Seismic Report Part 2 of 3

View the file

Other files

File Type Posted
0023_of_0148_r1_(2).pdf PDF
DOC624.PDF PDF
YOSE_154910_PreProposal_PresentationAHWAHNEE_03172015.pptx PPTX presentation
Revised_Wage_Rates_4-24-15.doc DOC document
Geotechnical_Report.pdf PDF
AHWAHNEE_QUESTIONS2.doc DOC document
addtl_provision_and_clause.docx DOCX document
YOSE_154910C-100__Final_CDs-Specifications_Part_2_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_350-374.pdf PDF
YOSE_Proposal_Submission_Pkg1.pdf PDF
Ahwahnee_-_URS_seismic_report_2002_Part_1_of_3.pdf PDF
5_YOSE_154910C-FinalCDs-Pgs41-54_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_3_of_5.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_4_of_5.pdf PDF
wage_rates_3-27-15.doc DOC document
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_5_of_5.pdf PDF
SF-1442.YOSE.pdf PDF
Ahwahnee_CLR_3.2011_Part_2_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_205-240.pdf PDF
3_YOSE_154910C_FinalCDs _Pages21-30_Drawings.pdf PDF
YOSE_154910C-100__Final_CDs-Specifications_Part_1_of_3.pdf PDF
YOSE_154910C-100__Final_CDs-Specifications_Part_3_of_3.pdf PDF
2_YOSE_154910C-FinalCDs-Pgs12-20_Drawings.pdf PDF
13_YOSE_154910C-FinalCDs-Pgs140-148_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_2_of_5.pdf PDF
Ahwahnee_HSR_1.2011_pgs_175-204.pdf PDF
Ahwahnee_HSR_1.2011_pgs_241-264.pdf PDF
Ahwahnee_HSR_signature_page_1.2011.pdf PDF
Ahwahnee_CLR_3.2011_Part_3_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_116-134.pdf PDF
8_YOSE_154910C-Final_CDs-Pgs75-89_Drawings.pdf PDF
Ahwahnee_CLR_3.2011_Part_1_of_3.pdf PDF
12_YOSE_154910C-FinalCDs-Pgs130-139_Drawings.pdf PDF
Solicitation_clauses.docx DOCX document
Ahwahnee_HSR_1.2011_pgs_301-349.pdf PDF
1_YOSE_154910C-FinalCDs-Pgs1-11_Drawings.pdf PDF
Ahwahnee_-_URS_seismic_report_2002_Part_3_of_3.pdf PDF
Ahwahnee_HSR_1.2011_pgs_46-85.pdf PDF
Ahwahnee_HSR_1.2011_pgs_86-115.pdf PDF
Ahwahnee_HSR_1.2011_Appendices_Vol_2_Part_1_of_5.pdf PDF
Ahwahnee_HSR_1.2011_pgs_265-300.pdf PDF
Ahwahnee_Asbestos_Survey_1990.pdf PDF
Ahwahnee_HSR_1.2011_pgs_1-45.pdf PDF
10_YOSE_154910C-FinalCDs-Pgs112-120_Drawings.pdf PDF
9_YOSE_154910C-FinalCDs-Pgs90-111_Drawings.pdf PDF
6_YOSE_154910C-FinalCDs-Pgs55-65_Drawings.pdf PDF
11_YOSE_154910C-FinalCDs-Pgs121-129_Drawings.pdf PDF
Ahwahnee_HSR_1.2011_pgs_135-174.pdf PDF
7_YOSE_154910C-FinalCDs-Pgs66-74_Drawings.pdf PDF
4_YOSE_154910C-FinalCDs-Pgs31-40_Drawings.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Description of Foundation Seismic Retrofit to mitigate Liquefaction Effects

Introduction This attachment presents preliminary conceptual retrofit schemes to mitigate liquefaction-induced damage during the design earthquake at the Ahwahnee Hotel. In developing these schemes, we considered liquefaction mitigation techniques that would be least invasive and be most compatible with the archeological and historic nature of the building and its environ. This section describes the basic concepts of two selected retrofit schemes that were finally selected and presents a preliminary cost estimate of each of these techniques. In developing these preliminary concepts, we based our evaluation on our firm's experience in similar projects and on our conversations with specialty contractors in ground modification.

Scope The scope of this section includes:

Identification of technically feasible and cost effective techniques to mitigate liquefaction;

Evaluation of the constructibility of such techniques for the existing conditions of the building;

Evaluation of the potential impacts of these techniques to the existing foundation and structure;

Evaluation of the successful application of such techniques in the foundation remediation of historic buildings;

Preliminary evaluation of effects of these techniques to the environment; and Preliminary cost estimate of each of the selected retrofit systems evaluated.

Objectives of the liquefaction retrofit The main objective of the remediation schemes is to minimize the total and relative settlement induced by liquefaction the structure is subjected to. Because the extent and depth of the liquefied volume is large, any scheme involving the modification of the whole liquefiable volume under the structure would be excessively expensive and require a more intrusive technique. Our concept involves the underpinning of individual footings with a continuous vertical support extending down to deeper layers. At the ground surface, it estimated that the design ground motions would produce settlements on the order of 14 inches. Differential settlements will probably be several inches. At a depth of about 40 to 45 feet, however, the cumulative liquefaction-induced total and differential settlement are estimated to be only 1.5 to 2 inches, and one inch, respectively. Because the bearing mechanism is transferred down to these deeper layers, the damaging effects at the surface are decoupled from the structure. As the ground adjacent to the building may liquefy and settle with respect to the structure, incoming pipelines and conduits, as well

Attachment 3 - Page 1

CAMurdock Highlight footing and in-between the four primary columns. Because of the reduced space, special equipment is necessary.

The main advantages of this solution are that the injection under high pressure not only produces a more or less continuous grout cylinder but also densify the soil in-between and outside columns. As a result, the liquefaction potential and the associated settlement can be significantly reduced. It anticipated that the relatively large diameters obtained with compaction grout, although smaller than those with jet grouting, would be adequate to provide bearing capacity at depth in the event the deposit liquefies. Because the compact grout columns would occupy a relatively small portion of the volume of soil underneath the hotel, it is estimated that the impact to the soil in-situ hydraulic conductivity and potential modification to the current groundwater flow will not be significant. It is estimated that the replacement volume of the treated area is about 10 to 15%. Spoils with this technique are minimal or nonexistent. Because the grout is a low-slump mixture with relatively low water content, it is expected that this material will not settle as much as jet grouting and will be more stable against groundwater flow.

Special requirements concerning the peak injection pressure and grout take will be necessary at shallow depths to prevent soil fracture and damage to the existing structure.

Continuous structural monitoring will be necessary during grout injection. Pre construction tests are recommended to ensure that the continuity and good control over the achieved diameter of the column over the entire depth can be achieved.

The scheme presented above is preliminary. The diameter, depth, and number of columns may decrease as further engineering analyses and evaluations are conducted.

Therefore, the estimate cost will vary accordingly. The scheme presented above, however, is estimated to be a conservative scenario.

Archeological and Environmental Impacts The environmental impacts of each retrofit scheme should be evaluated according to existing pertinent documents, e.g., National Environmental Policy Act (NEPA) guidelines drafted by the National Park Service (NPS, 1997).

It is known that there is an intact deposit of a prehistorichistoric Indian village site located near the parking lot and employee dormitory areas. The assessment of the impact of the proposed retrofit schemes to historic resources must be performed following procedures in accordance with the National Historic Preservation Act, and other federal and state agencies including the Advisory Council on Historic Preservation (ACHP) and the California State Historic Preservation Officer (SHPO). In addition, these procedures include consultation with Indian Tribes. Procedures to minimize impacts on cultural resources should be carefully developed.

Environmental and cultural resources impact assessments are beyond the scope of this seismic evaluation. Although the retrofit schemes presented earlier may be feasible from the technical and economic viewpoints, it is not known at this time the impact environmental and archeological considerations will have on the proposed solutions.

Attachment 3 - Page 6

CAMurdock Highlight

CAMurdock Highlight

Page Job NO.: 43-00066652-15 Client: National Park Service Job Name: Seismic Rehabilitation Alternatives for the Ahwahnee Hotel, Yosemite National Park, CA

Summary of Schemes A, B & C Conceptual Cost Estimate

11 Scheme A - Life Safety Conceptual Cost Estimate

Structural Cost $ 14,642,837.00 Non-Structural Cost $ 3,329,887.00

Total Estimated Cost - Scheme B - Life Safety Conceptual Cost Estimate bi

I

Structural Cost

I" Non-Structural Cost $ $- Total Estimate Cost -

Cii Scheme C.-.Limited Damage Conceptual Cost Estimate

Structural Cost Non-Structural Cost

$m $m Total Estimated Cost -

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

NATIONAL PARK SERVICE

SEISMIC SAFETY PROGRAM

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEME A LIFE SAFETY CONCEPTUAL ESTIMATE

SUMMARY 10131 100

NO. DESCRIPTION TOTAL COSTISF

1 DEMOLITION

2 SITEWORK

3 CONCRETE

4 MASONRY

5 METALS

6 WOOD & PLASTICS

7 THERMAL 81 MOISTURE

8 DOORS 81 GLAZING 0

9 FINISHES 727,199

10 SPECIALTIES 0

11 EQUIPMENT 0

12 FURNISHINGS 0

13 SPECIAL CONSTRUCTION 150,000

14 CONVEYANCES 0

15 MECHANICAL 200,000

16 ELECTRICAL 100,000

DIRECT COST SUBTOTAL

8,070,347

GENERAL CONDITIONS

G.C. MARK UP & BOND

m m

ESTIMATEIDESIGN CONTINGENCY 0

TOTAL CONSTRUCTION COST

ESCALATION TO 2003=2YRS@4% P.A. 0

TOTAL PROJECT COST $-

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Note Marked set by CAMurdock

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEME A LIFE SAFETY CONCEPTUAL ESTIMATE

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEMES A & B

NON STRUCTURAL ITEMS CONCEPTUAL ESTIMATE

SUMMARY 10/31/00

TOTAL

1,835,255

1,835,255

367,051 264,277

616,646

3,083,228

246,658

$ 3,329,887

20% 12%

25%

8%

NO.

COSTISF DESCRIPTION

SCHEMES A & B

NON STRUCTURAL ITEMS

DIRECT COST SUBTOTAL

GENERAL CONDITIONS

G.C. MARK UP & BOND

ESTIMATEtDESIGN CONTINGENCY

TOTAL CONSTRUCTION COST

ESCALATION TO 2003=2YRS@4% P.A.

TOTAL PROJECT COST

CAMurdock Highlight

CAMurdock Highlight

CAMurdock Highlight

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEMES A & B

NON STRUCTURAL ITEMS CONCEPTUAL ESTIMATE

DATE : 1 013 1 100

NO. DESCRIPTION IQUANTIT~ UNIT RATE AMOUNT

AHWAHNEE HOTEL

NON STRUCTURAL ITEMS

SCHEMES A &-B

UNISTRUT, REBAR & GROUT AT CLAY PARTITIONS - 7/S11 - 0

CEILING BRACE, PER 8lS11

STONE ANCHORS, STAINLESS

STONE ANCHORS TO EA STONE <4 SF EA ALLOWANCE

TOTAL NON STRUCTURAL

SUMMARY

SEISMIC SAFETY PROGRAM

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEME B LIFE SAFETY CONCEPTUAL ESTIMATE

SUMMARY 10131100

NO.

DESCRIPTION

DEMOLITION

SITEWORK

CONCRETE

MASONRY

METALS

WOOD & PLASTICS

THERMAL & MOISTURE

DOORS & GLAZING

FINISHES

SPECIALTIES

EQUIPMENT

FURNISHINGS

SPECIAL CONSTRUCTION

CONVEYANCES

MECHANICAL

ELECTRICAL

DIRECT COST SUBTOTAL

GENERAL CONDITIONS

G.C. MARK UP & BOND

ESTlMATElDESlGN CONTINGENCY

TOTAL CONSTRUCTION COST

ESCALATION TO 2003=2YRS@4% P.A.

TOTAL PROJECT COST

20% 12%

25%

8%

TOTAL

193,861 3,473,700 1,405,577

29,000 1,580,380

1 19,390 33,040

726,865

150,000

200,000 100,000

8,011,812

1,602,362 1,153,701

2,691,969

13,459,844

1,076,788

$ 14,536,632

COSTISF

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

SCHEME B LIFE SAFETY CONCEPTUAL ESTIMATE

SEISMIC REHABILITATION OF THE AHWAHNEE HOTEL

YOSEMITE PARK, CALIFORNIA.

NON STRUCTURAL ITEMS CONCEPTUAL ESTIMATE