About this file

P17PS00002 Volume 2 - Contract Price Schedule (2 pages). MS Excel version of form used in contract clauses. May be used in lieu of the PDF version.

View the file

Other files

File Type Posted
P17PS00002-000007_CWD-NY3_11-25-2016.pdf PDF
P17PS00002-000007_Amendment_signed.pdf PDF
P17PS00002-000007_Q As.pdf PDF
P17PS00002-000006_Q05-Attach_Poligon_Kiosk_Full_Plans.pdf PDF
P17PS00002-000006_Q As.pdf PDF
P17PS00002-000006_Amendment_signed.pdf PDF
P17PS00002-000004_Amendment_signed.pdf PDF
P17PS00002-000005_Amendment_signed.pdf PDF
204_P17PS00002_Reps_ _Certs.pdf PDF
P17PS00002-000003_Att-01_Pre-Bid_Clarifications.pdf PDF
P17PS00002-000003_Att-03_CWD-NY3_11-04-2016.pdf PDF
P17PS00002-000003_Amendment_Executed.pdf PDF
P17PS00002-000003_Att-02b_Revised_CPS-Clauses_ _Provisions.pdf PDF
P17PS00002-000003_Att-02a_Revised_CPS-Prop_Submission_Pkg.xlsx XLSX spreadsheet
P17PS00002_SF-1442_Solicitation_revised.pdf PDF
A15_CWD-NY3_10-21-2016.pdf PDF
P17PS00002-000002_Executed_Amendment.pdf PDF
P17PS00002_SF-1442_w-Constr_Clauses_ _Provisions.pdf PDF
B02_P17PS00002-000001_Amendment-Executed.pdf PDF
203_P17PS00002_Comb_Price_Schedule.pdf PDF
Att_01b_STLI_211177_Fence-Specs.pdf PDF
Att_02c_STLI_201065-Approach_Mall-Combined_Set.pdf PDF
101_P17PS00002_Experience_Form.docx DOCX document
207_P17PS00002_ProposedEquals.docx DOCX document
Att_04a_P17PS00002_Q As_10-13-2016.pdf PDF
100_P17PS00002_Sol_Cover_Sheet-Tech_Proposal.pdf PDF
00_P17PS00002_Competitive_Constr._Prop._Subm._Pkg.pdf PDF
202_P17PS00002_SF-1442_Solicitation.pdf PDF
Att_02b_02_STLI_201065-Main_Mall-Combined_Set.pdf PDF
Att_01a_STLI_211177-201065-Div_1_Specs.pdf PDF
Att_01c_STLI_201065_Main_Mall-Specs.pdf PDF
Att_04b_STLI_201065_Pre-Bid_Clarifications_07.19.16.pdf PDF
206_P17PS00002_HazmatForm.docx DOCX document
201_SF_24_Bid_Bond.pdf PDF
Att_03_DVB_Gen_Decision_No_NY3_NYCO_10-07-2016.pdf PDF
Att_02e_Opt_B_Audio_Kiosk_Relocation.pdf PDF
205_P17PS00002_GeneralReferences.docx DOCX document
105_P17PS00002_Performance_Questionnaire.docx DOCX document
200_P17PS00002_Sol_Cover_Sheet-Bus_Proposal.pdf PDF
103_P17PS00002_Key_Personnel_Form.docx DOCX document
Att_02a_STLI_211177-Combined_Set.pdf PDF
Att_01d_STLI_201065_Approach_Mall-Specs.pdf PDF
Att_02d_Opt_A_Fort_Wood_Ext_Electric.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P16PS00008 CPS

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: P17PS00002
PARK - PMIS: STLI 201065 & STLI 211177
DEVELOPED AREA: New York, New York
PROJECT TITLE: Site Improvements at Statue of Liberty National Monument, New York
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
STLI 211177 - Install New Fencing at Fort Wood
1Install Fencing at Fort Wood1LS
TOTAL BASE PRICE (Contract Line Item Number 1)
AOption A - Fort Wood Exterior Electrical1LS
TOTAL PROPOSED PRICE - STLI 211177 - Install New Fencing at Fort Wood - BASE PLUS OPTION A (Contract Line Item Number 1 & Option A)
STLI 201065 - Approach Mall / Flag Plaza
2Site Preparation1LS
3New Pedestrian Paving7,870SF
4Reinstall, Replace, and Reset Existing Pavers4,710SF
5Clean and Repoint Seat Wall1LS
6Reset Seat Wall Slabs44SF
7Relocate Kiosk and Associated Utilities1LS
8Storm Sewer System Cleaning200LF
9Site Utilities1LS
10Clean and Finish New and Existing Pavement46,225LS
TOTAL BASE PRICE (Contract Line Item Number 2 through 10)
BOption B - Audio Kiosk Relocation1LS
TOTAL PROPOSED PRICE - STLI 201065 - Approach Mall / Flag Plaza - BASE PLUS OPTION B (Contract Line Item Numbers 2 through 10 and Option B)
STLI 201065 - Main Mall and Tree Panels
11Site Preparation1LS
12New Pedestrian Paving Main Mall1LS
13Reinstall, Replace, and Reset Existing Pavers1,885SF
14New Pedestrian Paving Bosque Area15,561SF
15Clean and Repoint Seat Wall1LS
16Reset Seat Wall Slabs2,785SF
17Bosque Area Landscape Planting and Irrigation1LS
18Relocate Kiosk and Associated Utilities1LS
19Site Utilities1LS
TOTAL BASE PRICE - STLI 201065 - Main Mall and Tree Panels (Contract Line Item Numbers 11 through 19)
TOTAL PROPOSED PRICE ALL 3 PROJECTS AND OPTIONS
All measurement and payment information is included in the project specifications, Section 012700.