About this file

Attachment 4b - STLI 201065 - Pre-Bid Comments/Clarifications (7 pages) from NPS Solicitation P16PS00008. Contains documents provided after the pre-bid meeting from the previous solicitation held on 07/19/2016.

View the file

Other files

File Type Posted
P17PS00002-000007_CWD-NY3_11-25-2016.pdf PDF
P17PS00002-000007_Amendment_signed.pdf PDF
P17PS00002-000007_Q As.pdf PDF
P17PS00002-000006_Q05-Attach_Poligon_Kiosk_Full_Plans.pdf PDF
P17PS00002-000006_Q As.pdf PDF
P17PS00002-000006_Amendment_signed.pdf PDF
P17PS00002-000004_Amendment_signed.pdf PDF
P17PS00002-000005_Amendment_signed.pdf PDF
204_P17PS00002_Reps_ _Certs.pdf PDF
P17PS00002-000003_Att-01_Pre-Bid_Clarifications.pdf PDF
P17PS00002-000003_Att-03_CWD-NY3_11-04-2016.pdf PDF
P17PS00002-000003_Amendment_Executed.pdf PDF
P17PS00002-000003_Att-02b_Revised_CPS-Clauses_ _Provisions.pdf PDF
P17PS00002-000003_Att-02a_Revised_CPS-Prop_Submission_Pkg.xlsx XLSX spreadsheet
P17PS00002_SF-1442_Solicitation_revised.pdf PDF
A15_CWD-NY3_10-21-2016.pdf PDF
P17PS00002-000002_Executed_Amendment.pdf PDF
P17PS00002_SF-1442_w-Constr_Clauses_ _Provisions.pdf PDF
B02_P17PS00002-000001_Amendment-Executed.pdf PDF
203_P17PS00002_Comb_Price_Schedule.pdf PDF
Att_01b_STLI_211177_Fence-Specs.pdf PDF
Att_02c_STLI_201065-Approach_Mall-Combined_Set.pdf PDF
101_P17PS00002_Experience_Form.docx DOCX document
207_P17PS00002_ProposedEquals.docx DOCX document
Att_04a_P17PS00002_Q As_10-13-2016.pdf PDF
100_P17PS00002_Sol_Cover_Sheet-Tech_Proposal.pdf PDF
00_P17PS00002_Competitive_Constr._Prop._Subm._Pkg.pdf PDF
202_P17PS00002_SF-1442_Solicitation.pdf PDF
Att_02b_02_STLI_201065-Main_Mall-Combined_Set.pdf PDF
Att_01a_STLI_211177-201065-Div_1_Specs.pdf PDF
Att_01c_STLI_201065_Main_Mall-Specs.pdf PDF
206_P17PS00002_HazmatForm.docx DOCX document
201_SF_24_Bid_Bond.pdf PDF
Att_03_DVB_Gen_Decision_No_NY3_NYCO_10-07-2016.pdf PDF
Att_02e_Opt_B_Audio_Kiosk_Relocation.pdf PDF
205_P17PS00002_GeneralReferences.docx DOCX document
105_P17PS00002_Performance_Questionnaire.docx DOCX document
203_P17PS00002_Comb_Price_Schedule.xls XLS spreadsheet
200_P17PS00002_Sol_Cover_Sheet-Bus_Proposal.pdf PDF
103_P17PS00002_Key_Personnel_Form.docx DOCX document
Att_02a_STLI_211177-Combined_Set.pdf PDF
Att_01d_STLI_201065_Approach_Mall-Specs.pdf PDF
Att_02d_Opt_A_Fort_Wood_Ext_Electric.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STLI 201065 – Pre-Bid Comments/Clarifications

1. There is no “Call before You Dig” service for Liberty Island. The contractor shall utilize a private utility locating company.

2. The Sallyport access path from the Monument is the emergency egress route and access must be maintained at all times.

3. The contractor is required to protect the public at all times. The contractor may utilize the existing metal crowd control barriers for staging of the fence work. More substantial barriers will be required for activities that are potentially harmful to the public.

4. The contractor is required to protect the existing grounds. The contractor will be required to replace sod, as necessary, upon completion of the work.

5. The contractor will be required to provide portable toilets for workers.

6. The contractor may utilize the early staff boat (approximately 6:45pm) from Ellis Island for worker access to Liberty Island. Contractor’s workers will be required to carpool to Ellis Island due to limited parking.

7. A known company for landing barge is Miller’s Launch.

8. United States Park Police (USPP) will be performing K-9 screenings for all deliveries.

All costs associated with screenings shall be paid for by the Government.

9. Contractor will be required to provide temporary construction power. Noise levels need to be kept to a minimum during public hours. Coordination of public hours generator use will be required.

10. Construction trailer may be located in the back of house area by the landing beach.

Location to be coordinated with NPS.

11. The contractor will be required to coordinate with other contractors who will be working on Liberty Island during this project.

12. The contractor will be required to maintain 50% access for all areas at all times. This includes main walkways, paths and building access routes.

13. The contractor shall provide six (48” high x 36” wide) project information signs and install at a location to be determined by the Government. The price of the work shall be included in the Install Fencing at Fort Wood, and Site Preparation (Approach Mall/Flag Plaza and Main Mall and Tree Panels) bid items. Please see the attached document describing the requirements.

14. Contractors are encouraged to propose alternate working schedules that may be beneficial to the project provided they are described in detail in the Project Approach and Project Schedule technical evaluation factors.

STLI 201065 – Modification to Contract Documents

1. Sheet C2 Replacement (Approach Mall/Flag Plaza – Construction Staging and Staging Plan) – Replace Sheet C2 with attached updated sheet that indicates the new staging area.

2.A

Option 2.A | Projects ≥ $1M < $10M 48" x 48" Sign - Text Only

Notes:

Download sign logos from:

http://www.nps.gov/dsc/ workflows/upload/ NPS-SignLogos.zip

See framing and foundation details on drawings 2.C, 2.D, and 4.0.

DRAWING NUMBER

National Park Service U.S. Department of the Interior UniGuide Sign Program

Design and Construction of a New Visitor Center

World War II Valor in the Pacific National Monument Recovery Act Program | National Park Service

Your Recovery Dollars at Work U.S. Department of the Interior

WWW.RECOVERY.GOV

Visitor Information Recovery Sign, 48" x 48"

Visitor Information Recovery Sign, 48" x 48"

This is a general information style panel that is post mounted.

4' - 0"

3' - 0"

4' - 0"

4 x 4 Wood Post Painted Matthews Paint, Modeling Clay MP10277

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce iaculis auctor sapien. Nam bibendum. Morbi ornare ante at neque. Phasellus cursus. Nulla pulvinar, enim eu volutpat venenatis, magna mauris lobortis libero, quis hendrerit diam erat nec enim.

Morbi lacus orci, semper a, sagittis egestas, interdum ac, est. Proin facilisis enim et lacus.

Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Fusce nunc. Proin vel metus. Nullam vel quam vel tellus aliquet semper.

Design and Construction of a New Visitor Center

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce iaculis auctor sapien. Nam bibendum. Morbi ornare ante at neque. Phasellus cursus. Nulla pulvinar, enim eu volutpat venenatis, magna mauris lobortis libero, quis hendrerit diam erat nec enim.

Morbi lacus orci, semper a, sagittis egestas, interdum ac, est. Proin facilisis enim et lacus.

Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Fusce nunc. Proin vel metus. Nullam vel quam vel tellus aliquet semper.

World War II Valor in the Pacific National Monument Recovery Act Program | National Park Service

Your Recovery Dollars at Work U.S. Department of the Interior

WWW.RECOVERY.GOV

10" Blue Header (C 92, M76, Y37, K 25)

6"

Agency Logo and Park/Site or Facility Name

5"

PMS Warm Grey 2 (C 6, M7, Y9, K 11)

2" Blue Footer (C 92, M76, Y37, K 25)

Recovery Tagline 136 pt Frutiger LT Std 75 Black

Website 64 pt Frutiger LT Std 75 Black

Park Name 112 pt NPS Rawlinson OT Book

Program 64 pt Frutiger LT Std 75 Black

Project Name 256 pt NPS Rawlinson OT Bold

Project Description 80 pt NPS Rawlinson OT Bold

Font sizes are given at Full Size

Painted Exterior Grade 1/2" MDO or Plywood Panel Backer. Panel Back Painted Matthews Paint, Modeling Clay MP10277. Graphic is an Exterior Grade Digital Print on Adhesive Vinyl.

Project Information Sign - 48" high x 36" wide

4'-0"

Project Information Sign - 48" high x 36" wide

36"

48" High by 36" Wide Project Information Sign - Graphic to be Provided by Government upon Contract Award

3'-0"

2'-0"

2.C

Notes:

Include this drawing with either Option 2.A or Option 2.B.

DRAWING NUMBER

National Park Service U.S. Department of the Interior UniGuide Sign Program

4 x 4 Wood Post Painted Matthews Paint, Modeling Clay MP10277

2 x 4 Panel Frame Painted Matthews Paint, Modeling Clay MP10277

No.8 – #2 Drive x 3" Long Phillips Head, Deckboard Countersunk Head Wood

Screw

VIS Panel 48" x 48" - Sign Frame Assembly

36" 48"

48"

4.0

4.0

Project Information Sign - 48" high x 36" wide

48"

24"

36"

Additional may be required

2.D

Include this drawing with either Option 2.A or Option 2.B.

DRAWING NUMBER

National Park Service U.S. Department of the Interior UniGuide Sign Program

Design and Constructio n of a New Visito r Center

Lorem ipsum dolor sit a met, c onsectetur adipiscing elit.

Fusce iaculis auctor sapien. N am bibendum. M orbi ornare ante at neque. Phasellus cursus. N ulla pulvinar, e nim eu volutpat venenatis, m agna mauris lobortis lib ero, quis hendrerit d iam erat nec enim.

Morbi la cus orci, semper a, sagittis egestas, in terdum ac, est. P roin facilisis enim et la cus.

Pellentesque habitant m orbi tr istique senectus et netus et m alesuada fames ac turpis egestas. Fusce nunc. Proin vel m etus. N ullam vel quam vel te llus aliquet semper.

World War II Valor in the Pacific

Natio nal M onument

Recovery Act P rogram | N atio nal Park Service

Your R ecovery Dolla rs at W ork

U.S. D epartm ent o f t he In terio r

WWW.RECOVERY.GOV

4 x 4 Wood Posts Painted Matthews Paint, Modeling Clay MP10277

2 x 4 Painted Panel Frame Painted Matthews Paint, Modeling Clay MP10277

1/2" MDO or Exterior Grade Plywood Panel, Panel Back Painted Matthews Paint, Modeling Clay MP10277

Digital Print on Adhesive Vinyl

No.8 – #2 Drive x 3" Long Phillips Head, Deckboard Countersunk Head Wood

Screws, 4 Per Side

Sign Frame Assembly Exploded Axonometric

Additonal may be required

4.0

Include this drawing with either Option 2.A, Option 2.B, or Option 3.0.

DRAWING NUMBER

National Park Service U.S. Department of the Interior UniGuide Sign Program

No.8 #2 Drive x 3" Long Phillips Head, Deckboard Countersunk Head Wood

Screw, 4-6 Per Side

4 x 4 Wood Post 2 x 4 Wood Frame

1/2" MDO or Plywood

Typical Frame/Post Connection Detail

Scale: 3" = 1' - 0"

Typical Direct Embedment Detail

Scale: 1 1/2" = 1' - 0"

Concrete Footer or Sakrete Mix

Backfill

Gravel Layer (For Drainage)

4 x 4 Post

12"

V ar ie s

6"

48"

Additonal may be required

30" Min

MKutch Polygon

MKutch Callout Staging Area - No Longer to be Used

MKutch Callout New Staging Area - To be separated with 6' high chain link fence with green privacy construction screen.

File details come from the government source that posted it. Updated .