Proposal Submission Package - 13 pages

View the file

Other files

File Type Posted
0023_of_0148_r1_(2).pdf PDF
DOC624.PDF PDF
YOSE_154910_PreProposal_PresentationAHWAHNEE_03172015.pptx PPTX presentation
Revised_Wage_Rates_4-24-15.doc DOC document
Geotechnical_Report.pdf PDF
AHWAHNEE_QUESTIONS2.doc DOC document
addtl_provision_and_clause.docx DOCX document
YOSE_154910C-100__Final_CDs-Specifications_Part_2_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_350-374.pdf PDF
Ahwahnee_-_URS_seismic_report_2002_Part_1_of_3.pdf PDF
5_YOSE_154910C-FinalCDs-Pgs41-54_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_3_of_5.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_4_of_5.pdf PDF
wage_rates_3-27-15.doc DOC document
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_5_of_5.pdf PDF
SF-1442.YOSE.pdf PDF
Ahwahnee_CLR_3.2011_Part_2_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_205-240.pdf PDF
3_YOSE_154910C_FinalCDs _Pages21-30_Drawings.pdf PDF
Ahwahnee_-_URS_seismic_report_2002_Part_2_of_3.pdf PDF
YOSE_154910C-100__Final_CDs-Specifications_Part_1_of_3.pdf PDF
YOSE_154910C-100__Final_CDs-Specifications_Part_3_of_3.pdf PDF
2_YOSE_154910C-FinalCDs-Pgs12-20_Drawings.pdf PDF
13_YOSE_154910C-FinalCDs-Pgs140-148_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_2_of_5.pdf PDF
Ahwahnee_HSR_1.2011_pgs_175-204.pdf PDF
Ahwahnee_HSR_1.2011_pgs_241-264.pdf PDF
Ahwahnee_HSR_signature_page_1.2011.pdf PDF
Ahwahnee_CLR_3.2011_Part_3_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_116-134.pdf PDF
8_YOSE_154910C-Final_CDs-Pgs75-89_Drawings.pdf PDF
Ahwahnee_CLR_3.2011_Part_1_of_3.pdf PDF
12_YOSE_154910C-FinalCDs-Pgs130-139_Drawings.pdf PDF
Solicitation_clauses.docx DOCX document
Ahwahnee_HSR_1.2011_pgs_301-349.pdf PDF
1_YOSE_154910C-FinalCDs-Pgs1-11_Drawings.pdf PDF
Ahwahnee_-_URS_seismic_report_2002_Part_3_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_46-85.pdf PDF
Ahwahnee_HSR_1.2011_pgs_86-115.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_1_of_5.pdf PDF
Ahwahnee_HSR_1.2011_pgs_265-300.pdf PDF
Ahwahnee_Asbestos_Survey_1990.pdf PDF
Ahwahnee_HSR_1.2011_pgs_1-45.pdf PDF
10_YOSE_154910C-FinalCDs-Pgs112-120_Drawings.pdf PDF
9_YOSE_154910C-FinalCDs-Pgs90-111_Drawings.pdf PDF
6_YOSE_154910C-FinalCDs-Pgs55-65_Drawings.pdf PDF
11_YOSE_154910C-FinalCDs-Pgs121-129_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_pgs_135-174.pdf PDF
7_YOSE_154910C-FinalCDs-Pgs66-74_Drawings.pdf PDF
4_YOSE_154910C-FinalCDs-Pgs31-40_Drawings.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Yosemite National Park

Solicitation No. P15PS00437

Correct Critical Safety Hazards and Rehabilitate

The Ahwahnee Hotel, National Historic Landmark (NHL), Mariposa County, California

YOSE-154910C

PROPOSAL SUBMISSION PACKAGE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

YOSE-154910C

CPS -1

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

1 LU/LA Elevator Installation 1 Lump Sum N/A

2 East Wing Egress Stair 1 Lump Sum N/A

3 Guest Room Upgrades 1 Lump Sum N/A

4 Remodel Ahwahnee Bar 1 Lump Sum N/A

5 OPTION A, Bar South Wall 1 Lump Sum N/A

6 OPTION B, Snow Melt System 1 Lump Sum N/A

PROJECT TITLE: Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel NHL

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: P15PS00437

PARK - PMIS: YOSE - 154910C

DEVELOPED AREA: Yosemite Valley

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 through 6) ------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -----------

All measurement and payment information is included in the project specifications, Section 012700.

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award.

At the option of the Government, the period for exercise of options at the proposed prices shall extend 60 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any order deemed in the judgment of the Contracting Officer to offer the best value to the Government.

TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------------

20%�12�� ���������

2%/,*$7,21�

:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW

RI�WKH�SHQDO�VXP�

&21',7,216�

7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�

7+(5()25(�

7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH� �VL[W\������GD\V�LI�QR�SHULRG�LV�VSHFLILHG���H[HFXWHV�WKH�IXUWKHU�FRQWUDFWXDO�GRFXPHQWV�DQG�JLYHV�WKH�ERQG�V��UHTXLUHG�E\�WKH�WHUPV�RI�WKH ELG�DV�DFFHSWHG�ZLWKLQ�WKH�WLPH�VSHFLILHG��WHQ������GD\V�LI�QR�SHULRG�LV�VSHFLILHG��DIWHU�UHFHLSW�RI�WKH�IRUPV�E\�WKH�SULQFLSDO��RU��E��LQ�WKH�HYHQW�RI�IDLOXUH WR� H[HFXWH� VXFK� IXUWKHU� FRQWUDFWXDO� GRFXPHQWV�DQG�JLYH�VXFK�ERQGV��SD\V� WKH�*RYHUQPHQW� IRU�DQ\�FRVW�RI�SURFXULQJ� WKH�ZRUN�ZKLFK�H[FHHGV� WKH

DPRXQW�RI�WKH�ELG�

(DFK� 6XUHW\�H[HFXWLQJ� WKLV� LQVWUXPHQW�DJUHHV� WKDW� LWV�REOLJDWLRQ� LV�QRW� LPSDLUHG�E\�DQ\�H[WHQVLRQ�V��RI� WKH� WLPH� IRU� DFFHSWDQFH�RI� WKH�ELG� WKDW� WKH 3ULQFLSDO�PD\�JUDQW�WR�WKH�*RYHUQPHQW���1RWLFH�WR�WKH�VXUHW\�LHV��RI�H[WHQVLRQ�V��DUH�ZDLYHG���+RZHYHU��ZDLYHU�RI�WKH�QRWLFH�DSSOLHV�RQO\�WR�H[WHQVLRQV DJJUHJDWLQJ�QRW�PRUH�WKDQ�VL[W\������FDOHQGDU�GD\V�LQ�DGGLWLRQ�WR�WKH�SHULRG�RULJLQDOO\�DOORZHG�IRU�DFFHSWDQFH�RI�WKH�ELG�

:,71(66�

7KH�3ULQFLSDO�DQG�6XUHW\�LHV��H[HFXWHG�WKLV�ELG�ERQG�DQG�DIIL[HG�WKHLU�VHDOV�RQ�WKH�DERYH�GDWH�

67$1'$5'�)250�����5(9��������

3UHVFULEHG�E\�*6$���)$5�����&)5���������D�

$87+25,=('�)25�/2&$/�5(352'8&7,21

3UHYLRXV�HGLWLRQ�LV�XVDEOH

35,1&,3$/

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

6,*1$785(�6�

1$0(�6��

�7\SHG�

&RUSRUDWH

6HDO

�6HDO� �6HDO� �6HDO�

,1',9,'8$/�685(7<�,(6�

�6HDO� �6HDO�

3.�� ��

%,'�%21'

�6HH�LQVWUXFWLRQ�RQ�UHYHUVH�

'$7(�%21'� (;(&87('��0XVW�QRW�EH�ODWHU� WKDQ�ELG

RSHQLQJ�GDWH�

7<3(�2)�25*$1,=$7,21� ��;��RQH�

,1',9,'8$/

-2,17� 9(1785(

3$571(56+,3

&25325$7,21

67$7(�2)� ,1&25325$7,21

35,1&,3$/��/HJDO�QDPH�DQG�EXVLQHVV�DGGUHVV�

685(7<�,(6���1DPH�DQG�EXVLQHVV�DGGUHVV�

PENAL SUM OF BOND

3(5&(17 2)�%,' 35,&(

$02817� 127� 72�(;&(('

0,//,21�6� 7+286$1'�6� +81'5('�6� &(176

%,'�,'(17,),&$7,21

%,'�'$7(

)25��&RQVWUXFWLRQ�

6XSSOLHV��RU�6HUYLFHV�

,19,7$7,21� 12�

&25325$7(�685(7<�,(6�

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

&RUSRUDWH

6HDO

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

3XEOLF�UHSRUWLQJ�EXUGHQ�IRU�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ�LV�HVWLPDWHG�WR�DYHUDJH����PLQXWHV�SHU�UHVSRQVH��LQFOXGLQJ�WKH�WLPH�IRU�UHYLHZLQJ�LQVWUXFWLRQV��VHDUFKLQJ�H[LVWLQJ�GDWD VRXUFHV��JDWKHULQJ�DQG�PDLQWDLQLQJ�WKH�GDWD�QHHGHG��DQG�FRPSOHWLQJ�DQG�UHYLHZLQJ�WKH�FROOHFWLRQ�RI�LQIRUPDWLRQ�� �6HQG�FRPPHQWV�UHJDUGLQJ�WKLV�EXUGHQ�HVWLPDWH�RU�DQ\�RWKHU DVSHFW�RI�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ��LQFOXGLQJ�VXJJHVWLRQV�IRU�UHGXFLQJ�WKLV�EXUGHQ��WR�WKH�)$5�6HFUHWDULDW��095���)HGHUDO�$FTXLVLWLRQ�3ROLF\�'LYLVLRQ��*6$��:DVKLQJWRQ��'&

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 67$1'$5'�)250�����5(9���������%$&.

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

1$0(� $''5(66

6,*1$785(�6�

1$0(�6�� 7,7/(�6�

�7\SHG�

67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���

&RUSRUDWH

6HDO

(e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designed "SURETY(IES)" on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal";

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

P15PS00437 Page 1 of 1 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL)

HAZ-MAT IDENTIFICATION

HAZARDOUS MATERIALS IDENTIFICATION LISTING

In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.

List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.

General References READ CAREFULLY: The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell its side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record. Provide explanations on separate sheets as necessary.

NAME OF CONTRACTOR/OFFEROR:

SURETY

Name of Surety:

Address of Surety:

Name of Agent:

Telephone Number:

CORPORATE BANK

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

CORPORATE BANK

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

INSURANCE COMPANY

Name:

Address:

Name of Agent:

Types of Policies:

P15PS00437 Page 1 of 1 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) General Reference

General References

SUBCONTRACTOR

Name:

Address:

Name of Contact:

Area of Specialized Work:

Address:

Name of Contact:

Address:

Name of Contact:

MATERIAL SUPPLIER

Address:

Name of Contact:

Telephone Number:

Types of Material:

MATERIAL SUPPLIER

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

MATERIAL SUPPLIER

Name:

Address:

Name of Contact:

Types of Material:

P15PS00437 Page 1 of 2 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) General Reference

P15PS00437 Page 1 of 1 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) Form 4: Key Personnel Qualifications

Key Personnel Qualifications READ CAREFULLY: The purpose of this form is for the Offeror to list the qualifications of all key personnel as described in the Instructions, Conditions, and Notices to Offerors (Section L) .

Experience and qualifications include those job-related training courses; certificates and licenses; honors; performance awards; and specialty skills that are relevant to the proposed project. Provide dates, but do not send documents.

Provide the state in which registration or license is held and the registration or license number. Fill in the information by typing or printing legibly.

NAME OF CONTRACTOR/OFFEROR:

PERSONNEL INFORMATION:

Job Title:

Years of Experience With This Firm: Years of Experience With Other Firms:

EDUCATION AND PROFESSIONAL REGISTRATION:

Top Educational Level Obtained: Year:

Area of Specialization:

Professional Registrations:

Area of Specialization:

EXPERIENCE AND QUALIFICATIONS

PAST PERFORMANCE QUESTIONNAIRE

(COMPLETE SECTIONS I AND II AND SUBMIT WITH THE TECHNICAL PROPOSAL)

I. CONTRACT IDENTIFICATION

CONTRACTOR NAME: CONTRACT NO:

CONTRACTOR ADDRESS:

CONTRACT TYPE:

FIRM-FIXED-PRICE

COST REIMBURSEMENT

OTHER: (specify)

ACTIVE COMPLETED

ROUTINE COMPLEX

DATES OF PERFORMANCE:

AWARD AMOUNT: $

TOTAL WITH MODS $

PROJECT DESCRIPTION:

II. AGENCY (CUSTOMER) IDENTIFICATION

AGENCY (CUSTOMER) NAME:

POC NAME/TITLE/PHONE:

III. PAST PERFORMANCE RATING

Rating Scale: E = Excellent. Considerably surpassed requirements/expectations.

G = Good. Surpassed requirements/expectations.

S = Satisfactory. Met requirements/expectations M = Marginal. Met some requirements/expectations

U = Unsatisfactory. Did not meet requirements/expectations

1. QUALITY: (Circle applicable rating)

a. Conformance with contract requirements E G S M U

b. Quality of workmanship (including subcontractors) E G S M U

c. General oversight by project manager and superintendent E G S M U

d. Coordination with and control of subcontractors E G S M U

e. Compliance with Davis-Bacon wage rate and labor usage requirements

E G S M U

f. Avoidance of accidents/safety violations E G S M U

P15PS00437 Page 1 of 2 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL)

P15PS00437 Page 2 of 2 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) Past Performance Questionaire

2. TIMELINESS:

a. Adherence to project delivery schedules E G S M U

b. Submission of change proposals E G S M U

c. Response to technical direction and change orders E G S M U

d. Response to correction of identified problems E G S M U

e. Submission of timely/accurate/complete billings E G S M U

f. Submission of materials/other submittals E G S M U

3. BUSINESS RELATIONS:

a. Flexibility and cooperativeness in resolving problems E G S M U

b. Tenacity and innovativeness in resolving problems E G S M U

c. Relationships with subcontractors, including prompt payment E G S M U

d. End user was satisfied with services performed E G S M U

IV. COMMENTS

Required for ratings of E (Considerably Surpassed Requirements) or U (Did Not Meet Requirements)

Item No. Comment

Technical Evaluation Panel Member: Date:

P15PS00437 Page 1 of 2 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) Subcontractor Reference

READ CAREFULLY: The purpose of this form is for the offeror to list certain subcontractors identified in the Instructions, Conditions, and Notices to Offerors (Section L) who are considered critical to the successful accomplishment of the project. Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described in the plans and specifications. Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

SUB CONTRACTOR (PROPOSED):

ADDRESS:

TELEPHONE NUMBER: ( )

# PROJECT

NAME:

Name of Owner:

Location:

Prime Contractor Telephone Number:

Subcontract $ Value:

Dates of Construction:

Reference Name and Telephone Number: ( ) .

Dates of Construction:

DESCRIPTION & SCOPE OF WORK

SPECIFIC AREAS OF EXPERIENCE (SEE INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER

INFORMATION – CAPABILITY CRITERIA):

P15PS00437 Page 2 of 2 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL)

DESCRIPTION & SCOPE OF WORK {continuation}

SPECIFIC AREAS OF EXPERIENCE (SEE INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER INFORMATION – CAPABILITY CRITERIA) {continuation}:

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No. Paragraph No. Product/Model No. Proposed Product/Model No.

A. By submitting the proposed equal, the contractor certifies that it:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material.

Every effort will be made to approve these materials.

P15PS00437 Page 1 of 1 YOSE 154910C Correct Critical Safety Hazards and Rehabilitate The Ahwahnee Hotel, National Historic Landmark (NHL) Proposed Equals

AA Proposal Submission Cover
A ContractPriceScheduleYose
Price Schedule Template
B SF 24 BidBond
C Hazmat
D General References
E Key Personnel Qualification
F Past Performance Questionnaire
G SubcontractorReference
H Proposed Equals
Date:
Principal:
Type: Off
State of Incorp:
Sureties:
Percent:
Millions:
Thousands:
Hundreds:
Cents:
Bid Date:
Invitation No:
For What:
Principal1:
Principal2:
Principal3:
Surety1:
Surety2:
SuretyA:
State of Inc:
Liability Limit:
Name/Title1:
Name/Title2:
SuretyB:
StateB:
LimitB:
NameB:
NameB2:
SuretyC:
StateC:
LimitC:
NameC:
NameC2:
SuretyD:
StateD:
LimitD:
NameD:
NameD2:
SuretyE:
StateE:
LimitE:
NameE:
NameE2:
SuretyF:
StateF:
LimitF:
NameF:
NameF2:
SuretyG:
StateG:
LimitG:
NameG:
NameG2:

File details come from the government source that posted it. Updated .