P09_Combined Attached Forms.pdf
PDF 9 MB Posted
- Attached to
- Z2DA--631-23-014 Replace Roof Building 7 Federal contract opportunity
- Solicitation number
- 36C24123R0183
About this file
This federal contract opportunity notice solicits bids to replace the roof on Building 7 at a Department of Veterans Affairs medical center. The solicitation number is 36C24123R0183 and it seeks to replace an existing roof under project number Z2DA-631-23-014. Bids are due by contacting the listed contracting office. The work will be performed for the Veterans Health Administration within Veterans Integrated Service Network 1.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 010000 General Requirements Rev1.docx | DOCX document | |
| 36C24123R0183 0002.docx | DOCX document | |
| Replace Roof B7 - SOW Rev1.docx | DOCX document | |
| S06_H-103-Roof Plan_Rev1.pdf | ||
| 36C24123R0183 0001.docx | DOCX document | |
| S06_AE103-Roof Plan_Rev 1.pdf | ||
| P03 SSJ NEI signed CR.pdf | ||
| P09_Past Performance Information Form for Contractors.docx | DOCX document | |
| P07_Wage Determination_MA20230003 09-15-2023.pdf | ||
| P09_631-23-014 SOW_SPEC_Drawing Package.pdf | ||
| 36C24123R0183.docx | DOCX document | |
| P03 SSJ Best Locks signed CR.pdf | ||
| P09 Past Performance Questionnaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A ABOVE-THE-CEILING WORK PERMIT
Building:___________ Floor: ______ Room #: ______ Fire / Smoke Barrier: YES NO
Work Coordinator/Supervisor: Name: _____
Phone # or Extension: _____
Purpose of Work: ____________________________________
Date(s) Planned for Proposed Work: _____
Date Permit Submitted: _____
Project COR (if applicable): Name: _____
To be completed by the Work Coordinator / Responsible person prior to work beginning or a permit being issued.
Yes No
1. Did the responsible person obtain prints from FMS detailing hourly rated walls and identify the scope of work?
2. Will the proposed work open or penetrate an existing building structural element, such as a wall or floor, which is smoke-tight or fire-rated?
If YES, continue to #3.
If NO, complete bottom section, numbers 3 through 6 (no approval required)
3. Has the responsible person prepared an itemized schedule of fire/smoke walls to be penetrated?
4. Will the opening(s) or penetration(s) created by the proposed work be sealed using an available and approved UL fire stop system?
MATERIALS UTILIZED IN REPAIR
Attach installation detail sketch
Fire Stopping: _______________________________________________________________
Wall Board: _________________________________________________________________
Other: _____________________________________________________________________ Must provide documentation proving fire stopping is compatible with other fire stopping in area.
Approved by: Date: _____ NOTE: - Contact the POC when work is complete for inspection of area to ensure compliance
To be completed by the COR or designated staff Yes No
1. The proposed work area has been inspected and the proposed plan is approved.
2. A copy of the approved permit has been provided to the work coordinator/supervisor.
3. Work is complete: Every opening, penetration and joint is properly sealed to prevent the escape of fire and smoke.
4. Work is complete and
5. All work has been completed in accordance with industry practice and applicable building fire code requirements.
6. All j-boxes in the area are closed.
Closed by: Date:
to
Comments:
Complete Date and Time:
Location of Work:
HOT WORK PERMIT
THIS PERMIT IS REQUIRED FOR ANY TEMPORARY OPERATION INVOLVING OPEN FLAMES, HEAT, OR
SPARKS; SUCH AS" BRAZING, CUTTING, GRINDING OR WELDING (ANY TORCH USE).
INFORMATION
Safety personnel signing this permit must have valid 30 hour OSHA card and has verified, by his/her signature that all requirements located have been verified and completed.
REQUIRED PRECAUTIONS CHECKLIST
Available sprinklers, hose streams and
COR Final Check Name and Signature: Date:
Complete Date and Time:
Supervisor Name:
Supervisor's Signature:
Hot Work Technician VA Employee/Contractor Name:
Type of Hot Work to be Performed:
Start Date and Time:
Complete Date and Time:
HOT WORK PERMIT
THIS PERMIT IS REQUIRED FOR ANY TEMPORARY OPERATION INVOLVING OPEN FLAMES, HEAT, OR
SPARKS; SUCH AS" BRAZING, CUTTING, GRINDING OR WELDING (ANY TORCH USE).
INFORMATION REQUIRED PRECAUTIONS CHECKLIST
Available sprinklers, hose streams and extinguishers extinguishers are in service/operable? Safety personnel signing this permit must have valid 30 hour OSHA card and has verified, by his/her signature that all requirements located are in service/operable?
Hot work equipment inspected and in good repair?
Requirements within 35 ft. of work
Combustable floors wet down, covered with damp have been verified and completed.
Hot work equipment inspected and in good repair?
Hot Work Technician VA Employee/Contractor Name:
Requirements within 35 ft. of work
Combustable floors wet down, covered with damp sand or fire resistive sheets
Remove other combustables or cover with fire sand or fire resistive sheets
Remove other combustables or cover with fire blankets or curtains blankets or curtains
Wall and floor openings covered
Protect or shut down ducts that may carry sparks to Protect or shut down ducts that may carry sparks to
Location of Work: Wall and floor openings covered Work on walls, ceilings, or roofs combustable areas combustable areas
Type of Hot Work to be Performed: Work on walls, ceilings, or roofs
Construction is non-combustable Construction is non-combustable Combustables have been moved away
Work in enclosed equipment Enclosed permit quipment cleaned of all
Supervisor Name:
Supervisor's Signature:
Combustables have been moved away
Work in enclosed equipment Enclosed permit quipment cleaned of all combustables Containers purged of flammable liquids or vapors Start Date and Time: Containers purged of flammable liquids or vapors combustables Pressurized vessels/piping: isolated or vented Pressurized vessels/piping: isolated or vented Fire watch/monitoring of hot work area Complete Date and Time: Fire watch/monitoring of hot work area Fire watch shall be providedf 30 minutes after work Fire watch shall be providedf 30 minutes after work Fire watch shall be provided with extinguisher(s)
Fire watch is trained in the use of extinguishers and
Complete Date and Time: Fire watch shall be provided with extinguisher(s)
Fire watch is trained in the use of extinguishers and sounding alarm Fire watch may be required in adjoining areas to sounding alarm Complete Date and Time: Fire watch may be required in adjoining areas to Monitor hot work area for three hours after job is work work
Monitor hot work area for three hours after job is Safety Final Check and Approval Name and Signature: Date:
complete complete
Comments:
COR Final Check Name and Signature: Date:
Safety Final Check and Approval Name and Signature: Date:
Steps 1-3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX; C Fine CA Steps 4-14 Adapted with permission Fairview University Medical Center Minneapolis MN Forms modified /updated; provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills MI 2002. Jbartley@ameritech.net Updated, 2009.
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
Step One:
Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and Non-Invasive Activities.
Includes, but is not limited to:
• removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet
• painting (but not sanding)
• wallcovering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• installation of telephone and computer cabling
• access to chase spaces
• cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• sanding of walls for painting or wall covering
• removal of floorcoverings, ceiling tiles and casework
• new wall construction
• minor duct work or electrical work above ceilings
• major cabling activities
• any activity which cannot be completed within a single workshift.
TYPE D
Major demolition and construction projects Includes, but is not limited to:
• activities which require consecutive work shifts
• requires heavy demolition or removal of a complete cabling system
• new construction.
Step 1:
mailto:Jbartley@ameritech.net
Steps 1-3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX; C Fine CA Steps 4-14 Adapted with permission Fairview University Medical Center Minneapolis MN Forms modified /updated; provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills MI 2002. Jbartley@ameritech.net Updated, 2009.
Step Two:
Using the following table, identify the Patient Risk Groups that will be affected.
If more than one risk group will be affected, select the higher risk group:
Low Risk Medium Risk High Risk Highest Risk
• Office areas
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology/MRI
• Respiratory
Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories
(specimen)
• Medical Units
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care
Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Negative pressure isolation rooms
• Oncology
• Operating rooms including C-section rooms
Step 2 Step Three: Match the
Patient Risk Group (Low, Medium, High, Highest) with the planned … Construction Project Type (A, B, C, D) on the following matrix, to find the … Class of Precautions (I, II, III or IV) or level of infection control activities required.
Class I-IV or Color-Coded Precautions are delineated on the following page.
IC Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk Group I II II III/IV
MEDIUM Risk Group I II III IV HIGH Risk Group I II III/IV IV
HIGHEST Risk Group II III/IV III/IV IV Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary.
Step 3
Steps 1-3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX; C Fine CA Steps 4-14 Adapted with permission Fairview University Medical Center Minneapolis MN Forms modified /updated; provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills MI 2002. Jbartley@ameritech.net Updated, 2009.
Description of Required Infection Control Precautions by Class During Construction Project Upon Completion of Project
C L
A
SS
I 1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection
1. Clean work area upon completion of task.
A
SS
II
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with cleaner/disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Upon completion, restore HVAC system where work was performed.
A
SS
II
I
1. Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with cleaner/disinfectant.
5. Upon completion, restore HVAC system
A
SS
IV
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Dept.
2. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
3. Contain construction waste before transport in tightly covered containers.
4. Cover transport receptacles or carts. Tape covering unless solid lid.
5. Vacuum work area with HEPA filtered vacuums.
6. Wet mop area with cleaner/disinfectant.
7. Upon completion, restore HVAC system
Steps 1-3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX; C Fine CA Steps 4-14 Adapted with permission Fairview University Medical Center Minneapolis MN Forms modified /updated; provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills MI 2002. Jbartley@ameritech.net Updated, 2009.
Step 4. Identify the areas surrounding the project area, assessing potential impact
Unit Below Unit Above Lateral Lateral Behind Front
Risk Group Risk Group Risk Group Risk Group Risk Group Risk Group
Step 5. Identify specific site of activity e.g., patient rooms, medication room, etc.
Step 6. Identify issues related to: ventilation, plumbing, electrical in terms of the occurrence of probable outages.
Step 7. Identify containment measures, using prior assessment. What types of barriers?
(E.g., solids wall barriers); Will HEPA filtration be required?
(Note: Renovation/construction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas)
Step 8. Consider potential risk of water damage. Is there a risk due to compromising structural integrity? (e.g., wall, ceiling, roof)
Step 9. Work hours: Can or will the work be done during non-patient care hours?
Step 10. Do plans allow for adequate number of isolation/negative airflow rooms?
Step 11. Do the plans allow for the required number & type of handwashing sinks?
Step 12. Does the infection prevention & control staff agree with the minimum number of sinks for this project? (Verify against FGI Design and Construction Guidelines for types and area)
Step 13. Does the infection prevention & control staff agree with the plans relative to clean and soiled utility rooms?
Step 14. Plan to discuss the following containment issues with the project team.
E.g., traffic flow, housekeeping, debris removal (how and when), Appendix: Identify and communicate the responsibility for project monitoring that includes infection prevention & control concerns and risks. The ICRA may be modified throughout the project.
Revisions must be communicated to the Project Manager.
Steps 1-3 Adapted with permission V Kennedy, B Barnard, St Luke Episcopal Hospital, Houston TX; C Fine CA Steps 4-14 Adapted with permission Fairview University Medical Center Minneapolis MN Forms modified /updated; provided courtesy of Judene Bartley, ECSI Inc. Beverly Hills MI 2002. Jbartley@ameritech.net Updated, 2009.
Infection Control Construction Permit Permit No:
Location of Construction: Project Start Date:
Project Coordinator: Estimated Duration:
Contractor Performing Work: Permit Expiration Date:
Supervisor: Telephone:
YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low Risk TYPE B: Small scale, short duration, moderate to high levels GROUP 2: Medium Risk
TYPE C: Activity generates moderate to high levels of dust, requires greater 1 work shift for completion
GROUP 3: Medium/High Risk
TYPE D: Major duration and construction activities Requiring consecutive work shifts
GROUP 4: Highest Risk
CLASS I 1. Execute work by methods to minimize raising dust from 3. Minor Demolition for Remodeling construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection.
CLASS II 1. Provides active means to prevent air-borne dust from 6. Contain construction waste before transport in tightly dispersing into atmosphere covered containers.
2. Water mist work surfaces to control dust while cutting. 7. Wet mop and/or vacuum with HEPA filtered vacuum
3. Seal unused doors with duct tape. before leaving work area.
4. Block off and seal air vents. 8. Place dust mat at entrance and exit of work area.
5. Wipe surfaces with cleaner/disinfectant. 9. Isolate HVAC system in areas where work is being performed; restore when work completed.
CLASS III
1. Obtain infection control permit before construction begins. 6. Vacuum work with HEPA filtered vacuums.
2. Isolate HVAC system in area where work is being done to 7. Wet mop with cleaner/disinfectant prevent contamination of the duct system. 8. Remove barrier materials carefully to minimize
3. Complete all critical barriers or implement control cube spreading of dirt and debris associated with method before construction begins. construction.
9. Contain construction waste before transport in
4. Maintain negative air pressure within work site utilizing tightly covered containers.
HEPA equipped air filtration units. 10. Cover transport receptacles or carts. Tape covering.
5. Do not remove barriers from work area until complete 11. Upon completion, restore HVAC system where work project is checked by Infection Prevention & Control and was performed.
thoroughly cleaned by Environmental Services.
Date
Initial
CLASS IV
1. Obtain infection control permit before construction begins. 8. Do not remove barriers from work area until completed
2. Isolate HVAC system in area where work is being done to project is checked by Infection Prevention & Control prevent contamination of duct system. and thoroughly cleaned by Environmental. Services.
3. Complete all critical barriers or implement control cube 9. Vacuum work area with HEPA filtered vacuums.
method before construction begins. 10. Wet mop with disinfectant.
4. Maintain negative air pressure within work site utilizing 11. Remove barrier materials carefully to minimize
HEPA equipped air filtration units. spreading of dirt and debris associated with
5. Seal holes, pipes, conduits, and punctures appropriately. construction.
6. Construct anteroom and require all personnel to pass 12. Contain construction waste before transport in tightly through this room so they can be vacuumed using a HEPA covered containers.
vacuum cleaner before leaving work site or they can wear 13. Cover transport receptacles or carts. Tape covering.
cloth or paper coveralls that are removed each time they 14. Upon completion, restore HVAC system where work leave the work site. was performed.
7. All personnel entering work site are required to wear shoe covers
Date
Initial
Additional Requirements:
Date Initials Exceptions/Additions to this permit
Date Initials are noted by attached memoranda Permit Request By: Permit Authorized By:
Date: Date:
CCR/Project Lead:
Safety Official:
X
X
ILSM APPROVAL
Edward P. Boland VA Medical Center
VA Central Western Massachusetts Healthcare System 421 North Main Street
Leeds, MA 01053-9764
REQUEST FOR INFORMATION
NO.
PROJECT TITLE:
LOCATION: JOB:
CONTRACT NO.:
VA PROJECT NO.:
DATE REQUIRED:
TO: CC:
REQUEST SUBJECT:
Requested By: Date:
Signed:
RESPONSE:
This response does not constitute a change to the contract and is not an authorization to the contractor to proceed with any work that modifies the contract price or the time of performance. If the contractor believes that this response modifies any portion of the contract, the contractor shall make timely notice to the Contracting Officer and await the Contracting Officer’s direction before proceeding with any work that the contractor believes is a modification to the contract.
This response may constitute a change to the contract documents. Do not proceed with any work indicated in this response that changes the contract documents until directed in writing by the Contracting Officer.
Response By: Concur:
Signed:
Signed:
VA Project Manager
Date: Date:
Research Laboratory Safety Guidebook Volume 1:
Managing Chemical Safety
Construction Safety Guidebook
Published by
VHA Healthcare Environment and Facilities Programs (HEFP) http://vaww.hefp.va.gov/ i
Table of Contents
PREFACE
Disclaimers ................................................................................................................ xii
Executive Summary ................................................................................................. xiv
Acknowledgements ................................................................................................... xv
Update Listing .......................................................................................................... xvii
Acronyms and Abbreviations ............................................................................... xviii
1 Program Management
1.1. Introduction
1.2. Construction Safety Program
1.2.1. VHA Policy
1.2.2. Plan-Do-Check-Act
1.3. Regulations and Standards
1.3.1. FAR
1.3.2. FAR
1.3.3. VAAR
1.3.4. VHA Procurement Manual
1.3.5. OSHA
1.3.6. VA Medical Center Memorandum (MCM)
1.4. Construction Safety Responsibilities
1.4.1. Veterans Integrated Service Network (VISN) Director
1.4.2. VA Facility Director
1.4.3. Multi-Disciplinary Team (Construction Safety Committee)
1.4.4. Chief Engineer and Resident Engineer (RE)
1.4.5. Facility Safety Program Manager
1.4.6. CO and COR or Project Engineer
1.4.7. Construction Safety Officer (CSO)
1.4.8. GEMS Coordinator
1.4.9. Emergency Planning Coordinator
1.4.10. Construction Lead Person
1.4.11. Police and Security
ii
1.4.12. Infection Control Professional (ICP)
1.4.13. General Contractor
1.4.14. Subcontractor
1.4.15. Intervention Authority and Compliance
1.5. Pre-Award Period and Preconstruction
1.5.1. Responsible Prospective Contractors
1.5.2. ILSM Assessment
1.5.3. Infection Prevention and Control
1.5.4. PICRA
1.5.5. References
1.6. Post-Award and Construction Period
1.6.1. Surveillance
1.6.2. Written Site-Specific Plan
1.7. Post-Construction Period
1.8. Program Evaluation
1.9. Enclosures
2 Hazard Communication
2.1. Key Requirements
2.2. Discussion
2.2.1. Definitions
2.2.2. Certifications
2.2.3. Chemical Classifications
2.2.4. Contractor Written Hazard Communication Program
2.2.5. Employer Written Hazard Communication Program
2.2.6. Labels and Warnings
2.2.7. SDS Documents
2.2.8. Minimum Requirements of SDS Documents
2.2.9. Location and Copies of SDS
2.3. Education and Training
2.4. On-Site Review of Hazard Communication
2.5. References
2.6. Online Resources
2.7. Enclosure
3 Personal Protective Equipment
3.1. Key Requirements
iii
3.2. Discussion
3.2.1. General PPE
3.2.2. Occupational Foot Protection
3.2.3. Head Protection
3.2.4. Eye and Face Protection
3.2.5. Hearing Protection
3.2.6. Safety Belts, Lifelines and Lanyards
3.2.7. Respiratory Protection
3.2.7.a. Permissible Practice
3.2.7.b. Respiratory Protection Program
3.2.7.c. Selection of Respirators
3.2.7.d. Medical Evaluation of Employees
3.2.7.e. Medical Determination
3.2.7.f. Additional Medical Evaluations
3.2.7.g. Fit Testing Requirements
3.2.7.h. Use of Respirators
3.2.7.i. Facepiece Seal Protection
3.2.7.j. Continuing Respirator Effectiveness
3.2.7.k. Maintenance and Care of Respirators
3.2.7.l. Cleaning and Disinfection of Respirators
3.2.7.m. Storage of Respirators
3.2.7.n. Inspection of Respirators
3.2.7.o. Checklist for Respirator Inspection
3.2.7.p. Repairs to Respirators
3.2.7.q. Supplied Air Respirators
3.2.7.r. Identification of Filters, Cartridges and Canisters
3.2.7.s. Program Evaluation
3.2.7.t. Recordkeeping
3.3. Education and Training
3.3.1. Respirator Training and Information
3.4. Certifications
3.5. Formalized Written Program
3.6. References
3.7. Online Resources
3.8. Enclosures
iv
4 Asbestos
4.1. Key Requirements
4.2. Discussion
4.2.1. Definitions
4.2.2. Asbestos History
4.2.3. Initial Project Phase
4.2.4. Design Project Phase
4.2.5. Construction Project Phase
4.3. Training
4.4. Online Resources
4.5. Enclosure
5 Lead
5.1. Key Requirements
5.2. Discussion
5.2.1. Definitions
5.2.2. General
5.2.3. Environmental Lead Assessment
5.3. Education and Training
5.3.1. Certifications
5.3.2. Training
5.4. References
5.5. Online Resources
5.6. Enclosures
6 Silica
6.1. Key Requirements
6.2. Discussion
6.2.1. Definitions
6.2.2. General
6.3. Exposure Assessment
6.4. Controls
6.5. Other Provisions
6.6. Education and Training
6.7. References
6.8. Online Resources
7 Hexavalent Chromium v
7.1. Key Requirements
7.2. Discussion
7.2.1. Definitions
7.2.2. Health Effects
7.2.3. Exposure
7.2.4. Exposure Determination
7.2.5. Methods of Compliance
7.2.5.a. Engineering and Work Practice Controls
7.2.5.b. Respiratory Protection
7.2.5.c. Protective Work Clothing and Equipment
7.2.5.d. Hygiene Areas and Practices
7.2.5.e. Prohibited Activities
7.2.5.f. Medical Surveillance
7.3. Education and Training
7.4. References
7.5. Online Resources
7.6. Enclosures
8 Fire Protection/Prevention and Emergency Planning
8.1. Key Requirements
8.2. Discussion
8.2.1. Mandatory Program Elements
8.2.1.a. Fire Protection
8.2.1.b. Water Supply
8.2.1.c. Portable Fire Fighting Equipment
8.2.1.d. Fire Hose and Connections
8.2.1.e. Sprinkler Protection
8.2.1.f. Fire Alarm Devices
8.2.1.g. Ignition Hazards
8.2.1.h. Hazardous Locations
8.2.1.i. Open Yard Storage
8.2.1.j. Indoor Storage
8.2.1.k. Temporary Heaters
8.2.1.l. Weather Enclosures
8.3. Flammable and Combustible Liquids
8.3.1. Mandatory Program Elements
vi
8.4. Emergency Protection and Prevention
8.4.1. Employee Emergency Action Plans
8.4.2. Mandatory Program Elements
8.5. Education and Training
8.6. References
8.7. Online Resource
8.8. Enclosure
9 Welding and Cutting
9.1. Key Requirements
9.2. Discussion
9.2.1. Permit Authorizing Individual (PAI)
9.2.2. Hot Work Permit
9.2.3. Fire Watch
9.2.4. Gas Welding and Cutting
9.2.5. Arc Welding and Cutting
9.2.6. Welding and Cutting Precautions
9.2.7. Welding, Cutting and Heating in Way of Preservative Coatings
9.3. Education and Training
9.4. References
9.5. Online Resources
9.6. Enclosures
10 Electrical
10.1. Key Requirements
10.2. Discussion
10.2.1. General Requirements
10.2.2. Wiring Design and Protection
10.2.3. Wiring Methods, Components and Equipment for General Use
10.2.4. Specific Purpose Equipment and Installations
10.2.5. Safety Related Work Practices
10.2.6. Locking and Tagging of Circuits
10.2.7. Batteries and Battery Charging
10.3. Education and Training
10.4. References
10.5. Enclosure
11 Energy Isolation vii
11.1. Key Requirements
11.2. Discussion
11.2.1. Definitions
11.2.2. General
11.2.3. Control of Hazardous Energy
11.2.4. Forms of Hazardous Energy
11.2.5. Energy Isolation Procedures
11.2.6. Formalized Written Program Required
11.2.7. Hot Tapping
11.3. Education and Training
11.4. References
11.5. Online Resources
11.6. Enclosures
12 Confined Space Entry
12.1. Key Requirements
12.2. Discussion
12.2.1. Major OSHA Violations
12.2.2. Confined Space Identification
12.2.3. Confined Space Procedures
12.2.4. CSCP/Safety Supervisor Responsibilities
12.2.5. Confined Space Entry Written Program Elements
12.3. Education and Training
12.3.1. Rescue and Emergency Services
12.4. References
12.5. Enclosures
13 Excavation and Trenching
13.1. Key Requirements
13.2. Discussion
13.2.1. Definitions
13.2.2. Soil Testing
13.2.3. Soil Classification
13.2.4. General Protection Provisions
13.2.5. Employee Awareness Training
13.3. Formalized Written Program Required
13.4. Education and Training
viii
13.4.1. Certifications
13.5. References
13.6. Online Resource
13.7. Enclosures
14 Fall Protection
14.1. Key Requirements
14.2. Discussion
14.2.1. Definitions
14.2.2. Formalized Written Program Required
14.2.3. General
14.3. Education and Training
14.3.1. Certifications
14.4. Reference
14.5. Online Resources
14.6. Enclosure
15 Material Handling and Rigging
15.1. Key Requirements
15.2. Discussion
15.2.1. Material Storage
15.2.2. Rigging Equipment
15.2.3. Inspection Criteria
15.2.4. Alloy Steel Chains
15.2.5. Wire Ropes
15.2.5.a. Natural or Synthetic Fiber Rope
15.3. Education and Training
15.3.1. Certifications
15.4. References
15.5. Online Resources
15.6. Enclosures
16 Steel Erection
16.1. Key Requirements
16.2. Discussion
16.2.1. Definitions
16.2.2. Site Layout, Site-Specific Erection Plan and
Construction Sequence ix
16.2.3. Hoisting and Rigging
16.2.4. Structural Steel Assembly
16.2.5. Column Anchorage
16.2.6. Beams and Columns
16.2.7. Open Web Steel Joists
16.2.8. Systems-Engineered Metal Buildings
16.2.9. Falling Object Protection
16.2.10. Fall Protection
16.3. Education and Training
16.4. Reference
16.5. Online Resources
16.6. Enclosure
17 Scaffolds and Aerial Lifts
17.1. Key Requirements
17.2. Discussion
17.2.1. Definitions
17.2.2. Competent Person
17.2.3. General
17.3. Education and Training
17.4. Reference
17.5. Online Resources
17.6. Enclosures
18 Stairways and Ladders
18.1. Key Requirements
18.2. Discussion
18.2.1. Definitions
18.2.2. General
18.3. Training
18.4. References
18.5. Online Resources
18.6. Enclosures
19 Concrete and Masonry
19.1. Key Requirements
19.2. Discussion
19.2.1. Definitions
x
19.2.2. General
19.2.3. PPE and Sanitation Requirements
19.2.4. Requirements for Equipment and Tools
19.2.5. Requirements for Cast-In-Place Concrete
19.2.6. Requirements for Precast Concrete
19.2.7. Requirements for Lift-Slab Operations
19.2.8. Requirements for Masonry Construction
19.3. Education and Training
19.3.1. Certifications
19.4. References
19.5. Online Resources
19.6. Enclosures
20 Hand and Power Tools
20.1. Key Requirements
20.2. Discussion
20.2.1. General
20.2.2. Hand Tools
20.2.3. Power Tools
20.2.4. Abrasive Wheels and Tools
20.2.5. Woodworking Tools
20.2.6. Jacks: Lever and Ratchet, Screw and Hydraulic
20.2.7. Air Receivers
20.3. Education and Training
20.3.1. Certifications
20.4. Reference
20.5. Online Resources
20.6. Enclosure
21 Cranes and Load Handling Equipment
21.1. Key Requirements
21.2. Discussion
21.2.1. Definitions
21.2.2. Types of Cranes
21.2.3. Standard Lift Plan (SLP)
21.2.4. Inspection Criteria for Load Handling Equipment
21.2.5. Safety Devices and Operational Aids
xi
21.2.6. Testing
21.2.7. Operation
21.2.8. Critical Lifts
21.2.9. Environmental Considerations
21.3. Education and Training
21.3.1. Crane Operator Requirements − General
21.3.2. Crane Operator Certification, Qualification and Designation
21.3.3. Signal Person Qualifications
21.4. References
21.5. Online Resources
21.6. Enclosures
Enclosures xii
Disclaimers Endorsement
Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government and shall not be used for advertising or product endorsement purposes.
Hyperlinks
The appearance of external hyperlinks does not constitute endorsement by the
Department of Veterans Affairs (VA) of the linked websites or the information, products, or services contained therein. For other than authorized VA activities, the Department does not exercise any editorial control over the information you may find at these locations. All links are provided with the intent of meeting the mission of the Department and the VA website. Please let us know about existing external links that you believe are inappropriate and about specific additional external links that you believe should be included.
Liability
With respect to documents available from this server, neither the U.S.
Government nor any of its employees makes any warranty, expressed or implied, including the warranties of merchantability and fitness for a particular purpose, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately-owned rights.
Reference from this website or from any of the information services sponsored by
VA to any non-governmental entity, product, service, or information does not constitute an endorsement or recommendation by VA or any of its employees. We are not responsible for the content of any “off-site” websites referenced from the
Veterans Health Administration (VHA) Healthcare Environment Facilities
Programs (HEFP) website, electronic media, or printed media.
Guidance
VHA HEFP guidebooks are “BEST PRACTICE” resources designed to assist health care facilities implement and enhance programs and more effectively comply with current VA/VHA policy and external regulatory standards. HEFP guidebooks are NOT OFFICIAL POLICY. In accordance with VHA Directive
6330(1), Controlled National Policy/Directives Management System, official policy documents include: (1) Directives, which carry the authority to mandate
Department- or Administration-wide policies and (2) Handbooks, which carry the xiii authority to mandate procedures or operational requirements implementing policies contained in directives.
xiv
Executive Summary Safety is a philosophy and a practice that identifies and eliminates jobsite hazards throughout the lifecycle of a project and discourages work practices and equipment that place individuals at risk of injury. The Office of Occupational Safety, Health and GEMS Programs (10NA8) in the
Veterans Health Administration (VHA) Headquarters recognized the need to assist Department of Veterans
Affairs (VA) facilities in complying with safety standards and ensuring a safe environment for patients, visitors and staff.
As a result, VHA Directive 2004-012, Safety and Health
During Construction Activities, and its subsequent revisions, VHA Directive 2011-036, Safety and Health During
Construction (2011), and VHA Directive 7715, Safety and
Health During Construction (2017) established policy for consistent construction safety programs across VHA. To support the VHA Directive, the Healthcare Environment
Facilities Programs (HEFP) established a standing multi-disciplinary task group to create a functional guidebook that would be revised as needed to reflect the latest guidance for safe construction activities at VHA facilities.
The goal of this guidebook is to provide guidance for active participation in the facility Construction Safety Program. It provides safety training guidelines and will assist managers in identifying risks/hazards and establishing a process for their control, elimination and prevention. This guidebook is designed not only for program officials (e.g., Safety Officer, Chief
Engineer, etc.), but is also intended for use by all managers throughout the facility.
Questions regarding the use and application of this guidebook may be addressed to Mr. Richard Watson, HEFP Construction
Safety Product and Service Manager, at 937-268-6511, ext. 2069, or by email at
Richard.Watson@va.gov.
xv
Acknowledgements This guidebook was possible because of the devoted attention of the personnel and management of the VHA Center for Engineering & Occupational Safety and Health
(CEOSH), St. Louis, Missouri.
A special thank you is extended to the Construction Safety Professional Advisory
Group (PAG) who developed this guidebook, and to management at their respective facilities for their support.
David Birk, PE, CSP, Construction Safety Engineer, VAMC, West Haven, CT
Claudia Boutot, Construction Safety Engineer, VAMC, Bay Pines, FL
Che Buval, Safety and Occupational Health Specialist, VAMC, Temple, TX
Jerry Fox, BS, Environmental Safety Manager, VAMC, Danville, IL
*Jennifer Hamner, CHSP, MSPH, Safety Manager, VAMC, Biloxi, MS
Michael Henrickson, MPH, CHMM, CFI, Occupational Safety and Health
Manager, VISN 7, Columbia, SC
Richard Hofman, CIH, CSP, CPEA, Senior Industrial Hygienist, VHACO, Washington, DC
John Houvener, CHCM, Safety and Occupational Health Program Manager, VHACO, Washington, DC
Sean Kaminski, Contracting Officer, PCAC, Cleveland, OH
Gary Krupa, PE, Senior Electrical Engineer, VAMC, Omaha, NE
Brian Marcyjanik, CSP, CHMM, General Safety Program Manager, VHACO, Washington, DC
David McClintock, Safety Specialist, VAMC, Danville, IL
Mike Minicky, CSP, General Safety Product and Service Manager, HEFP, St.
Louis, MO
Darlene Powell, CHSP, HEM, Chief, Safety and Emergency Management, VAMC, Bay Pines, FL
Michael Reed, BSEE, CHFM, Healthcare Engineering Product and Service
Manager, HEFP, St. Louis, MO
George Stevens, PE, MPH, Chief, Safety and Emergency Management, VAMC, Phoenix, AZ
Sheila Taylor, BS, Safety Manager, VAMC, Saginaw, MI xvi
*Richard Watson, MPH, CSP, Construction Safety Product and Service
Manager, HEFP, Dayton, OH
Carl Wise, Maintenance Mechanic Leader, VAMC, Danville, IL
*Chairpersons
HEFP Publishing Staff:
Tina Beckner, Lead Technical Information Specialist, St. Louis, MO
Lesley Luscri, Technical Information Specialist, HEFP, St. Louis, MO
Melody Watts, Technical Information Specialist, HEFP, St. Louis, MO
Connie Young, Chief, Publishing Services, HEFP, St. Louis, MO xvii
Update Listing The following listing identifies online updates for this guidebook. It is designed to assist the reader in verifying the most current information available.
Table 1: Update Listing
Update
Number Date Updated Remarks Chapter xviii
Acronyms and Abbreviations Acronym/
Abbreviation
Definition μg Micrograms μg/m3 Micrograms per Cubic Meter
A2B Anti-Two Blocking Device
AC Alternate Current
ACD Allergic Contact Dermatitis
ACGIH American Conference of Governmental Industrial
Hygienists
ACI American Concrete Institute
ACM Asbestos Containing Materials
AE Architect and Engineering
AHA Activity Hazard Analysis
AHERA Asbestos Hazard Emergency Response Act
AIA American Institute of Architects
AIIR Airborne Infection Isolation Room
ANSI American National Standards Institute
API American Petroleum Institute
APIC Association for Professionals in Infection Control and
Epidemiology
APP Accident Prevention Plan
ASHARA Asbestos School Hazard Abatement Reauthorization
Act
ASHRAE American Society of Heating, Refrigerating and Air
Conditioning Engineers
ASME American Society of Mechanical Engineers
AWE Annual Workplace Evaluation
BLL Blood Lead Level xix
BLS Bureau of Labor Statistics
CAI Capital Asset Inventory
CDC Center for Disease Control
CDZ Controlled Decking Zone
CEOSH Center for Engineering & Occupational Safety and
Health
CERCLA Comprehensive Environmental Responsibility, Compensation and Liability Act
CFM Office of Construction & Facilities Management
CFR Code of Federal Regulations
CIH® Certified Industrial Hygienist cm Centimeter
CO Contracting Officer
COR Contracting Officer’s Representative
COTR Contracting Officer’s Technical Representative
CP Competent Person
CPL Compliance
CPR Cardiopulmonary Resuscitation
CPSC Consumer Product Safety Commission
CR(VI) Hexavalent Chromium
CS Construction Safety
CSE Confined Space Entry
CSCP Confined Space Competent Person
CSI Clinical-Specific Initiatives
CSO Construction Safety Officer
DART Days Away, Restricted, Transferred dBA Decibels xx
DC Direct Current
DHHS Department of Health and Human Services
D.O. Doctor of Osteopathy
DOL Department of Labor
DOT Department of Transportation
EMR Experience Modification Rate
EPA Environmental Protection Agency
E-SAFE Environmental Safety Automated Facility Evaluation
ESCBA Escape Self-Contained Breathing Apparatus f/cc Fibers per Cubic Centimeter
FAA Federal Aviation Administration
FAR Federal Acquisitions Regulations
FDA Food and Drug Administration
FGI Facilities Guidelines Institute
ft. Foot/Feet g Gram
GEMS Green Environmental Management Systems
GFCI Ground Fault Circuit Interrupters
GHS Globally-Harmonized System of Classification and
Labeling of Chemicals
GPM Gallons Per Minute
H Horizontal
HAI Healthcare Associated Infections
HCP Hazard Communication Program
HEPA
HEFP
High Efficiency Particulate Air
Healthcare Environment Facilities Programs
HVAC Heating, Ventilation and Air Conditioning xxi
HUD Housing and Urban Development
IARC International Agency for Research on Cancer
ICP Infection Control Practitioner
ICRA Infection Control Risk Assessment
ICU Intensive Care Unit
ID Identification
IDLH Immediately Dangerous to Life and Health
IH Industrial Hygienist
ILSM Interim Life Safety Measures
in. Inch
ISO International Standards Organization kPa Kilopascal kv Kilovolt
lb. Pound
LBP Lead Based Paint
LDR Land Disposal Restrictions
LFL Lower Flammable Limit
LHE Load Handling Equipment
LMI Load Moment Indicator
LOI Letter of Interpretation
LOTO Lockout/Tagout
LP Liquefied Petroleum
LWDIR Loss Work Day Incident Rate m Meter m3 Cubic Meter
M&O Maintenance and Operations
MAP Model Accreditation Plan xxii
MCM Medical Center Memorandum
M.D. Doctor of Medicine mg Milligram
MLR Multiple Lift Rigging
MMAD Mass Median Aerodynamic Diameter mppcf Millions of Particles per Cubic Foot
NAICS North American Industrial Classification System
NCCCO National Commission for the Certification of Crane
Operators
NEC National Electric Code
NESHAP National Emission Standards for Hazardous Air
Pollutants
NFPA National Fire Protection Association
NIOSH National Institute for Occupational Safety and Health
NOB Non-Friable Organically Bound
NPRCS Non-Permit-Required Confined Spaces
NRM Non-Recurring Maintenance
NRR Noise Reduction Rating
NTP National Toxicology Program
OD Optical Density
O&M Operations and Maintenance
OSH Occupational Safety and Health
OSHA Occupational Safety and Health Administration
OTI OSHA Training Institute
PACM Presumed Asbestos Containing Material
PACU Post-Anesthesia Care Unit
PAI Permit Authorizing Individual xxiii
PAPR Powered Air-Purifying Respirator
PCB polychlorinated biphenyl
PCM Phase Contrast Microscopy
PDF Personal Decontamination Facility
PEL Permissible Exposure Limit
PFAS Personal Fall Arrest System
PG Program Guide
PHSC Project Health and Safety Coordinator
PICRA Preconstruction/Infection Control Risk Assessment
PLHCP Professionally Licensed Health Care Professional
PLM Polarized Light Microscopy
PM Procurement Manual
PM&R Physical Medicine and Rehabilitation
PNOR Particulates Not Otherwise Regulated ppb Parts per Billion
PPE Personal Protective Equipment
PPM Parts Per Million
PRCS Permit Required Confined Space psf. Per Square Foot psi Pound Per Square Inch
Q&A Questions and Answers
QLFTP Qualitative Fit Testing Procedures
QNFTP Quantitative Fit Testing Procedures
QP Qualified Person
QR Qualified Rigger
RACM Regulated Asbestos-Containing Material
RCRA Resource Conservation and Recovery Act xxiv
RE Resident Engineer
REL Recommended Exposure Level
ROPS Rollover Protective Structures
RPE Registered Professional Engineer
RPM Revolutions Per Minute
RQ Reportable Quantity
RRP Renovation, Repair and Painting Rule
S Service
SAFE Safety Automated Facility Evaluation
SAR Supplied Air Respirator
SCBA Self-Contained Breathing Apparatus
SCIP Strategic Capital Investment Planning
SEG Similar Exposure Group
SI International System of Units
SiO2 Crystalline Silica
SIC Standard Industrial Classification
SJ Service Junior
SJO Service Junior with Oil Resistant Jacket
SJT Service Junior Thermoplastic
SJTO Service Junior Thermoplastic with Oil Resistant Jacket
SLP Standard Lift Plan
SO Service Oil Resistant Jacket
SOP Standard Operating Procedure
SOW Statement of Work
SPD Supply, Processing and Distribution
ST Service Thermoplastic
STO Service Thermoplastic with Oil Resistant Jacket xxv
SWL Safe Working Load
TB Tuberculosis
TC Toxicity Characteristic
TCLP Toxicity Characteristic Leaching Procedure
TEM Transmission Electron Microscopy
TIL Technical Information Library
TSI Thermal Systems Insulation tsf Tons per square foot
TWA Time-Weighted Average
UL Underwriters Laboratories Incorporated
U.S. United States
USC United States Code
USDL United States Department of Labor
V Vertical
VA Veterans Affairs
VAAR VA Acquisition Regulation
VACO VA Central Office
VAI Vermiculite Attic Insulation
VAMC VA Medical Center
VAT Vinyl Asbestos Floor Tiles
VHA Veterans Health Administration
VISN Veterans Integrated Service Network
W/EDF Waste/Equipment Decontamination Facility
WLL Working Load Limit
XRF X-ray Fluorescence Technology
ZPP Zinc-Protoporphyrin xxvi
Chapter 1 Program Management
1 Program Management
1.1. Introduction
Construction is a high hazard occupation. Over 11 million construction workers build and maintain roads, houses, workplaces and physical infrastructure. This work includes many inherently hazardous tasks and conditions such as work at height, excavations, noise, dust, power tools and equipment, confined spaces and electricity. Construction work includes about 8 percent of United States (U.S.)
workers, but accounts for 22 percent of the fatalities − the largest number of fatalities reported for any of the industry sectors according to the National Institute for Occupational Safety and Health (NIOSH).
The implementation of Construction Safety Programs is expected to reduce the potential for injuries and illnesses to Veterans Affairs (VA) patients, employees and visitors from unsafe construction activities conducted by contractors as well as VA employees, including operations and maintenance crews, permanent construction crews and temporary purchase and hire staff. Construction Safety
Programs will also reduce the potential for VA liability, lost time, added costs and other intangibles that often result from construction accidents, life safety deficiencies or infection control failures.
Historically, Infection Control Practitioners (ICPs) have had minimal involvement in construction, demolition and renovation activities in medical centers. They have always been involved in preventing infections such as urinary tract infections, pneumonias, surgical site infections and bacteremias (bloodstream infections) in hospitalized patients. It was not until the late 1990’s that ICPs and others began to see the importance of their early and continuous involvement in construction activities.
Occupational Safety and Health Administration (OSHA) and Environmental
Protection Agency (EPA) regulations, The Joint Commission requirements and
Facilities Guidelines Institute (FGI), formerly the American Institute of Architects
(AIA), guidance identify opportunities for maintaining the health and safety of VA patients, staff, visitors and contractors. OSHA and EPA regulations, in addition to requirements with VA Directive 7700, Occupational Safety and Health; Veterans
Health Administration (VHA) Directive 7701, Occupational Safety and Health
(OSH), occupational safety and health issues for employees and contractors working on VA/VHA property are addressed. The Joint Commission requirements and FGI guidance address patient safety during construction activities.
1.2. Construction Safety Program
Construction work is inherently dangerous and can result in serious injury, illness and even death. In order to protect patients, staff, volunteers, visitors and contractors from safety and health hazards associated with construction activities, strategies need to be established to control the hazards inherent in conducting construction or renovation activities. These strategies include the assignment of appropriate responsibility at all levels of the organization, establishing and maintaining the necessary expertise to manage an effective Construction Safety and Health Program, applying technical guidance and best practices to assist in managing the program and providing a Construction Safety Multi-Disciplinary
Team to oversee and enforce the application of the Construction Safety Program.
The intent of the Construction Safety Program is to reduce the potential for injury and illness resulting from unsafe construction activities conducted by contractors and VA employees. In the past, VHA has experienced several injuries, illnesses and even fatalities of patients, staff and contractors due to unsafe construction activities. According to a U.S. Department of Labor (US DOL) study (National
Census of Fatal Occupational Injuries in 2015: USDL-16-2304), fatal injuries among construction and extraction occupations rose by 2 percent to 924 cases in
2015; the highest since 2008. Several construction occupations recorded their highest fatality total in years, including construction laborers (highest since 2008);
carpenters (2009); electricians (2009); and plumbers, pipefitters and steamfitters
(2003). The current Bureau of Labor Statistics (BLS) data is available at http://www.bls.gov/news.release/cfoi.nr0.htm.
OSHA conducts half of all enforcement inspections in the construction industry and has established national emphasis programs in general construction, excavation and trenching and falls from elevation. Moreover, OSHA regional emphasis programs may include cranes, confined spaces, electrical safety and scaffolding. OSHA Title 29 Code of Federal Regulations (CFR) Part 1960 (29
CFR 1960, Basic Program Elements for Federal Employee Occupational Safety and Health Programs and Related Matters) requires each agency to develop, implement and evaluate an Occupational Safety and Health (OSH) Program to include construction safety. Federal Acquisition Regulations (FAR) require that contracts have provisions for assurance that construction contractors implement
Construction Safety and Health Programs and require Contracting Officers (COs) to enforce compliance of Federal safety and health standards. The Joint
Commission requires that hospitals have a written plan for managing the safety of patients, staff, volunteers and visitors during construction activities.
The purpose of the Construction Safety Guidebook is to provide users with strategies for reducing the potential for occupational injury or illness and decrease the risk of exposure to hazardous conditions and situations to patients, employees, volunteers and visitors. The challenge of reducing exposure, risks and injury during construction can be met by supporting on-going education, focusing on hazardous exposures and integrating the procedures outlined in this guidebook.
1.2.1. VHA Policy
The VHA policy and specific strategies for construction safety have been updated in revised VHA Directive 7715, Safety and Health During Construction.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .