About this file

P17PS00002-000006_Offeror Questions and Government Responses (Questions 1 - 8) (2 pages)

View the file

Other files

File Type Posted
P17PS00002-000007_CWD-NY3_11-25-2016.pdf PDF
P17PS00002-000007_Amendment_signed.pdf PDF
P17PS00002-000007_Q As.pdf PDF
P17PS00002-000006_Q05-Attach_Poligon_Kiosk_Full_Plans.pdf PDF
P17PS00002-000006_Amendment_signed.pdf PDF
P17PS00002-000004_Amendment_signed.pdf PDF
P17PS00002-000005_Amendment_signed.pdf PDF
204_P17PS00002_Reps_ _Certs.pdf PDF
P17PS00002-000003_Att-01_Pre-Bid_Clarifications.pdf PDF
P17PS00002-000003_Att-03_CWD-NY3_11-04-2016.pdf PDF
P17PS00002-000003_Amendment_Executed.pdf PDF
P17PS00002-000003_Att-02b_Revised_CPS-Clauses_ _Provisions.pdf PDF
P17PS00002-000003_Att-02a_Revised_CPS-Prop_Submission_Pkg.xlsx XLSX spreadsheet
P17PS00002_SF-1442_Solicitation_revised.pdf PDF
A15_CWD-NY3_10-21-2016.pdf PDF
P17PS00002-000002_Executed_Amendment.pdf PDF
P17PS00002_SF-1442_w-Constr_Clauses_ _Provisions.pdf PDF
B02_P17PS00002-000001_Amendment-Executed.pdf PDF
203_P17PS00002_Comb_Price_Schedule.pdf PDF
Att_01b_STLI_211177_Fence-Specs.pdf PDF
Att_02c_STLI_201065-Approach_Mall-Combined_Set.pdf PDF
101_P17PS00002_Experience_Form.docx DOCX document
207_P17PS00002_ProposedEquals.docx DOCX document
Att_04a_P17PS00002_Q As_10-13-2016.pdf PDF
100_P17PS00002_Sol_Cover_Sheet-Tech_Proposal.pdf PDF
00_P17PS00002_Competitive_Constr._Prop._Subm._Pkg.pdf PDF
202_P17PS00002_SF-1442_Solicitation.pdf PDF
Att_02b_02_STLI_201065-Main_Mall-Combined_Set.pdf PDF
Att_01a_STLI_211177-201065-Div_1_Specs.pdf PDF
Att_01c_STLI_201065_Main_Mall-Specs.pdf PDF
Att_04b_STLI_201065_Pre-Bid_Clarifications_07.19.16.pdf PDF
206_P17PS00002_HazmatForm.docx DOCX document
201_SF_24_Bid_Bond.pdf PDF
Att_03_DVB_Gen_Decision_No_NY3_NYCO_10-07-2016.pdf PDF
Att_02e_Opt_B_Audio_Kiosk_Relocation.pdf PDF
205_P17PS00002_GeneralReferences.docx DOCX document
105_P17PS00002_Performance_Questionnaire.docx DOCX document
203_P17PS00002_Comb_Price_Schedule.xls XLS spreadsheet
200_P17PS00002_Sol_Cover_Sheet-Bus_Proposal.pdf PDF
103_P17PS00002_Key_Personnel_Form.docx DOCX document
Att_02a_STLI_211177-Combined_Set.pdf PDF
Att_01d_STLI_201065_Approach_Mall-Specs.pdf PDF
Att_02d_Opt_A_Fort_Wood_Ext_Electric.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STLI-201065/211177/224137 – NPS Solicitation P17PS00002 Amendment No. 6 – 11/18/2016

QUESTIONS AND ANSWERS - #1 - #8:

Please find the following government responses (in red) to Questions #1 through #8:

1. It was noted at the walk-thru that separation barriers will need to be in place to allow at least 50% access to all areas, at all times (including general and accessible routes). Please confirm that separation barriers can remain in place through construction and will not need to be dismantled on a daily basis (overnight). Barriers may remain in place overnight. Work areas should be sized to minimize the length of time an area is closed.

2. The Contract Price Schedule provides a breakout of pricing for each of the three drawing sets/projects. Please confirm which CLIN's constitutes the overall Base Bid and which CLIN's would constitute an Option. The general conditions (i.e.: supervision, power, etc.) needs to be distributed across the base bid CLIN's. See Revised Contract Price Schedule included in Amendment 3.

3. Is the Owner contemplating awarding the three projects to multiple (up to three) prime contractors? No. The three projects will be awarded as one contract.

4. There are three line items to be completed in the Contract Price Schedule where it is indicated

"TOTAL BASE PRICE (Contract Line Item Number # through ##". Do these constitute three base bid amounts? No. There is only one base bid. See Revised Contract Price Schedule included in Amendment 3.

5. Are as-built drawings of existing kiosk foundations available? Pile foundations were observed during the walk through of other buildings on site and it is unclear if they exist at the kiosks. If as-builts are not available, can bids be based on the assumption that piles will not be required?

Please see the attached as-built documents. For bidding purposes, foundations should be assumed to match that of these as-built documents. See attached plans (13 pages).

6. Clarification is requested on the trench drain being installed along the Main Mall/Tree Panels. The Legend on sheet C3 indicates the trench drains to be stainless steel. Section 5/C5 also notes stainless steel. The manufacturer's specifications listed on drawing C5 indicate the drain is to be polymer concrete with galvanized edge rails. Please confirm which model and material the design is based on. The basis of design for the trench drain shall be the KS300 – Stainless Steel Edge Rail Channel System with polymer concrete channel. The basis of design for the grate shall be stainless steel model 847Q.

7. Please clarify the kiosk relocations and their associated bid items. There are two kiosk relocations on the project. The kiosk and associated utility relocations located on the Approach Mall drawings is Bid Option B. The Vending Machine Shelter (Kiosk) relocation on the Main Mall and Tree Panels project is CLIN 18, Relocate Kiosk and Associated Utilities.

8. With regards to the past performance questionnaires, can CPARS/CCASS Evaluations be submitted in their place? Yes, completed CPARS/CCASS performance evaluations are acceptable.

File details come from the government source that posted it. Updated .