N00421-20-R-0158-0001 Modified version.pdf

PDF 20 KB Posted

Attached to
FACSFAC Field Maintenance Support Federal contract opportunity
Solicitation number
N00421-20-R-0158
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This modification amends a solicitation for FACSFAC Field Maintenance Support services. The solicitation is issued by the Department of the Navy Naval Air Systems Command Naval Air Warfare Center to extend the proposal due date from December 18, 2020 to January 15, 2021. Proposals are due no later than 2:00 PM EST on the new date. The modification also marks Attachment 4 in Section J as reserved. No other changes are made to the requirements for field maintenance support services or terms of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to FACSFAC Field Maintenance Support, newest first.
File Type Posted
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS.pdf PDF
Questions 1.4.2021.pdf PDF
P5_CPAQ Instructions.pdf PDF
P4_CPAQ.pdf PDF
P1 (Cost Summary Spreadsheet) 12.14.20.xlsx XLSX spreadsheet
Att.6_Locator Form.pdf PDF
Att.5_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
Att.3_Field Maintenance Support_CSP V3.pdf PDF
P6_Staffing Requirements.pdf PDF
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS FASCFAC.pdf PDF
Att.1_Field Maintenance Support DD254.pdf PDF
Final RFP Q A 12.14.20.pdf PDF
N0042120R0158 RFP Amendment 2.pdf PDF
P3_PPIF.pdf PDF
N00421-20-R-0158 RFP.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
Att.4_Equipment to be Maintained.pdf PDF
EXh. A_Field Maintenance Support CDRLs.pdf PDF
N00421-20-R-0158-0001 Conformed Amendment.pdf PDF
CPAQ Instructions.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
08_Field Maintenance Support DD254.pdf PDF
07_Field Maintenance Support CDRLs.pdf PDF
P1 (Cost Summary Spreadsheet).xlsx XLSX spreadsheet
CPAQ.pdf PDF
Locator Form.pdf PDF
11_Field Maintenance Support_CSP V3.pdf PDF
PPIF.pdf PDF
17_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
FACSFAC Field Support RFP.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the proposal due date from 18 Dec 2020 to 15 Jan 2021 and to mark Attachment 4 in Section J as Reserved.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042120R0158

X 9B. DATED (SEE ITEM 11)

18-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Nov-2020

CODE

NAVAL AIR WARFARE CENTER AD (PAX)

BLDG 433, 47060 LILJENCRANTZ ROAD

PATUXENT RIVER MD 20670

N00421 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0042120R0158

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 18-Dec-2020 02:00 PM to 15-Jan-2021 02:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

EXHIBITS/ATTACHMENTS

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs

Attachment 1 DD 254

Attachment 2 List of Applicable Wage

Determinations

Attachment 3 CSP

Attachment 4 Reserved

Attachment 5 Data Transmittal Form

Attachment 6 Locator Form

Attachment P1 P1 Cost Summary

Spreadsheet

Attachment P2 P2 Annual Fully

Burdened Rates

Attachment P3 Past Performance

Information Form (PPIF)

Attachment P4 CPAQ

Attachment P5 CPAQ Instructions

(End of Summary of Changes)

File details come from the government source that posted it. Updated .