P09 Drawings 589A5-15-115B -2021 Phase II_Part3of4 (15 PGS).pdf

PDF 18 MB Posted

Attached to
589A5-15-115B: UPGRADE EMERGENCY DEPARTMENT PHASE II
Solicitation number
36C25522R0042
Issued by

About this file

This document contains a request for proposal for an upgrade to an emergency department at a Veterans Administration medical center. The solicitation requests proposals to upgrade the emergency department at the Colmery-O'Neil Veterans Administration Medical Center in Topeka, Kansas, as outlined in the attached schedule, statement of work, specifications and drawings. Proposals are due through the vendor portal by the request due date of January 26, 2022. Contractors working on the project are exempt from state sales tax and will be issued a project exemption certificate upon award of the contract. The site visit will take place on the due date at the specified time and location. The NAICS code for this project is 236220 for Commercial and Institutional Building Construction, with a size standard of $39.5 million.

View the file

Other files

File Type Posted
36C25522R0042 Amendment No.0004 589A5-15-115B ED Phase II.pdf PDF
589A5-15B-115_081400 INTERIOR WOOD DOORS SPECIFICATION.pdf PDF
SPECS 100CD_VA 589A5-15-115_084113 ALUM ENTRANCES STOREFRONTS ICU SLIDING DOORS (003).pdf PDF
Final CD Single Page 589A5-15-115 Topeka VAMC ED Project FINAL .pdf PDF
1-FA104.pdf PDF
Fire Protection Legacy Drawings B1.pdf PDF
1-FA103.pdf PDF
Wage Determination KS20220058 1-7-2022.pdf PDF
SPEC Section 13 05 41 Siesmic Restraint Requirements.pdf PDF
Appendix Asbestos Lead Fungal Reports.pdf PDF
1-FA101.pdf PDF
36C25522R0042 Amendment No.0003 589A5-15-115B ED Phase II.pdf PDF
589A5-15-115 Topeka VAMC ED Project FINAL CDs Full Set 66.pdf PDF
1-FA102.pdf PDF
589A5-15-115B Response II to Bidder RFI.pdf PDF
36C25522R0042 Amendment No.0003 589A5-15-115B ED Phase II.pdf PDF
REVISED 36C25522R0042 589A5-15-115B ED Phase II.pdf PDF
Government Response to RFIs 1 - ED Phase II.pdf PDF
36C25522R0042 Amendment No. 0002 ED Phase II.pdf PDF
Site Visit Attendees - 1-26-2022 - 589A5-15-115B Ed Phase II.pdf PDF
Site Visit Meeting Minutes 1-26-2022 - 589A5-15-115B ED Phase II.pdf PDF
36C25522R0042 Amendment No.0001 589A5-15-115B ED Phase II.pdf PDF
P09 Drawings 589A5-15-115B -2021 Phase II_Part1of4 (40 PGS).pdf PDF
AHU Commissioning Scope 589A5-15-115B ED Phase II.pdf PDF
P09 Drawings 589A5-15-115B - 2021 Phase II Part2of4 (34 PGS).pdf PDF
P07 KS20210058 10-01-2021 589A5-15-115B ED Phase II (1).pdf PDF
P09 Final Specs. Vol. I 589A5-15-115 ED Phase II.pdf PDF
P09 Drawings 589A5-15-115B -2021 Phase II_Part4of4 (16 PGS).pdf PDF
Addendum-No.1 589A5-15-115B ED Phase II.pdf PDF
P09 Final Specs. Vol. II 589A5-15-115 ED Phase II.pdf PDF
Solicitation 36C25522R0042 - 589A5-15-115B ED Phase II.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:40 AM

M601

MECHANICAL

SCHEDULES

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

BOH INH

No. Description Date

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

05/07/2021

4/29/2021 8:15:17 AM

05/04/2021

#589A5-15-115B

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:41 AM

M602

MECHANICAL

SCHEDULES

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

BOH INH

No. Description Date

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

05/07/2021

4/29/2021 8:15:17 AM

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:41 AM

M603

MECHANICAL

SCHEDULES

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

BOH INH

No. Description Date

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

05/07/2021

4/29/2021 8:15:17 AM

SECLUSION 2

B105

SA 155

RA 155

SOILED

B104

SA 30

EA 125

NURSE STATION

B116

SA 300

RA 300

CORR

C101

SA 415

RA 115

CORR

B1-03B

SA 625

RA 115

CORR

B1-03A

SA 615

RA 180

JAN

C121

SA 0

EA 75

TRAUMA 1

B113

SA 600

RA 600

TRAUMA 2

B112

SA 600

RA 600

CORR

B1-03

SA 440

RA 155

TRTMT 4 (ISO)

B110

SA 165

EA 300

ANTE

B110A

SA 45

EA 90

TLT

B110B

SA 0

EA 75

TRTMT 5

B109

SA 205

RA 240

TRTMT 6

B108

SA 205

RA 240

BARIATRIC TLT

B106

SA 100

RA 100

CLEAN

B102

SA 135

RA 65

HAC

B102A

SA 55

EA 125

DECON

B111

SA 200

EA 250

TRTMT 7

B103

SA 300

RA 255

NOT IN SCOPE OF WORK

OUTPATIENT

ENTRY

C100

SA 175

RA 0

ED ENTRY

AC100

SA 250

RA 0

CORRIDOR

C144

SA 450

RA 800

VA POLICE

AC101A

SA 85

RA 85

TLT

C130

SA 0

EA 85

ED WAITING

AC101

SA 1255

EA 1375

CONSULT/

BRVMNT

AC101D

SA 150

RA 150

ADMIT

AC101C

SA 145

RA 165

NURSE MGR

AC133

SA 155

RA 155

TLT

AC136A

SA 0

EA 80

WORK

AC132

SA 100

RA 60

TRIAGE

AC128

SA 270

EA 310

TRTMT 1

AC129

SA 180

RA 210

TRTMT 2 FEMALE

AC134

SA 185

RA 75

TRTMT 3

AC135

SA 180

RA 75

BREAK

AC136

SA 125

EA 90

MENTAL HEATH

INTERVENTION

AC119

SA 190

RA 190

VESTIBULE

AC104

SA 270

RA 230

TLT

AC134A

SA 0

EA 110

TLT

AC135A

SA 0

EA 125

WAITING

AC137

SA 250

RA 250

TLT

AC134C

SA 0

EA 80

TLT

B1-03D

SA 0

EA 80

EXAM #39

AC139

SA 85

RA 120

EXAM #40

AC140

SA 85

RA 120

OFFICE

B116A

SA 100

RA 100

CLEAN UTILITY

B116C

SA 60

RA 0

SOILED UTILITY

B116D

SA 0

EA 80

PUBLIC TOILET

SA 0

EA 100

NEW STAIR

AC103

SA 0

RA 0

HALL

AC131

SA 50

RA 30

PROCEDURE

ROOM

SA 360

RA 0

EXAM

SA 75

RA 0

EXAM

SA 80

RA 0

EXAM

SA 90

RA 0 CORRIDOR

AC114

SA 325

RA 0

EXAM

SA 100

RA 0

EXAM

SA 65

RA 0

WORK ROOM

SA 0

RA 0

WORK ROOM

SA 0

RA 0

PHARMACY

SA 60

RA 0

RED TEAM

AC108

SA 550

RA 0

SOILED UTILITY

AC113

SA 0

RA 0

EXAM #5

SA 115

EA 0

EXAM #6

SA 90

RA 0

EXAM #9

SA 90

RA 0

EXAM #10

AC110

SA 170

RA 0

EXAM #11

AC111

SA 115

RA 0

TOILET

AC112

SA 0

RA 0

CORRIDOR

AC115

SA 40

RA 0

EXAM #21

SA 115

RA 0

EXAM #23

SA 100

RA 0

EXAM #25

SA 105

RA 0

OFFICE

SA 0

RA 0

Space

AC167

SA 0

RA 0

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:49:08 AM

M701

HVAC ROOM AIRFLOW

PLAN

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

-- INH

1/8" = 1'-0" M701

1 ROOM AIRFLOW PLAN

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:02 AM

PP001

PLUMBING COVER

SHEET

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.

LAYOUT IS BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

DIMENSIONS.

2. NO PIPING, EQUIPMENT, ETC. SHALL PENETRATE STRUCTURAL MEMBERS.

3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED TO

ACCOMMODATE THE NEW WORK.

4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE

AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR

LOCATIONS.

5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACT LOCATION, CONFIGURATION AND ROUTING OF EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION DURING THE PROJECT TO PREVENT DAMAGE DURING

DEMOLITION AND PHASING.

6. REMOVE ALL EXISTING EQUIPMENT AND PIPING THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.

7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.

8. ALL CUTTING AND PATCHING SHALL BE CLOSELY COORDINATED WITH THE G.C.

9. COORDINATE ROUTING OF PLUMBING WITH LIGHTS, ARCHITECTURAL CEILING AND STRUCTURAL ELEMENTS. PIPING

SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE CONFLICTS RISING FROM LACK OF COORDINATION SHALL NOT JUSTIFY AN INCREASE IN THE CONTRACT

AMOUNT.

10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE FIRE STOPPED BY THE TRADE MAKING THE PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR REQUIREMENTS.

11. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR EQUIPMENT. PIPING SHALL NOT BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM ROOMS OR ELEVATOR EQUIPMENT ROOMS UNLESS SPECIFICALLY BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM ROOMS OR ELEVATOR EQUIPMENT ROOMS UNLESS SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C. PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST APPROVED

RECEPTOR WHERE REQUIRED.

12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL

EQUIPMENT WITH G.C.

13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND STANDARDS.

14. COORDINATE ACCESS TO EQUIPMENT AND VALVES INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY CHASES

WITH GENERAL CONTRACTOR. PROVIDE LOCKING ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS REQUIRED

TO SERVICE CONCEALED DAMPERS, VALVES AND EQUIPMENT.

15. REFER TO ARCH FOR PHASING PLAN AND ALLOWABLE WORK HOURS.

16. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

17. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY PARAGRAPH "SUBMITTAL" IN SPECIFICATION

SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN

APPROVED BY VA.

18. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL REMAIN REASONABLY OPERATIONAL IN THE CASE OF A SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE STRUCTURE. REFER TO SPECIFICATION SECTION 130541.

1. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE ARCHITECT IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE DEMOLITION WORK SHALL NOT

JUSTIFY AN ADDITIONAL COST.

2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA SHUT-

OFF VALVES. INSTALL NEW ISOLATION VALVES WHERE REQUIRED FOR COMPLETION OF WORK.

3. REMOVAL OF EXISTING PLUMBING FIXTURES AND EQUIPMENT, ETC. WILL REQUIRE CAPPING AND SEALING EXISTING MAINS OR BRANCHES AS NECESSARY AND REQUIRED TO ALLOW THE REMAINING SYSTEMS TO FULLY OPERATE WITHOUT DEGRADATION. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP CLOTHS TO PROTECT THE EXISTING OCCUPIED AREAS AND EQUIPMENT FROM DUST AND DEBRIS DURING THE CONSTRUCTION WORK, AND SHALL CLEAN THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE WORK. REFER TO

GENERAL CONDITIONS IN THE SPECIFICATIONS.

4. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED WITH PROPER FLUID AND PROPERLY VENTED BY THIS

CONTRACTOR, ONCE NEW WORK HAS BEEN INSTALLED.

5. COORDINATE WITH GENERAL CONTRACTOR THE REMOVAL AND REPLACEMENT OF ALL EXISTING CEILINGS, WALLS, ETC. AS REQUIRED FOR MECHANICAL DEMOLITION WORK.

6. EXISTING PIPING AND EQUIPMENT, ETC., NOT TO BE UTILIZED IN THE COMPLETED BUILDING SHALL BE DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS OF DISCONTINUED PIPING SHALL BE CAPPED IN THE NEAREST WALL, CEILING OR FLOOR SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT IN WALLS, CEILINGS, ETC., WHERE EQUIPMENT AND PIPE, ETC., ARE REMOVED AND NOT REPLACED, SHALL BE PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT CONSTRUCTION. REFER TO DRAWINGS DELINEATING NEW WORK FOR ADDITIONAL INFORMATION

REGARDING SYSTEMS OR PORTIONS OF SYSTEMS WHERE USE IS TO BE DISCONTINUED.

7. EXISTING PIPING, FIXTURES AND EQUIPMENT THAT ARE NOT TO BE REUSED SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE OWNER IF THEY WISH TO RETAIN OWNERSHIP OF SAME. IF NOT, EQUIPMENT SHALL BECOME THE PROPERTY OF THIS CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AS SOON AS PRACTICAL AND

DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS.

8. ALL CUTTING AND CHANNELING OF EXISTING BUILDING SHALL BE ACCOMPLISHED IN A NEAT AND WORKMANLIKE MANNER WITHOUT REMOVAL OF EXCESS MATERIALS. THIS CONTRACTOR SHALL PATCH AND REPLACE WITH

MATERIAL SIMILAR TO ADJACENT CONSTRUCTION.

9. WHERE EXISTING PIPING AND EQUIPMENT, ETC., THAT ARE TO BE UTILIZED IN THE COMPLETED PROGRAM CONFLICT WITH NEW CONSTRUCTION AND THE REQUIRED DEMOLITION, THEY SHALL BE RELOCATED AND RECONNECTED TO

MAINTAIN THE DESIRED SERVICE.

10. PORTIONS OF EXISTING SYSTEMS MAY BE SHOWN FOR CLARITY EVEN THOUGH IT MAY NOT BE NECESSARY TO MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE SHOWN BASED ON ORIGINAL OR REMODEL BUILDING

DRAWINGS. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS.

11. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE OWNER AND OCCUPANTS OF THIS BUILDING SO AS TO

PROVIDE THE LEAST AMOUNT OF DISRUPTION OF BUILDING ACTIVITIES AS POSSIBLE.

12. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED AND PROPERLY DISPOSED OF.

GENERAL NOTES

GENERAL DEMOLITION NOTES

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

1 1

1 1

I

D

(EX)4"RL & ORL

(EX)6"RL & ORL

CAP8"ORL

8"RL

6"ORL

6"RL

(Ex) 3"W

UP

(Ex)3"W

UP

NOT IN SCOPE OF WORK

GENERAL NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL

ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE

AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED

SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY

COR OF DISCREPENCIES.

2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE

CLOSELY COORDINATED WITH THE EXISTING CONDITIONS

AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND

FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH

ADJACENT SURFACES.

3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,

AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.

4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.

5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR

PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS

ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK

CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND

CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.

6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE

AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE

BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES

AS DIRECTED BY THE COR.

7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.

SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8

HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO

SHUTDOWN.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:05 AM

PD100

PLUMBING DEMOLITION

PLAN - BASEMENT

FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PD100

1 PLUMBING DEMO PLAN - BASEMENT FLOOR

PLAN NOTES

1 REMOVE EXISTING SECTION OF WASTE PIPING.

2 EXISTING VERTICAL SECTION OF RAIN AND

OVERFLOW RAIN LEADER PIPING TO BE

REMOVED. REMAINING PIPING WILL BE

RECONNECTED UNDER NEW WORK.

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

1 1

1 1

I

D

(EX)4"RL & ORL

(EX)6"RL & ORL

CAP8"ORL

8"RL

6"ORL

6"RL

(Ex) 3"W

UP

(Ex)3"W

UP

NOT IN SCOPE OF WORK

GENERAL NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL

ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE

AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED

SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY

COR OF DISCREPENCIES.

2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE

CLOSELY COORDINATED WITH THE EXISTING CONDITIONS

AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND

FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH

ADJACENT SURFACES.

3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,

AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.

4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.

5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR

PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS

ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK

CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND

CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.

6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE

AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE

BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES

AS DIRECTED BY THE COR.

7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.

SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8

HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO

SHUTDOWN.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:05 AM

PD100

PLUMBING DEMOLITION

PLAN - BASEMENT

FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PD100

1 PLUMBING DEMO PLAN - BASEMENT FLOOR

PLAN NOTES

1 REMOVE EXISTING SECTION OF WASTE PIPING.

2 EXISTING VERTICAL SECTION OF RAIN AND

OVERFLOW RAIN LEADER PIPING TO BE

REMOVED. REMAINING PIPING WILL BE

RECONNECTED UNDER NEW WORK.

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

I D

(EX) 1/2"MA, 3/4"MV

MA

(EX)1-1/4"MV, 1"MA

3/4"O2 RISERS

(EX)3" VACUUM EXHAUST

REMOVE (EX)3" VACUUM

EXHAUST PIPING BETWEEN

BASEMENT AND 2ND FLOOR

FOR REROUTING AND

RECONNECTION UNDER

NEW WORK

NOT IN SCOPE OF WORK

GENERAL NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL

ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE

AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED

SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY

COR OF DISCREPENCIES.

2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE

CLOSELY COORDINATED WITH THE EXISTING CONDITIONS

AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND

FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH

ADJACENT SURFACES.

3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,

AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.

4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.

5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR

PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS

ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK

CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND

CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.

6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE

AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE

BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES

AS DIRECTED BY THE COR.

7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.

SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8

HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO

SHUTDOWN.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:12 AM

PD110

MED GAS DEMO PLAN -

BASEMENT FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PD110

1 MED GAS DEMO PLAN - BASEMENT FLOOR

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

REMOVE MED GAS OUTLETS

DEMO MED

GAS

ALARM

DEMO ZONE

VALVE BOX

DEMO MED GAS

OUTLETS

..REMOVE MED GAS OUTLETS

I

D

(EX)3" VACUUM UP

REMOVE VERTICAL

PIPING BETWEEN BASEMENT

AND 2ND FLOOR FOR

RECONNECTION UNDER

NEW WORK

NOT IN SCOPE OF WORK

GENERAL NOTES

1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL

ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE

AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED

SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY

COR OF DISCREPENCIES.

2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE

CLOSELY COORDINATED WITH THE EXISTING CONDITIONS

AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND

FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH

ADJACENT SURFACES.

3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,

AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.

4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.

5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR

PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS

ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK

CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND

CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.

6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE

AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE

BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES

AS DIRECTED BY THE COR.

7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.

SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8

HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO

SHUTDOWN.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:18 AM

PD111

MEDICAL GAS DEMO

PLAN - FIRST FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PD111

1 MED GAS DEMO PLAN - FIRST FLOOR

PLAN NOTES

1 REMOVE EXISTING SECTION OF MEDICAL

AIR, OXYGEN AND VACUUM MEDICAL GAS

PIPING.

2 EXISTING 1/2" MEDICAL AIR, 3/4" OXYGEN

AND 1" VACUUM PIPING TO BE REMOVED

DOWN TO BASEMENT FOR RECONNECTION

UNDER NEW WORK IN NEW WALL.

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

(E)6" W

(E)2"W

(E)4"W

(E)1/2" HWC (E)3/4" CW

(E)3/4" HW(E)3/4" CW

(E)3/4" CW

(E)3" CW

(E)2 1/2" HW

(E)1/2" HWC

(E)6" W

(E)4" CW

3"W

(E)4"W DN

I D

(E) 4"CW

(E)2"W

(E)6"RL/ORL

3"W UP TO P-502

CAP

(E)6"W DN

2"W UP

TO P-531

CO

3"W UP

2"W

2"W UP

TO P-531

2"W UP

TO P-519

4"

4"W

4"

3"W UP TO P-505

3"W

4"W

3"W

CO

(EX)3"W UP

4"W

2"W

4"RL UP

CONN. TO

(E) 4"RL

4"RL

2"W UP

SEE FIRST FLOOR

PLUMBING PLAN FOR

CONTINUATION OF 3"

WASTE PIPING FROM

TRENCH DRAIN

(E)6" ORL

(E)6" RL

(E)8" ORL

(E)8" RL

CO

(E)4"

(E)4"

(E)4"

2" W UP TO FD

(E)3" RL

3"W UP TO

P-502

CO

4"W

2"W UP

TO FD

NOT IN SCOPE OF WORK

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE

ARCHITECTURAL SPECIFICATIONS.

3. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

4. SIZES OF ALL CW AND HW RUNOUTS TO PLUMBING

FIXTURES CAN BE FOUND ON THE FIXTURE SCHEDULES.

5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING

FULL COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS. COORDINATION SHOULD BE

COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL

COORDINATION DRAWINGS HAVE BEEN REVIEWED BY

THE ENGINEER AND COR.

6. CONFIRM CONNECTED SERVICES AND AREAS BEFORE

TAPPING OR OPENING ANY EXISTING SYSTEMS.

SCHEDULE ALL SHUTDOWNS WITH COR.

7. ALL RUNOUTS TO INDIVIDUAL FIXTURES SHALL HAVE AN

ISOLATION VALVE AT MAXIMUM 4' ABOVE FLOOR,

BEHIND LOCKABLE ACCESS PANEL.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:23 AM

PL100

PLUMBING PLAN -

BASEMENT FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PL100

1 PLUMBING PLAN - BASEMENT

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

PLAN NOTES

1 2"W UP TO P418.

2 2"W UP TO SINK.

3 3"W UP TO WC.

4 2"V UP.

REF: DTL #2 PL101 FOR

PIPE PENETRATION

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

MRI ZONE II

C146

OUTPATIENT ENTRY

C100

ED ENTRY

AC100

CORRIDOR

C144

VA POLICE

AC101A

TLT

C130

ED WAITING

AC101

CONSULT/ BRVMNT

AC101D

NEW STAIR

AC103

VESTIBULE

AC104

TRAUMA 1

B113

TRAUMA 2

B112

DECON

B111

TRTMT 4 (ISO)

B110

ANTE

B110A

TLT

B110B TRTMT 5

B109

TRTMT 6

B108

BARIATRIC TLT

B106

CHIEF ED

A131

CLEAN

B102

SOILED

B104

ROOM

B144D

ROOM

B144C

CLOSET

B144B

EXAM #39

AC139

SECLUSION 2

B105

MENTAL HEATH

INTERVENTION

AC119

BREAK

AC136

TLT

AC136A

TLT

AC135A

TLT

AC134A

NURSE MGR

AC133

WORK

AC132

HALL

AC131

TRTMT 1

AC129

TRIAGE

AC128

ADMIT

AC101C

ADMIT

AC101B

TRTMT 2 FEMALE

AC134

TRTMT 3

AC135

CORR

B1-03B

CORR

B1-03A

P-116

P-418

P-713

P-713 P-418

P-116

P-519

P-502

P-418

P-505P-418

XERXES 300 GALLON

DECONTAMINATION

TANK. SEE DTL. 1/PL401

I

D

P-418

P-502 P-531

P-531

P-710

P-710

(EX)4" UP TO RD

(EX)4" UP TO ORD

(EX) 3" VTR

(EX) 2 1/2" VTR

(EX)2" VTR

(EX)3/4"HW

(EX)2"V

(EX)2"V

(E)2-1/2"CW&HW

(EX)1-1/2"HW

(EX)2"CW

(EX)1/2"

(EX)3/4"

(EX)1-1/2"CW

(EX)2"

(EX)2"V

(EX)1-1/2"V IN CHASE

(EX)2-1/2"V

(EX)3/4"HW (EX)1"HW

3/4"HW

1-1/4"CW

1"HW

1-1/2"CW

1"

1-1/4"HW

2"CW

1"HW

2"CW

1-1/4"CW

2-1/2"V

(EX)4"V

P-801

3/4"CW

2"V

3/4"CW&HW 2"V

2"V 3/4"CW

1-1/4"CW

1-1/4"

1-1/2"V 2"V

1"

2"V

2"CW

2"V

1"2"CW

1"

1-1/2"V

(EX)3"W

1-1/4"CW

(EX)6"RL/ORL

2"V

4"RL

3/4"HW

3/4"CW

3"W

2 3"W RLCT

(EX)4"RL UP

(EX)4"RL UP

(E)1 1/2" V

3/4"HW

1 1/4"CW

2"V

3" FD-C

3"W

DECON TANK ALARM

(EX)4"RL

0.5 GPM

0.5 GPM

(EX)3/4"HWC

WHA-B

WHA-A

WHA-AP-801

(E)1 1/4" CW

(EX)2"V DN

(E)1/2" (E)1/2"

(E)2"

(E)1 1/4"

(E)2"

(E)2" V

(EX)1/2"

(EX) UP TO 3"RD/ORD

(E)1/2" CW

NURSE STATION

B116

P-418

TRTMT 7

B103

HAC

B102A

3/4" 1/2" 3/4"

WHA-A

P-422

1 1/2"CW

P-114

2 P-531

P-531 1 1/2"V

2"FD-D2"V DN

NOT IN SCOPE OF WORK

(EX)3"RL/ORL

PLUMBING WORK FOR

TRAUMA 1 WAS

COMPLETED IN PHASE 1.

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE

ARCHITECTURAL SPECIFICATIONS.

3. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES

LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

4. SIZES OF ALL CW AND HW RUNOUTS TO PLUMBING

FIXTURES CAN BE FOUND ON THE FIXTURE SCHEDULES.

5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING

FULL COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS. COORDINATION SHOULD BE

COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL

COORDINATION DRAWINGS HAVE BEEN REVIEWED BY

THE ENGINEER AND COR.

6. CONFIRM CONNECTED SERVICES AND AREAS BEFORE

TAPPING OR OPENING ANY EXISTING SYSTEMS.

SCHEDULE ALL SHUTDOWNS WITH COR.

7. ALL RUNOUTS TO INDIVIDUAL FIXTURES SHALL HAVE AN

ISOLATION VALVE AT MAXIMUM 4' ABOVE FLOOR,

BEHIND LOCKABLE ACCESS PANEL.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:34 AM

PL101

PLUMBING PLAN - FIRST

FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PL101

1 PLUMBING PLAN - FIRST FLOOR

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

PLAN NOTES

1 ROUTE PIPING DOWN IN NEW LOCATION AND

CONNECT TO EXISTING PIPING IN BASEMENT.

2 CONNECT TO EXISTING PIPING SERVING FLOOR

ABOVE.

3 EXISTING PLUMBING FIXTURE TO REMAIN.

4 PROVIDE TRAP PRIMER TO SERVE FLOOR DRAIN IN

ROOM.

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

I D

(EX) 1/2"MA, 3/4"MV

(EX)1-1/4"MV, 1"MA

3/4"O2 RISERS

M A

M V

M A

M V

M A

M V

O

(EX)VACUUM EXHAUST

NEW 3" VACUUM

EXHAUST UP

(EX)1 1/4"V, 3/4"O2, 3/4"MA

UP IN WALL

NOT IN SCOPE OF WORK

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:37 AM

PL110

MED GAS PLAN -

BASEMENT

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PL110

1 MED GAS PLAN - BASEMENT

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

TRAUMA 1

B113

TRAUMA 2

B112

TRTMT 5

B109

TRTMT 6

B108

BREAK

AC136

ED WAITING

AC101

TRIAGE

AC128

NEW STAIR

AC103

CLEAN

B102

TRTMT 1

AC129

TRTMT 2 FEMALE

AC134

TRTMT 3

AC135

WORK

AC132

ADMIT

AC101B

ADMIT

AC101C

HALL

AC131

CLOSET

B144B

DECON

B111

CORR

B1-03A

CORR

B1-03B

VESTIBULE

AC104

ED ENTRY

AC100

OUTPATIENT ENTRY

C100

EXAM #39

AC139

NURSE MGR

AC133

ROOM

B144C

CHIEF ED

A131

SOILED

B104

MENTAL HEATH

INTERVENTION

AC119

SECLUSION 2

B105

JAN

AC127B

BARIATRIC TLT

B106

WAITING

AC137

CONSULT/ BRVMNT

AC101D

VA POLICE

AC101A

TLT

C130

ANTE

B110A

TRTMT 4 (ISO)

B110 TLT

B110B

TLT

AC136A

EXAM #40

AC140

CORRIDOR

C144

MRI ZONE II

C146

ROOM

B144D

MGO-1

ALARM "A"

MGO-2

MGO-2

MGO-1 MGO-1MGO-1

O

M V

M A

O

M V

M

AM

A

M V

O

O2

MV

MA MA

MV

D

MGO-1

O

M V

M A

1/ 2"

M A

3/ 4"

M V

1/ 2"

O

M A

M V

O

1/2"O2

1/2"MA

1-1/4"MV

1/4" PIPING TO

AREA ALARM

1/2"O2

1/2"O2

1-1/4"MV

1/2"O2

1/2"MA1"MV

1/2"O2

CONNECT TO (EX)3" VACUUM

EXHAUST UP THROUGH ROOF

NEW 3"VACUUM EXHAUST DN

3/4"MA

3/4"MV

1 1/4"O2

(EX)ZVB-A

TRTMT 7

B103

HAC

B102A

MGO-1

NOT IN SCOPE OF WORK

(E)1/2" O2

(E)3/4" MV

(E)1/2" MA

(E)1 1/4" MV

(E)2" MV

MEDICAL GAS OUTLETS

AND TEMPORARY PIPING

WERE INSTALLED UNDER

PHASE 1. CONTRACTOR

SHALL REWORK MEDICAL

GAS PIPING AS SHOWN.

GENERAL NOTES

1. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES. ACCESS PANELS SHALL

BE FURNISHED AND INSTALLED UNDER THE

ARCHITECTURAL SPECIFICATIONS.

2. MED GAS SYSTEM CONNECTIONS MUST BE

COORDINATED WITH COR. CERTIFICATION MUST BE

ARRANGED AHEAD OF INSTALL TO ENSURE MINIMUM

DOWNTIME.

3. MED GAS DROPS WITHIN PATIENT ROOMS WILL BE TO

MANUFACTURED HEADWALL SYSTEMS WITH PRE-

CONNECTED OUTLETS. COORDINATE CONNECTION

LOCATIONS WITH FINAL PURCHASED HEADWALL

SYSTEM. OTHER DROPS TO COUTER-TOP AND

ALTERNATE WALL OUTLETS ARE TO BE INDIVIDUALLY

PIPED PER ARCHITECTURAL DETAILS.

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

1/8" = 1'-0"

4/20/2021 11:47:44 AM

PL111

MED GAS PLAN - FIRST

FLOOR

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

1/8" = 1'-0" PL111

1 MED GAS PLAN - FIRST FLOOR

PLAN NOTES

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

MARK

P-101

DESCRIPTION

WASTE

PIPE IN

VENT

PIPE IN

COLD

WATER IN

1.25

HOT

WATER IN

WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST

BLADE

N/A

HANDLES

ELECTRIC

SENSOR

YES

REMARKS

P-418 LAVATORY 2 1.5 .5 .5 2 2 N/A YES

PLUMBING FIXTURE SCHEDULE

P-505 3 2 1.25 .5 10 10 NO NO

WATER CLOSET

FLOOR MOUNTED

P-531 SINK 2 1.5 .5 .5 2 2 NO YES

P-712 SHOWER 2 1.5 .5 .5 2 2 N/A NO

P-713 DECON SHOWER 2 1.5 .5 .5 2 2 N/A NO

FLUSH VALVE, BED PAN WASHER W/FOOT PEDAL CONTROL

CLINICAL SERVICE

SINK - FV

P-502 3 2 3/4 3/4 2 3 NO NOSERVICE SINK

DUAL FLUSH, PUBLIC AND STAFF WATER CLOSET

P-116 3 2 1.25 -- 4 6 N/A YES

WATER CLOSET

FLOOR MOUNTED

PATIENT WATER CLOSET

P-710 FACE/EYEWASH - - .5 .5 - 3 N/A NO DECK MOUNTED FACE/EYEWASH

P-519 1.5 1.5 .5 .5 3 2 NO NOSCRUB SINK

3 2 1.25 -- 4 6 N/A YES

WATER CLOSET

FLOOR MOUNTED

BARIATRIC PATIENT WATER CLOSETP-114

P-422 LAVATORY 2 1.5 .5 .5 2 2 N/A YES BARIATRIC, WALL MOUNTED

ALL WORK SHOWN IN SHADED AREAS WAS

COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR

REFERENCE ONLY. THE CONTRACTOR SHALL

PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1

AND PHASE 2 AT THE COMPLETION OF THE PROJECT.

G

F

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt

As indicated

4/20/2021 11:47:48 AM

PL501

PLUMBING SCHEDULES

#589A5-15-115

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

4/21/2021

INH JAW

MEDICAL GAS CONNECTION SCHEDULE

EQUIPMENT

CALLOUT

LOC

PIPING CONNECTIONS ALARM SIGNAL

REMARKS

OXYGEN

MEDICAL

AIR

VACUUM OXYGEN

MEDICAL

AIR

VACUUM

ZONE VALVE BOX

A 3/4" 1/2" 2"

AREA ALARM

A X X X

MEDICAL GAS OUTLET SCHEDULE

MARK

OXYGEN

(O2)

MED AIR

(MA)

VAC

(VAC)

REMARKS

MGO-1 1 1 1 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.

MGO-2 2 1 3 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.

MGO-3 1 1 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.

P101: WATER CLOSET, FLOOR MOUNTED:

BASED ON KOHLER K-4302 “HIGHCREST” FLOOR MOUNTED ELONGATED VITREOUS CHINA WATER CLOSET WITH TOP SPUD, BOLT CAPS - SLOAN OPTIMA ECOS 111-1.6/1.1 HW HARD-WIRED SENSOR OPERATED DUAL FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE – WHITE SOLID PLASTIC ELONGATED OPEN FRONT SEAT, LESS COVER. SET WATER CLOSET SO THAT CENTERLINE IS 18” FROM NEAREST WALL AND RIM IS 16-1/2” AFF.

P-114: WATER CLOSET, FLOOR MOUNTED, BARIATRIC:

BASED ON WHITEHALL MODEL WH2125-A-T-3-FM BARIATRIC FLOOR MOUNTED STAINLESS STEEL WATER CLOSET WITH TOP SPUD AND FLOOR OUTLET - SLOAN OPTIMA ECOS 111-1.6/1.1 HW HARD-WIRED SENSOR OPERATED DUAL FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE - "BIG JOHN" HINGED TOILET

SEAT. SET WATER CLOSET ACCORDING TO ADA REQUIREMENTS.

P116: WATER CLOSET, FLOOR MOUNTED:

BASED ON KOHLER K-4302 “HIGHCREST” FLOOR MOUNTED ELONGATED VITREOUS CHINA WATER CLOSET WITH TOP SPUD, BOLT CAPS - SLOAN OPTIMA 111-1.6 ES-S TMO HARD-WIRED SENSOR OPERATED FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE – WHITE SOLID PLASTIC ELONGATED OPEN FRONT SEAT, LESS COVER. SET WATER CLOSET SO THAT CENTERLINE IS 18” FROM NEAREST WALL AND RIM IS 16-1/2” AFF.

P-418: LAVATORY:

BASED ON KOHLER K-2005 “KINGSTON” 20”X18” WALL HUNG VITREOUS CHINA LAVATORY WITH 4” CENTERS, FRONT OVERFLOW, DRILLED FOR CONCEALED ARM CARRIER - CHICAGO FAUCET 116.779.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 1.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER –DRAIN WITH GRID STRAINER – CHROME PLATED WALL SUPPLIES WITH LOOSE KEY STOPS – 1-1/4” CHROME PLATED CAST BRASS “P” TRAP – FLOOR MOUNTED CONCEALED ARM CARRIER – INSULATE “P” TRAP AND HOT WATER SUPPLY.

P-422: BARIATRIC LAVATORY:

BASED ON WHITEHALL MODEL WH3740BAR-09 BARIATRIC POWDER COATED STAINLESS STEELWALL MOUNTED LAVATORY WITH 4" CENTERS, FRONT OVERFLOW, AND TRAP COVER - CHICAGO FAUCET 116.779.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 1.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER –DRAIN WITH GRID STRAINER – CHROME PLATED WALL SUPPLIES WITH LOOSE KEY STOPS – 1-1/4” CHROME PLATED CAST BRASS “P” TRAP - PROVIDE BARIATRIC MOUNTING CARRIER AND SUPPORT PER MANUFACTURER'S RECOMMENDATIONS.

P-502: SERVICE SINK, FLOOR MOUNTED:

BASED ON FIAT TSB100 24”X24”X12” DEEP TERRAZZO MOP BASIN WITH STAINLESS STEEL CAPS – CAST BRASS DRAIN WITH STAINLESS STEEL STRAINER – CHICAGO FAUCET 540-LD897SWXFXKCP SERVICE SINK FAUCET WITH INTEGRAL CHECKSTOPS, SPOUT WITH BUCKET HOOK, 3/4" HOSE THREAD END, VACUUM BREAKER, ADJUSTABLE TOP BRACE, CERAMIC DISC CARTRIDGE – STAINLESS STEEL BACKSPLASH

PANELS ON ADJACENT WALLS – 3” CAST IRON “P” TRAP.

P-505: CLINICAL SEVICE SINK:

BASED ON KOHLER K-12867 "CAMERTON" WALL MOUNTED TOP SPUD CLINICAL SINK WITH STAINLESS STEEL RIM GAURDS – CAST BRASS DRAIN WITH STAINLESS STEEL STRAINER – SLOAN ROYAL MODEL 117 FLUSH VALVE WITH VACUUM BREAKER, TAILPIECE - KOHLER K-7309-5A SERVICE SINK FAUCET WITH INTEGRAL CHECKSTOPS, WRIST BLADE HANDLES – KOHLER K-13925 BEDPAN WASHWER WITH VACUUM

BREAKER.

P-519: SCRUB SINK:

BASED ON TBJ INCORPORATED WS16-45-8-FS-M_1144-3 SURGEON'S FOOT PEDAL ACTIVATED STAINLESS STEEL SCRUB SINK - 8" DEEP BOWL WITH 16"X45" SCRUB AREA - GOOSENECK FAUCETS WITH SENSOR CONTROL, LAMINAR FLOW, THERMOSTATIC MIXING VALVE - STAINESS SEEL GRID STRAINER - WALL SUPPORTS - "P" TRAP AND COLD AND HOT WATER SUPPLY.

P-531: SINGLE COMPARTMENT SINK:

BASED ON ELKAY ECTSR15159BG 15”X15”X9” DEEP UNDERMOUNT 18 GAUGE SINGLE COMPARTMENT STAINLESS STEEL SINK - FAUCET BASED ON CHICAGO FAUCET 116.597.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 2.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER – DUO STRAINER WITH NEOPRENE STOPPER – WALL SUPPLIES WITH LOOSE KEY STOPS – CHROME PLATED CAST BRASS “P” TRAP. INSTALL PIPING TO FIT WITHIN

ARCHITECTURAL ENCLOSURE.

P-710: EMERGENCY EYE AND FACE WASH:

BASED ON GUARDIAN G3600 EMERGENCY EYE/FACE WASH - THERMOSTATIC MIXING VALVE WITH TEMPERATURE GAUGE UNDER SINK AND PIPE 1/2" TEMPERED WATER UP TO GUARDIAN G1774 EMERGENCY

EYEWASH MOUNTED ON COUNTERTOP, LOCATED TO SWING OVER ADJACENT SINK.

P-712: ON CALL SHOWER:

BASED ON SYMMONS SAFETYMIX 1-25-FSB 3-PORT PRESSURE BALANCING MIXING VALVE WITH LEVER HANDLE AND ADJUSTABLE STOP SCREW LIMIT HANDLE TURN. 30 INCH SLIDE BAR FOR HAND SHOWER. 2.5 GPM FLOW RATE SHOWER HEAD - 60" STAINLESS STEEL HOSE - SYMMONS TEMPTROL PRESSURE BALANCING MIXING VALVE WITH INTEGRAL STOPS - ZURN ZS880-36-LS STAINLESS STEEL TRENCH DRAIN WTIH

LINEAR SLOTTED GRATE.

P-713: DECON SHOWER:

BASED ON GUARDIAN G5018BP-TMV DRENCH HOUSE UNIT, WALL MOUNTED WITH BACKFLOW PREVENTOR - SINGLE SPRAY HEAD WITH FLIP TOP DUST COVER, INTERNAL FLOW CONTROL AND FILTER TO REMOVE IMPURITIES, 1/2" STAY OPEN BALL VALVE OPERATED BY PUSH FLAG, RETRACTABLE COILED HOSE, THERMOSTATIC MIXING VALVE GUARDIAN MODEL G3600LF.

P-801: WALL HYDRANT:

BASED ON WOODFORD MODEL 67 FREEZELESS WALL HYDRANT WITH HIGH FLOW DOUBLE CHECK BACKFLOW PREVENTOR - LOOSE KEY OPERATION.

P-812: WATER SUPPLY BOX:

BASED ON SIOUX CHIEF 696-1010 ICE MAKER BOX WITH ABS BOX AND FRAME, QUARTER TURN BALL VALVE, WATER HAMMER ARRESTOR. COORDINATE HEIGHT WITH EQUIPMENT.

PLUMBING FIXTURE LIST

MINIMUM RUNOUT SIZE FROM MAIN TO BE 1/2" FOR OXYGEN AND MEDICAL AIR, 3/4" FOR VACUUM.

SELECT MED FAS OUTLETS ARE TO BE PROVIDED IN PATIENT HEADWALL UNITS. RE. ARCH FOR HEADWALL SYSTEM LOCATIONS.

NOTE: ALL RUNOUTS TO FIXTURES ARE TO BE PROVIDED WITH ISOLATION VALVES NO MORE THAT 4' AFF, BEHIND LOCKABLE ACCESS PANEL.

No. Description Date 05/07/2021

4/29/2021 8:15:17 AM

D

CBA

E

N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D e p a rt m e n t o f

V e te ra n s A ff a ir s

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS:

VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center Leavenworth

Colmery-O'Neil VA Medical Center Topeka

Building Key Plan: A/E Seal

BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER ELEC-R19.rvt

1/8" = 1'-0"

5/5/2021 11:55:22 AM

E001

ELECTRICAL

INFORMATION

#589A5-15-115B

UPGRADE

EMERGENCY

DEPARTMENT

05/07/2021

DDC RWL

No. Description Date

05/05/2021

File details come from the government source that posted it. Updated .