This document contains a contract surveillance plan for field maintenance support services. The contractor will provide operations, maintenance, training, and emergency support services for various air traffic control and airspace management systems at Fleet Area Control and Surveillance Facility sites. The contract has a five-year ordering period and cost-plus-fixed-fee terms. The Naval Air Systems Command Naval Air Warfare Center is the contracting agency. The surveillance plan defines roles for the contracting officer, contracting officer's representative, technical points of contact, and describes quarterly and annual review processes to monitor contractor performance against the statement of work and contract data requirements.

View the file

Other files for this federal contract opportunity

Other files attached to FACSFAC Field Maintenance Support, newest first.
File Type Posted
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS.pdf PDF
Questions 1.4.2021.pdf PDF
P5_CPAQ Instructions.pdf PDF
P4_CPAQ.pdf PDF
P1 (Cost Summary Spreadsheet) 12.14.20.xlsx XLSX spreadsheet
Att.6_Locator Form.pdf PDF
Att.5_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
P6_Staffing Requirements.pdf PDF
Att. 2_ LIST OF APPLICABLE WAGE DETERMINATIONS FASCFAC.pdf PDF
Att.1_Field Maintenance Support DD254.pdf PDF
Final RFP Q A 12.14.20.pdf PDF
N0042120R0158 RFP Amendment 2.pdf PDF
P3_PPIF.pdf PDF
N00421-20-R-0158 RFP.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
Att.4_Equipment to be Maintained.pdf PDF
EXh. A_Field Maintenance Support CDRLs.pdf PDF
N00421-20-R-0158-0001 Conformed Amendment.pdf PDF
N00421-20-R-0158-0001 Modified version.pdf PDF
CPAQ Instructions.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
08_Field Maintenance Support DD254.pdf PDF
07_Field Maintenance Support CDRLs.pdf PDF
P1 (Cost Summary Spreadsheet).xlsx XLSX spreadsheet
CPAQ.pdf PDF
Locator Form.pdf PDF
11_Field Maintenance Support_CSP V3.pdf PDF
PPIF.pdf PDF
17_Field Maintenance Support_Data Item Transmittal Form.pdf PDF
FACSFAC Field Support RFP.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Contract Surveillance Plan for

Air Traffic Control & Landing Systems Division

Field Maintenance Support

1. Purpose

This Contract Surveillance Plan (CSP) document is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the

Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the

Government receives the quality of services called for in each Task Order (TO) SOW.

This Contract will provide field maintenance services in support of Area Control Services

Surveillance Systems, including Fleet Area Control and Surveillance Facility (FACSFAC) Air

Control Tracking System (FACTS), Stand Alone Radar Console (STARCON), Integrated Range

Status System (IRSS), and Standard Terminal Automation Replacement System (STARS) located at various FACSFAC sites. These services shall include refurbishment, maintenance, integration, sustainment, repair, installation, configuration management, training, and logistic support for the Air Traffic Control and Landing Systems (ATC&LS) Division and other designated systems, subsystems, and components associated with air traffic control and airspace management systems.

This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The

Contract will have a five-year ordering period. A properly executed CSP will assist the

Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this CSP is provided under Contract Section E – Inspection and

Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.

The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.

Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY

4. Government Resources

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting

Officer (PCO)), or a person with the authority to administer contracts (Administrative

Contracting Officer (ACO)) and make related determinations and findings on behalf of the

Government. The PCO for this Contract is Jennifer Lundburg. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.

Technical Point of Contact (TPOC): The COR designates individual TPOCs to assist in administering of specific efforts under the Contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this

CSP:

KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. The KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the Contract and assures proper

Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.

Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.

Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY

TPOC: The TPOC is responsible for assisting in administering specific efforts under the

Contract. A TPOC cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The

Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists

(CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.

b. CSP: This document will be used by the COR, ACOR, and TPOCs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).

7. Surveillance

Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the

Contractor, the COR/ACOR, and TPOCs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the

Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.

9. Enclosures

Enclosure (1): SAC

Enclosure (2): Quarterly Evaluation by CDRL

Enclosure (3): Annual Surveillance Summary

Enclosure (1)

Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (1): SAC

Quarterly Surveillance:

The COR will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of SB, and other areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION BY SOW PARAGRAPH

Description Surveillance

Method/Measure Dates

Quality

Assessment

Schedule

Assessment

Cost Control

Assessment

Business

Relations

Assessment

Management

Assessment

Utilization of SB

Assessment

Other

Areas

Assessment

Provide operations services support

IAW SOW Para.

3.3.1

100% Inspection by

COR/ACOR and/or

TPOCs

Provide maintenance services support

IAW SOW Para.

3.3.2

100% Inspection by

Provide on-the-job training support

IAW SOW Para.

3.3.3

100% Inspection by

Provide IRSS support IAW SOW

Para. 3.3.4

100% Inspection by

Provide emergency support services

IAW SOW Para.

3.3.5

100% Inspection by

Enclosure (2)

Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (2): QUARTERLY EVALUATION BY CDRL

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Technical Report – Study/Services

(Equipment Maintenance Log Report) CDRL

A001

100% Inspection by

COR/ACOR and/or TPOCs.

Government Furnished Inspection

Equipment Maintenance Report (Monthly

Maintenance Activity (MMA) Report)

CDRL A002

Trip/Travel Report CDRL A003

Validation Report (Independent Verification and Validation Test Report) CDRL A004

Training Materials (On-The-Job Training

Documents) CDRL A005

Contractor’s Training Plan (New Hire

Training Plan) CDRL A006

Operations Security (OPSEC) Plan CDRL

A007

Contracting Officer’s Management Report

(Segregation of Costs and Invoice

Requirements Reporting) CDRL A008

Phase-Out Transition Plan CDRL A009

Metric Summary:

Current Period

Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Enclosure (3)

Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY

The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in

Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.

Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results

Quality of Product or Service Review of Quarterly Ratings

Schedule Review of Quarterly Ratings

Cost Control Review of Quarterly Ratings

Business Relations Review of Quarterly Ratings

Management Review of Quarterly Ratings

Utilization of SB Review of Quarterly Ratings

Other Areas Review of Quarterly Ratings

Annual Surveillance Completed By: _______________________

Date Completed: ________________

All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.

Quality of product or service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Cost control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB

(including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes

ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran

Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.

Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

1. Purpose
2. Authority
3. Scope
4. Government Resources
5. Responsibilities
6. Methods of QA Surveillance
7. Surveillance
8. Documentation
9. Enclosures