC. CIRCULATING

C.J. CONTROL JOINT

CLG CEILING

CMU CONCRETE MASONRY UNIT

C.O. CLEAN OUT

COL. COLUMN

CONC. CONCRETE

CONN. CONNECTION

CONST. CONSTRUCTION

CONT. CONTINUOUS

COR CONTRACTING OFFICER'S REPRESENTATIVE

C.T. CERAMIC TILE

C.T.B. CERAMIC TILE BASE

C.F.C.I. CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

D

DET. DETAIL

DEST. DESTINATION

DIA. DIAMETER

DIFF. DIFFUSER

DIM. DIMENSION

DN DOWN

DR. DRAIN

DS DOWN SPOUT

DWGs DRAWING(S)

E

EA. EACH

E.F. EXHAUST FAN

ELEV. ELEVATION

ELEC. ELECTRICAL

E.P. ELECTRICAL PANEL

EQUIP. EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH. EXHAUST

EXP. JT. EXPANSION JOINT

EXT. EXTERIOR

EXIST. EXISTING

F

F.A. FIRE ALARM

F.D. FLOOR DRAIN

F.E. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER CABINET

FIN. FINISH

FL. FLOOR

F.O. FACE OF

FR. FRAME

FT. FOOT, FEET

FTG. FOOTING

G

GA. GAGE

GAL. GALLON

GALV. GALVANIZED

GFCI GOVERNMENT FURNISHED,

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED,

GOVERNMENT INSTALLED

GL. GLASS

GND. GROUND

GOV'T GOVERNMENT

G.P.H. GALLONS/HOUR

G.P.M. GALLONS/MINUTE

GR. GRILLE

G.B. GYPSUM BOARD

H

HB HOSE BIB

H.C. HOLLOW CORE

HEWC HANDICAPPED ELECTRICAL

WATER COOLER

HT. HEIGHT

H.M. HOLLOW METAL

HR. HOUR

HTG. HEATING

HTR. HEATER

HW HOT WATER

I

IGU INSULATED GLASS UNIT

IN. INCHES

INSUL. INSULATION

INT. INTERIOR

J

J.B. JUNCTION BOX

JCT. JUNCTION

JT. JOINT

L

LB., # POUND

L.P. LIGHTING PANEL

LTG. LIGHTING

M

MAINT. MAINTENANCE

MAX. MAXIMUM

MECH. MECHANICAL

MTL. METAL

MIN. MINIMUM

MISC. MISCELLANEOUS

M.O. MASONRY OPENING

M.T. METAL THRESHOLD

MTD. MOUNTED

MTG. MOUNTING

N

N.A. NOT APPLICABLE

N.I.C. NOT IN CONTACT

NO. NUMBER

NOM. NOMINAL

NTS NOT TO SCALE

O

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

O.F..I. OWNER FURNISH CONTRACTOR INSTALL

O.F.O.I. OWNER FURNISH OWNER INSTALL

OH. OVERHEAD

OPNG. OPENING

P

PART. PARTITION

PEMB PRE-ENGINEERED MANUFACTURED BUILDING

PH PHASE

P.I. PROJECT IN

PL. PLATE

PLBG. PLUMBING

PLW'D PLYWOOD

PNL. PANEL

P.O. PROJECT OUT

PRES PRESSURE

PSF POUNDS/SQUARE FOOT

PSI POUNDS/SQUARE INCH

PT PRESSURE TREATED

Q

QTR. QUARTER

R

R.A. RETURN AIR

RAD. RADIUS

RCP REFLECTED CEILING PLAN

RD. ROUND

RE RESIDENT ENGINEER

REC'D RECESSED

RECP. RECEPTACLE

REINF. REINFORCING

REQ. REQUIRED

RM. ROOM

S

SAB SOUND ATTENUATION BLANKET

S.A. SUPPLY AIR

SCH. SCHEDULE

S.D. SOAP DISPENSER

SECT. SECTION

SHT. SHEET

S.J. SLIP JOINT

SPEC. SPECIFICATIONS

SQ. FT. SQUARE FEET

STL. STEEL

STOR. STORAGE

SS SANITARY SEWER

STRUCT. STRUCTURAL

SUSP. SUSPENDED

T

T THERMOSTAT

TELE. TELEPHONE

THD. THRESHOLD

TOIL. TOILET

TYP. TYPICAL

TOC TOP OF CURB (ELEVATION)

U

UNK. UNKNOWN

UNO UNLESS NOTED OTHERWISE

UNK DEST UNKNOWN DESTINATION

V

V.T. VINYL TILE

VCT VINYL COMPOSITION TILE

VENT. VENTILATION

VERT. VERTICAL

VIF VERIFY IN FIELD

W

W/ WITH

WD. WOOD

INTERIOR FINISH

INTERIOR FINISH INDICATOR

EQUIPMENT INDICATOR

EQUIPMENT NUMBER

WINDOW INDICATOR

ROOM NAME

ROOM NUMBER

ROOM NAME

SHEET NUMBER

DETAIL NUMBER

INTERIOR ELEVATIONS

COLUMN NUMBER

COLUMN INDICATOR

DETAIL NUMBER

SHEET NUMBER

SECTION INDICATOR

SHEET NUMBER

DETAIL NUMBER

EXTERIOR ELEVATION

ALTERNATE INDICATOR

ALTERNATE NUMBER

NOT ALL SYMBOLS ARE USED IN THIS DRAWING SET

DEMOLITION NOTES

1. VA DESIGN MANUAL (PG-18-0)

2. VA DESIGN, QUALITY, AND STANDARD ALERTS

3. VA DESIGN GUIDES (PG-18-12)

4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)

5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES

6. VA FIRE PROTECTION DESIGN MANUAL

7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)

8. NFPA 101: LIFE SAFETY CODE, VERSION 2018

9. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS,

VERSION 2019

10. NFPA 70: NATIONAL ELECTRICAL CODE, VERSION 2017

11. ASHRAE 62.1-2019: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

12. ASHRAE 90.1-2019: ENERGY STANDARD FOR BUILDINGS EXCEPT LOW RISE

RESIDENTIAL BUILDINGS

13. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES AND STANDARDS

(EXCEPT NFPA 900 AND NFPA 5000) - CURRENT EDITION ACCEPTED BY LOCAL

AUTHORITY HAVING JURISDICTION.

14. VA SEISMIC DESIGN REQUIREMENTS, H-18-8, NOVEMBER 1, 2019, REVISED MAY

1, 2020

15. OSHA STANDARDS

16. EPA 2005

17. VA MASTER SPECIFICATIONS

18. VA SUSTAINABLE DESIGN MANUAL, MAY 2014

19. VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DEC. 2010

SUSTAINABLE DESIGN

PHOTO DETAIL

KEY NOTE TAG

DEMOLITION NOTE TAG

ROOM

NAME

WINDOW

DESIGNATION

MATERIAL KEYNOTE

SEALED CONCRETE

METAL TRIM W/ GYPSUM

RADIATOR

GYPSUM BOARD

METAL TRIM

RECESSED METAL TRIM

CERAMIC TILE 4X4

ACT 2X2

ACT 2X4

GYPSUM BOARD

CERAMIC TILE 2X2

VINYL PLANK

LINOLEUM TILE

QUARRY TILE

TERRAZZO

CONCRETE

LAMINATE FLOORING

CARPET

VINYL COMPOSITION TILE

WINDOW SILLSIDE WALLSCEILINGS

FLOORS

INTERIOR FINISH LEGEND

GYPSUM BOARD W/ 4X4

CERAMIC TILE UP 42" AFF

GYPSUM BOARD W/1X2

WOOD TRIM AT 4'-0" AFF

METAL TRIM W/4X4 CERAMIC

TILE BELOW

SOLID SURFACE

W/GYP.BOARD BELOW

GENERAL SUMMARY

DUE TO THE NATURE OF THIS RENOVATION PROJECT NOT ALL SUSTAINABLE DESIGN CONCEPTS AND

GOALS CAN BE COMPLETED FOR THIS PROJECT. HOWEVER, THERE ARE A NUMBER OF SUSTAINABLE

DESIGN STRATEGIES THAT HAVE BEEN IMPLEMENTED IN THE DESIGN AND CONSTRUCTION.

ENERGY AND ATMOSPHERE (EA)

WINDOW REPLACEMENT WITHIN THE FACILITY IS BEING COMPLETED TO IMPROVE THE OVERALL ENERGY

EFFICIENCY OF THE FACILITY. THE EXISTING WINDOWS DO NOT PROMOTE ENERGY CONSERVATION AS

MANY OF THE SEALS ARE DAMAGED OR MISSING ALLOWING FOR AIR INFILTRATION THROUGH THE

SYSTEM. THE NEW WINDOWS HAVE BEEN DESIGNED TO PROVIDE MAXIMUM ENERGY EFFICIENCY WITH

INSULATED GLASS UNITS, THERMALLY BROKEN ALUMINUM FRAMES, AND HIGH QUALITY GLASS UNITS.

THERMAL IMPROVEMENTS ARE ALSO BEING IMPLEMENTED BETWEEN THE WINDOWS WITH THE

INSTALLATION OF THERMAL BATT INSULATION WITHIN THE CAVITY OF THE WINDOW MULLIONS.

MATERIALS AND RESOURCES (MR)

THE USE OF RECYCLED MATERIALS AND WASTE REDUCTION MANAGEMENT IS A SUSTAINABLE DESIGN

PRACTICE THAT WILL BE IMPLEMENTED DURING THE CONSTRUCTION PHASE. NEW MATERIALS SHALL BE

PROVIDED WITH THE USE OF RECYCLED CONTENT WITHIN THE PRODUCT. CONSTRUCTION WASTE SHALL

BE SALVAGED OR RECYCLED TO THE EXTENT POSSIBLE WITH A GOAL OF 50% OF NON-HAZARDOUS

CONSTRUCTION MATERIALS BEING DIVERTED FROM LANDFILLS. THE CONTRACTOR SHALL MAINTAIN

RECORDS OF ALL WASTE THAT IS DELIVERED TO A LANDFILL AS WELL AS ALL WASTE THAT IS RECYCLED

DURING CONSTRUCTION. A COPY OF THESE REPORTS SHALL BE SUBMITTED TO THE COR/RE AS PART OF

THE CONSTRUCTION CLOSE-OUT DOCUMENTS.

BOARD BELOW

INDOOR ENVIRONMENTAL QUALITY (IEQ)

THE NEW WINDOWS NOT ONLY PROVIDE FOR INCREASED ENERGY CONSERVATION OF THE FACILITY BUT THEY

WILL ALSO IMPROVE INDOOR ENVIRONMENTAL QUALITY. OCCUPANT COMFORT WITHIN A SPACE HAS BEEN

PROVEN TO IMPROVE PERSONAL ATTITUDES AND INCREASE PRODUCTIVITY. THERMAL COMFORT WILL BE

ACHIEVED WITH THE NEW WINDOW UNITS DUE TO THE IMPROVED GLASS AND WINDOW FRAMES. THE

OPERABLE WINDOWS WILL PROVIDE POTENTIAL FOR VENTILATION WITHIN THE ROOMS. ANOTHER ASPECT OF

OCCUPANT COMFORT IS DAYLIGHTING, THE NEW WINDOWS HAVE BEEN DESIGNED WITH GLASS THAT HAS A

HIGH LEVEL OF OPTICAL PERFORMANCE TO PROMOTE DAYLIGHTING AND VIEWS.

DURING CONSTRUCTION THE CONTRACTOR SHALL PROTECT INDOOR AIR QUALITY THROUGHOUT THE COURSE

OF THE CONSTRUCTION, INCLUDING MINIMIZED EXPOSURE TO CONTAMINANTS AND MAINTAINING INDOOR AIR

TEMPERATURE AND RELATIVE HUMIDITY. NEW MATERIALS AND PRODUCTS INSTALLED SHALL BE LOW-EMITTING

MATERIALS.

ACT 2X2 VINYL FACED

GYPSUM BOARD

DEFINITIONS:

CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION OR PERFORMANCE OF OTHER WORK.

PATCHING: FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL CONDITIONS AFTER INSTALLATION OF NEW

WORK.

REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE

SALVAGED OR REMOVED AND REINSTALLED.

SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER READY FOR REUSE.

REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM

WHERE INDICATED.

EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE

INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED.

GENERAL NOTES:

1. DEPICTION OF EXISTING CONDITIONS IS BASED ON THE ORIGINAL CONSTRUCTION DOCUMENTS AND LIMITED FIELD

OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT

OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO

COR/RE/AE.

2. PROTECT ALL EXISTING FINISHES AND ELEMENTS TO REMAIN. REPAIR OR REPLACE DAMAGED SURFACES TO MATCH ADJACENT

FINISHES EXACTLY.

3. INTERIOR DEMOLITION WORK SHALL BE CONDUCTED TO MINIMIZE DAMAGE TO EXISTING INTERIOR FINISHES ADJACENT TO THE

WORK. DAMAGED MATERIALS SHALL BE REPAIRED/RESTORED TO THEIR ORIGINAL CONDITION PRIOR TO FINAL ACCEPTANCE BY

THE COR/RE/AE.

4. EXISTING CEILINGS, EQUIPMENT, FIXTURES, AND FURNISHINGS SHALL REMAIN WITHIN THE AREAS OF WORK DURING

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND/OR TEMPORARILY RELOCATE THESE ITEMS

DURING THE WORK. ALL ITEMS SHALL BE RETURNED TO THEIR ORIGINAL LOCATIONS AND WORKING CONDITIONS PRIOR TO FINAL

ACCEPTANCE BY THE COR/RE.

5. REMOVAL OF ALL EXISTING WINDOWS MUST BE PERFORMED FROM THE EXTERIOR TO AVOID CONTAMINATION OF INTERIOR

SPACES. THE CONTRACTOR SHALL SUBMIT ALL SCAFFOLD PLANS FOR APPROVAL.

6. CONTRACTOR TO PERFORM THE COMPLETE SCOPE OF WORK WITHIN THE TIME FRAME OF APRIL 1, 2021 TO NOVEMBER 1, 2021. NO

MOBILIZATION COST WILL BE PAID AS PART OF THIS CONTRACT.

7. WORK SHALL COMMENCE ON THE NINTH FLOOR OF BUILDING 100 OF THE FACILITY, IN THE 9B AREA.

8. DO NOT CONSIDER DEMOLITION AND ALTERATION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

INSPECT AND ASSESS EACH SPACE AND TO FULFILL THE INTENT OF THE WORK INDICATED BY THE CONTRACT DOCUMENTS.

VERIFY EXTENT OF ALL DEMOLITION WITHIN THE CONTRACT LIMITS. BRING DEVIATIONS FROM THE CONTRACT DOCUMENTS

NECESSITATED BY FIELD CONDITIONS TO THE ATTENTION OF THE COR/RE/AE.

9. CONTRACTOR IS TO COORDINATE ALL INDICATED DEMOLITION WITH NEW CONSTRUCTION TO INSURE PROPER LOCATION AND

DIMENSION OF DEMOLISHED AREAS. INFORM COR/RE/AE OF ANY DISCREPANCIES.

10. EXISTING WALL FINISHES TO REMAIN INTACT, EXCEPT AS OTHERWISE NOTED. WHERE DAMAGE IS INCURRED, OR PATCHING IS

REQUIRED DUE TO DEMOLITION, PROVIDE NEW FINISH TO MATCH EXISTING SURFACE, FLUSH WITH EXISTING.

11. LOCATION OF EXISTING ITEMS AND ALL CONCEALED WORKS, ETC. ARE APPROXIMATE. IT IS REQUIRED THAT THE CONTRACTOR EXAMINE

THE SITE AFTER DEMOLITION HAS EXPOSED "AS-BUILT" CONDITIONS TO VERIFY EXISTING CONDITIONS. THE CONTRACTOR SHALL MAKE

ADJUSTMENTS AND/OR ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN ACCORDANCE WITH THE CODES

HAVING JURISDICTION AT NO ADDITIONAL COST TO THE GOVERNMENT

12. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO

MATCH ADJACENT FINISH. PREPARE SURFACES TO RECEIVE NEW FINISH, SEE ARCHITECTURAL DRAWINGS FOR NEW FINISH SCHEDULE.

ALL REPAIRS AND NEW FINISH SHALL BE BY TRADES SKILLED IN FINISH WORK.

13. DURING THE LIFE OF THE CONTRACT (DEMOLITION AND CONSTRUCTION TO POINT OF BENEFICIAL OCCUPANCY BY OWNER). THE

CONTRACTOR SHALL PROTECT MATERIALS TO REMAIN FOR REUSE FROM DAMAGE.

14. ALL HAZMAT WILL BE REMOVED FROM THE BUILDING THROUGH OUTSIDE, DO NOT PLAN TO USE THE INSIDE OF THE BUILDING FOR THE

REMOVAL OF MATERIALS.

ROLL VINYL

GENERAL NOTES

1. VA WORK HOURS ARE FROM 0800 TO 1630 MONDAY THRU FRIDAY.

2. CONTRACTOR ALLOWED TO MOVE ITEMS THROUGH THE MEDICAL CENTER ONLY BEFORE 0800

HOURS AND AFTER 1700 HOURS.

3. CONTRACTOR MUST STOP WORK WHEN SUSTAINED WIND SPEEDS EXCEED 25 MILES PER HOUR.

CAREFUL CONSIDERATION SHOULD BE GIVEN WHEN SUSTAINED WINDS ARE AT OR ABOVE 15 MPH.

4. FIRE EXITS AT GRADE LEVEL WILL NOT BE BLOCKED DURING CONSTRUCTION.

5. CONTRACTOR SHALL FURNISH THE COR A TWO WEEK LOOK-AHEAD WITH THE PROPOSED PHASING

DATES.

6. CONTRACTOR SHALL COORDINATE THE PHASING PLAN WITH THE COR.

7. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS WITH ACCURATE WINDOW COUNTS PER THE SHOP

DRAWING REQUIREMENT IN THE SPECIFICATIONS.

8. CONTRACTOR SHALL LIMIT THE NUMBER OF WINDOWS STORED ON SITE TO THOSE REQUIRED FOR

THE NEXT FIVE PHASES.

9. WHEN CODE PERMITS, THE CONTRACTOR SHALL TAKE DOWN THE SIDEWALK SCAFFOLDING NO

LONGER NEEDED DURING NON-WORKING PERIODS.

10. CONTRACTOR SHALL ATTEND A BI-WEEKLY JOB PROGRESS MEETING HELD AT THE TIME AND

LOCATION DETERMINED BY COR. AGENDA ITEMS TO INCLUDE:

· PROVIDE AN UPDATED CONSTRUCTION SCHEDULE.

· REPORT ON PROGRESS SINCE LAST MEETING AND PROJECTED ACTIVITY FOR THE NEXT TWO

WEEKS.

· ITEMS TO BE COORDINATED AND SCHEDULED WITH COR.

11. THE CONTRACTOR SHALL VERIFY ALL WINDOW SIZES AND COUNTS PRIOR TO CONSTRUCTION.

1. ERECT AND TEST A PERFORMANCE MOCK-UP IN COORDINATION WITH APPROVED SCOPE AND MOCKUP DRAWINGS, AT THE PROJECT

SITE. THE TESTING SHALL INCORPORATE A PORTION OF THE WINDOW SYSTEM. SCOPE WILL INCLUDE ALL LABOR AND MATERIAL TO

DEMOLISH AND INSTALL ONE SECTION OF THE WINDOW SYSTEM. SECTION WILL BE ONE FLOOR HIGH AND ONE COLUMN-TO-COLUMN

SPACING WIDE. SCOPE WIDTH WILL START AND STOP AT BUILDING EXPANSION JOINTS. THIS IS ROUGHLY 22'6" X 6'4". TOTAL COSTS OF

SUCH TESTING AND REQUIRED TEST MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

2. PERFORMANCE MOCKUP SHOP DRAWINGS: SUBMISSION OF ON -SITE PERFORMANCE MOCK-UPS SHOP DRAWINGS ARE REQUIRED.

PROVIDE DETAILED SHOP DRAWINGS DESCRIBING THE FABRICATED OF SPECIFIED TESTING MOCK-UP. SUBMISSION SHOULD ALSO

INCLUDE:

a. PROPOSED TEST PROCEDURES BY 3RD PARTY TESTING AGENCY.

b. MATERIAL AND SAMPLE SUBMITTALS

c. STAMPED STRUCTURAL CALCULATIONS

3. BUILD MOCKUPS TO COMPLY WITH THE FOLLOWING REQUIREMENTS, USING MATERIALS INDICATED FOR WORK:

a. OBTAIN A/E/BRONX VA APPROVAL OF MOCKUPS BEFORE START OF WORK.

b. NOTIFY ARCHITECT 7 DAYS IN ADVANCE OF THE DATES AND TIMES WHEN MOCKUPS WILL BE CONSTRUCTED.

c. DEMONSTRATE THE PROPOSED RANGE OF AESTHETIC EFFECTS AND WORKMANSHIP.

d. THE TEST PROCEDURE SHALL INCLUDE, BUT NOT BE LIMITED TO:

i. OPEN, CLOSE AND LOCK ALL OPERABLE UNITS A MINIMUM OF 5 TIMES.

ii. STATIC AIR INFILTRATION AND EXFILTRATION - ASTM E783: AT 6.24 PSF AIR INFILTRATION ALLOWANCE FOR OPERABLE WINDOWS TO

BE 0.30 CFM.

iii. STATIC WATER INFILTRATION- ASTM E 1105: WHEN STATIC PRESSURE OF 10 PSF (2/3 FIELD REDUCTION) HAS BEEN STABILIZED, FIVE

GALLONS OF WATER PER SQUARE FOOT SHALL BE APPLIED FOR A PERIOD OF 15 MINUTES. NO UNCONTROLLED WATER/LEAKAGE

AT INTERIOR FACE OF THE WINDOW IS ALLOWED.

iv. IMMEDIATELY AFTER SATISFACTORY COMPLETION OF LABORATORY TESTING, PREPARE "AS-BUILT" MOCK-UP DRAWINGS SHOWING

ANY MODIFICATIONS OR ADDITIONS MADE DURING TESTING TO MEET THE SYSTEM PERFORMANCE REQUIREMENTS. SUBMIT WITHIN

15 DAYS AFTER COMPLETING MOCK-UP TESTING.

v. RE-TESTING: WHERE MANUFACTURING OR INSTALLATION METHODS REQUIRE MODIFICATION IN ORDER TO MEET SPECIFIED

PERFORMANCE REQUIREMENTS, THE CONTRACTOR WHOSE WORK FAILS TO MEET THE SPECIFIED REQUIREMENTS SHALL, AT NO

ADDITIONAL COST TO THE GOVERNMENT , MODIFY, REBUILD, AND RETEST MOCK-UPS UNTIL THE SPECIFIED PERFORMANCE

REQUIREMENTS ARE MET. SHOW THE REQUIRED MODIFICATIONS ON THE PROJECT SHOP DRAWINGS AND RESUBMIT SHOP

DRAWINGS AS REQUIRED.

vi. MOCK-UP MATERIALS AND ASSEMBLIES, AS TESTED AND APPROVED, GOVERN THE MATERIALS AND ASSEMBLIES FURNISHED FOR

FINAL ERECTION.

4. THE CONTRACTOR WILL NOT BE GIVEN THE GO AHEAD TO PROCEED TO PRODUCTION UNTIL THE DESIGN A/E AND BRONX VA ARE

SATISFIED THAT THE WINDOWS PROPOSED AND THE INSTALLATION PROCEDURE AND MATERIAL MEET THE DESIGN REQUIREMENTS.

ON SITE PERFORMANCE MOCK-UP

SPECIAL NOTES/PHASING/DEMOLITION

1. THE CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY RELOCATE, STORE AND PROTECT

EXISTING FURNISHINGS AND EQUIPMENT WITHIN EACH ROOM DURING DEMOLITION AND CONSTRUCTION.

THE CONTRACTOR SHALL RELOCATE THESE ITEMS BACK TO THEIR ORIGINAL LOCATION PRIOR TO

COMPLETION OF EACH PHASE. IF REQUIRED, THE CONTRACTOR SHALL REMOVE ALL EXISTING SPECIAL

EQUIPMENT IN THE VICINITY OF THE WINDOWS BEING REPLACED THAT IMPACTS/AFFECTS THE

CONTRACT PERFORMANCE. THE CONTRACTOR SHALL REMOVE, STORE AND REINSTALL, BY CERTIFIED

TECHNICIANS/INSTALLERS, ALL EXISTING SPECIALIZED EQUIPMENT, SUCH AS, BUT NOT LIMITED TO;

MEDICAL GAS TOWERS, DIALYSIS EQUIPMENT, PATIENT LIFTS, PARTITIONS AND SOFFITS. ALL

EQUIPMENT, TO INCLUDE SPECIALIZED EQUIPMENT THAT IS REMOVED, SHALL BE REINSTALLED AND

CERTIFIED BY CERTIFIED INSTALLERS. THIS WILL BE AT NO COST TO THE GOVERNMENT.

HOLIHAN ASSOCIATES LLC

FINAL SUBMISSION

Bronx, New York

NOVEMBER 2020

Office of

Facility

Management

Service

REPLACE EXTERIOR WINDOWS PHASE 1

JAMES J. PETERS MEDICAL CENTER

BRONX, NEW YORK

526-18-103

Drawing TitleMedical Center Director Approval

Associate Director Approval

PCC Director Approval

Chief Engineer Approval

Safety Manager Approval

Chief Nurse Executive / Chief of Staff Approval Location

Drawing Number

Building Number

Project Title

Of

DrawnCheckedDate

Project Number

Dwg.

DESIGN CHANGE APPROVED

DESCRIPTION DATE

CONSULTANT FIRM ARCHITECTURAL ENGINEERING FIRM

311 FELS AVE. FAIRHOPE, AL 36532

LEGENDS, SYMBOLS

AND ABBREVIATIONS

GI002

JLLSD

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text A100

AutoCAD SHX Text A

AutoCAD SHX Text A100

AutoCAD SHX Text

ALT.16

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AE100

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F10

AutoCAD SHX Text J6

AutoCAD SHX Text J5

AutoCAD SHX Text S1

AutoCAD SHX Text S2

AutoCAD SHX Text S3

AutoCAD SHX Text S4

AutoCAD SHX Text J1

AutoCAD SHX Text J2

AutoCAD SHX Text J3

AutoCAD SHX Text J4

AutoCAD SHX Text C1

AutoCAD SHX Text C2

AutoCAD SHX Text C3

AutoCAD SHX Text C4

AutoCAD SHX Text F9

AutoCAD SHX Text F8

AutoCAD SHX Text F7

AutoCAD SHX Text F6

AutoCAD SHX Text F5

AutoCAD SHX Text F4

AutoCAD SHX Text F3

AutoCAD SHX Text F2

AutoCAD SHX Text F1

AutoCAD SHX Text F11

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text

INCORPORATED

GI002-GIO02X.pdf
Sheets and Views
GIO02

File details come from the government source that posted it. Updated .