36C24123R0183 0001.docx
DOCX document 22 KB Posted
- Attached to
- Z2DA--631-23-014 Replace Roof Building 7 Federal contract opportunity
- Solicitation number
- 36C24123R0183
About this file
This document contains questions and answers related to federal contract solicitation number 36C24123R0183. The solicitation is for replacing the roof on Building 7 at the VA Central Western Massachusetts Healthcare System located in Leeds, Massachusetts. Work can be performed simultaneously on Building 7 and Building 5. Staging will take place behind Building 7. The contractor is responsible for project management software and submittal exchange will be accepted. Lead-based paint removal is expected to be paint on fascia, soffit, and trim, which must be contained and disposed of according to specifications. New fascia, soffit and trim will be PVC material. An administrative notice to proceed will not be issued to allow for early material procurement, as the statement of work accounts for ordering, demolition, and weather delays within the 240 calendar day period of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Replace Roof B7 - SOW Rev1.docx | DOCX document | |
| 010000 General Requirements Rev1.docx | DOCX document | |
| 36C24123R0183 0002.docx | DOCX document | |
| S06_H-103-Roof Plan_Rev1.pdf | ||
| S06_AE103-Roof Plan_Rev 1.pdf | ||
| P03 SSJ NEI signed CR.pdf | ||
| P09_Past Performance Information Form for Contractors.docx | DOCX document | |
| P07_Wage Determination_MA20230003 09-15-2023.pdf | ||
| P09_631-23-014 SOW_SPEC_Drawing Package.pdf | ||
| 36C24123R0183.docx | DOCX document | |
| P03 SSJ Best Locks signed CR.pdf | ||
| P09 Past Performance Questionnaire.docx | DOCX document | |
| P09_Combined Attached Forms.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 631-23-014 36C241 Department of Veterans Affairs Network Contracting Office 1 VA Central Western Massachusetts HCS 421 North Main Street Leeds
MA
01053-9764 36C241 Department of Veterans Affairs VAMC Manchester 718 Smyth Road Manchester
NH
03104 To all Offerors/Bidders
36C24123R0183 10-11-2023
X X
See CONTINUATION Page X The purpose of this amendment is to:
1. Publish RFI questions and answers.
2. Publish the drawing revisions, please see attached.
All other terms and conditions remain unchanged.
Chelsea Rodrigue Contracting Officer
VA-VHA-RPOE-2023-0029
PROJECT NAME: 631-23-014_Replace Roof Building 7
Question #: 01 Sheet: N/A Spec: General Conditions Topic: Management Question: Please confirm, must the SSHO and superintendent / QCM be separate individuals, or can one individual fill both positions?
Response: One individual can fill both positions.
Question #: 02 Sheet: N/A Spec: N/A Topic: Work Hours Question: Please confirm, is the entirety of this project anticipated to be performed during regular day shift hours?
Response: Confirmed, the project can perform during regular shift hours.
Question #: 03 Sheet: N/A Spec: 02 82 11 Topic: Abatement Question: In the asbestos report provided in the specifications, it states to assume entire roof system requires abatement, however it also lists a quantity 2,000 SF of ACM at the roof. Being that the actual area of the roof is much larger than 2,000 SF, how many square feet of ACM within the existing roof system should the contractor assume, for bidding purposes, will require abatement?
Response: We expect 2000SF ACM slater cement to be present. In past roofing demolitions, we have found slater cement in the first few feet off of the roof edge and eaves.
Question #: 04 Sheet: N/A Spec: N/A Topic: Roof Warranty Question: Is the existing roof of Building 7 and/or Building 5 under an existing warranty? If so, who holds the current warranty?
Response: There is no existing warranty roof for Building 7 and Building 5.
Question #: 05 Sheet: N/A Spec: General Conditions Topic: Material Staging Question: Is there a designated material staging location at the facility for this project? If so, where is it relative to the work area?
Response: Staging location will be behind Building 7.
Question #: 06 Sheet: N/A Spec: N/A Topic: Phasing Question: Can work be performed on Building 7 and Building 5 simultaneously, or will the contractor be constrained to complete one roof before moving onto the other?
Response: Work can be performed on Building 5 and Building 7 simultaneously.
Question #: 07 Sheet: N/A Spec: N/A Topic: Submittal Exchange Question: Is the contractor responsible for costs associated with the Submittal Exchange platform as part of this contract?
Response: Contractor is responsible for project management software. The Station will accept Submittal Exchange for use on this project.
Question #: 08 Sheet: 7-H-103 Spec: 02 83 33.13 Topic: Lead Based Paint Question: The contract documents do not seem to give a direct means of quantifying the lead-based paint removal. For bidding purposes, how much lead-based paint is to be assumed to be removed as part of this contract?
Response: The expected lead-based materials will be the paint on the old facia, soffit, and trim which must be contained and disposed during demolition per the specifications. The new facia, soffit, and trim will be a PVC type material per the specifications.
Question #: 09 Sheet: 7-H-103 Spec: Solicitation Topic: Deduct Alternate Question: 7-H-103 mentions a deductive alternate for keeping the existing slate roof, however this is not reflected in the price schedule provided on page 5 of the solicitation. Please clarify whether there is to be a deductive alternate on this bid, and if so please provide a revised price schedule to show the deduct alternate for bid submission.
Response: There will be no deductive alternative on this bid and drawing 7-H-103 will be revised and updated.
Question #: 10 Sheet: See Page 1 of SOW (1.2) Spec: N/A Topic: Administrative NTP Question: Because of long lead times on roofing material, would the VA consider issuing an administrative NTP to allow for procurement prior to the start of the period of performance?
Response: We do not have administrate NTPs for ordering material, we will address any delays with proof of any delay as we receive them. We have not experienced any issues with ordering roofing materials on any of our previous site projects. As shown in the SOW (1.2) time has been built into the 240 calendar days for construction, ordering, demo, and weather delays etc...
See attached document: S06_AE103-Roof Plan_Rev 1.
See attached document: S06_H-103-Roof Plan_Rev1.