SF_30_amendment_5_P17PS01037.pdf
PDF 88 KB Posted
- Attached to
- Rehabilitation of Arlington House and Grounds
- Solicitation number
- P17PS01037
About this file
SF 30 questions & responses
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
P17PS01037
x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
GWMP 21601008/11/2017000005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/03/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The subject Solicitation P17PS01037 for the George Washington Memorial Parkway, Arlington House, The Robert E. Lee Memorial Repair/Rehabilitation and Preservation
Work PMIS 216010 is hereby issued as follows:
Project Location: George Washington Memorial Parkway, Arlington House, McLean, Arlington County, Virginia
Performance Period: Anticipate November 1, 2017 - December 6, 2018
Estimated Construction Magnitude: $5M - $10M
NAICS Code: 236220, Size Standard $36.5M
This Amendment No. 005 provides the following responses to offeror questions:
1. Please reference section 013100-par.1.4. Please clarify if this paragraph is applicable
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Victoria Nosal
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
P17PS01037/000005
to this project. If yes, please identify the areas where space limitations necessitate coordination drawings.
RESPONSE: Coordination drawings are required to assist the contractor in protecting the historic fabric of the buildings.
2. Please confirm that the Owner¿s curators will have emptied the buildings of all furniture, draperies, furnishings and collections before work of this contract begins.
Response: All mansion and other buildings collections, furnishings and other artifacts are currently being removed to storage and the buildings will be empty by the time that construction/rehabilitation work is to begin.
3. There are instances where the scope of work includes replacing portions of a unit ¿ such as wood doors, door frames, windows, etc. We presume that our warranty will cover the work we have provided only. Please clarify.
RESPONSE: The assumption that the contractor warranty is only to apply to the work being provided by the contractor is correct. However, in addition to the replacement of portions of a unit, where the scope of work includes adjustment of units and associated hardware to ensure proper operation and secure, weathertight closure the contractor warranty shall be applicable to those adjustments whether the associated unit or portions thereof is contractor-provided or not.
4. Option C, Wayfinding and Site Signage. Please confirm that signage will be delivered fully assembled and ready for installation by the
Contractor and will include all accessories, such as, casters, bases and hardware, required for its installation.
Response: Wayfinding and Site Signage components, including signs, panels, mounting bases, hardware, etc. shall be provided by the government to the contractor. The contractor shall be responsible for assembly of all components, installation of appropriate in-ground footings, and installation/mounting of each
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
P17PS01037/000005
wayside or sign unit on the site per the location map included in the Wayfinding and Site Signage drawing package.
5. Reference drawing E1.8. Provide specification for light fixture type V1.
RESPONSE: 4 Foot in length rough service luminaire with impact resistant polycarbonate housing and impact resistant lens and listed for wet location
Lithonia VAP-4000LM-FST-WD-MVOLT-35K-80CRI or approved equal
6. Light fixture types AE, D4, D4E, S3, and TX-1 are shown on the light fixture schedule, but not on the drawings. Please confirm these are not applicable.
RESPONSE: AE ¿ not used
D4 ¿ not used
D4E ¿ not used
S3 ¿ not used
TX-1 ¿ is a suspension kit that goes with the T4, T8 and T12 track. So a T4-1 would be the 4 foot track with the suspension kit. The `X¿ is variable and based on track length.
The submission due date remains 1500 MT September
19, 2017. All required hardcopy proposals and the electronic submission (thumb drive or CD) are due
NLT 1500 MT, September 19, 2017.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .