P09 Drawings 589A5-15-115B -2021 Phase II_Part3of4 (15 PGS).pdf
PDF 18 MB Posted
- Solicitation number
- 36C25522R0042
About this file
This document contains a request for proposal for an upgrade to an emergency department at a Veterans Administration medical center. The solicitation requests proposals to upgrade the emergency department at the Colmery-O'Neil Veterans Administration Medical Center in Topeka, Kansas, as outlined in the attached schedule, statement of work, specifications and drawings. Proposals are due through the vendor portal by the request due date of January 26, 2022. Contractors working on the project are exempt from state sales tax and will be issued a project exemption certificate upon award of the contract. The site visit will take place on the due date at the specified time and location. The NAICS code for this project is 236220 for Commercial and Institutional Building Construction, with a size standard of $39.5 million.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:40 AM
M601
MECHANICAL
SCHEDULES
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
BOH INH
No. Description Date
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
05/07/2021
4/29/2021 8:15:17 AM
05/04/2021
#589A5-15-115B
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:41 AM
M602
MECHANICAL
SCHEDULES
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
BOH INH
No. Description Date
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
05/07/2021
4/29/2021 8:15:17 AM
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt4/20/2021 8:40:41 AM
M603
MECHANICAL
SCHEDULES
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
BOH INH
No. Description Date
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
05/07/2021
4/29/2021 8:15:17 AM
SECLUSION 2
B105
SA 155
RA 155
SOILED
B104
SA 30
EA 125
NURSE STATION
B116
SA 300
RA 300
CORR
C101
SA 415
RA 115
CORR
B1-03B
SA 625
RA 115
CORR
B1-03A
SA 615
RA 180
JAN
C121
SA 0
EA 75
TRAUMA 1
B113
SA 600
RA 600
TRAUMA 2
B112
SA 600
RA 600
CORR
B1-03
SA 440
RA 155
TRTMT 4 (ISO)
B110
SA 165
EA 300
ANTE
B110A
SA 45
EA 90
TLT
B110B
SA 0
EA 75
TRTMT 5
B109
SA 205
RA 240
TRTMT 6
B108
SA 205
RA 240
BARIATRIC TLT
B106
SA 100
RA 100
CLEAN
B102
SA 135
RA 65
HAC
B102A
SA 55
EA 125
DECON
B111
SA 200
EA 250
TRTMT 7
B103
SA 300
RA 255
NOT IN SCOPE OF WORK
OUTPATIENT
ENTRY
C100
SA 175
RA 0
ED ENTRY
AC100
SA 250
RA 0
CORRIDOR
C144
SA 450
RA 800
VA POLICE
AC101A
SA 85
RA 85
TLT
C130
SA 0
EA 85
ED WAITING
AC101
SA 1255
EA 1375
CONSULT/
BRVMNT
AC101D
SA 150
RA 150
ADMIT
AC101C
SA 145
RA 165
NURSE MGR
AC133
SA 155
RA 155
TLT
AC136A
SA 0
EA 80
WORK
AC132
SA 100
RA 60
TRIAGE
AC128
SA 270
EA 310
TRTMT 1
AC129
SA 180
RA 210
TRTMT 2 FEMALE
AC134
SA 185
RA 75
TRTMT 3
AC135
SA 180
RA 75
BREAK
AC136
SA 125
EA 90
MENTAL HEATH
INTERVENTION
AC119
SA 190
RA 190
VESTIBULE
AC104
SA 270
RA 230
TLT
AC134A
SA 0
EA 110
TLT
AC135A
SA 0
EA 125
WAITING
AC137
SA 250
RA 250
TLT
AC134C
SA 0
EA 80
TLT
B1-03D
SA 0
EA 80
EXAM #39
AC139
SA 85
RA 120
EXAM #40
AC140
SA 85
RA 120
OFFICE
B116A
SA 100
RA 100
CLEAN UTILITY
B116C
SA 60
RA 0
SOILED UTILITY
B116D
SA 0
EA 80
PUBLIC TOILET
SA 0
EA 100
NEW STAIR
AC103
SA 0
RA 0
HALL
AC131
SA 50
RA 30
PROCEDURE
ROOM
SA 360
RA 0
EXAM
SA 75
RA 0
EXAM
SA 80
RA 0
EXAM
SA 90
RA 0 CORRIDOR
AC114
SA 325
RA 0
EXAM
SA 100
RA 0
EXAM
SA 65
RA 0
WORK ROOM
SA 0
RA 0
WORK ROOM
SA 0
RA 0
PHARMACY
SA 60
RA 0
RED TEAM
AC108
SA 550
RA 0
SOILED UTILITY
AC113
SA 0
RA 0
EXAM #5
SA 115
EA 0
EXAM #6
SA 90
RA 0
EXAM #9
SA 90
RA 0
EXAM #10
AC110
SA 170
RA 0
EXAM #11
AC111
SA 115
RA 0
TOILET
AC112
SA 0
RA 0
CORRIDOR
AC115
SA 40
RA 0
EXAM #21
SA 115
RA 0
EXAM #23
SA 100
RA 0
EXAM #25
SA 105
RA 0
OFFICE
SA 0
RA 0
Space
AC167
SA 0
RA 0
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:49:08 AM
M701
HVAC ROOM AIRFLOW
PLAN
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
-- INH
1/8" = 1'-0" M701
1 ROOM AIRFLOW PLAN
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:02 AM
PP001
PLUMBING COVER
SHEET
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS.
2. NO PIPING, EQUIPMENT, ETC. SHALL PENETRATE STRUCTURAL MEMBERS.
3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED TO
ACCOMMODATE THE NEW WORK.
4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE
AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR
LOCATIONS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACT LOCATION, CONFIGURATION AND ROUTING OF EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION DURING THE PROJECT TO PREVENT DAMAGE DURING
DEMOLITION AND PHASING.
6. REMOVE ALL EXISTING EQUIPMENT AND PIPING THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.
7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
8. ALL CUTTING AND PATCHING SHALL BE CLOSELY COORDINATED WITH THE G.C.
9. COORDINATE ROUTING OF PLUMBING WITH LIGHTS, ARCHITECTURAL CEILING AND STRUCTURAL ELEMENTS. PIPING
SHALL RISE AND DROP, JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS. DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE GRADE MUST BE MAINTAINED FOR DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE CONFLICTS RISING FROM LACK OF COORDINATION SHALL NOT JUSTIFY AN INCREASE IN THE CONTRACT
AMOUNT.
10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE FIRE STOPPED BY THE TRADE MAKING THE PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR REQUIREMENTS.
11. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR EQUIPMENT. PIPING SHALL NOT BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM ROOMS OR ELEVATOR EQUIPMENT ROOMS UNLESS SPECIFICALLY BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM ROOMS OR ELEVATOR EQUIPMENT ROOMS UNLESS SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C. PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST APPROVED
RECEPTOR WHERE REQUIRED.
12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL
EQUIPMENT WITH G.C.
13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND STANDARDS.
14. COORDINATE ACCESS TO EQUIPMENT AND VALVES INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY CHASES
WITH GENERAL CONTRACTOR. PROVIDE LOCKING ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS REQUIRED
TO SERVICE CONCEALED DAMPERS, VALVES AND EQUIPMENT.
15. REFER TO ARCH FOR PHASING PLAN AND ALLOWABLE WORK HOURS.
16. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
17. COMPLETE COORDINATION OF DRAWINGS SHALL BE REQUIRED BY PARAGRAPH "SUBMITTAL" IN SPECIFICATION
SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN
APPROVED BY VA.
18. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL REMAIN REASONABLY OPERATIONAL IN THE CASE OF A SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE STRUCTURE. REFER TO SPECIFICATION SECTION 130541.
1. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE ARCHITECT IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE DEMOLITION WORK SHALL NOT
JUSTIFY AN ADDITIONAL COST.
2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA SHUT-
OFF VALVES. INSTALL NEW ISOLATION VALVES WHERE REQUIRED FOR COMPLETION OF WORK.
3. REMOVAL OF EXISTING PLUMBING FIXTURES AND EQUIPMENT, ETC. WILL REQUIRE CAPPING AND SEALING EXISTING MAINS OR BRANCHES AS NECESSARY AND REQUIRED TO ALLOW THE REMAINING SYSTEMS TO FULLY OPERATE WITHOUT DEGRADATION. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP CLOTHS TO PROTECT THE EXISTING OCCUPIED AREAS AND EQUIPMENT FROM DUST AND DEBRIS DURING THE CONSTRUCTION WORK, AND SHALL CLEAN THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE WORK. REFER TO
GENERAL CONDITIONS IN THE SPECIFICATIONS.
4. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED WITH PROPER FLUID AND PROPERLY VENTED BY THIS
CONTRACTOR, ONCE NEW WORK HAS BEEN INSTALLED.
5. COORDINATE WITH GENERAL CONTRACTOR THE REMOVAL AND REPLACEMENT OF ALL EXISTING CEILINGS, WALLS, ETC. AS REQUIRED FOR MECHANICAL DEMOLITION WORK.
6. EXISTING PIPING AND EQUIPMENT, ETC., NOT TO BE UTILIZED IN THE COMPLETED BUILDING SHALL BE DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS OF DISCONTINUED PIPING SHALL BE CAPPED IN THE NEAREST WALL, CEILING OR FLOOR SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT IN WALLS, CEILINGS, ETC., WHERE EQUIPMENT AND PIPE, ETC., ARE REMOVED AND NOT REPLACED, SHALL BE PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT CONSTRUCTION. REFER TO DRAWINGS DELINEATING NEW WORK FOR ADDITIONAL INFORMATION
REGARDING SYSTEMS OR PORTIONS OF SYSTEMS WHERE USE IS TO BE DISCONTINUED.
7. EXISTING PIPING, FIXTURES AND EQUIPMENT THAT ARE NOT TO BE REUSED SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE OWNER IF THEY WISH TO RETAIN OWNERSHIP OF SAME. IF NOT, EQUIPMENT SHALL BECOME THE PROPERTY OF THIS CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AS SOON AS PRACTICAL AND
DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS.
8. ALL CUTTING AND CHANNELING OF EXISTING BUILDING SHALL BE ACCOMPLISHED IN A NEAT AND WORKMANLIKE MANNER WITHOUT REMOVAL OF EXCESS MATERIALS. THIS CONTRACTOR SHALL PATCH AND REPLACE WITH
MATERIAL SIMILAR TO ADJACENT CONSTRUCTION.
9. WHERE EXISTING PIPING AND EQUIPMENT, ETC., THAT ARE TO BE UTILIZED IN THE COMPLETED PROGRAM CONFLICT WITH NEW CONSTRUCTION AND THE REQUIRED DEMOLITION, THEY SHALL BE RELOCATED AND RECONNECTED TO
MAINTAIN THE DESIRED SERVICE.
10. PORTIONS OF EXISTING SYSTEMS MAY BE SHOWN FOR CLARITY EVEN THOUGH IT MAY NOT BE NECESSARY TO MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE SHOWN BASED ON ORIGINAL OR REMODEL BUILDING
DRAWINGS. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS.
11. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE OWNER AND OCCUPANTS OF THIS BUILDING SO AS TO
PROVIDE THE LEAST AMOUNT OF DISRUPTION OF BUILDING ACTIVITIES AS POSSIBLE.
12. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED AND PROPERLY DISPOSED OF.
GENERAL NOTES
GENERAL DEMOLITION NOTES
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
1 1
1 1
I
D
(EX)4"RL & ORL
(EX)6"RL & ORL
CAP8"ORL
8"RL
6"ORL
6"RL
(Ex) 3"W
UP
(Ex)3"W
UP
NOT IN SCOPE OF WORK
GENERAL NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON
BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL
ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE
AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED
SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY
COR OF DISCREPENCIES.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE
CLOSELY COORDINATED WITH THE EXISTING CONDITIONS
AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND
FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH
ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,
AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.
5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR
PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS
ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK
CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND
CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.
6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE
AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE
BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES
AS DIRECTED BY THE COR.
7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.
SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8
HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO
SHUTDOWN.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:05 AM
PD100
PLUMBING DEMOLITION
PLAN - BASEMENT
FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PD100
1 PLUMBING DEMO PLAN - BASEMENT FLOOR
PLAN NOTES
1 REMOVE EXISTING SECTION OF WASTE PIPING.
2 EXISTING VERTICAL SECTION OF RAIN AND
OVERFLOW RAIN LEADER PIPING TO BE
REMOVED. REMAINING PIPING WILL BE
RECONNECTED UNDER NEW WORK.
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
1 1
1 1
I
D
(EX)4"RL & ORL
(EX)6"RL & ORL
CAP8"ORL
8"RL
6"ORL
6"RL
(Ex) 3"W
UP
(Ex)3"W
UP
NOT IN SCOPE OF WORK
GENERAL NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON
BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL
ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE
AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED
SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY
COR OF DISCREPENCIES.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE
CLOSELY COORDINATED WITH THE EXISTING CONDITIONS
AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND
FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH
ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,
AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.
5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR
PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS
ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK
CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND
CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.
6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE
AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE
BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES
AS DIRECTED BY THE COR.
7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.
SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8
HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO
SHUTDOWN.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:05 AM
PD100
PLUMBING DEMOLITION
PLAN - BASEMENT
FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PD100
1 PLUMBING DEMO PLAN - BASEMENT FLOOR
PLAN NOTES
1 REMOVE EXISTING SECTION OF WASTE PIPING.
2 EXISTING VERTICAL SECTION OF RAIN AND
OVERFLOW RAIN LEADER PIPING TO BE
REMOVED. REMAINING PIPING WILL BE
RECONNECTED UNDER NEW WORK.
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
I D
(EX) 1/2"MA, 3/4"MV
MA
(EX)1-1/4"MV, 1"MA
3/4"O2 RISERS
(EX)3" VACUUM EXHAUST
REMOVE (EX)3" VACUUM
EXHAUST PIPING BETWEEN
BASEMENT AND 2ND FLOOR
FOR REROUTING AND
RECONNECTION UNDER
NEW WORK
NOT IN SCOPE OF WORK
GENERAL NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON
BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL
ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE
AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED
SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY
COR OF DISCREPENCIES.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE
CLOSELY COORDINATED WITH THE EXISTING CONDITIONS
AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND
FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH
ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,
AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.
5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR
PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS
ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK
CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND
CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.
6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE
AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE
BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES
AS DIRECTED BY THE COR.
7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.
SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8
HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO
SHUTDOWN.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:12 AM
PD110
MED GAS DEMO PLAN -
BASEMENT FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PD110
1 MED GAS DEMO PLAN - BASEMENT FLOOR
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
REMOVE MED GAS OUTLETS
DEMO MED
GAS
ALARM
DEMO ZONE
VALVE BOX
DEMO MED GAS
OUTLETS
..REMOVE MED GAS OUTLETS
I
D
(EX)3" VACUUM UP
REMOVE VERTICAL
PIPING BETWEEN BASEMENT
AND 2ND FLOOR FOR
RECONNECTION UNDER
NEW WORK
NOT IN SCOPE OF WORK
GENERAL NOTES
1. PLANS ARE SCHEMATIC IN NATURE. LAYOUT IS BASED ON
BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS AND DIMENSIONS. SPECIAL
ATTENTION IS TO BE PAID TO PIPING SERVING LEVELS ABOVE
AND TO BE RE-CONNECTED TO. CONFIRM CONNECTED
SYSTEMS AND EXISTING SIZING, AND IMMEDIATELY NOTIFY
COR OF DISCREPENCIES.
2. ALL CUTTING, PATCHING AND DEMOLITION WORK SHALL BE
CLOSELY COORDINATED WITH THE EXISTING CONDITIONS
AND THE REQUIRED NEW WORK. G.C. SHALL PATCH AND
FINISH PENETRATIONS OF EXISTING SURFACES TO MATCH
ADJACENT SURFACES.
3. ALL PIPING TO BE REMOVED SHALL BE CAPPED AT THE MAINS,
AND HANGERS REMOVED, UNLESS OTHERWISE NOTED.
4. ALL ACCESSIBLE ABANDONED PIPING SHALL BE REMOVED.
5. REFER TO ARCHITECTURAL SPECIFICATIONS AND PLANS FOR
PHASING OF DEMOLITION AND NEW WORK. ADJACENT AREAS
ARE 100% OCCUPIED AND CONTRACTOR SHALL WORK
CLOSELY WITH OWNER TO SCHEDULE DEMOLITION AND
CONSTRUCTION TO BE AS LEAST DISRUPTIVE AS POSSIBLE.
6. ALL DEMO WORK ON SECOND FLOOR LEVEL SHALL BE DONE
AT NIGHT AND/OR WEEKENDS, WITH EXCEPTION OF THE
BEHAVIORAL HEALTH UNIT WHICH SHALL BE DONE IN PHASES
AS DIRECTED BY THE COR.
7. SHUTDOWN OF SYSTEMS MUST BE COORDINATED WITH COR.
SYSTEMS MAY NOT BE SHUT DOWN FOR MORE THATN 8
HOURS, AND A WORK PLAN MUST BE SUBMITTED PRIOR TO
SHUTDOWN.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:18 AM
PD111
MEDICAL GAS DEMO
PLAN - FIRST FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PD111
1 MED GAS DEMO PLAN - FIRST FLOOR
PLAN NOTES
1 REMOVE EXISTING SECTION OF MEDICAL
AIR, OXYGEN AND VACUUM MEDICAL GAS
PIPING.
2 EXISTING 1/2" MEDICAL AIR, 3/4" OXYGEN
AND 1" VACUUM PIPING TO BE REMOVED
DOWN TO BASEMENT FOR RECONNECTION
UNDER NEW WORK IN NEW WALL.
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
(E)6" W
(E)2"W
(E)4"W
(E)1/2" HWC (E)3/4" CW
(E)3/4" HW(E)3/4" CW
(E)3/4" CW
(E)3" CW
(E)2 1/2" HW
(E)1/2" HWC
(E)6" W
(E)4" CW
3"W
(E)4"W DN
I D
(E) 4"CW
(E)2"W
(E)6"RL/ORL
3"W UP TO P-502
CAP
(E)6"W DN
2"W UP
TO P-531
CO
3"W UP
2"W
2"W UP
TO P-531
2"W UP
TO P-519
4"
4"W
4"
3"W UP TO P-505
3"W
4"W
3"W
CO
(EX)3"W UP
4"W
2"W
4"RL UP
CONN. TO
(E) 4"RL
4"RL
2"W UP
SEE FIRST FLOOR
PLUMBING PLAN FOR
CONTINUATION OF 3"
WASTE PIPING FROM
TRENCH DRAIN
(E)6" ORL
(E)6" RL
(E)8" ORL
(E)8" RL
CO
(E)4"
(E)4"
(E)4"
2" W UP TO FD
(E)3" RL
3"W UP TO
P-502
CO
4"W
2"W UP
TO FD
NOT IN SCOPE OF WORK
GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE HARD
SUSPENDED CEILING.
2. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE
REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,
CLEANOUTS, ETC. ACCESS PANELS SHALL BE
FURNISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS.
3. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES
LISTED ARE GAGE PRESSURE UNLESS OTHERWISE
NOTED.
4. SIZES OF ALL CW AND HW RUNOUTS TO PLUMBING
FIXTURES CAN BE FOUND ON THE FIXTURE SCHEDULES.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING
FULL COORDINATION AND LAYOUT DRAWINGS PER
SPECIFICATIONS. COORDINATION SHOULD BE
COMPLETED WITH ALL TRADES INCLUDED.
CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY
THE ENGINEER AND COR.
6. CONFIRM CONNECTED SERVICES AND AREAS BEFORE
TAPPING OR OPENING ANY EXISTING SYSTEMS.
SCHEDULE ALL SHUTDOWNS WITH COR.
7. ALL RUNOUTS TO INDIVIDUAL FIXTURES SHALL HAVE AN
ISOLATION VALVE AT MAXIMUM 4' ABOVE FLOOR,
BEHIND LOCKABLE ACCESS PANEL.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:23 AM
PL100
PLUMBING PLAN -
BASEMENT FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PL100
1 PLUMBING PLAN - BASEMENT
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
PLAN NOTES
1 2"W UP TO P418.
2 2"W UP TO SINK.
3 3"W UP TO WC.
4 2"V UP.
REF: DTL #2 PL101 FOR
PIPE PENETRATION
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
MRI ZONE II
C146
OUTPATIENT ENTRY
C100
ED ENTRY
AC100
CORRIDOR
C144
VA POLICE
AC101A
TLT
C130
ED WAITING
AC101
CONSULT/ BRVMNT
AC101D
NEW STAIR
AC103
VESTIBULE
AC104
TRAUMA 1
B113
TRAUMA 2
B112
DECON
B111
TRTMT 4 (ISO)
B110
ANTE
B110A
TLT
B110B TRTMT 5
B109
TRTMT 6
B108
BARIATRIC TLT
B106
CHIEF ED
A131
CLEAN
B102
SOILED
B104
ROOM
B144D
ROOM
B144C
CLOSET
B144B
EXAM #39
AC139
SECLUSION 2
B105
MENTAL HEATH
INTERVENTION
AC119
BREAK
AC136
TLT
AC136A
TLT
AC135A
TLT
AC134A
NURSE MGR
AC133
WORK
AC132
HALL
AC131
TRTMT 1
AC129
TRIAGE
AC128
ADMIT
AC101C
ADMIT
AC101B
TRTMT 2 FEMALE
AC134
TRTMT 3
AC135
CORR
B1-03B
CORR
B1-03A
P-116
P-418
P-713
P-713 P-418
P-116
P-519
P-502
P-418
P-505P-418
XERXES 300 GALLON
DECONTAMINATION
TANK. SEE DTL. 1/PL401
I
D
P-418
P-502 P-531
P-531
P-710
P-710
(EX)4" UP TO RD
(EX)4" UP TO ORD
(EX) 3" VTR
(EX) 2 1/2" VTR
(EX)2" VTR
(EX)3/4"HW
(EX)2"V
(EX)2"V
(E)2-1/2"CW&HW
(EX)1-1/2"HW
(EX)2"CW
(EX)1/2"
(EX)3/4"
(EX)1-1/2"CW
(EX)2"
(EX)2"V
(EX)1-1/2"V IN CHASE
(EX)2-1/2"V
(EX)3/4"HW (EX)1"HW
3/4"HW
1-1/4"CW
1"HW
1-1/2"CW
1"
1-1/4"HW
2"CW
1"HW
2"CW
1-1/4"CW
2-1/2"V
(EX)4"V
P-801
3/4"CW
2"V
3/4"CW&HW 2"V
2"V 3/4"CW
1-1/4"CW
1-1/4"
1-1/2"V 2"V
1"
2"V
2"CW
2"V
1"2"CW
1"
1-1/2"V
(EX)3"W
1-1/4"CW
(EX)6"RL/ORL
2"V
4"RL
3/4"HW
3/4"CW
3"W
2 3"W RLCT
(EX)4"RL UP
(EX)4"RL UP
(E)1 1/2" V
3/4"HW
1 1/4"CW
2"V
3" FD-C
3"W
DECON TANK ALARM
(EX)4"RL
0.5 GPM
0.5 GPM
(EX)3/4"HWC
WHA-B
WHA-A
WHA-AP-801
(E)1 1/4" CW
(EX)2"V DN
(E)1/2" (E)1/2"
(E)2"
(E)1 1/4"
(E)2"
(E)2" V
(EX)1/2"
(EX) UP TO 3"RD/ORD
(E)1/2" CW
NURSE STATION
B116
P-418
TRTMT 7
B103
HAC
B102A
3/4" 1/2" 3/4"
WHA-A
P-422
1 1/2"CW
P-114
2 P-531
P-531 1 1/2"V
2"FD-D2"V DN
NOT IN SCOPE OF WORK
(EX)3"RL/ORL
PLUMBING WORK FOR
TRAUMA 1 WAS
COMPLETED IN PHASE 1.
GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE HARD
SUSPENDED CEILING.
2. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE
REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,
CLEANOUTS, ETC. ACCESS PANELS SHALL BE
FURNISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS.
3. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES
LISTED ARE GAGE PRESSURE UNLESS OTHERWISE
NOTED.
4. SIZES OF ALL CW AND HW RUNOUTS TO PLUMBING
FIXTURES CAN BE FOUND ON THE FIXTURE SCHEDULES.
5. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING
FULL COORDINATION AND LAYOUT DRAWINGS PER
SPECIFICATIONS. COORDINATION SHOULD BE
COMPLETED WITH ALL TRADES INCLUDED.
CONSTRUCTION SHALL NOT BEGIN UNTIL
COORDINATION DRAWINGS HAVE BEEN REVIEWED BY
THE ENGINEER AND COR.
6. CONFIRM CONNECTED SERVICES AND AREAS BEFORE
TAPPING OR OPENING ANY EXISTING SYSTEMS.
SCHEDULE ALL SHUTDOWNS WITH COR.
7. ALL RUNOUTS TO INDIVIDUAL FIXTURES SHALL HAVE AN
ISOLATION VALVE AT MAXIMUM 4' ABOVE FLOOR,
BEHIND LOCKABLE ACCESS PANEL.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:34 AM
PL101
PLUMBING PLAN - FIRST
FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PL101
1 PLUMBING PLAN - FIRST FLOOR
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
PLAN NOTES
1 ROUTE PIPING DOWN IN NEW LOCATION AND
CONNECT TO EXISTING PIPING IN BASEMENT.
2 CONNECT TO EXISTING PIPING SERVING FLOOR
ABOVE.
3 EXISTING PLUMBING FIXTURE TO REMAIN.
4 PROVIDE TRAP PRIMER TO SERVE FLOOR DRAIN IN
ROOM.
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
I D
(EX) 1/2"MA, 3/4"MV
(EX)1-1/4"MV, 1"MA
3/4"O2 RISERS
M A
M V
M A
M V
M A
M V
O
(EX)VACUUM EXHAUST
NEW 3" VACUUM
EXHAUST UP
(EX)1 1/4"V, 3/4"O2, 3/4"MA
UP IN WALL
NOT IN SCOPE OF WORK
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:37 AM
PL110
MED GAS PLAN -
BASEMENT
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PL110
1 MED GAS PLAN - BASEMENT
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
TRAUMA 1
B113
TRAUMA 2
B112
TRTMT 5
B109
TRTMT 6
B108
BREAK
AC136
ED WAITING
AC101
TRIAGE
AC128
NEW STAIR
AC103
CLEAN
B102
TRTMT 1
AC129
TRTMT 2 FEMALE
AC134
TRTMT 3
AC135
WORK
AC132
ADMIT
AC101B
ADMIT
AC101C
HALL
AC131
CLOSET
B144B
DECON
B111
CORR
B1-03A
CORR
B1-03B
VESTIBULE
AC104
ED ENTRY
AC100
OUTPATIENT ENTRY
C100
EXAM #39
AC139
NURSE MGR
AC133
ROOM
B144C
CHIEF ED
A131
SOILED
B104
MENTAL HEATH
INTERVENTION
AC119
SECLUSION 2
B105
JAN
AC127B
BARIATRIC TLT
B106
WAITING
AC137
CONSULT/ BRVMNT
AC101D
VA POLICE
AC101A
TLT
C130
ANTE
B110A
TRTMT 4 (ISO)
B110 TLT
B110B
TLT
AC136A
EXAM #40
AC140
CORRIDOR
C144
MRI ZONE II
C146
ROOM
B144D
MGO-1
ALARM "A"
MGO-2
MGO-2
MGO-1 MGO-1MGO-1
O
M V
M A
O
M V
M
AM
A
M V
O
O2
MV
MA MA
MV
D
MGO-1
O
M V
M A
1/ 2"
M A
3/ 4"
M V
1/ 2"
O
M A
M V
O
1/2"O2
1/2"MA
1-1/4"MV
1/4" PIPING TO
AREA ALARM
1/2"O2
1/2"O2
1-1/4"MV
1/2"O2
1/2"MA1"MV
1/2"O2
CONNECT TO (EX)3" VACUUM
EXHAUST UP THROUGH ROOF
NEW 3"VACUUM EXHAUST DN
3/4"MA
3/4"MV
1 1/4"O2
(EX)ZVB-A
TRTMT 7
B103
HAC
B102A
MGO-1
NOT IN SCOPE OF WORK
(E)1/2" O2
(E)3/4" MV
(E)1/2" MA
(E)1 1/4" MV
(E)2" MV
MEDICAL GAS OUTLETS
AND TEMPORARY PIPING
WERE INSTALLED UNDER
PHASE 1. CONTRACTOR
SHALL REWORK MEDICAL
GAS PIPING AS SHOWN.
GENERAL NOTES
1. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE
REQUIRED FOR ALL VALVES. ACCESS PANELS SHALL
BE FURNISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS.
2. MED GAS SYSTEM CONNECTIONS MUST BE
COORDINATED WITH COR. CERTIFICATION MUST BE
ARRANGED AHEAD OF INSTALL TO ENSURE MINIMUM
DOWNTIME.
3. MED GAS DROPS WITHIN PATIENT ROOMS WILL BE TO
MANUFACTURED HEADWALL SYSTEMS WITH PRE-
CONNECTED OUTLETS. COORDINATE CONNECTION
LOCATIONS WITH FINAL PURCHASED HEADWALL
SYSTEM. OTHER DROPS TO COUTER-TOP AND
ALTERNATE WALL OUTLETS ARE TO BE INDIVIDUALLY
PIPED PER ARCHITECTURAL DETAILS.
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
1/8" = 1'-0"
4/20/2021 11:47:44 AM
PL111
MED GAS PLAN - FIRST
FLOOR
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
1/8" = 1'-0" PL111
1 MED GAS PLAN - FIRST FLOOR
PLAN NOTES
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
MARK
P-101
DESCRIPTION
WASTE
PIPE IN
VENT
PIPE IN
COLD
WATER IN
1.25
HOT
WATER IN
WASTE
FIXTURE
UNITS
WATER
FIXTURE
UNITS
WRIST
BLADE
N/A
HANDLES
ELECTRIC
SENSOR
YES
REMARKS
P-418 LAVATORY 2 1.5 .5 .5 2 2 N/A YES
PLUMBING FIXTURE SCHEDULE
P-505 3 2 1.25 .5 10 10 NO NO
WATER CLOSET
FLOOR MOUNTED
P-531 SINK 2 1.5 .5 .5 2 2 NO YES
P-712 SHOWER 2 1.5 .5 .5 2 2 N/A NO
P-713 DECON SHOWER 2 1.5 .5 .5 2 2 N/A NO
FLUSH VALVE, BED PAN WASHER W/FOOT PEDAL CONTROL
CLINICAL SERVICE
SINK - FV
P-502 3 2 3/4 3/4 2 3 NO NOSERVICE SINK
DUAL FLUSH, PUBLIC AND STAFF WATER CLOSET
P-116 3 2 1.25 -- 4 6 N/A YES
WATER CLOSET
FLOOR MOUNTED
PATIENT WATER CLOSET
P-710 FACE/EYEWASH - - .5 .5 - 3 N/A NO DECK MOUNTED FACE/EYEWASH
P-519 1.5 1.5 .5 .5 3 2 NO NOSCRUB SINK
3 2 1.25 -- 4 6 N/A YES
WATER CLOSET
FLOOR MOUNTED
BARIATRIC PATIENT WATER CLOSETP-114
P-422 LAVATORY 2 1.5 .5 .5 2 2 N/A YES BARIATRIC, WALL MOUNTED
ALL WORK SHOWN IN SHADED AREAS WAS
COMPLETED UNDER PHASE 1 WORK AND SHOWN FOR
REFERENCE ONLY. THE CONTRACTOR SHALL
PROVIDE A COMPLETE AIR BALANCE OF BOTH PHASE 1
AND PHASE 2 AT THE COMPLETION OF THE PROJECT.
G
F
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER MECH-R19.rvt
As indicated
4/20/2021 11:47:48 AM
PL501
PLUMBING SCHEDULES
#589A5-15-115
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
4/21/2021
INH JAW
MEDICAL GAS CONNECTION SCHEDULE
EQUIPMENT
CALLOUT
LOC
PIPING CONNECTIONS ALARM SIGNAL
REMARKS
OXYGEN
MEDICAL
AIR
VACUUM OXYGEN
MEDICAL
AIR
VACUUM
ZONE VALVE BOX
A 3/4" 1/2" 2"
AREA ALARM
A X X X
MEDICAL GAS OUTLET SCHEDULE
MARK
OXYGEN
(O2)
MED AIR
(MA)
VAC
(VAC)
REMARKS
MGO-1 1 1 1 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.
MGO-2 2 1 3 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.
MGO-3 1 1 SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF OUTLETS.
P101: WATER CLOSET, FLOOR MOUNTED:
BASED ON KOHLER K-4302 “HIGHCREST” FLOOR MOUNTED ELONGATED VITREOUS CHINA WATER CLOSET WITH TOP SPUD, BOLT CAPS - SLOAN OPTIMA ECOS 111-1.6/1.1 HW HARD-WIRED SENSOR OPERATED DUAL FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE – WHITE SOLID PLASTIC ELONGATED OPEN FRONT SEAT, LESS COVER. SET WATER CLOSET SO THAT CENTERLINE IS 18” FROM NEAREST WALL AND RIM IS 16-1/2” AFF.
P-114: WATER CLOSET, FLOOR MOUNTED, BARIATRIC:
BASED ON WHITEHALL MODEL WH2125-A-T-3-FM BARIATRIC FLOOR MOUNTED STAINLESS STEEL WATER CLOSET WITH TOP SPUD AND FLOOR OUTLET - SLOAN OPTIMA ECOS 111-1.6/1.1 HW HARD-WIRED SENSOR OPERATED DUAL FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE - "BIG JOHN" HINGED TOILET
SEAT. SET WATER CLOSET ACCORDING TO ADA REQUIREMENTS.
P116: WATER CLOSET, FLOOR MOUNTED:
BASED ON KOHLER K-4302 “HIGHCREST” FLOOR MOUNTED ELONGATED VITREOUS CHINA WATER CLOSET WITH TOP SPUD, BOLT CAPS - SLOAN OPTIMA 111-1.6 ES-S TMO HARD-WIRED SENSOR OPERATED FLUSH VALVE (PROVIDE LOW VOLTAGE TRANSFORMER) WITH VACUUM BREAKER, TAILPIECE, DUAL FILTERED BYPASS, TRUE MECHANICAL OVERRIDE – WHITE SOLID PLASTIC ELONGATED OPEN FRONT SEAT, LESS COVER. SET WATER CLOSET SO THAT CENTERLINE IS 18” FROM NEAREST WALL AND RIM IS 16-1/2” AFF.
P-418: LAVATORY:
BASED ON KOHLER K-2005 “KINGSTON” 20”X18” WALL HUNG VITREOUS CHINA LAVATORY WITH 4” CENTERS, FRONT OVERFLOW, DRILLED FOR CONCEALED ARM CARRIER - CHICAGO FAUCET 116.779.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 1.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER –DRAIN WITH GRID STRAINER – CHROME PLATED WALL SUPPLIES WITH LOOSE KEY STOPS – 1-1/4” CHROME PLATED CAST BRASS “P” TRAP – FLOOR MOUNTED CONCEALED ARM CARRIER – INSULATE “P” TRAP AND HOT WATER SUPPLY.
P-422: BARIATRIC LAVATORY:
BASED ON WHITEHALL MODEL WH3740BAR-09 BARIATRIC POWDER COATED STAINLESS STEELWALL MOUNTED LAVATORY WITH 4" CENTERS, FRONT OVERFLOW, AND TRAP COVER - CHICAGO FAUCET 116.779.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 1.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER –DRAIN WITH GRID STRAINER – CHROME PLATED WALL SUPPLIES WITH LOOSE KEY STOPS – 1-1/4” CHROME PLATED CAST BRASS “P” TRAP - PROVIDE BARIATRIC MOUNTING CARRIER AND SUPPORT PER MANUFACTURER'S RECOMMENDATIONS.
P-502: SERVICE SINK, FLOOR MOUNTED:
BASED ON FIAT TSB100 24”X24”X12” DEEP TERRAZZO MOP BASIN WITH STAINLESS STEEL CAPS – CAST BRASS DRAIN WITH STAINLESS STEEL STRAINER – CHICAGO FAUCET 540-LD897SWXFXKCP SERVICE SINK FAUCET WITH INTEGRAL CHECKSTOPS, SPOUT WITH BUCKET HOOK, 3/4" HOSE THREAD END, VACUUM BREAKER, ADJUSTABLE TOP BRACE, CERAMIC DISC CARTRIDGE – STAINLESS STEEL BACKSPLASH
PANELS ON ADJACENT WALLS – 3” CAST IRON “P” TRAP.
P-505: CLINICAL SEVICE SINK:
BASED ON KOHLER K-12867 "CAMERTON" WALL MOUNTED TOP SPUD CLINICAL SINK WITH STAINLESS STEEL RIM GAURDS – CAST BRASS DRAIN WITH STAINLESS STEEL STRAINER – SLOAN ROYAL MODEL 117 FLUSH VALVE WITH VACUUM BREAKER, TAILPIECE - KOHLER K-7309-5A SERVICE SINK FAUCET WITH INTEGRAL CHECKSTOPS, WRIST BLADE HANDLES – KOHLER K-13925 BEDPAN WASHWER WITH VACUUM
BREAKER.
P-519: SCRUB SINK:
BASED ON TBJ INCORPORATED WS16-45-8-FS-M_1144-3 SURGEON'S FOOT PEDAL ACTIVATED STAINLESS STEEL SCRUB SINK - 8" DEEP BOWL WITH 16"X45" SCRUB AREA - GOOSENECK FAUCETS WITH SENSOR CONTROL, LAMINAR FLOW, THERMOSTATIC MIXING VALVE - STAINESS SEEL GRID STRAINER - WALL SUPPORTS - "P" TRAP AND COLD AND HOT WATER SUPPLY.
P-531: SINGLE COMPARTMENT SINK:
BASED ON ELKAY ECTSR15159BG 15”X15”X9” DEEP UNDERMOUNT 18 GAUGE SINGLE COMPARTMENT STAINLESS STEEL SINK - FAUCET BASED ON CHICAGO FAUCET 116.597.AB.1 DECK MOUNTED, SINGLE HOLE, SENSOR OPERATED FAUCET WITH 2.5 GPM VANDAL PROOF NON-AERATING LAMINAR OUTLET (PROVIDE LOW VOLTAGE TRANSFORMER), USER ADJUSTABLE TEMPERATURE CONTROL MIXER, STAINLESS STEEL BRAIDED HOSES – 12 VOLT TRANSFORMER – DUO STRAINER WITH NEOPRENE STOPPER – WALL SUPPLIES WITH LOOSE KEY STOPS – CHROME PLATED CAST BRASS “P” TRAP. INSTALL PIPING TO FIT WITHIN
ARCHITECTURAL ENCLOSURE.
P-710: EMERGENCY EYE AND FACE WASH:
BASED ON GUARDIAN G3600 EMERGENCY EYE/FACE WASH - THERMOSTATIC MIXING VALVE WITH TEMPERATURE GAUGE UNDER SINK AND PIPE 1/2" TEMPERED WATER UP TO GUARDIAN G1774 EMERGENCY
EYEWASH MOUNTED ON COUNTERTOP, LOCATED TO SWING OVER ADJACENT SINK.
P-712: ON CALL SHOWER:
BASED ON SYMMONS SAFETYMIX 1-25-FSB 3-PORT PRESSURE BALANCING MIXING VALVE WITH LEVER HANDLE AND ADJUSTABLE STOP SCREW LIMIT HANDLE TURN. 30 INCH SLIDE BAR FOR HAND SHOWER. 2.5 GPM FLOW RATE SHOWER HEAD - 60" STAINLESS STEEL HOSE - SYMMONS TEMPTROL PRESSURE BALANCING MIXING VALVE WITH INTEGRAL STOPS - ZURN ZS880-36-LS STAINLESS STEEL TRENCH DRAIN WTIH
LINEAR SLOTTED GRATE.
P-713: DECON SHOWER:
BASED ON GUARDIAN G5018BP-TMV DRENCH HOUSE UNIT, WALL MOUNTED WITH BACKFLOW PREVENTOR - SINGLE SPRAY HEAD WITH FLIP TOP DUST COVER, INTERNAL FLOW CONTROL AND FILTER TO REMOVE IMPURITIES, 1/2" STAY OPEN BALL VALVE OPERATED BY PUSH FLAG, RETRACTABLE COILED HOSE, THERMOSTATIC MIXING VALVE GUARDIAN MODEL G3600LF.
P-801: WALL HYDRANT:
BASED ON WOODFORD MODEL 67 FREEZELESS WALL HYDRANT WITH HIGH FLOW DOUBLE CHECK BACKFLOW PREVENTOR - LOOSE KEY OPERATION.
P-812: WATER SUPPLY BOX:
BASED ON SIOUX CHIEF 696-1010 ICE MAKER BOX WITH ABS BOX AND FRAME, QUARTER TURN BALL VALVE, WATER HAMMER ARRESTOR. COORDINATE HEIGHT WITH EQUIPMENT.
PLUMBING FIXTURE LIST
MINIMUM RUNOUT SIZE FROM MAIN TO BE 1/2" FOR OXYGEN AND MEDICAL AIR, 3/4" FOR VACUUM.
SELECT MED FAS OUTLETS ARE TO BE PROVIDED IN PATIENT HEADWALL UNITS. RE. ARCH FOR HEADWALL SYSTEM LOCATIONS.
NOTE: ALL RUNOUTS TO FIXTURES ARE TO BE PROVIDED WITH ISOLATION VALVES NO MORE THAT 4' AFF, BEHIND LOCKABLE ACCESS PANEL.
No. Description Date 05/07/2021
4/29/2021 8:15:17 AM
D
CBA
E
N o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D e p a rt m e n t o f
V e te ra n s A ff a ir s
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS:
VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical Center Leavenworth
Colmery-O'Neil VA Medical Center Topeka
Building Key Plan: A/E Seal
BIM 360://15G69-000 - VA Topeka - ED Renovation & Addn MEPT/15G69-000-MASTER ELEC-R19.rvt
1/8" = 1'-0"
5/5/2021 11:55:22 AM
E001
ELECTRICAL
INFORMATION
#589A5-15-115B
UPGRADE
EMERGENCY
DEPARTMENT
05/07/2021
DDC RWL
No. Description Date
05/05/2021