This document contains a request for proposal for an upgrade to an emergency department at a Veterans Administration medical center. The solicitation requests proposals to upgrade the emergency department at the Colmery-O'Neil Veterans Administration Medical Center in Topeka, Kansas. Proposals are due by January 26, 2022 and are to be submitted through the vendor portal and in binders with a CD to the NCO 15 Contracting Office by that date. The work will be exempt from state sales tax and a project exemption certificate will be issued upon contract award. The site code for this project is 236220 and the size standard is $39.5 million. A mandatory site visit will be held on January 26, 2022 at 10:00 AM CST at the medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the agency issuing this solicitation.

View the file

Other files

File Type Posted
36C25522R0042 Amendment No.0004 589A5-15-115B ED Phase II.pdf PDF
589A5-15B-115_081400 INTERIOR WOOD DOORS SPECIFICATION.pdf PDF
SPECS 100CD_VA 589A5-15-115_084113 ALUM ENTRANCES STOREFRONTS ICU SLIDING DOORS (003).pdf PDF
Final CD Single Page 589A5-15-115 Topeka VAMC ED Project FINAL .pdf PDF
1-FA104.pdf PDF
Fire Protection Legacy Drawings B1.pdf PDF
1-FA103.pdf PDF
Wage Determination KS20220058 1-7-2022.pdf PDF
SPEC Section 13 05 41 Siesmic Restraint Requirements.pdf PDF
Appendix Asbestos Lead Fungal Reports.pdf PDF
1-FA101.pdf PDF
36C25522R0042 Amendment No.0003 589A5-15-115B ED Phase II.pdf PDF
589A5-15-115 Topeka VAMC ED Project FINAL CDs Full Set 66.pdf PDF
1-FA102.pdf PDF
589A5-15-115B Response II to Bidder RFI.pdf PDF
36C25522R0042 Amendment No.0003 589A5-15-115B ED Phase II.pdf PDF
REVISED 36C25522R0042 589A5-15-115B ED Phase II.pdf PDF
Government Response to RFIs 1 - ED Phase II.pdf PDF
36C25522R0042 Amendment No. 0002 ED Phase II.pdf PDF
Site Visit Attendees - 1-26-2022 - 589A5-15-115B Ed Phase II.pdf PDF
Site Visit Meeting Minutes 1-26-2022 - 589A5-15-115B ED Phase II.pdf PDF
36C25522R0042 Amendment No.0001 589A5-15-115B ED Phase II.pdf PDF
AHU Commissioning Scope 589A5-15-115B ED Phase II.pdf PDF
P09 Drawings 589A5-15-115B - 2021 Phase II Part2of4 (34 PGS).pdf PDF
P09 Drawings 589A5-15-115B -2021 Phase II_Part3of4 (15 PGS).pdf PDF
P07 KS20210058 10-01-2021 589A5-15-115B ED Phase II (1).pdf PDF
P09 Final Specs. Vol. I 589A5-15-115 ED Phase II.pdf PDF
P09 Drawings 589A5-15-115B -2021 Phase II_Part4of4 (16 PGS).pdf PDF
Addendum-No.1 589A5-15-115B ED Phase II.pdf PDF
P09 Final Specs. Vol. II 589A5-15-115 ED Phase II.pdf PDF
Solicitation 36C25522R0042 - 589A5-15-115B ED Phase II.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

EXISTING ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101 MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

A3.1

BUILDING ELEVATION

A6.1 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM

NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

ME100E EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

-- PRECAST CONCRETE

WALL PANEL TAG

XXX

A101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES

X

X.X

X

X.X

PROJECT

LOCATION

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK - REF. ELEVATIONS

CONCRETE

EARTH

EXISTING

CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG

CLR

CMU

COL

CLO

clear/clearance column closet

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet

FE

FEC

FDN

FD

east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

insulation interior inside diameter

INSUL

IN(")

INT

ID

inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

height

GB

GL

GRD

GYP

GC

HDWD

HB

grade

PART

PLAS

OVHD

partition plaster overhead

SRT

SS

SQ

miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

on center overall nominal not to scale office opening

MISC

N

MO

MULL

MTL

NIC

NA

north mullion metal

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

architect/ architectural

AB anchor bolt

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum

A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

conference concrete

CONF

CONC

finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic

FV

FT(')

FURR

FURN

FTG

G

GA

foot furring gas gauge

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

floor finish grade finish floor

FG

FF

joistJST low volume change masonryMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

manufacturer material mechanical membrane maximum minimum manhole mirror

LDR

LF

LAV

LAM

LVC

LOCN

lineal feet ladder lavatory laminate location

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN janitor joint

PL

under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications

YD

suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W W/ W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out

RT

SICU

central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room

FOR MEDICAL

emergency room computed tomography

FACILITIES ONLY

STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B T

SUSP

STRUCT

TEL

TB

T&G plate/plastic/ property line STL

STD

storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

steel standard

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

Building Key Plan:

BLDG. 1

A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated GI-001

COVER SHEET PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

UPGRADE EMERGENCY DEPARTMENT

COLMERY-O'NEIL VA MEDICAL

CENTER

TOPEKA, KS

5/7/2021

CONSTRUCTION DOCUMENTS

SHEET INDEX

EP602 ELECTRICAL SCHEDULES

EY101 ELECTRICAL SYSTEMS PLAN - 1ST FLOOR

EY501 ELECTRICAL SYSTEMS DETAILS

T101 ELECTRICAL TELECOM PLAN - 1ST FLOOR

T501 ELECTRICAL TELECOM DETAILS

SHEET INDEX

AI-403 INTERIOR HEADWALL ELEVATIONS PHASE 2

AI-501 MILLWORK SECTION DETAILS PH2

AI-502 MILLWORK SECTION DETAILS PHASE 2

STRUCTURAL

S-001 GENERAL NOTES

S-002 TYPICAL DETAILS

S-003 TYPICAL DETAILS

S-004 TYPICAL DETAILS

S-100 LEVEL ONE FRAMING AND FOUNDATION PLAN

S-500 SECTIONS AND DETAILS

S-501 SECTIONS AND DETAILS

S-502 SECTIONS AND DETAILS

S-503 SECTIONS AND DETAILS

MECHANICAL

FP101 FIRE PROTECTION PLAN - FIRST FLOOR

MM001 MECHANICAL COVER SHEET

MM002 MECHANICAL COVER SHEET

MD101 HVAC BASEMENT DEMOLITION PLAN

MD111 HVAC FIRST FLOOR DEMOLITION PLAN

MD112 HYDRONICS DEMOLITION PLAN - FIRST FLOOR

MH100 HVAC BASEMENT PLAN

MH111 HVAC FIRST FLOOR SA AND EA PLAN

MH112 HVAC FIRST FLOOR MED. VEL SA AND RA PLAN

MH121 HVAC SECOND FLOOR PLAN

MP101 HYDRONICS FIRST FLOOR PLAN

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M511 MECHANICAL CONTROL DETAILS

M512 MECHANICAL CONTROL DETAILS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M603 MECHANICAL SCHEDULES

M701 HVAC ROOM AIRFLOW PLAN

PLUMBING

PP001 PLUMBING COVER SHEET

PD100 PLUMBING DEMOLITION PLAN -BASEMENT FLOOR

PD111 MEDICAL GAS DEMO PLAN - FIRST FLOOR

PL110 MED GAS PLAN - BASEMENT

PL111 MED GAS PLAN - FIRST FLOOR

PL501 PLUMBING SCHEDULES

ELECTRICAL

E001 ELECTRICAL INFORMATION

ED101 ELECTRICAL DEMO PLANS - BSMT & 1ST

ED102 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR

EL101 ELECTRICAL LIGHTING PLAN - 1ST FLOOR

EL501 ELECTRICAL LIGHTING DETAILS

EP000 ELECTRICAL OVERALL PLAN - BASEMENT

EP001 ELECTRICAL OVERALL PLAN - 1ST FLOOR

EP101 ELECTRICAL POWER PLAN - 1ST FLOOR

EP102 ELECTRICAL POWER PLAN - ROOF

EP501 ELECTRICAL POWER DETAILS

EP601 ELECTRICAL ONE-LINE DIAGRAM

SHEET INDEX

PD110 MED-GAS DEMO PLAN BASEMENT FLOOR

ARCHITECTURE

ASI-101 1ST FLR PLAN / WALL ELEVATIONS PHASE 2

ASI-102 REVISED CLG PLAN / EQUIP PLAN PHASE 2

ASI-103 FLOOR / WALL PROTECTION PHASE 2

ASI-104 LIFE SAFETY PLAN - 1ST FLOOR PHASE 2

GENERAL

GI-001 COVER SHEET PHASE 2

GI-002 ACCESSIBILITY PHASE 2

GI-003 PHASING PLAN - BASEMENT/2ND PHASE 2

GI-004 PHASING PLAN 1ST FLOOR - PHASE 2

GI-005 PHASING PLAN 1ST FLOOR - PHASE 2

LIFE SAFETY

FS100 LIFE SAFETY PLAN - BASEMENT/ 2ND PHASE 2

FS101 LIFE SAFETY PLAN - 1ST FLOOR PHASE 2

CIVIL

GS 1 TOPOGRAPHICAL SURVEY, GENERAL NOTES, UTILITY

CONTACTS

GS 2 DEMOLITION PLAN

GS 3 SITE LAYOUT AND PAVING PLAN

GS 4 GRADING PLAN

GS 5 UTILITY PLAN

GS 6 EROSION CONTROL PLAN

GS 7 EROSION CONTROL DETAILS

GS 8 DETAILS

ARCHITECTURE

AD-100 DEMO PLAN - BASEMENT/2ND FLR PHASE 2

AD-101 DEMOLITION PLAN - 1ST FLOOR PHASE 2

AS-100 FLOOR PLAN - BASEMENT/2ND FLOOR PH2

AS-101 FLOOR PLAN - 1ST FLOOR PHASE 2

AS-102 DIMENSION FLOOR PLAN - BASEMENT/ 2ND PHASE2

AS-103 DIMENSIONS PLAN - 1ST FLOOR PHASE 2

AS-104 ENLARGED PLANS PHASE 2

AS-201 ROOF PLAN PHASE 2

AS-302 EXTERIOR ELEVATIONS PHASE 2

AS-401 BUILDING SECTIONS PHASE 2

AS-501 WALL SECTIONS PHASE 2

AS-505 SECTION DETAILS PH2

AS-506 SECTION DETAILS PH2

AS-601 DOOR SCHEDULE AND DETAILS PHASE 2

AS-602 DOOR & WINDOW DETAILS PHASE 2

AS-700 REFLECTED CEILING - BASEMENT/ 2ND FLOOR PH2

AS-701 Rev. REFLECTED CEILING - 1ST FLOOR PHASE 2

AS-702 CEILING DETAILS PHASE 2

ARCHITECTURE INTERIORS

AI-101 FINISH & FURNITURE PLAN - 1ST FLOOR PHASE 2

AI-102 FINISH SCHEDULE PHASE 2

AI-201 EQUIPMENT PLAN FIRST FLOOR PHASE 2

AI-202 ENLARGED EQUIPMENT PLANS PHASE 2

AI-301 WALL PROTECTION & SIGNAGE PLAN PHASE 2

AI-401 INTERIOR ELEVATIONS PHASE 2

AI-402 INTERIOR ELEVATIONS PHASE 2

No. Description Date

PHASE 2

PROJECT

589A5-15-115-B dhickerson Image

2'

BASE AS

SCHEDULED

PAPER TOWEL

DISPENSER,

PROVIDED BY

VA GLOVE

DISPENSER,

PROVIDED

BY VA

SOAP

DISPENSER,

PROVIDED

BY VA

CG

BASE AS

SCHEDULED R

VS

4'

0"

BASE AS

SCHEDULED

PT-1E

AI-101

2'

PAPER TOWEL

DISPENSER,

PROVIDED BY

VA SOAP DISPENSER,

PROVIDED BY

VA

BASE AS

SCHEDULED

R

VS

-3

4'

0"

PT-4

R

VS

4'

0"

MOP SINK,

REF PLUMB

PT-1E

MOP HOOK,

REF SPECS

BASE AS

SCHEDULED

PAPER TOWEL

DISP, PROVIDED

BY VA

SOAP DISP,

PROVIDED

BY VA

HAND

SANITIZER,

PROVIDED

BY VA

2'

3" 5'

3"

6"

AI-101

BULLNOSE

TRIM, T-2

EPOXY

PAINT, PT-2E

WALL TILE,

T-1

EPOXY COVE

BASE, EPX-1

SCHLUTER

RONDEC TRIM

REF SPEC

6" 5'

3"

2'

3"

AI-101

BULLNOSE

TRIM, T-2

EPOXY

PAINT, PT-2E

WALL TILE,

T-1

EPOXY COVE

BASE, EPX-1

PAPER TOWEL

DISP., PROVIDED

BY VA

SOAP DISP.,

PROVIDED

BY VA

MIRROR, 24x36, REF. SPEC.

2'

AI-502

AI-101

TOILET PAPER

DISP., PROVIDED

BY VA

GRAB BARS,

REF SPEC

AI-101

6" BASE AS SCHEDULED

GYP BD SOFFIT

SS-2

GRAIN

DIRECTION OF

LAMINATION

AI-502

4' - 0" 4' - 0" 4' - 0" 1/4 "Tempered Glass Ref Spec

1/2" DeepAnoized Alum Channels

3'

6"

3' - 0" 2'- 9" +/-

Pass Through Verify Size of Opening

REVISED

EDIS EDIS

COMP COMP

GYP BD SOFFIT

SS-1

UCB, REF SPEC 5

AI-502

7'

2"

Pass Through Verify Size of Opening

REVISED

ADJ SHELVES,

REF SPEC

2'

SOAP DISPENSER,

PROVIDED BY

VA

PAPER TOWEL

DISPENSER,

PROVIDED BY VA

GYP BD SOFFIT

7'

2"

L-1

SS-2

UCB, REF SPEC

2'

AI-501

AI-501

2'

ADJ SHELVES,

REF SPECS

SS-2 SS-2

L-1

GYP BD

SOFFIT

PAPER TOWEL &

SOAP DISPENSER

PROVIDED BY VA

UCB, REF SPEC 1" 1' - 2" 2' - 6" 1"

2'

AI-501

LOCK ALL

DRAWERS

AI-501

AI-501

DOUBLE PXYS

MEDS

REFRIG

BLANKET

WARMER

R

VS

4'

0" 4"

2'

1'

9" 2'

5"

7'

0"

1 5/16"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2 1/8"

SS-2

L-1

L-1

SLOPED TOP1 5/16"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2 1/8"

AI-501

AI-501

1'

0" 2'

6"

COMP COMP

EDIS EDIS

1' - 4"1' - 4"

COLUMN

GYP BD SOFFIT

SS-2

BASE AS SCHEDULED

PENCIL DRAWERS

REF SPEC

1" UCB, REF SPEC4

AI-502 SIM

1' - 4"1' - 4" 1"

7'

0"

3' - 8"2' - 6 1/4"3' - 8"3' - 8"2'-7" +/- 1'-8" +/-

1/4" Tempered Glass Ref Spec

Pass Through Verify size of opening

1/2" Deep Anodized Channels Top and Bottom

REVISED

3'

6"

SS-2

EQUIPMENT BEYOND

6" BASE AS

SCHEDULED

COLUMN

GRAIN

DIRECTION OF

LAMINATION

METAL TRIM,

REF SPEC

AI-502

OPEN OPEN

SIM

3' - 4 7/8"2' - 5" 1' - 10 3/8"3' - 4 7/8"3' - 4 7/8"1' - 10 1/4"

REVISED

ASI-101

ASI-101

ASI-101

ASI-101

ASI-101 13

ASI-10110

ASI-101 3

ASI-101

ASI-101

ASI-101

ASI-101

CLEAN

B102

SOILED

B104

MENTAL

HEATH

INTERVENTION

AC119

SECLUSION

B105

BARIATRIC

TLT

B106

PHASE 3

FUTURE

BY VA

B144E

NURSE

STATION

B116

HAC

B102A

CORR

B1-03B

C100D

AC119

B105

B104

B103

B102

A128

B102A

B106

CORR

B1-03B

NURSE

STATION

B116

TRTMT 7

B103

Tempered Glass

Tempered Glass

REVISED

REVISED

Tempered Glass

Tempered Glass

ExpJt

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

1/4" = 1'-0"

5/6/2021 10:09:15 AM

ASI-101

1ST FLR PLAN / WALL

ELEVATIONS PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021

NORTH

DOOR SCHEDULE ASI

WT DOOR TYPE

DOOR SIZE HDW

R

SET

FIRE

RTNG

DOOR FRAME DETAILS

REMARKSWIDTH

HEIGH

T THICK TYPE MAT'L GLASS TYPE MAT'L

GLAS

S HEAD JAMB

THRESHOL

D

A128 DOUBLE WOOD DOORS W-VISION PANELS 7' - 0" 7' - 0" 1 3/4" 7.0 90 I WD RATED 4 HM - 5/AS-601 6/AS-601 - AUTO OPERATOR AC119 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 17.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B102 FLUSH WOOD SWING DOOR 3' - 0" 7' - 0" 1 3/4" 29.0 A WD - 1 HM - 1/AS-601 2/AS-601 -

B102A FLUSH WOOD SWING DOOR 3' - 0" 7' - 0" 1 3/4" 28.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B103 MANUAL ALUM. SLIDING DOOR 8' - 0" 7' - 8" 22.0 E ALUM. SAFETY - 7/AS-601 13/AS-602 B104 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 33.0 45 A WD - 1 HM - 1/AS-601 2/AS-601 - B105 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 17.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B106 FLUSH WOOD SWING DOOR 4' - 0" 7' - 0" 1 3/4" 33.0 45 A WD - 1 HM 1/AS-601 2/AS-601 -

C100D FLUSH WOOD SWING DOOR W-VISION PANEL 3' - 0" 7' - 0" 1 3/4" 33.0 90 B WD RATED 1 HM 1/AS-601 2/AS-601

1/4" = 1'-0"2 B1-03B CORR E

1/4" = 1'-0"3 B-103B CORR S 1/4" = 1'-0"4 B104 SOILED SW

1/4" = 1'-0"5 B103 TREATMENT #7

1/4" = 1'-0"6 B102A HAC EAST

1/4" = 1'-0"7 B106 BARIATRIC E

1/4" = 1'-0"8 B106 BARIATRIC S

1/4" = 1'-0"9 B106 BARIATRIC W

1/4" = 1'-0"10 B106 BARIATRIC N

1/4" = 1'-0"11 B116 NURSE A

1/4" = 1'-0"12 B116 NURSE B

1/4" = 1'-0"13 B116 NURSE C

1/4" = 1'-0"14 B116 NURSE D

1/4" = 1'-0"15 B116 NURSE E

1/4" = 1'-0"16 B116 NURSE F

1/4" = 1'-0"17 B116 NURSE G

1/4" = 1'-0"18 B116 NURSE H

No. Description Date

1/4" = 1'-0"1 FLOOR PLAN - 1ST FLOOR .1

OS

HAC

B102A

CLEAN

B102BARIATRIC

TLT

B106

SOILED

B104

SECLUSION

B105

MENTAL

HEATH

INTERVENTION

AC119

NURSE

STATION

B116

CORR

B1-03B

9' - 0"

9' - 0"

8' - 0"

8' - 0"

CC

8' - 0"

8' - 0"

8' - 0"

7' - 2"

7' - 2"

7' - 2"

7' - 2" 7' - 2"

7' - 2"

CORR

B1-03B

8' - 0"

8' - 0"

NURSE

STATION

B116

PT-4

PT-4

PT-4 PT-4

PT-4

CLEAN

B102

CORR

B1-03B

SOILED

B104

MENTAL

HEATH

INTERVENTION

AC119

SECLUSION

B105

BARIATRIC

TLT

B106

PHASE 3

FUTURE

BY VA

B144E

NURSE

STATION

B116

HAC

B102A

20054E20053E 20051N

20049E

20056N

20049E

20001E 20045E 20099E 20099E

20038N 20038N

20049E 20049E

20104E 20106E 20037E

20055E

20049E

20052E

20050N

20056E

20049E20051E

20057E

20049E20049E

20096E

20033E 20033E

20034E

20035E

20031E20031E

20091E 20026N

20071E

20025N

20095E

20097N

SOAP DISP

UTILITY SHELF

W/ MOP/BROOM

PAPER TOWEL

DISP

20115N

EYE WASH

MOP SINK

GLOVE

DISPENSER

HAND SANITIZER

20116N

PAPER TOWEL

DISPENSER

SOAP

DISPENSER

TOILET PAPER

DISPENSER

PAPER TOWEL

DISPENSER

SOAP

DISPENSER

PAPER TOWEL

DISPENSER

SOAP DISPENSER

GLOVE DISPENSER

PAPER TOWEL

DISPENSER

SOAP DISPENSER

SOAP

DISPENSER

PAPER TOWEL

DISPENSER

DOME MIRROR

20046E 20043E 20046E

20047E

DOME MIRROR

20000N

20000N

20051E 20051E

20051E20051E

TRTMT 7

B103

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

1/4" = 1'-0"

5/6/2021 10:09:18 AM

ASI-102

REVISED CLG PLAN /

EQUIP PLAN PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021

1/4" = 1'-0"1 ASI REF CLG

NORTH

1/4" = 1'-0"2 ENLARGED EQUIP PLAN

NORTH

EQUIPMENT SCHEDULE ASI

Item No. Description Qty.

Provided by

Installed by

REQUIREMENTS

Elec. Plumb. Data

20000N PATIENT BED/STRETCHER 2 VA VA

20001E CLEAN LIN CART 1 VA VA No No No 20025N WELLCH ALLEN OTOSCOPE 1 VA VA Y No No 20026N BLOOD PRESSURE CUFF 1 VA VA No No No 20031E SUPPLY CABINETS SINGLE 2 VA VA No No No 20033E SUPPLY CAB TRIPLE 2 VA VA No No No 20034E EMPTY OXYGEN 1 VA VA No No No 20035E FULL OXYGEN 1 VA VA No No No 20037E BLANKET WARMER 1 VA VA Yes No No 20038N ROLLING IV CART 2 VA VA Yes No No 20043E SCANNER CHARGER 1 VA VA No No No 20045E MOBILE EXAM LIGHT 1 VA VA Yes No No 20046E DUAL MONITOR COMPUTERS 2 VA VA Yes No Yes 20047E TELEMETRY MONITOR 1 VA VA Yes No Yes 20049E SINGLE COMPUTERS 13 VA VA Yes No Yes 20050E WHITEBOARD 1 VA VA Yes No Yes 20050N WHITEBOARD 1 VA VA Yes No Yes 20051E EDIS-ERSTATUS BOARD 6 VA VA Yes No Yes 20051N EDIS-ERSTATUS BOARD 3 VA VA Yes No Yes 20052E DISPATCH RADIO 1 VA VA Yes No No 20053E SECURITY MONITOR 2 VA VA No No No 20054E PRINTER 2 VA VA No No No 20055E PATIENT RESPIONDER PHONE 1 VA VA Yes No Yes 20056E TELEMETRY MONITOR 1 VA VA No No No 20056N TELEMETRY MONITOR 2 VA VA No No No 20057E PRINTER 1 VA VA Yes No Yes 20071E SINGLE COMPUTER 1 VA VA Yes No Yes 20091E VITALS MONITOR 1 VA VA Yes No Yes 20095E VITALS CART 1 VA VA No No No 20096E BIOHAZ TRASH 1 VA VA No No No 20097N OSCILLATING FAN 3 VA VA No No 20099E BACKBOARD 2 VA VA No No No 20104E DOUBLE PXYS 1 VA VA No No No 20106E MEDS REFRIG 1 VA VA Yes Yes Yes 20110N HORIZONTAL HEADWALL 1 C C Yes Yes Yes 20115N JANITOR CART 1 VA VA No No No 20116N BUCKET MOP 1 VA VA No No No

No. Description Date

ACCESSORIES SCHEDULE ASI

MARK QTY DESCRIPTION

PROVIDED

BY

INSTALLED

BY

A100 1 GRAB BAR CONTRACTOR CONTRACTOR

A101 1 MIRROR CONTRACTOR CONTRACTOR

A102 6 PAPER TOWEL DISPENSER VA CONTRACTOR

A103 7 HAND SOAP DISPENSER VA CONTRACTOR

A104 1 TOILET PAPER DISPENSER VA CONTRACTOR

A105 1 MOP RACK CONTRACTOR CONTRACTOR

A108 2 GLOVE BOX VA CONTRACTOR

A109 1 HAND SANITIZER DISPENSER VA CONTRACTOR

T T

T

T

T T

T

6'

1/

2"

PT-2

6'

6"

PT-2

PT-2

EXPANSION

JOINT COVER

EXPANSION

JOINT

COVER

MENTAL

HEATH

INTERVENTION

AC119

SECLUSION

B105

SOILED

B104

BARIATRIC

TLT

B106 CLEAN

B102

HAC

B102A

CORR

B1-03B

NURSE

STATION

B116

PT-2

PT-2

PT-2

PT-2

PT-2

EPX-1

LVT-1

LVT-2

SC

WSF-1

WSF-1

WSF-1

WSF-1

WSF-1

PHASE 3

FUTURE

BY VA

B144E6' - 3 1/4"

6' - 5 1/2"

TRTMT 7

B103

PT-4

PT-4

PT-4

PT-5

MODULAR

CASEWORK LEGEND

B

A

GENERAL NOTE: MODULAR CASEWORK KEY.

LETTERS BELOW RELATE TO SPECIFICATION

SECTION 12 34 00 - REFER TO THIS SPEC FOR

FURTHER DEFINITION.

C MODULAR MOBILE PEDS, REF. SPEC.

CLINICAL TRAUMA MANUFACTURED

PLASTIC CASEWORK- REF. SPEC. AND

SHEET AI-203

CLINICAL TREATMENT MANUFACTURED

PLASTIC CASEWORK- REF. SPEC. AND

SHEET AI-203

D ON CALL ROOM MODULAR PLASTIC

CASEWORK, REF SPEC.

NOTE: THIS PLAN DEPICTS FLOOR FINISH

MATERIALS IN AREAS OF SPECIAL SIGNIFICANCE

(IE. BORDER AREAS, PATTERNS, AND MATERIAL

CHANGES WITHIN A SINGLE ROOM OR SPACE).

REFER TO FINISH SCHEDULE AND COLOR

SCHEDULE KEY IN SPECIFICATIONS FOR THE

FLOORING MATERIAL AND COLOR SELECTION

OF EACH INDIVIDUAL ROOM NOT OTHERWISE

DESIGNATED ON THIS PLAN.

FLOOR FINISH LEGEND

LUXURY VINYL TILE (LVT-1) LVT-1

LUXURY VINYL TILE (LVT-2) LVT-2

FLOORING GRAIN

DIRECTION

FLOORING SEAM

WELDED SHEET FLR (WSF-1) WSF-1

EPOXY FLOORING (EPX-1) EPX-1

AG-2.4

HR-1 & BG-1

HR-1 &

BG-1

HR-1 & BG-1

RVS-2.4

CG-1.4

CG-1.4

RVS-2.4

RVS-2.4

CG-1.4CG-1.4

CG-1.4CG-1.4CG-1.4

RVS-3.6.6

RVS-3.6.6

RVS-1.4

RVS-3.4

CG-2.4

RVS-2.4

RVS-2.4

MENTAL

HEATH

INTERVENTION

AC119

SECLUSION

B105

PHASE 3

FUTURE

BY VA

B144E

SOILED

B104

CORR

B1-03B

NURSE

STATION

B116

BARIATRIC

TLT

B106 CLEAN

B102

HAC

B102A

CG-1.4

CG-3.4

CG-1.4

RVS-3.4

RVS-3.4

AG-3.4

CG-1.4

CG-1.4

CG-1.4

CG-1.4

CG-1.4

EG-1.4

EG-1.4 CG-1.4 CG-1.4 EG-1.4

EG-1.4

EG-1.4

RVS-3.4

RVS-3.4 RVS-3.4

CG-1.4

CG-1.4

RVS-3.4 RVS-3.4

CORR

B1-03B

CG-1.4

EG-1.4

EG-1.4 EG-1.4

CG-1.4

CG-1.4

EG-1.4

EG-1.4

TRTMT 7

B103

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated

5/7/2021 9:47:42 AM

ASI-103

FLOOR / WALL

PROTECTION PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021 No. Description Date

FINISH

CLARIFICATIONS

12-12-19

1/8" = 1'-0"1 FINISH FLOOR PLAN - 1ST FLOOR

ACCENT PAINT

PT-2

PT-3

PT-4

PT-5

PLAN NOTES

MATCH ADJACENT FINISH

CORNER TO CORNER.

MATCH DOOR FRAME PAINT

TO OTHER DOOR FRAMES

ACROSS THE CORRIDOR

PAINT ELEVATOR DOOR AND

FRAME WITH STD DOOR

PAINT, PT-7.

FINISH SCHEDULE ASI

RM #

ROOM

NAME FLOOR BASE

WALLS MILLWORK MILLWORK CEILING CEILING

COLOR NOTESN. E. S. W. VERT. HORIZ. TYPE

LEVEL 1

AC119 MENTAL HEATH

INTERVENTION

WSF-1 CSF-1 PT-2 PT-2 PT-4, RVS-3 PT-2 - - GYP PT-6E ASI

B1-03B CORR LVT-1, LVT-2 RB-1 PT-2 PT-2 PT-2 PT-2 - - SAT-1 ASI

B102 CLEAN WSF-1 CSF-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 - - SAT-3 ASI - REFER TO SPECS FOR MODULAR

FINISHES

B102A HAC SC RB-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 SAT-1 ASI

B103 TRTMT 7 WSF-1 RB-1 PT-2 PT-2 PT-2 PT-4, RVS-3 - - SAT-1 ASI

B104 SOILED WSF-1 CSF-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 - - GYP PT-6E ASI

B105 SECLUSION 2 WSF-1 CSF-1 PT-2 PT-2 PT-4, RVS-3 PT-2 - - GYP PT-6E ASI

B106 BARIATRIC TLT EPX-1 EPX-1 T-1, PT-2E T-1, PT-2E T-1, PT-2E T-1, PT-2E - - SAT-1 ASI B116 NURSE STATION LVT-2 RB-1 PT-2, RVS-3 PT-2, RVS-3 PT-2, RVS-3 PT-2 L-1 SS-2 GYP, SAT-1 ASI

1/8" = 1'-0"2

SIGNAGE & WALL PROTECTION PLAN - 1ST

FLOOR

SIGNAGE SCHEDULE ASI

SIGN # MOUNT SIGN TYPE

RM # ON

SIGN

ROOM

NUMBER COPY - SIDE A COPY - SIDE B

ARROW /

PICTOGRAM

Room:

Departmen t Level 132 GLASS D1A/F/W Yes AC119 MENTAL HEALTH

INTERVENTION

NONE NONE PHASE 2 LEVEL 1

133 GLASS D1A/F/W Yes B105 SECLUSION 2 NONE NONE PHASE 2 LEVEL 1 134 DOOR Q/W Yes B104 SOILED NONE YES PHASE 2 LEVEL 1 135 WALL D1A/F/W Yes B104 SOILED NONE NONE PHASE 2 LEVEL 1 136 WALL D1A/F/W Yes B103 TREATMENT #7 NONE NONE PHASE 2 LEVEL 1 137 WALL D1A/F/W Yes B102 CLEAN NONE NONE PHASE 2 LEVEL 1 138 DOOR Q/W Yes A125 RESTRICTED ENTRY NONE NONE PHASE 2 LEVEL 1 139 WALL D1A/F/W Yes B102A HAC NONE NONE PHASE 2 LEVEL 1 145 DOOR Q/W Yes A128 STAFF ONLY NONE YES PHASE 2 LEVEL 1 146 WALL D1A/F/W Yes B106 BARIATRIC TOILET NONE YES LEVEL 1

UP

TRAUMA 1

TRAUMA 2

TRTMT 5

TRTMT 6

BREAK

TRIAGE

CLEAN

TRTMT 1

TRTMT 2

FEMALE

TRTMT 3

WORK

ADMIT

ADMIT

HALL

CLOSET

DECON

CORR

CORR

ED ENTRY

OUTPATIENT

ENTRY

EXAM #39

NURSE MGR

ROOM

CHIEF ED

SOILED

MENTAL

HEATH

INTERVENTION

SECLUSION 2

JAN

BARIATRIC

TLT

WAITING

TLT

CONSULT/

BRVMNT

VA POLICE

2 TLT

ANTE

TRTMT 4

(ISO)

TLT

TLT

EXAM #40

ED WAITING

ROOM

33/1 6.6" 48"

218/5 8.8" 96"

218/5 8.8" 96"

MRI ZONE II

BLUE TEAM

CLINICAL

PHARMACIST

CLINICAL

PHARMACIST

CLINICAL

PHARMACIST

NUTRITION

CLINIC 1

NUTRITION

CLINIC 2

CLINICAL

PHARMACIST

SOUTH ELEV

LOBBY

SCANNER

CONTROL

ROOM

UTILITY

EXAM #12 EXAM #13

EXAM #14 EXAM #15 CHASE EXAM #18 EXAM #19

CORRIDOR

RED TEAM

EXAM #9

EXAM #10

ELEC

CLOSET

EXAM #11

RESTROOM

EXAM #6

EXAM #5

STORAGE

WORK ROOM

WORK ROOM

PHARMACY

EXAM #25

EXAM #23

EXAM #21

EXAM #20

RESTROOM

EXAM #1 EXAM #2

WORK ROOM

BLUE TEAM

CLINICS

STAIR 3

SUPPLY

CORRIDOR

WOMEN

MEN

DUMBWAITER

HOUSEKEEPING

ELEVATOR

LOBBY

STORAGE

STORAGE

NEW STAIR

CORRIDOR

CORRIDOR

CORR

FACP

FA

C

P

FA

A

P

ROOM

TLT

ELEC

TLT

CORRIDOR

DASHED LINE INDICATES

PERIMETER OF SECOND FLOOR

ABOVE AND SEPARATE

BUILDING (TYPE I (332)) - 2 HR

RATED FLOOR ASSEMBLY

CLINICAL

PHARMACIST

WORK ROOM

EXAMPATIENT

TOILETEQUIPEXAMEXAMSPECIALTY

EXAM CORRIDOR CORRIDOR

OCCUPANCY AMBULATORY HEALTH CARE

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 54

OCCUPANCY 2 : FIRST FLOOR = 7,013 SF

BUSINESS OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 218

OCCUPANCY 1 : FIRST FLOOR = 15,376 SF

25/1 6.6" 48"

218/5 8.8" 36"

218/5 8.8" 42"

FA

C

P

FUTURE

OCCUPANCY

SEPARATION

FEC

FEC

FEC

FEC

FE

C

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

3/32" = 1'-0"

5/6/2021 10:09:26 AM

ASI-104

LIFE SAFETY PLAN - 1ST

FLOOR PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021 No. Description Date

3/32" = 1'-0"1 LIFE SAFETY PLAN - 1st FLOOR

CL

CL

CL

CLC L

" A

.F .F

AL

L

C H

AR

AC

TE

R

S

ACCESSIBLE TOILET STALLS

STANDARD STALL

HANDRAILS

STANDARD END OF WALL STALL

DIRECTIONAL

PARKING STALL

PLAN VIEW

ELEVATION A ELEVATION B

PLAN: ROLL-IN TYPE ELEVATION: ROLL-IN

PARKING SPACES

H.C. LAVATORYH.C. URINAL

H.C. FLOOR MTD. TOILET H.C. WALL MTD. TOILET

FRONT APPROACHSIDE APPROACH

LAV FLOOR SPACE

PARKING

RESERVEDHANDICAP

ENTRANCE

ACCESSIBLE

SINGLE TOILET

OUTDOOR SIGNAGE

ACCESSIBLE SHOWER

PARKING SYMBOL

MENRESTROOM

GENERAL ROOM

IDENTIFICATION RESTROOM RESTROOM

DRINKING FOUNTAINS

INTERIOR SIGNAGE

BATHROOM FIXTURES & ACCESSORIES

VICE

PRINCIPAL

OFFICE

GENERAL REACH DIMENSIONS

LAVATORY DIMENSIONS

MOUNTING HEIGHT DIMENSIONS

NEW CONSTRUCTION

1 1/2 " CLEAR

" m in

" m in

52" min.

12" max

"-1

8"

32" min4" max

" m in 66" min.

42" min latch approach 48" min other approaches

4" m ax

6" m ax

Alternate door location

42" min 12" max

"-1

8"

" m in

6" m ax

36" min

56" min for wall mounted W.C.

59" min for flr mounted W.C.

NEW CONSTRUCTION

16"-18" Lavatory

60" min

12 "

2" 2"

1" 2"

1" 6"4"

4" 2"

1' -6

5'

-0 " A

BO

VE

T.

O

. C U

R B

3"3"

2" x 2" x 1/4 " STL

POST PAINTED & SET

IN 12" DIA x 3'-0"

CONC FILLED POST HOLE

12 "

2" 2"

1" 2"

1" 6"4"

4"

1' -6

3"3"

3' -0

" T O

'-0

AB

O

VE

G R

AD

E

SIGN TO BE MOUNTED IN THE

MOST VISIBLE & CONVENANT

LOCATION

1.25"-2" DIA.

IF

CIRCULAR

NO SCALE

NO SCALE

NO SCALE

2" x 2" x 1/4 " STL

POST PAINTED & SET

IN 12" DIA x 3'-0"

CONC FILLED POST HOLE

TO

C

O N

TR

O

LS

18"

1'-6"

2'-9"

TO

C

O N

TR

O

LS

" T

O

8" M

AX

FLEXIBLE SHOWER

HEAD EXTENSION

SHOWER UNIT W/

ACCESSIBLE CONTROLS

" T

O

8"

GRAB BAR

4'-0"

" m ax

16" max

23"max

Fu ll de pt h of

St al l o r 4

8"

48" min

" m in

CLEAR FLOOR SPACE

1/2" max TRANSITION

NO SCALE

GRAB BAR

ELEV A

SEAT

SEAT

60" min

" m in

" m in

CLEAR FLOOR SPACE

27" max

GRAB BAR

1/2 " MAX TRANSITION

"-3

6"

"-3

6"

" T

O

8"

"-3

6"

16"-27"

TO

C

O N

TR

O

LS

GRAB BAR

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

SHOWER UNIT W/

ACCESSIBLE CONTROLS

& FLEX SHOWER HEAD

FOLDING SEAT

(OPTIONAL)

FOLDING SEAT

(0PTIONAL)

8'-0" MIN. 8'-0" MIN5'-0" CAR

UNIVERSAL PARKING SPACE DESIGN

NO SCALE

NO SCALE

Symbol to be White (Typ.)

3" 13"

6" 18"R.

26"

(Typ.)

6"

30"

6"

18"

Dia.

15"

2'-0" 5'-2"

'-0

" t o

Fa ce o f C ur b

3' -9

6' -9

(OR REFER TO SITE PLAN FOR DIMENSIONED

ACCESSIBLE PARKING)

16"-18"

17" MIN.

19" MAX.

48" MIN.

" M

IN

NOT TO EXCEED

FOUNTAIN DEPTH

30" MIN.

" M

IN

36" min

" m ax

-1

9"

7-9"

Sanitary napkin disposal

Toilet paper dispenser

24"-42"6" max

12" max

-1 9"

7"-9"

12" max

24"-42"

42" min

Toilet paper dispenser

Sanitary napkin disposal

-3

6" 36" min 6" max

" m ax

" m in

" m in

1'-7" min

8" min6" max

9"

Clearance profile Insulate drain & supply lines 40

" m ax

Mirror

Paper towel dispenser

"Soap dispenser 30 " m in

19" max

48" min

17" min

12" min

16"-18"

54" min 42" min

1/

5/

1/

1/32 " HIGH RAISED

CHARACTERS, TYP.

5/

1/

BRAILLE CHARACTERS, TYP

RAISED BORDER, TYPROOM NUMBER 1/32" HIGH RAISED

INTERN'L SYMBOLS, TYP

6"

1/2 " R TYP

NOTE: MOUNT ACRYLIC SIGNS W/ DOUBLE SIDED FOAM TAPE

ACRYLIC SIGNS 2 CONTRASTING FIN COLORS

TO BUBBLER

3' -6

9" M

IN

" M

AX

HIGH

FOUNTAIN

LOW

FOUNTAIN

17-19"

6" MAX

8" MIN

" M

IN

" M

AX

8" M

IN

LO

W

F O

U N

TA

IN

NO SCALE

NO SCALE

NO SCALE

" m ax

13 1/2"min

"m ax

TO FLUSH CONTROL

HANDICAP BAR

SOAP DISPENSER

MIRROR URINAL

TELEPHONE

CLOCK

LIGHT SWITCH

-1

9" 42

" M

AX

" M

AX

7' -8

"60

" M

AX

" M

AX

" M

AX

1'-2"

(TO HIGHEST

OPERABLE PART)

17" MIN

" M

IN

" M

IN

" M

AX

" M

AX

9" M

IN

6" MAX

17" MIN

" M

IN

" M

AX

" M

AX

9" M

IN

6" MAX

8" MIN

TOILET PAPER

DISPENSER

SANITARY NAPKIN

DISPOSAL

PAPER TOWEL

DISPENSER

OCCUPANCY SIGN

LATCH SIDE PERFERED

TOILET SEAT HT

THERMOSTAT

OR OTHER

CONTROL

" M

IN

" M

AX

48"

" M

IN

Z 48"

Y

X 30" 24"

" M

AX

30"

10" MAX

21" MAX

" M

IN

" M

AX

36" MIN

" M

IN

" M

AX

NOTE: X SHALL BE < 25";

Z SHALL BE > X, WHEN X < 20",

THEN Y SHALL BE 48" MAX

WHEN X IS 20"-25",

THEN Y SHALL BE 44" MAX.

INSULATE

EXPOSED PIPES

NO SCALE

NO SCALE

NO SCALE

" M

AX

COUNTER

OR

LAVATORY

-1

9"

8'-0" VAN

" m in

GRAB BARS

1 1/2 " CLEAR

1.25"-2" DIA.

IF

CIRCULAR

IF NON-

CIRCULAR

PERIMETER

MUST BE 4"-6.25"

AND DIAMETER

MUST NOT

EXCEED 2.25"

IF NON-

CIRCULAR

PERIMETER

MUST BE 4"-6.25"

AND DIAMETER

MUST NOT

EXCEED 2.25"

1/

2" m in

" m in

18" min. grab bar per

ANSI A117.1-2009 39"-41"

1/ 4"

1/

2"

BEVELED FLOORING TRANSITIONS

1/ 4" m ax

1/ 2" m ax

CARPET ON FLOOR SURFACES

1/ 4" m ax

BEVELED FLOORING TRANSITIONS

ACCESSIBLE

VAN

18" min. grab bar per

ANSI A117.1-2009

EL

EV

B

PLAN: TRANSFER TYPE

CONCRETE

WHEEL STOP

4" WIDE PAINT

STRIPING,

TYP.

4' o.c.

TOP AND SIDES

MUST BE

UNOBSTRUCTED.

UP TO 20% OF

BOTTOM MAY BE

OBSTRUCTED

FOR SUPPORTS.

CARPET CUSHION/ PADDING NOT PERMITTED

MOUNTING HEIGHTS

5' -6

MEDICAL GAS

ZONE VALVE

NURSE CALL -

PATIENT TOILET

5' -6

4"

CORD

ROBE HOOK

6' -0

5' -0

CALL STATION/

FLUSH-MOUNTED

STATION

8"

RETURN AIR

REGISTER

5' -2

5' -2

O

R

FILM

ILLUMINATOR

5' -2

RECEPTACLE

& GROUND

5' -2

GROUND

FAULT

INDICATOR

5' -2

REMOTE

GROUND

INDICATOR

5' -2

VARIABLE

INTENSITY O.R.

LIGHT CONTROL

5' -0

NITROGEN

SHUT-OFF

VALVE

5' -2

O.R. RECEPTACLE

CODE BLUE

5' -2

SWITCH

NEED TO VERIFY ALL

FIXTURE TYPE & SIZES

WITH MANUFACTURER

3' -6

ELEVATOR

CALL BUTTON

O.R.

6' -0

ELEVATOR

HALL LANTERN

5' -0

" RAISED

CHARACTER

FLOOR

DESIGNATION

5' -0

2' -1

1"

ELEVATOR

CONTROL

PHONE

ELEVATOR MEDICAL EQUIPMENT

NO SCALE

WHEELCHAIR MANEUVERING

TURNING CLEAR

2' - 6"

4'

0"

5' - 0"

5'

0"

1' - 0" 3' - 0"

1' - 0"

2'

0" 3'

0"

T-SHAPED

5' - 0"

MANEUVERING CLEARANCES AT DOORS

LATCH SIDE APPROACHLATCH SIDE APPROACH

HINGE SIDE APPROACH

HINGE SIDE APPROACH

FRONT APPROACHFRONT APPROACH

Y

" M

IN

.X

24" MIN. X

Y

Y

" M

IN

X

24" MIN.

X

" M

IN

" M

IN

18" MIN.

24" PREF.

54" MIN.

Y

" M

IN

NOET: Y=48" MIN. IF DOOR

HAD BOTH A LATCH AND

CLOSER

PATIENT BEDROOM MIN. DOOR WIDTH: 3'-10"

NOTE: X=12" IF

DOOR HAS BOTH A

CLOSER AND LATCH

NOTE: X=36" MIN. IF Y=60",

X=42" MIN. IF Y=54"

NOTE: Y=48" MIN. IF

DOOR HAS CLOSER

NOTE: Y=54" MIN. IF

DOOR HAS CLOSER

PULL SIDE

PUSH SIDE

PULL SIDE PUSH SIDEPUSH SIDE

90 TURNS 180 TURN

60"

X < 48"

60"

48" 48"

60"

X < 48"

GENERAL NOTES

ALL CONSTRUCTION & RENOVATION SHALL MEET THE UNIFORM FEDERAL ACCESSIBILITY

STANDARDS (UFAS), ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS & FACILITIES (ADAAG), &

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).

SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF

THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE BARRIER FREE

DESIGN GUIDE: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY

STANDARDS (PG-18-13).

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated

5/6/2021 9:56:14 AM

GI-002

ACCESSIBILITY PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021 No. Description Date

STORAGE

C148

STAIRS

C149

ROOM

B1C

PHASING NOTES & LEGEND

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO

DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD

OFFICE WILL BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH

ROUTE OUT OF THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED

TRAUMA 1 IN PHASE 2A .

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated

5/6/2021 9:56:17 AM

GI-003

PHASING PLAN -

BASEMENT/2ND PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021

1/8" = 1'-0"A PHASING PLAN - BASEMENT

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date

MRI ZONE

II

C146

BLUE

TEAM

B145

CLINICAL

PHARMACIST

B147

CLINICAL

PHARMACIST

B148

CLINICAL

PHARMACIST

B149

NUTRITION

CLINIC 1

A135

NUTRITION

CLINIC 2

A136

CLINICAL

PHARMACIST

A137

SOUTH

ELEV

LOBBY

A141

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

CORRIDOR

C144

CORRIDOR

C144

WORK

ROOM

B143

WORK

ROOM

B142

EXAM #18

B141

EXAM #17

B140

EXAM #4

B125

EXAM #3

B124

EXAM #2

B123

EXAM #1

B119

CORRIDOR

B1-02

STAIR 3

B117A

CORRIDOR

B1-02

MEN

B101

DUMBWAITER

A134

WOMEN

A113

HOUSEKEEPING

A138

ELEVATOR

LOBBY

A140

STORAGE

A129A

STORAGE

A129

EXAM #21

AC121

EXAM #23

AC123

EXAM #25

AC125PHARMACY

AC124

WORK

ROOM

AC122A

WORK

ROOM

AC122

EXAM #5

AC105

EXAM #6

AC106

EXAM #9

AC109

RED TEAM

AC108EXAM #10

AC110

EXAM #11

AC111

ELEC

CLOSET

AC116E

1 HR RATED CONSTRUCTION

BARRIER - REF SPECS

NOTE: BARRIERS ON EITHER

SIDE OF CORRIDOR SHALL

NOT

EXIST CONCURRENTLY.

PHASE 1

NOT IN SCOPE

OF WORK

1 HR RATED

CONSTRUCTION BARRIER

DURING PHASE 2

ROOM

B144D

ROOM

B144C

ROOM

B144

EXAM #40

AC140

EXAM #39

AC139

NOT IN

SCOPE OF

WORK

1 HR RATED

CONSTRUCTION BARRIER

DURING PHASE 2

PHASE 2 A TRAUMA 1-

B113 TO REMAIN OPEN

PHASE 1

PHASE 2

PHASE 2

PHASING NOTES & LEGEND

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO

DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD

OFFICE WILL BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH

ROUTE OUT OF THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED

TRAUMA 1 IN PHASE 2A .

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated

5/6/2021 9:56:28 AM

GI-004

PHASING PLAN 1ST

FLOOR - PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021

1/8" = 1'-0"A PHASING PLAN - 1ST FLOOR - PHASE 2

4' 8' 16'

1/8" = 1'-0"

0'

NORTH

No. Description Date

MRI ZONE

II

C146

BLUE

TEAM

B145

CLINICAL

PHARMACIST

B147

CLINICAL

PHARMACIST

B148

CLINICAL

PHARMACIST

B149

NUTRITION

CLINIC 1

A135

NUTRITION

CLINIC 2

A136

CLINICAL

PHARMACIST

A137

SOUTH

ELEV

LOBBY

A141

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

CORRIDOR

C144

CORRIDOR

C144

WORK

ROOM

B143

WORK

ROOM

B142

EXAM #18

B141

EXAM #17

B140

EXAM #4

B125

EXAM #3

B124

EXAM #2

B123

EXAM #1

B119

CORRIDOR

B1-02

STAIR 3

B117A

CORRIDOR

B1-02

MEN

B101

DUMBWAITER

A134

WOMEN

A113

HOUSEKEEPING

A138

ELEVATOR

LOBBY

A140

STORAGE

A129A

STORAGE

A129

EXAM #21

AC121

EXAM #23

AC123

EXAM #25

AC125PHARMACY

AC124

WORK

ROOM

AC122A

WORK

ROOM

AC122

EXAM #5

AC105

EXAM #6

AC106

EXAM #9

AC109

RED TEAM

AC108EXAM #10

AC110

EXAM #11

AC111

ELEC

CLOSET

AC116E

1 HR RATED CONSTRUCTION

BARRIER DURING PHASE 2

CORRIDOR

C144

ED

WAITING

AC101

ADMIT

AC101B

ADMIT

AC101C

WORK

AC132

NURSE

MGR

AC133

WAITING

AC137

TLT

AC135A

TRTMT 3

AC135

TRTMT 2

FEMALE

AC134

HALL

AC131

TRTMT 1

AC129TRIAGE

AC128CONSULT/

BRVMNT

AC101D

NEW

STAIR

AC103

ED ENTRY

AC100

OUTPATIENT

ENTRY

C100

VA

POLICE

AC101A TLT

C130

JAN

AC127B

TRAUMA 1

B113

BREAK

AC136

TLT

AC136A

EXAM #40

AC140

EXAM #39

AC139

CLOSET

B144B

ROOM

B144C

ROOM

B144D

SECLUSION

B105

MENTAL

HEATH

INTERVENTION

AC119

TLT

AC134A

NOT IN SCOPE

OF WORK

NEW TRAUMA 1 ROOM

REMAN OPEN IN PHASE 2

REMODEL PHASE 2A

CORR

B1-03B

ELEVATOR

S1

TEMP. TRIAGE

DURING THIS PHASE

ROOM

B144

CORRIDOR

B1-03B

CORRIDOR

B1-03

ELEC

AC127A

TLT

B1-03D

1 HR RATED

CONSTRUCTION

BARRIER DURING PH 2

NOT IN SCOPE OF WORK

PHASE 2

PHASING NOTES & LEGEND

PHASE 2:

GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO

DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.

2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD

OFFICE WILL BE TEMPORARY TRIAGE.

3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.

4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.

5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH

ROUTE OUT OF THE UNIT.

6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.

7. CONSTRUCT DECON ROOM ADDITION

8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED

TRAUMA 1 IN PHASE 2A .

G

F

D

CBA

E

N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

D ep ar tm en t o f Ve te ra ns A ffa irs

Dwg. Of

BLDG. 1

ARCHITECTS/ENGINEERS: VA EASTERN KANSAS

HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical

Center Leavenworth Colmery-O'Neil VA Medical Center

Topeka

Building Key Plan: A/E Seal

C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt

As indicated

5/6/2021 9:56:42 AM

GI-005

PHASING PLAN 1ST

FLOOR - PHASE 2

#589A5-15-115-B

UPGRADE

EMERGENCY

DEPARTMENT

TOPEKA, KS

5/7/2021

1/8" = 1'-0"1 PHASING PLAN - 1ST FLOOR - PHASE 2

NORTH

4' 8' 16'

1/8" = 1'-0"

0'

No. Description Date

STORAGE

STAIRS

STORAGE

STORAGE

ELEC./ IT

STORAGE

ROOM

IT CLOSET

FEC

VACANT

EX

IT

12/1 2.4" 48"

GROUP S OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 12

OCCUPANCY 1 : BASEMENT = 5,628 SF

STAIRS

CORR.

DENTAL

SURGERY

DECON

ROOM

DENTAL

OFFICE

DENTAL

OFFICE

X-RAY ROOM

ISOLATION

PATIENT

EXAM

LAB

SUPPLIES

DENTAL

ADMINISTRATION

OFFICE

DENTAL

RECEPTION

CORRIDOR

DENTAL

TREATMENT

SUITE

DENTAL

TREATMENT

ROOM

AUTHORIZED

PERSONNEL

ONLY

SUPPLY

ROOM

BREAK

ROOM

FEC

VACANT

HORIZONTAL EXIT

EXTERIOR WALL

RATED 1 HR FOR

10'-0"

EXTERIOR WALL

RATED 1 HR FOR 10'-0"

44/2 4.4" 48"

BUSINESS OCCUPANCY

TYPE I (332) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 42

OCCUPANCY 1 : SECOND FLOOR = 4,461 SF

CORRIDOR

BUSINESS OCCUPANCY

TYPE II (000) CONSTRUCTION

FULLY SPRINKLERED = YES

TOTAL OCCUPANTS : 0

OCCUPANCY 2 : SECOND FLOOR = 668 SF

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 2015

(NEW HC)

NFPA 2015

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

1 HR 60 MIN NFPA 8.2.3.2.3.1

(1)

IBC 706.7

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 19.3.1.1

NFPA 8.2.5.4

NFPA 18.3.1.1

NFPA 8.2.5.4

NFPA 8.2.3.2.3.1

IBC 715.4/714.2

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1020.12

IBC 715.5.3

IBC 716.5.21 HR

2 HR

60 MIN

90 MIN

HR

2 HR

EXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

NFPA 8.2.3.2.3.1 IBC

715.4/714.2

NFPA 18.2.2.7

NFPA 7.2.6

NOT

ALLOWED

NFPA 1005.3.4.1

NFPA 1021.5

NFPA 19.2.2.7

NFPA 7.2.6

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN

NFPA 8.2.3.2.3.1 (2)

IBC 706.7

IBC 715.4

NFPA

18.3.2.1

NFPA 8.4.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.4.1.1

IBC 715.3.1

IBC 716.3.1

IBC 715.5.2

IBC 716.5.2

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

IBC 710.5.3

IBC 715.4.7.3

IBC 508.2.2.1

NFPA 8.4.1.2 SEE

NOTE B

NFPA 8.4.1.2

SUBDIVIDING SPACES

SMOKE BARRIER

20 MIN NFPA 8.3.4.2 (1)

IBC 709.5

NFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 8.3.5.1

IBC 709.8

IBC 716.5.5

SEE NOTE [C]

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NFPA 18.2.5 IBC 710.5.3

IBC 715.4.7.3

SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

10/1 2" 34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

PROPERTY LINE

FEC

FACP

FSA

FAAP

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3) (IBC 710.7)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED

TO A SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

90 MIN NFPA 8.2.3.2.3.1

(1)

IBC 706.7

FIRE

90 MIN

NFPA 6.1.14

NFPA 8.2.3.1.2

NFPA 8.2.3.2.4.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 6.1.14

NFPA 8.2.3.1.2

2 HR

RATED UL

ASSEMBLES

UL U412

UL U419

UL U412

UL U419

UL U412

UL U419

UL U415(B)

UL U412

UL U419

UL U412

UL U419

UL U415(A)

HORIZONTAL BUILDING SEPARATION:

FIRE BARRIER

2 HR NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

UL U412

UL U419

CODE INFORMATION

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION

2. REASON FOR SUBMITTAL: NEW CONSTRUCTION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

2015 LIFE SAFETY CODE (NFPA-101)

2014 NATIONAL ELECTRICAL CODE (NFPA-70)

CURRENT ABA ACCESSIBILITY STANDARDS

2014 INTERNATIONAL BUILDING CODE (IBC)

2014 INTERNATIONAL MECHANICAL CODE (IMC)

2014 INTERNATIONAL PLUMBING CODE (IPC)

4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN

5. OWNER:

COLMERY - O'NEIL VA MEDICAL CENTER

2200 SW GAGE BLVD.

TOPEKA, KS 66622

PH (785) 350-3111

7. DESIGN TEAM:

ARCHITECT:

HEALTH FACILITIES GROUP, LLC

142 N. MOSLEY ST., SUITE 300

WICHITA, KS 67202 316-262-2500

CONTACT: BEN HARVEY

DESIGN CONSULTANTS:

STRUCTURAL:

KH ENGINEERING GROUP, P.A.

15377 W. 95TH ST.

LENEXA, KS 66219 913-825-9381

CONTACT:

KATHY HAGEN

KHAGEN@KHEGROUP.COM

CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:

PROFESSIONAL ENGINEERING CONSULTANTS

303 S. TOPEKA

WICHITA, KS 67202 316-262-2691

CONTACT:

DARIN CROWDER

DARIN.CROWDER@PEC1.COM

8. ARCHITECTS SEAL: SEE STAMP AT BELOW

9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT

10. INSPECTION: VISN SAFETY OFFICER

11. OCCUPANCY GROUP TYPE:

OCCUPANCY 1 - BUSINESS

OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE

12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)

13. STRUCTURAL CODE REQUIREMENTS

A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:

TOTAL ALLOWABLE FLOOR AREA:

TYPE I (332) = UNLIMITED

TYPE II (000) = 23,000

NEW FLOOR AREA ADDED W/ THIS PROJECT:

OCCUPANCY 1 - BUSINESS

FIRST FLOOR = 15,261 SF

SECOND FLOOR = 659 SF

OCCUPANY 2 - NEW AMBULATORY…