P2 (Annual Fully Burdened Rates).xlsx

XLSX spreadsheet 17 KB Posted

Attached to
FACSFAC Field Maintenance Support
Solicitation number
N00421-20-R-0158
Issued by

About this file

This document provides instructions for completing an attachment to a request for proposal for field maintenance support services. The Naval Air Systems Command is soliciting proposals due by December 18, 2020 at 2:00 PM EST to provide field maintenance support at various Navy and Marine Corps sites. Offerors should submit fully burdened annual labor rates using the template attachment, listing labor categories and individual designators. Rates should be provided for a five year period and include fringe benefits, overhead, fee, and G&A costs, but not other direct costs. The purpose is to obtain field maintenance support at sites including Patuxent River, Jacksonville, Vacapes, St. Inigoes, San Diego, Pearl Harbor, Twentynine Palms, Camp Pendleton, Cherry Point, Okinawa, Townsend, and Fort Bragg.

View the file

Other files

File Type Posted
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS.pdf PDF
Questions 1.4.2021.pdf PDF
P5_CPAQ Instructions.pdf PDF
P4_CPAQ.pdf PDF
P1 (Cost Summary Spreadsheet) 12.14.20.xlsx XLSX spreadsheet
Att.6_Locator Form.pdf PDF
Att.5_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
Att.3_Field Maintenance Support_CSP V3.pdf PDF
P6_Staffing Requirements.pdf PDF
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS FASCFAC.pdf PDF
Att.1_Field Maintenance Support DD254.pdf PDF
Final RFP Q A 12.14.20.pdf PDF
N0042120R0158 RFP Amendment 2.pdf PDF
P3_PPIF.pdf PDF
N00421-20-R-0158 RFP.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
Att.4_Equipment to be Maintained.pdf PDF
EXh. A_Field Maintenance Support CDRLs.pdf PDF
N00421-20-R-0158-0001 Conformed Amendment.pdf PDF
N00421-20-R-0158-0001 Modified version.pdf PDF
CPAQ Instructions.pdf PDF
08_Field Maintenance Support DD254.pdf PDF
07_Field Maintenance Support CDRLs.pdf PDF
P1 (Cost Summary Spreadsheet).xlsx XLSX spreadsheet
CPAQ.pdf PDF
Locator Form.pdf PDF
11_Field Maintenance Support_CSP V3.pdf PDF
PPIF.pdf PDF
17_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
FACSFAC Field Support RFP.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions to Prime Contractors for completing Attachment P1 Annual Fully Burdened Labor

RFP # N00421-19-R-0105

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
AOfferor NameEnter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies
CProposed Labor Category (Furnished by Government)Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
DIndividual Designator*For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment P1.
E-IProposed Annual Fully-Burdened Labor per Labor Catergory, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Prime Burdened Labor Rates

Offeror NameATTACHMENT P2Individual Designator*Proposed Annual Fully-Burdened Labor
Proposed Labor CategoryYear 1Year 2Year 3Year 4Year 5
Manager/Operations Manager (Program Manager)* - Patuxent River, MD
Manager/Operations Manager (Project Manager)*-Patuxent River, MD
Program / Project / Management Analysts (Management Analyst)- Patuxent River, MD
Engineering Technician VI*-Jacksonville, Fl
Engineering Technician V- Jacksonville, FL
Engineering Technician VI*- Vacapes, VA
Engineering Technician V - Vacapes, VA
Engineering Technician VI*- St. Inigoes, MD
Engineering Technician VI*- San Diego, CA
Engineering Technician V- San Diego, CA
Engineering Technician VI*- Pearl Harbor, HI
Engineering Technician V- Pearl Harbor, HI
Engineering Technician VI*- Twentynine Palms, CA
Engineering Technician VI*- Camp Pendleton, CA
Engineering Technician VI*-Cherry Point, NC
Engineering Technician VI*-Okinawa, JP
Engineering Technician VI*- Townsend, GA
Engineering Technician VI*- Fort Bragg, NC
Engineering Technician V- Fort Bragg, NC

File details come from the government source that posted it. Updated .