This document contains a request for proposal for an upgrade to an emergency department at a Veterans Administration medical center. The solicitation requests proposals to upgrade the emergency department at the Colmery-O'Neil Veterans Administration Medical Center in Topeka, Kansas. Proposals are due by January 26, 2022 and are to be submitted through the vendor portal and in binders with a CD to the NCO 15 Contracting Office by that date. The work will be exempt from state sales tax and a project exemption certificate will be issued upon contract award. The site code for this project is 236220 and the size standard is $39.5 million. A mandatory site visit will be held on January 26, 2022 at 10:00 AM CST at the medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the agency issuing this solicitation.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
EXISTING ELEVATION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
EXISTING ELEVATION
PROPERTY LINE
/1 A101
/1 A101 MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
A3.1
BUILDING ELEVATION
A6.1 INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM
NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
ME100E EQUIPMENT NUMBER
? SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
-- PRECAST CONCRETE
WALL PANEL TAG
XXX
A101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES
X
X.X
X
X.X
PROJECT
LOCATION
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK - REF. ELEVATIONS
CONCRETE
EARTH
EXISTING
CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG
CLR
CMU
COL
CLO
clear/clearance column closet
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet
FE
FEC
FDN
FD
east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
insulation interior inside diameter
INSUL
IN(")
INT
ID
inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
height
GB
GL
GRD
GYP
GC
HDWD
HB
grade
PART
PLAS
OVHD
partition plaster overhead
SRT
SS
SQ
miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
on center overall nominal not to scale office opening
MISC
N
MO
MULL
MTL
NIC
NA
north mullion metal
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
architect/ architectural
AB anchor bolt
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum
A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
conference concrete
CONF
CONC
finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic
FV
FT(')
FURR
FURN
FTG
G
GA
foot furring gas gauge
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
floor finish grade finish floor
FG
FF
joistJST low volume change masonryMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
manufacturer material mechanical membrane maximum minimum manhole mirror
LDR
LF
LAV
LAM
LVC
LOCN
lineal feet ladder lavatory laminate location
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN janitor joint
PL
under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications
YD
suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W W/ W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out
RT
SICU
central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room
FOR MEDICAL
emergency room computed tomography
FACILITIES ONLY
STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B T
SUSP
STRUCT
TEL
TB
T&G plate/plastic/ property line STL
STD
storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
steel standard
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
Building Key Plan:
BLDG. 1
A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated GI-001
COVER SHEET PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
UPGRADE EMERGENCY DEPARTMENT
COLMERY-O'NEIL VA MEDICAL
CENTER
TOPEKA, KS
5/7/2021
CONSTRUCTION DOCUMENTS
SHEET INDEX
EP602 ELECTRICAL SCHEDULES
EY101 ELECTRICAL SYSTEMS PLAN - 1ST FLOOR
EY501 ELECTRICAL SYSTEMS DETAILS
T101 ELECTRICAL TELECOM PLAN - 1ST FLOOR
T501 ELECTRICAL TELECOM DETAILS
SHEET INDEX
AI-403 INTERIOR HEADWALL ELEVATIONS PHASE 2
AI-501 MILLWORK SECTION DETAILS PH2
AI-502 MILLWORK SECTION DETAILS PHASE 2
STRUCTURAL
S-001 GENERAL NOTES
S-002 TYPICAL DETAILS
S-003 TYPICAL DETAILS
S-004 TYPICAL DETAILS
S-100 LEVEL ONE FRAMING AND FOUNDATION PLAN
S-500 SECTIONS AND DETAILS
S-501 SECTIONS AND DETAILS
S-502 SECTIONS AND DETAILS
S-503 SECTIONS AND DETAILS
MECHANICAL
FP101 FIRE PROTECTION PLAN - FIRST FLOOR
MM001 MECHANICAL COVER SHEET
MM002 MECHANICAL COVER SHEET
MD101 HVAC BASEMENT DEMOLITION PLAN
MD111 HVAC FIRST FLOOR DEMOLITION PLAN
MD112 HYDRONICS DEMOLITION PLAN - FIRST FLOOR
MH100 HVAC BASEMENT PLAN
MH111 HVAC FIRST FLOOR SA AND EA PLAN
MH112 HVAC FIRST FLOOR MED. VEL SA AND RA PLAN
MH121 HVAC SECOND FLOOR PLAN
MP101 HYDRONICS FIRST FLOOR PLAN
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M511 MECHANICAL CONTROL DETAILS
M512 MECHANICAL CONTROL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M603 MECHANICAL SCHEDULES
M701 HVAC ROOM AIRFLOW PLAN
PLUMBING
PP001 PLUMBING COVER SHEET
PD100 PLUMBING DEMOLITION PLAN -BASEMENT FLOOR
PD111 MEDICAL GAS DEMO PLAN - FIRST FLOOR
PL110 MED GAS PLAN - BASEMENT
PL111 MED GAS PLAN - FIRST FLOOR
PL501 PLUMBING SCHEDULES
ELECTRICAL
E001 ELECTRICAL INFORMATION
ED101 ELECTRICAL DEMO PLANS - BSMT & 1ST
ED102 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR
EL101 ELECTRICAL LIGHTING PLAN - 1ST FLOOR
EL501 ELECTRICAL LIGHTING DETAILS
EP000 ELECTRICAL OVERALL PLAN - BASEMENT
EP001 ELECTRICAL OVERALL PLAN - 1ST FLOOR
EP101 ELECTRICAL POWER PLAN - 1ST FLOOR
EP102 ELECTRICAL POWER PLAN - ROOF
EP501 ELECTRICAL POWER DETAILS
EP601 ELECTRICAL ONE-LINE DIAGRAM
SHEET INDEX
PD110 MED-GAS DEMO PLAN BASEMENT FLOOR
ARCHITECTURE
ASI-101 1ST FLR PLAN / WALL ELEVATIONS PHASE 2
ASI-102 REVISED CLG PLAN / EQUIP PLAN PHASE 2
ASI-103 FLOOR / WALL PROTECTION PHASE 2
ASI-104 LIFE SAFETY PLAN - 1ST FLOOR PHASE 2
GENERAL
GI-001 COVER SHEET PHASE 2
GI-002 ACCESSIBILITY PHASE 2
GI-003 PHASING PLAN - BASEMENT/2ND PHASE 2
GI-004 PHASING PLAN 1ST FLOOR - PHASE 2
GI-005 PHASING PLAN 1ST FLOOR - PHASE 2
LIFE SAFETY
FS100 LIFE SAFETY PLAN - BASEMENT/ 2ND PHASE 2
FS101 LIFE SAFETY PLAN - 1ST FLOOR PHASE 2
CIVIL
GS 1 TOPOGRAPHICAL SURVEY, GENERAL NOTES, UTILITY
CONTACTS
GS 2 DEMOLITION PLAN
GS 3 SITE LAYOUT AND PAVING PLAN
GS 4 GRADING PLAN
GS 5 UTILITY PLAN
GS 6 EROSION CONTROL PLAN
GS 7 EROSION CONTROL DETAILS
GS 8 DETAILS
ARCHITECTURE
AD-100 DEMO PLAN - BASEMENT/2ND FLR PHASE 2
AD-101 DEMOLITION PLAN - 1ST FLOOR PHASE 2
AS-100 FLOOR PLAN - BASEMENT/2ND FLOOR PH2
AS-101 FLOOR PLAN - 1ST FLOOR PHASE 2
AS-102 DIMENSION FLOOR PLAN - BASEMENT/ 2ND PHASE2
AS-103 DIMENSIONS PLAN - 1ST FLOOR PHASE 2
AS-104 ENLARGED PLANS PHASE 2
AS-201 ROOF PLAN PHASE 2
AS-302 EXTERIOR ELEVATIONS PHASE 2
AS-401 BUILDING SECTIONS PHASE 2
AS-501 WALL SECTIONS PHASE 2
AS-505 SECTION DETAILS PH2
AS-506 SECTION DETAILS PH2
AS-601 DOOR SCHEDULE AND DETAILS PHASE 2
AS-602 DOOR & WINDOW DETAILS PHASE 2
AS-700 REFLECTED CEILING - BASEMENT/ 2ND FLOOR PH2
AS-701 Rev. REFLECTED CEILING - 1ST FLOOR PHASE 2
AS-702 CEILING DETAILS PHASE 2
ARCHITECTURE INTERIORS
AI-101 FINISH & FURNITURE PLAN - 1ST FLOOR PHASE 2
AI-102 FINISH SCHEDULE PHASE 2
AI-201 EQUIPMENT PLAN FIRST FLOOR PHASE 2
AI-202 ENLARGED EQUIPMENT PLANS PHASE 2
AI-301 WALL PROTECTION & SIGNAGE PLAN PHASE 2
AI-401 INTERIOR ELEVATIONS PHASE 2
AI-402 INTERIOR ELEVATIONS PHASE 2
No. Description Date
PHASE 2
PROJECT
589A5-15-115-B dhickerson Image
2'
BASE AS
SCHEDULED
PAPER TOWEL
DISPENSER,
PROVIDED BY
VA GLOVE
DISPENSER,
PROVIDED
BY VA
SOAP
DISPENSER,
PROVIDED
BY VA
CG
BASE AS
SCHEDULED R
VS
4'
0"
BASE AS
SCHEDULED
PT-1E
AI-101
2'
PAPER TOWEL
DISPENSER,
PROVIDED BY
VA SOAP DISPENSER,
PROVIDED BY
VA
BASE AS
SCHEDULED
R
VS
-3
4'
0"
PT-4
R
VS
4'
0"
MOP SINK,
REF PLUMB
PT-1E
MOP HOOK,
REF SPECS
BASE AS
SCHEDULED
PAPER TOWEL
DISP, PROVIDED
BY VA
SOAP DISP,
PROVIDED
BY VA
HAND
SANITIZER,
PROVIDED
BY VA
2'
3" 5'
3"
6"
AI-101
BULLNOSE
TRIM, T-2
EPOXY
PAINT, PT-2E
WALL TILE,
T-1
EPOXY COVE
BASE, EPX-1
SCHLUTER
RONDEC TRIM
REF SPEC
6" 5'
3"
2'
3"
AI-101
BULLNOSE
TRIM, T-2
EPOXY
PAINT, PT-2E
WALL TILE,
T-1
EPOXY COVE
BASE, EPX-1
PAPER TOWEL
DISP., PROVIDED
BY VA
SOAP DISP.,
PROVIDED
BY VA
MIRROR, 24x36, REF. SPEC.
2'
AI-502
AI-101
TOILET PAPER
DISP., PROVIDED
BY VA
GRAB BARS,
REF SPEC
AI-101
6" BASE AS SCHEDULED
GYP BD SOFFIT
SS-2
GRAIN
DIRECTION OF
LAMINATION
AI-502
4' - 0" 4' - 0" 4' - 0" 1/4 "Tempered Glass Ref Spec
1/2" DeepAnoized Alum Channels
3'
6"
3' - 0" 2'- 9" +/-
Pass Through Verify Size of Opening
REVISED
EDIS EDIS
COMP COMP
GYP BD SOFFIT
SS-1
UCB, REF SPEC 5
AI-502
7'
2"
Pass Through Verify Size of Opening
REVISED
ADJ SHELVES,
REF SPEC
2'
SOAP DISPENSER,
PROVIDED BY
VA
PAPER TOWEL
DISPENSER,
PROVIDED BY VA
GYP BD SOFFIT
7'
2"
L-1
SS-2
UCB, REF SPEC
2'
AI-501
AI-501
2'
ADJ SHELVES,
REF SPECS
SS-2 SS-2
L-1
GYP BD
SOFFIT
PAPER TOWEL &
SOAP DISPENSER
PROVIDED BY VA
UCB, REF SPEC 1" 1' - 2" 2' - 6" 1"
2'
AI-501
LOCK ALL
DRAWERS
AI-501
AI-501
DOUBLE PXYS
MEDS
REFRIG
BLANKET
WARMER
R
VS
4'
0" 4"
2'
1'
9" 2'
5"
7'
0"
1 5/16"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2 1/8"
SS-2
L-1
L-1
SLOPED TOP1 5/16"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2' - 6"2 1/8"
AI-501
AI-501
1'
0" 2'
6"
COMP COMP
EDIS EDIS
1' - 4"1' - 4"
COLUMN
GYP BD SOFFIT
SS-2
BASE AS SCHEDULED
PENCIL DRAWERS
REF SPEC
1" UCB, REF SPEC4
AI-502 SIM
1' - 4"1' - 4" 1"
7'
0"
3' - 8"2' - 6 1/4"3' - 8"3' - 8"2'-7" +/- 1'-8" +/-
1/4" Tempered Glass Ref Spec
Pass Through Verify size of opening
1/2" Deep Anodized Channels Top and Bottom
REVISED
3'
6"
SS-2
EQUIPMENT BEYOND
6" BASE AS
SCHEDULED
COLUMN
GRAIN
DIRECTION OF
LAMINATION
METAL TRIM,
REF SPEC
AI-502
OPEN OPEN
SIM
3' - 4 7/8"2' - 5" 1' - 10 3/8"3' - 4 7/8"3' - 4 7/8"1' - 10 1/4"
REVISED
ASI-101
ASI-101
ASI-101
ASI-101
ASI-101 13
ASI-10110
ASI-101 3
ASI-101
ASI-101
ASI-101
ASI-101
CLEAN
B102
SOILED
B104
MENTAL
HEATH
INTERVENTION
AC119
SECLUSION
B105
BARIATRIC
TLT
B106
PHASE 3
FUTURE
BY VA
B144E
NURSE
STATION
B116
HAC
B102A
CORR
B1-03B
C100D
AC119
B105
B104
B103
B102
A128
B102A
B106
CORR
B1-03B
NURSE
STATION
B116
TRTMT 7
B103
Tempered Glass
Tempered Glass
REVISED
REVISED
Tempered Glass
Tempered Glass
ExpJt
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
1/4" = 1'-0"
5/6/2021 10:09:15 AM
ASI-101
1ST FLR PLAN / WALL
ELEVATIONS PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021
NORTH
DOOR SCHEDULE ASI
WT DOOR TYPE
DOOR SIZE HDW
R
SET
FIRE
RTNG
DOOR FRAME DETAILS
REMARKSWIDTH
HEIGH
T THICK TYPE MAT'L GLASS TYPE MAT'L
GLAS
S HEAD JAMB
THRESHOL
D
A128 DOUBLE WOOD DOORS W-VISION PANELS 7' - 0" 7' - 0" 1 3/4" 7.0 90 I WD RATED 4 HM - 5/AS-601 6/AS-601 - AUTO OPERATOR AC119 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 17.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B102 FLUSH WOOD SWING DOOR 3' - 0" 7' - 0" 1 3/4" 29.0 A WD - 1 HM - 1/AS-601 2/AS-601 -
B102A FLUSH WOOD SWING DOOR 3' - 0" 7' - 0" 1 3/4" 28.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B103 MANUAL ALUM. SLIDING DOOR 8' - 0" 7' - 8" 22.0 E ALUM. SAFETY - 7/AS-601 13/AS-602 B104 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 33.0 45 A WD - 1 HM - 1/AS-601 2/AS-601 - B105 FLUSH WOOD SWING DOOR 3' - 6" 7' - 0" 1 3/4" 17.0 A WD - 1 HM - 1/AS-601 2/AS-601 - B106 FLUSH WOOD SWING DOOR 4' - 0" 7' - 0" 1 3/4" 33.0 45 A WD - 1 HM 1/AS-601 2/AS-601 -
C100D FLUSH WOOD SWING DOOR W-VISION PANEL 3' - 0" 7' - 0" 1 3/4" 33.0 90 B WD RATED 1 HM 1/AS-601 2/AS-601
1/4" = 1'-0"2 B1-03B CORR E
1/4" = 1'-0"3 B-103B CORR S 1/4" = 1'-0"4 B104 SOILED SW
1/4" = 1'-0"5 B103 TREATMENT #7
1/4" = 1'-0"6 B102A HAC EAST
1/4" = 1'-0"7 B106 BARIATRIC E
1/4" = 1'-0"8 B106 BARIATRIC S
1/4" = 1'-0"9 B106 BARIATRIC W
1/4" = 1'-0"10 B106 BARIATRIC N
1/4" = 1'-0"11 B116 NURSE A
1/4" = 1'-0"12 B116 NURSE B
1/4" = 1'-0"13 B116 NURSE C
1/4" = 1'-0"14 B116 NURSE D
1/4" = 1'-0"15 B116 NURSE E
1/4" = 1'-0"16 B116 NURSE F
1/4" = 1'-0"17 B116 NURSE G
1/4" = 1'-0"18 B116 NURSE H
No. Description Date
1/4" = 1'-0"1 FLOOR PLAN - 1ST FLOOR .1
OS
HAC
B102A
CLEAN
B102BARIATRIC
TLT
B106
SOILED
B104
SECLUSION
B105
MENTAL
HEATH
INTERVENTION
AC119
NURSE
STATION
B116
CORR
B1-03B
9' - 0"
9' - 0"
8' - 0"
8' - 0"
CC
8' - 0"
8' - 0"
8' - 0"
7' - 2"
7' - 2"
7' - 2"
7' - 2" 7' - 2"
7' - 2"
CORR
B1-03B
8' - 0"
8' - 0"
NURSE
STATION
B116
PT-4
PT-4
PT-4 PT-4
PT-4
CLEAN
B102
CORR
B1-03B
SOILED
B104
MENTAL
HEATH
INTERVENTION
AC119
SECLUSION
B105
BARIATRIC
TLT
B106
PHASE 3
FUTURE
BY VA
B144E
NURSE
STATION
B116
HAC
B102A
20054E20053E 20051N
20049E
20056N
20049E
20001E 20045E 20099E 20099E
20038N 20038N
20049E 20049E
20104E 20106E 20037E
20055E
20049E
20052E
20050N
20056E
20049E20051E
20057E
20049E20049E
20096E
20033E 20033E
20034E
20035E
20031E20031E
20091E 20026N
20071E
20025N
20095E
20097N
SOAP DISP
UTILITY SHELF
W/ MOP/BROOM
PAPER TOWEL
DISP
20115N
EYE WASH
MOP SINK
GLOVE
DISPENSER
HAND SANITIZER
20116N
PAPER TOWEL
DISPENSER
SOAP
DISPENSER
TOILET PAPER
DISPENSER
PAPER TOWEL
DISPENSER
SOAP
DISPENSER
PAPER TOWEL
DISPENSER
SOAP DISPENSER
GLOVE DISPENSER
PAPER TOWEL
DISPENSER
SOAP DISPENSER
SOAP
DISPENSER
PAPER TOWEL
DISPENSER
DOME MIRROR
20046E 20043E 20046E
20047E
DOME MIRROR
20000N
20000N
20051E 20051E
20051E20051E
TRTMT 7
B103
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
1/4" = 1'-0"
5/6/2021 10:09:18 AM
ASI-102
REVISED CLG PLAN /
EQUIP PLAN PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021
1/4" = 1'-0"1 ASI REF CLG
NORTH
1/4" = 1'-0"2 ENLARGED EQUIP PLAN
NORTH
EQUIPMENT SCHEDULE ASI
Item No. Description Qty.
Provided by
Installed by
REQUIREMENTS
Elec. Plumb. Data
20000N PATIENT BED/STRETCHER 2 VA VA
20001E CLEAN LIN CART 1 VA VA No No No 20025N WELLCH ALLEN OTOSCOPE 1 VA VA Y No No 20026N BLOOD PRESSURE CUFF 1 VA VA No No No 20031E SUPPLY CABINETS SINGLE 2 VA VA No No No 20033E SUPPLY CAB TRIPLE 2 VA VA No No No 20034E EMPTY OXYGEN 1 VA VA No No No 20035E FULL OXYGEN 1 VA VA No No No 20037E BLANKET WARMER 1 VA VA Yes No No 20038N ROLLING IV CART 2 VA VA Yes No No 20043E SCANNER CHARGER 1 VA VA No No No 20045E MOBILE EXAM LIGHT 1 VA VA Yes No No 20046E DUAL MONITOR COMPUTERS 2 VA VA Yes No Yes 20047E TELEMETRY MONITOR 1 VA VA Yes No Yes 20049E SINGLE COMPUTERS 13 VA VA Yes No Yes 20050E WHITEBOARD 1 VA VA Yes No Yes 20050N WHITEBOARD 1 VA VA Yes No Yes 20051E EDIS-ERSTATUS BOARD 6 VA VA Yes No Yes 20051N EDIS-ERSTATUS BOARD 3 VA VA Yes No Yes 20052E DISPATCH RADIO 1 VA VA Yes No No 20053E SECURITY MONITOR 2 VA VA No No No 20054E PRINTER 2 VA VA No No No 20055E PATIENT RESPIONDER PHONE 1 VA VA Yes No Yes 20056E TELEMETRY MONITOR 1 VA VA No No No 20056N TELEMETRY MONITOR 2 VA VA No No No 20057E PRINTER 1 VA VA Yes No Yes 20071E SINGLE COMPUTER 1 VA VA Yes No Yes 20091E VITALS MONITOR 1 VA VA Yes No Yes 20095E VITALS CART 1 VA VA No No No 20096E BIOHAZ TRASH 1 VA VA No No No 20097N OSCILLATING FAN 3 VA VA No No 20099E BACKBOARD 2 VA VA No No No 20104E DOUBLE PXYS 1 VA VA No No No 20106E MEDS REFRIG 1 VA VA Yes Yes Yes 20110N HORIZONTAL HEADWALL 1 C C Yes Yes Yes 20115N JANITOR CART 1 VA VA No No No 20116N BUCKET MOP 1 VA VA No No No
No. Description Date
ACCESSORIES SCHEDULE ASI
MARK QTY DESCRIPTION
PROVIDED
BY
INSTALLED
BY
A100 1 GRAB BAR CONTRACTOR CONTRACTOR
A101 1 MIRROR CONTRACTOR CONTRACTOR
A102 6 PAPER TOWEL DISPENSER VA CONTRACTOR
A103 7 HAND SOAP DISPENSER VA CONTRACTOR
A104 1 TOILET PAPER DISPENSER VA CONTRACTOR
A105 1 MOP RACK CONTRACTOR CONTRACTOR
A108 2 GLOVE BOX VA CONTRACTOR
A109 1 HAND SANITIZER DISPENSER VA CONTRACTOR
T T
T
T
T T
T
6'
1/
2"
PT-2
6'
6"
PT-2
PT-2
EXPANSION
JOINT COVER
EXPANSION
JOINT
COVER
MENTAL
HEATH
INTERVENTION
AC119
SECLUSION
B105
SOILED
B104
BARIATRIC
TLT
B106 CLEAN
B102
HAC
B102A
CORR
B1-03B
NURSE
STATION
B116
PT-2
PT-2
PT-2
PT-2
PT-2
EPX-1
LVT-1
LVT-2
SC
WSF-1
WSF-1
WSF-1
WSF-1
WSF-1
PHASE 3
FUTURE
BY VA
B144E6' - 3 1/4"
6' - 5 1/2"
TRTMT 7
B103
PT-4
PT-4
PT-4
PT-5
MODULAR
CASEWORK LEGEND
B
A
GENERAL NOTE: MODULAR CASEWORK KEY.
LETTERS BELOW RELATE TO SPECIFICATION
SECTION 12 34 00 - REFER TO THIS SPEC FOR
FURTHER DEFINITION.
C MODULAR MOBILE PEDS, REF. SPEC.
CLINICAL TRAUMA MANUFACTURED
PLASTIC CASEWORK- REF. SPEC. AND
SHEET AI-203
CLINICAL TREATMENT MANUFACTURED
PLASTIC CASEWORK- REF. SPEC. AND
SHEET AI-203
D ON CALL ROOM MODULAR PLASTIC
CASEWORK, REF SPEC.
NOTE: THIS PLAN DEPICTS FLOOR FINISH
MATERIALS IN AREAS OF SPECIAL SIGNIFICANCE
(IE. BORDER AREAS, PATTERNS, AND MATERIAL
CHANGES WITHIN A SINGLE ROOM OR SPACE).
REFER TO FINISH SCHEDULE AND COLOR
SCHEDULE KEY IN SPECIFICATIONS FOR THE
FLOORING MATERIAL AND COLOR SELECTION
OF EACH INDIVIDUAL ROOM NOT OTHERWISE
DESIGNATED ON THIS PLAN.
FLOOR FINISH LEGEND
LUXURY VINYL TILE (LVT-1) LVT-1
LUXURY VINYL TILE (LVT-2) LVT-2
FLOORING GRAIN
DIRECTION
FLOORING SEAM
WELDED SHEET FLR (WSF-1) WSF-1
EPOXY FLOORING (EPX-1) EPX-1
AG-2.4
HR-1 & BG-1
HR-1 &
BG-1
HR-1 & BG-1
RVS-2.4
CG-1.4
CG-1.4
RVS-2.4
RVS-2.4
CG-1.4CG-1.4
CG-1.4CG-1.4CG-1.4
RVS-3.6.6
RVS-3.6.6
RVS-1.4
RVS-3.4
CG-2.4
RVS-2.4
RVS-2.4
MENTAL
HEATH
INTERVENTION
AC119
SECLUSION
B105
PHASE 3
FUTURE
BY VA
B144E
SOILED
B104
CORR
B1-03B
NURSE
STATION
B116
BARIATRIC
TLT
B106 CLEAN
B102
HAC
B102A
CG-1.4
CG-3.4
CG-1.4
RVS-3.4
RVS-3.4
AG-3.4
CG-1.4
CG-1.4
CG-1.4
CG-1.4
CG-1.4
EG-1.4
EG-1.4 CG-1.4 CG-1.4 EG-1.4
EG-1.4
EG-1.4
RVS-3.4
RVS-3.4 RVS-3.4
CG-1.4
CG-1.4
RVS-3.4 RVS-3.4
CORR
B1-03B
CG-1.4
EG-1.4
EG-1.4 EG-1.4
CG-1.4
CG-1.4
EG-1.4
EG-1.4
TRTMT 7
B103
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated
5/7/2021 9:47:42 AM
ASI-103
FLOOR / WALL
PROTECTION PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021 No. Description Date
FINISH
CLARIFICATIONS
12-12-19
1/8" = 1'-0"1 FINISH FLOOR PLAN - 1ST FLOOR
ACCENT PAINT
PT-2
PT-3
PT-4
PT-5
PLAN NOTES
MATCH ADJACENT FINISH
CORNER TO CORNER.
MATCH DOOR FRAME PAINT
TO OTHER DOOR FRAMES
ACROSS THE CORRIDOR
PAINT ELEVATOR DOOR AND
FRAME WITH STD DOOR
PAINT, PT-7.
FINISH SCHEDULE ASI
RM #
ROOM
NAME FLOOR BASE
WALLS MILLWORK MILLWORK CEILING CEILING
COLOR NOTESN. E. S. W. VERT. HORIZ. TYPE
LEVEL 1
AC119 MENTAL HEATH
INTERVENTION
WSF-1 CSF-1 PT-2 PT-2 PT-4, RVS-3 PT-2 - - GYP PT-6E ASI
B1-03B CORR LVT-1, LVT-2 RB-1 PT-2 PT-2 PT-2 PT-2 - - SAT-1 ASI
B102 CLEAN WSF-1 CSF-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 - - SAT-3 ASI - REFER TO SPECS FOR MODULAR
FINISHES
B102A HAC SC RB-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 SAT-1 ASI
B103 TRTMT 7 WSF-1 RB-1 PT-2 PT-2 PT-2 PT-4, RVS-3 - - SAT-1 ASI
B104 SOILED WSF-1 CSF-1 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 PT-1E, RVS-2 - - GYP PT-6E ASI
B105 SECLUSION 2 WSF-1 CSF-1 PT-2 PT-2 PT-4, RVS-3 PT-2 - - GYP PT-6E ASI
B106 BARIATRIC TLT EPX-1 EPX-1 T-1, PT-2E T-1, PT-2E T-1, PT-2E T-1, PT-2E - - SAT-1 ASI B116 NURSE STATION LVT-2 RB-1 PT-2, RVS-3 PT-2, RVS-3 PT-2, RVS-3 PT-2 L-1 SS-2 GYP, SAT-1 ASI
1/8" = 1'-0"2
SIGNAGE & WALL PROTECTION PLAN - 1ST
FLOOR
SIGNAGE SCHEDULE ASI
SIGN # MOUNT SIGN TYPE
RM # ON
SIGN
ROOM
NUMBER COPY - SIDE A COPY - SIDE B
ARROW /
PICTOGRAM
Room:
Departmen t Level 132 GLASS D1A/F/W Yes AC119 MENTAL HEALTH
INTERVENTION
NONE NONE PHASE 2 LEVEL 1
133 GLASS D1A/F/W Yes B105 SECLUSION 2 NONE NONE PHASE 2 LEVEL 1 134 DOOR Q/W Yes B104 SOILED NONE YES PHASE 2 LEVEL 1 135 WALL D1A/F/W Yes B104 SOILED NONE NONE PHASE 2 LEVEL 1 136 WALL D1A/F/W Yes B103 TREATMENT #7 NONE NONE PHASE 2 LEVEL 1 137 WALL D1A/F/W Yes B102 CLEAN NONE NONE PHASE 2 LEVEL 1 138 DOOR Q/W Yes A125 RESTRICTED ENTRY NONE NONE PHASE 2 LEVEL 1 139 WALL D1A/F/W Yes B102A HAC NONE NONE PHASE 2 LEVEL 1 145 DOOR Q/W Yes A128 STAFF ONLY NONE YES PHASE 2 LEVEL 1 146 WALL D1A/F/W Yes B106 BARIATRIC TOILET NONE YES LEVEL 1
UP
TRAUMA 1
TRAUMA 2
TRTMT 5
TRTMT 6
BREAK
TRIAGE
CLEAN
TRTMT 1
TRTMT 2
FEMALE
TRTMT 3
WORK
ADMIT
ADMIT
HALL
CLOSET
DECON
CORR
CORR
ED ENTRY
OUTPATIENT
ENTRY
EXAM #39
NURSE MGR
ROOM
CHIEF ED
SOILED
MENTAL
HEATH
INTERVENTION
SECLUSION 2
JAN
BARIATRIC
TLT
WAITING
TLT
CONSULT/
BRVMNT
VA POLICE
2 TLT
ANTE
TRTMT 4
(ISO)
TLT
TLT
EXAM #40
ED WAITING
ROOM
33/1 6.6" 48"
218/5 8.8" 96"
218/5 8.8" 96"
MRI ZONE II
BLUE TEAM
CLINICAL
PHARMACIST
CLINICAL
PHARMACIST
CLINICAL
PHARMACIST
NUTRITION
CLINIC 1
NUTRITION
CLINIC 2
CLINICAL
PHARMACIST
SOUTH ELEV
LOBBY
SCANNER
CONTROL
ROOM
UTILITY
EXAM #12 EXAM #13
EXAM #14 EXAM #15 CHASE EXAM #18 EXAM #19
CORRIDOR
RED TEAM
EXAM #9
EXAM #10
ELEC
CLOSET
EXAM #11
RESTROOM
EXAM #6
EXAM #5
STORAGE
WORK ROOM
WORK ROOM
PHARMACY
EXAM #25
EXAM #23
EXAM #21
EXAM #20
RESTROOM
EXAM #1 EXAM #2
WORK ROOM
BLUE TEAM
CLINICS
STAIR 3
SUPPLY
CORRIDOR
WOMEN
MEN
DUMBWAITER
HOUSEKEEPING
ELEVATOR
LOBBY
STORAGE
STORAGE
NEW STAIR
CORRIDOR
CORRIDOR
CORR
FACP
FA
C
P
FA
A
P
ROOM
TLT
ELEC
TLT
CORRIDOR
DASHED LINE INDICATES
PERIMETER OF SECOND FLOOR
ABOVE AND SEPARATE
BUILDING (TYPE I (332)) - 2 HR
RATED FLOOR ASSEMBLY
CLINICAL
PHARMACIST
WORK ROOM
EXAMPATIENT
TOILETEQUIPEXAMEXAMSPECIALTY
EXAM CORRIDOR CORRIDOR
OCCUPANCY AMBULATORY HEALTH CARE
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 54
OCCUPANCY 2 : FIRST FLOOR = 7,013 SF
BUSINESS OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 218
OCCUPANCY 1 : FIRST FLOOR = 15,376 SF
25/1 6.6" 48"
218/5 8.8" 36"
218/5 8.8" 42"
FA
C
P
FUTURE
OCCUPANCY
SEPARATION
FEC
FEC
FEC
FEC
FE
C
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
3/32" = 1'-0"
5/6/2021 10:09:26 AM
ASI-104
LIFE SAFETY PLAN - 1ST
FLOOR PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021 No. Description Date
3/32" = 1'-0"1 LIFE SAFETY PLAN - 1st FLOOR
CL
CL
CL
CLC L
" A
.F .F
AL
L
C H
AR
AC
TE
R
S
ACCESSIBLE TOILET STALLS
STANDARD STALL
HANDRAILS
STANDARD END OF WALL STALL
DIRECTIONAL
PARKING STALL
PLAN VIEW
ELEVATION A ELEVATION B
PLAN: ROLL-IN TYPE ELEVATION: ROLL-IN
PARKING SPACES
H.C. LAVATORYH.C. URINAL
H.C. FLOOR MTD. TOILET H.C. WALL MTD. TOILET
FRONT APPROACHSIDE APPROACH
LAV FLOOR SPACE
PARKING
RESERVEDHANDICAP
ENTRANCE
ACCESSIBLE
SINGLE TOILET
OUTDOOR SIGNAGE
ACCESSIBLE SHOWER
PARKING SYMBOL
MENRESTROOM
GENERAL ROOM
IDENTIFICATION RESTROOM RESTROOM
DRINKING FOUNTAINS
INTERIOR SIGNAGE
BATHROOM FIXTURES & ACCESSORIES
VICE
PRINCIPAL
OFFICE
GENERAL REACH DIMENSIONS
LAVATORY DIMENSIONS
MOUNTING HEIGHT DIMENSIONS
NEW CONSTRUCTION
1 1/2 " CLEAR
" m in
" m in
52" min.
12" max
"-1
8"
32" min4" max
" m in 66" min.
42" min latch approach 48" min other approaches
4" m ax
6" m ax
Alternate door location
42" min 12" max
"-1
8"
" m in
6" m ax
36" min
56" min for wall mounted W.C.
59" min for flr mounted W.C.
NEW CONSTRUCTION
16"-18" Lavatory
60" min
12 "
2" 2"
1" 2"
1" 6"4"
4" 2"
1' -6
5'
-0 " A
BO
VE
T.
O
. C U
R B
3"3"
2" x 2" x 1/4 " STL
POST PAINTED & SET
IN 12" DIA x 3'-0"
CONC FILLED POST HOLE
12 "
2" 2"
1" 2"
1" 6"4"
4"
1' -6
3"3"
3' -0
" T O
'-0
AB
O
VE
G R
AD
E
SIGN TO BE MOUNTED IN THE
MOST VISIBLE & CONVENANT
LOCATION
1.25"-2" DIA.
IF
CIRCULAR
NO SCALE
NO SCALE
NO SCALE
2" x 2" x 1/4 " STL
POST PAINTED & SET
IN 12" DIA x 3'-0"
CONC FILLED POST HOLE
TO
C
O N
TR
O
LS
18"
1'-6"
2'-9"
TO
C
O N
TR
O
LS
" T
O
8" M
AX
FLEXIBLE SHOWER
HEAD EXTENSION
SHOWER UNIT W/
ACCESSIBLE CONTROLS
" T
O
8"
GRAB BAR
4'-0"
" m ax
16" max
23"max
Fu ll de pt h of
St al l o r 4
8"
48" min
" m in
CLEAR FLOOR SPACE
1/2" max TRANSITION
NO SCALE
GRAB BAR
ELEV A
SEAT
SEAT
60" min
" m in
" m in
CLEAR FLOOR SPACE
27" max
GRAB BAR
1/2 " MAX TRANSITION
"-3
6"
"-3
6"
" T
O
8"
"-3
6"
16"-27"
TO
C
O N
TR
O
LS
GRAB BAR
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
SHOWER UNIT W/
ACCESSIBLE CONTROLS
& FLEX SHOWER HEAD
FOLDING SEAT
(OPTIONAL)
FOLDING SEAT
(0PTIONAL)
8'-0" MIN. 8'-0" MIN5'-0" CAR
UNIVERSAL PARKING SPACE DESIGN
NO SCALE
NO SCALE
Symbol to be White (Typ.)
3" 13"
6" 18"R.
26"
(Typ.)
6"
30"
6"
18"
Dia.
15"
2'-0" 5'-2"
'-0
" t o
Fa ce o f C ur b
3' -9
6' -9
(OR REFER TO SITE PLAN FOR DIMENSIONED
ACCESSIBLE PARKING)
16"-18"
17" MIN.
19" MAX.
48" MIN.
" M
IN
NOT TO EXCEED
FOUNTAIN DEPTH
30" MIN.
" M
IN
36" min
" m ax
-1
9"
7-9"
Sanitary napkin disposal
Toilet paper dispenser
24"-42"6" max
12" max
-1 9"
7"-9"
12" max
24"-42"
42" min
Toilet paper dispenser
Sanitary napkin disposal
-3
6" 36" min 6" max
" m ax
" m in
" m in
1'-7" min
8" min6" max
9"
Clearance profile Insulate drain & supply lines 40
" m ax
Mirror
Paper towel dispenser
"Soap dispenser 30 " m in
19" max
48" min
17" min
12" min
16"-18"
54" min 42" min
1/
5/
1/
1/32 " HIGH RAISED
CHARACTERS, TYP.
5/
1/
BRAILLE CHARACTERS, TYP
RAISED BORDER, TYPROOM NUMBER 1/32" HIGH RAISED
INTERN'L SYMBOLS, TYP
6"
1/2 " R TYP
NOTE: MOUNT ACRYLIC SIGNS W/ DOUBLE SIDED FOAM TAPE
ACRYLIC SIGNS 2 CONTRASTING FIN COLORS
TO BUBBLER
3' -6
9" M
IN
" M
AX
HIGH
FOUNTAIN
LOW
FOUNTAIN
17-19"
6" MAX
8" MIN
" M
IN
" M
AX
8" M
IN
LO
W
F O
U N
TA
IN
NO SCALE
NO SCALE
NO SCALE
" m ax
13 1/2"min
"m ax
TO FLUSH CONTROL
HANDICAP BAR
SOAP DISPENSER
MIRROR URINAL
TELEPHONE
CLOCK
LIGHT SWITCH
-1
9" 42
" M
AX
" M
AX
7' -8
"60
" M
AX
" M
AX
" M
AX
1'-2"
(TO HIGHEST
OPERABLE PART)
17" MIN
" M
IN
" M
IN
" M
AX
" M
AX
9" M
IN
6" MAX
17" MIN
" M
IN
" M
AX
" M
AX
9" M
IN
6" MAX
8" MIN
TOILET PAPER
DISPENSER
SANITARY NAPKIN
DISPOSAL
PAPER TOWEL
DISPENSER
OCCUPANCY SIGN
LATCH SIDE PERFERED
TOILET SEAT HT
THERMOSTAT
OR OTHER
CONTROL
" M
IN
" M
AX
48"
" M
IN
Z 48"
Y
X 30" 24"
" M
AX
30"
10" MAX
21" MAX
" M
IN
" M
AX
36" MIN
" M
IN
" M
AX
NOTE: X SHALL BE < 25";
Z SHALL BE > X, WHEN X < 20",
THEN Y SHALL BE 48" MAX
WHEN X IS 20"-25",
THEN Y SHALL BE 44" MAX.
INSULATE
EXPOSED PIPES
NO SCALE
NO SCALE
NO SCALE
" M
AX
COUNTER
OR
LAVATORY
-1
9"
8'-0" VAN
" m in
GRAB BARS
1 1/2 " CLEAR
1.25"-2" DIA.
IF
CIRCULAR
IF NON-
CIRCULAR
PERIMETER
MUST BE 4"-6.25"
AND DIAMETER
MUST NOT
EXCEED 2.25"
IF NON-
CIRCULAR
PERIMETER
MUST BE 4"-6.25"
AND DIAMETER
MUST NOT
EXCEED 2.25"
1/
2" m in
" m in
18" min. grab bar per
ANSI A117.1-2009 39"-41"
1/ 4"
1/
2"
BEVELED FLOORING TRANSITIONS
1/ 4" m ax
1/ 2" m ax
CARPET ON FLOOR SURFACES
1/ 4" m ax
BEVELED FLOORING TRANSITIONS
ACCESSIBLE
VAN
18" min. grab bar per
ANSI A117.1-2009
EL
EV
B
PLAN: TRANSFER TYPE
CONCRETE
WHEEL STOP
4" WIDE PAINT
STRIPING,
TYP.
4' o.c.
TOP AND SIDES
MUST BE
UNOBSTRUCTED.
UP TO 20% OF
BOTTOM MAY BE
OBSTRUCTED
FOR SUPPORTS.
CARPET CUSHION/ PADDING NOT PERMITTED
MOUNTING HEIGHTS
5' -6
MEDICAL GAS
ZONE VALVE
NURSE CALL -
PATIENT TOILET
5' -6
4"
CORD
ROBE HOOK
6' -0
5' -0
CALL STATION/
FLUSH-MOUNTED
STATION
8"
RETURN AIR
REGISTER
5' -2
5' -2
O
R
FILM
ILLUMINATOR
5' -2
RECEPTACLE
& GROUND
5' -2
GROUND
FAULT
INDICATOR
5' -2
REMOTE
GROUND
INDICATOR
5' -2
VARIABLE
INTENSITY O.R.
LIGHT CONTROL
5' -0
NITROGEN
SHUT-OFF
VALVE
5' -2
O.R. RECEPTACLE
CODE BLUE
5' -2
SWITCH
NEED TO VERIFY ALL
FIXTURE TYPE & SIZES
WITH MANUFACTURER
3' -6
ELEVATOR
CALL BUTTON
O.R.
6' -0
ELEVATOR
HALL LANTERN
5' -0
" RAISED
CHARACTER
FLOOR
DESIGNATION
5' -0
2' -1
1"
ELEVATOR
CONTROL
PHONE
ELEVATOR MEDICAL EQUIPMENT
NO SCALE
WHEELCHAIR MANEUVERING
TURNING CLEAR
2' - 6"
4'
0"
5' - 0"
5'
0"
1' - 0" 3' - 0"
1' - 0"
2'
0" 3'
0"
T-SHAPED
5' - 0"
MANEUVERING CLEARANCES AT DOORS
LATCH SIDE APPROACHLATCH SIDE APPROACH
HINGE SIDE APPROACH
HINGE SIDE APPROACH
FRONT APPROACHFRONT APPROACH
Y
" M
IN
.X
24" MIN. X
Y
Y
" M
IN
X
24" MIN.
X
" M
IN
" M
IN
18" MIN.
24" PREF.
54" MIN.
Y
" M
IN
NOET: Y=48" MIN. IF DOOR
HAD BOTH A LATCH AND
CLOSER
PATIENT BEDROOM MIN. DOOR WIDTH: 3'-10"
NOTE: X=12" IF
DOOR HAS BOTH A
CLOSER AND LATCH
NOTE: X=36" MIN. IF Y=60",
X=42" MIN. IF Y=54"
NOTE: Y=48" MIN. IF
DOOR HAS CLOSER
NOTE: Y=54" MIN. IF
DOOR HAS CLOSER
PULL SIDE
PUSH SIDE
PULL SIDE PUSH SIDEPUSH SIDE
90 TURNS 180 TURN
60"
X < 48"
60"
48" 48"
60"
X < 48"
GENERAL NOTES
ALL CONSTRUCTION & RENOVATION SHALL MEET THE UNIFORM FEDERAL ACCESSIBILITY
STANDARDS (UFAS), ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS & FACILITIES (ADAAG), &
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS).
SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF
THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE BARRIER FREE
DESIGN GUIDE: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (PG-18-13).
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated
5/6/2021 9:56:14 AM
GI-002
ACCESSIBILITY PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021 No. Description Date
STORAGE
C148
STAIRS
C149
ROOM
B1C
PHASING NOTES & LEGEND
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO
DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD
OFFICE WILL BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH
ROUTE OUT OF THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED
TRAUMA 1 IN PHASE 2A .
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated
5/6/2021 9:56:17 AM
GI-003
PHASING PLAN -
BASEMENT/2ND PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021
1/8" = 1'-0"A PHASING PLAN - BASEMENT
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date
MRI ZONE
II
C146
BLUE
TEAM
B145
CLINICAL
PHARMACIST
B147
CLINICAL
PHARMACIST
B148
CLINICAL
PHARMACIST
B149
NUTRITION
CLINIC 1
A135
NUTRITION
CLINIC 2
A136
CLINICAL
PHARMACIST
A137
SOUTH
ELEV
LOBBY
A141
NOT IN SCOPE
OF WORK
NOT IN
SCOPE OF
WORK
CORRIDOR
C144
CORRIDOR
C144
WORK
ROOM
B143
WORK
ROOM
B142
EXAM #18
B141
EXAM #17
B140
EXAM #4
B125
EXAM #3
B124
EXAM #2
B123
EXAM #1
B119
CORRIDOR
B1-02
STAIR 3
B117A
CORRIDOR
B1-02
MEN
B101
DUMBWAITER
A134
WOMEN
A113
HOUSEKEEPING
A138
ELEVATOR
LOBBY
A140
STORAGE
A129A
STORAGE
A129
EXAM #21
AC121
EXAM #23
AC123
EXAM #25
AC125PHARMACY
AC124
WORK
ROOM
AC122A
WORK
ROOM
AC122
EXAM #5
AC105
EXAM #6
AC106
EXAM #9
AC109
RED TEAM
AC108EXAM #10
AC110
EXAM #11
AC111
ELEC
CLOSET
AC116E
1 HR RATED CONSTRUCTION
BARRIER - REF SPECS
NOTE: BARRIERS ON EITHER
SIDE OF CORRIDOR SHALL
NOT
EXIST CONCURRENTLY.
PHASE 1
NOT IN SCOPE
OF WORK
1 HR RATED
CONSTRUCTION BARRIER
DURING PHASE 2
ROOM
B144D
ROOM
B144C
ROOM
B144
EXAM #40
AC140
EXAM #39
AC139
NOT IN
SCOPE OF
WORK
1 HR RATED
CONSTRUCTION BARRIER
DURING PHASE 2
PHASE 2 A TRAUMA 1-
B113 TO REMAIN OPEN
PHASE 1
PHASE 2
PHASE 2
PHASING NOTES & LEGEND
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO
DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD
OFFICE WILL BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH
ROUTE OUT OF THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED
TRAUMA 1 IN PHASE 2A .
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated
5/6/2021 9:56:28 AM
GI-004
PHASING PLAN 1ST
FLOOR - PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021
1/8" = 1'-0"A PHASING PLAN - 1ST FLOOR - PHASE 2
4' 8' 16'
1/8" = 1'-0"
0'
NORTH
No. Description Date
MRI ZONE
II
C146
BLUE
TEAM
B145
CLINICAL
PHARMACIST
B147
CLINICAL
PHARMACIST
B148
CLINICAL
PHARMACIST
B149
NUTRITION
CLINIC 1
A135
NUTRITION
CLINIC 2
A136
CLINICAL
PHARMACIST
A137
SOUTH
ELEV
LOBBY
A141
NOT IN SCOPE
OF WORK
NOT IN
SCOPE OF
WORK
CORRIDOR
C144
CORRIDOR
C144
WORK
ROOM
B143
WORK
ROOM
B142
EXAM #18
B141
EXAM #17
B140
EXAM #4
B125
EXAM #3
B124
EXAM #2
B123
EXAM #1
B119
CORRIDOR
B1-02
STAIR 3
B117A
CORRIDOR
B1-02
MEN
B101
DUMBWAITER
A134
WOMEN
A113
HOUSEKEEPING
A138
ELEVATOR
LOBBY
A140
STORAGE
A129A
STORAGE
A129
EXAM #21
AC121
EXAM #23
AC123
EXAM #25
AC125PHARMACY
AC124
WORK
ROOM
AC122A
WORK
ROOM
AC122
EXAM #5
AC105
EXAM #6
AC106
EXAM #9
AC109
RED TEAM
AC108EXAM #10
AC110
EXAM #11
AC111
ELEC
CLOSET
AC116E
1 HR RATED CONSTRUCTION
BARRIER DURING PHASE 2
CORRIDOR
C144
ED
WAITING
AC101
ADMIT
AC101B
ADMIT
AC101C
WORK
AC132
NURSE
MGR
AC133
WAITING
AC137
TLT
AC135A
TRTMT 3
AC135
TRTMT 2
FEMALE
AC134
HALL
AC131
TRTMT 1
AC129TRIAGE
AC128CONSULT/
BRVMNT
AC101D
NEW
STAIR
AC103
ED ENTRY
AC100
OUTPATIENT
ENTRY
C100
VA
POLICE
AC101A TLT
C130
JAN
AC127B
TRAUMA 1
B113
BREAK
AC136
TLT
AC136A
EXAM #40
AC140
EXAM #39
AC139
CLOSET
B144B
ROOM
B144C
ROOM
B144D
SECLUSION
B105
MENTAL
HEATH
INTERVENTION
AC119
TLT
AC134A
NOT IN SCOPE
OF WORK
NEW TRAUMA 1 ROOM
REMAN OPEN IN PHASE 2
REMODEL PHASE 2A
CORR
B1-03B
ELEVATOR
S1
TEMP. TRIAGE
DURING THIS PHASE
ROOM
B144
CORRIDOR
B1-03B
CORRIDOR
B1-03
ELEC
AC127A
TLT
B1-03D
1 HR RATED
CONSTRUCTION
BARRIER DURING PH 2
NOT IN SCOPE OF WORK
PHASE 2
PHASING NOTES & LEGEND
PHASE 2:
GENERAL DESCRIPTION: RENOVATE REMAINDER OF EXISTING ED
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER’S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING BUT NOT LIMITED TO; TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO THE ASBESTOS REPORT, LEAD BASED PAINT REPORT, AND ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL. HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL PHASING PLAN. REFER ALSO TO
DEMOLITION PLANS FOR ADDITIONAL CLARIFYING INFORMATION.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY ADJACENT TO WORKING CLINICAL AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC) IN SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA’S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
1. ED LOCATION: THE EMERGENCY DEPARTMENT WILL RELOCATE TO THE NEWLY COMPLETE PHASE 1 AREA.
2. AOD (ADMISSIONS/CHECK-IN/TRIAGE): ADMISSIONS AND CHECK-IN WILL BE LOCATED IN THE EAST AOD OFFICE WHILE THE WEST AOD
OFFICE WILL BE TEMPORARY TRIAGE.
3. TOILETS: 3 NEW PUBLIC TOILETS WILL BE AVAILABLE, 2 PATIENT TOILETS, AND A STAFF TOILET.
4. TREATMENT/TRAUMA ROOMS: ASSUMING TRIAGE CAN SERVE AS TEMPORARY TREATMENT, THERE WILL BE 5 TREATMENT ROOMS (INCLUDING A SECLUSION ROOM). THE NEW EAST TRAUMA ROOM WILL SERVE AS TEMPORARY NURSE STATION DURING THIS PHASE.
5. ACCESS/EGRESS: NORTHEAST EXIT WILL BE OPEN. TEMPORARY DOOR IN STAFF BREAK ROOM WILL SERVE AS TEMPORARY SOUTH
ROUTE OUT OF THE UNIT.
6. CONSTRUCTION ZONE: WEST AREA OF THE PROJECT, AN AREA GENERALLY FOLLOWING EXISTING EMERGENCY DEPARTMENT OUTLINE.
7. CONSTRUCT DECON ROOM ADDITION
8. TRAUMA 1 WAS COMPLETED IN PHASE 1 AND WILL REMAIN IN OPERATIONAL UNTIL TRAUMA 2 HAS BEEN COMPLETED. COMPLETED
TRAUMA 1 IN PHASE 2A .
G
F
D
CBA
E
N on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
F
E
D
C
B
A
97 8654321
Drawing Title:
Scale:
Approved:
Building Number:
Location:
Project Title:
Checked By: Drawing No.
Project No.
Drawn By:
Date:
D ep ar tm en t o f Ve te ra ns A ffa irs
Dwg. Of
BLDG. 1
ARCHITECTS/ENGINEERS: VA EASTERN KANSAS
HEALTH CARE SYSTEM
Dwight D. Eisenhower VA Medical
Center Leavenworth Colmery-O'Neil VA Medical Center
Topeka
Building Key Plan: A/E Seal
C:\Users\dhickerson\Documents\TopekaVA_ED_2019_Phase 2_duaneh4U2X5.rvt
As indicated
5/6/2021 9:56:42 AM
GI-005
PHASING PLAN 1ST
FLOOR - PHASE 2
#589A5-15-115-B
UPGRADE
EMERGENCY
DEPARTMENT
TOPEKA, KS
5/7/2021
1/8" = 1'-0"1 PHASING PLAN - 1ST FLOOR - PHASE 2
NORTH
4' 8' 16'
1/8" = 1'-0"
0'
No. Description Date
STORAGE
STAIRS
STORAGE
STORAGE
ELEC./ IT
STORAGE
ROOM
IT CLOSET
FEC
VACANT
EX
IT
12/1 2.4" 48"
GROUP S OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 12
OCCUPANCY 1 : BASEMENT = 5,628 SF
STAIRS
CORR.
DENTAL
SURGERY
DECON
ROOM
DENTAL
OFFICE
DENTAL
OFFICE
X-RAY ROOM
ISOLATION
PATIENT
EXAM
LAB
SUPPLIES
DENTAL
ADMINISTRATION
OFFICE
DENTAL
RECEPTION
CORRIDOR
DENTAL
TREATMENT
SUITE
DENTAL
TREATMENT
ROOM
AUTHORIZED
PERSONNEL
ONLY
SUPPLY
ROOM
BREAK
ROOM
FEC
VACANT
HORIZONTAL EXIT
EXTERIOR WALL
RATED 1 HR FOR
10'-0"
EXTERIOR WALL
RATED 1 HR FOR 10'-0"
44/2 4.4" 48"
BUSINESS OCCUPANCY
TYPE I (332) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 42
OCCUPANCY 1 : SECOND FLOOR = 4,461 SF
CORRIDOR
BUSINESS OCCUPANCY
TYPE II (000) CONSTRUCTION
FULLY SPRINKLERED = YES
TOTAL OCCUPANTS : 0
OCCUPANCY 2 : SECOND FLOOR = 668 SF
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY
NFPA 2015
(NEW HC)
NFPA 2015
(EXIST. HC)
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
1 HR 60 MIN NFPA 8.2.3.2.3.1
(1)
IBC 706.7
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)
NFPA 19.3.1.1
NFPA 8.2.5.4
NFPA 18.3.1.1
NFPA 8.2.5.4
NFPA 8.2.3.2.3.1
IBC 715.4/714.2
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1020.12
IBC 715.5.3
IBC 716.5.21 HR
2 HR
60 MIN
90 MIN
HR
2 HR
EXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
NFPA 8.2.3.2.3.1 IBC
715.4/714.2
NFPA 18.2.2.7
NFPA 7.2.6
NOT
ALLOWED
NFPA 1005.3.4.1
NFPA 1021.5
NFPA 19.2.2.7
NFPA 7.2.6
60 MIN
90 MIN
HAZ./INCIDENTAL USE
FIRE BARRIER
1 HR 45 MIN
NFPA 8.2.3.2.3.1 (2)
IBC 706.7
IBC 715.4
NFPA
18.3.2.1
NFPA 8.4.1.1
FIRE
90 MIN
NFPA 18.3.2.1
NFPA 8.4.1.1
IBC 715.3.1
IBC 716.3.1
IBC 715.5.2
IBC 716.5.2
HAZ./INCIDENTAL USE
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
IBC 710.5.3
IBC 715.4.7.3
IBC 508.2.2.1
NFPA 8.4.1.2 SEE
NOTE B
NFPA 8.4.1.2
SUBDIVIDING SPACES
SMOKE BARRIER
20 MIN NFPA 8.3.4.2 (1)
IBC 709.5
NFPA 18.3.7.1
NFPA 18.3.7.3
SMOKE
90 MIN
SEE NOTE [A]
NFPA 8.3.5.1
IBC 709.8
IBC 716.5.5
SEE NOTE [C]
NFPA 19.3.7.1
1/2
HR
1 HR
SUITE SEPARATION
SMOKE PARTITION
NR NFPA 18.2.5 IBC 710.5.3
IBC 715.4.7.3
SEE
NOTE [B]
NR
SELF OR AUTO
CLOSING
NFPA 18.2.5
10/1 2" 34"
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT
WIDTH
NO. OF OCC./
NO. OF EXITS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD
FACTOR
1:50
FIRE EXTINGUISHER AND CABINET
FIRE ALARM CONTROL PANEL
FIRE SYSTEM ANNUNCIATOR ALARM
ANNUNCIATOR PANEL
PROPERTY LINE
FEC
FACP
FSA
FAAP
100'
(50)
STARTING
LOCATION
EXITING #
TRAVEL
DISTANCE
TRAVEL PATH
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS
WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA
8.2.4.4.3) (IBC 710.7)
[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED
TO A SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)
[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED
ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)
NOTES
SYMBOLS
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
90 MIN NFPA 8.2.3.2.3.1
(1)
IBC 706.7
FIRE
90 MIN
NFPA 6.1.14
NFPA 8.2.3.1.2
NFPA 8.2.3.2.4.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 6.1.14
NFPA 8.2.3.1.2
2 HR
RATED UL
ASSEMBLES
UL U412
UL U419
UL U412
UL U419
UL U412
UL U419
UL U415(B)
UL U412
UL U419
UL U412
UL U419
UL U415(A)
HORIZONTAL BUILDING SEPARATION:
FIRE BARRIER
2 HR NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
UL U412
UL U419
CODE INFORMATION
PROJECT INFORMATION:
1. CONSTRUCTION PURPOSE: ADDITION / RENOVATION
2. REASON FOR SUBMITTAL: NEW CONSTRUCTION
3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE
SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT
COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:
2015 LIFE SAFETY CODE (NFPA-101)
2014 NATIONAL ELECTRICAL CODE (NFPA-70)
CURRENT ABA ACCESSIBILITY STANDARDS
2014 INTERNATIONAL BUILDING CODE (IBC)
2014 INTERNATIONAL MECHANICAL CODE (IMC)
2014 INTERNATIONAL PLUMBING CODE (IPC)
4. LOCATION OF ANTICIPATED FUTURE ADDITIONS: UNKNOWN
5. OWNER:
COLMERY - O'NEIL VA MEDICAL CENTER
2200 SW GAGE BLVD.
TOPEKA, KS 66622
PH (785) 350-3111
7. DESIGN TEAM:
ARCHITECT:
HEALTH FACILITIES GROUP, LLC
142 N. MOSLEY ST., SUITE 300
WICHITA, KS 67202 316-262-2500
CONTACT: BEN HARVEY
DESIGN CONSULTANTS:
STRUCTURAL:
KH ENGINEERING GROUP, P.A.
15377 W. 95TH ST.
LENEXA, KS 66219 913-825-9381
CONTACT:
KATHY HAGEN
KHAGEN@KHEGROUP.COM
CIVIL, MECHANICAL, ELECTRICAL, & PLUMBING:
PROFESSIONAL ENGINEERING CONSULTANTS
303 S. TOPEKA
WICHITA, KS 67202 316-262-2691
CONTACT:
DARIN CROWDER
DARIN.CROWDER@PEC1.COM
8. ARCHITECTS SEAL: SEE STAMP AT BELOW
9. FIRE SERVICE: TOPEKA, KANSAS FIRE DEPARTMENT
10. INSPECTION: VISN SAFETY OFFICER
11. OCCUPANCY GROUP TYPE:
OCCUPANCY 1 - BUSINESS
OCCUPANCY 2 - NEW AMBULATORY HEALTH CARE
12. CONSTRUCTION TYPE: NFPA TYPE I (332) & NFPA TYPE II (000)
13. STRUCTURAL CODE REQUIREMENTS
A. ALLOWABLE FLOOR AREA FROM NFPA 5000 TABLE 7.4.1:
TOTAL ALLOWABLE FLOOR AREA:
TYPE I (332) = UNLIMITED
TYPE II (000) = 23,000
NEW FLOOR AREA ADDED W/ THIS PROJECT:
OCCUPANCY 1 - BUSINESS
FIRST FLOOR = 15,261 SF
SECOND FLOOR = 659 SF
OCCUPANY 2 - NEW AMBULATORY…