S06_AE103-Roof Plan_Rev 1.pdf

PDF 152 KB Posted

Attached to
Z2DA--631-23-014 Replace Roof Building 7 Federal contract opportunity
Solicitation number
36C24123R0183
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains a roof plan drawing and related federal contract opportunity solicitation. The roof plan drawing provides details for replacing the roof on Building 7 at a VA facility, including removing and replacing damaged roof sheathing, installing new flashing and roofing materials. A TPO membrane roof will be installed over new roof recovery board with flashings. Existing slate roofs will have slate shingles, underlayment and flashings removed and replaced with new slate shingle roofing and copper flashings. The contract opportunity solicitation is for replacing the roof on Building 7 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The solicitation number is provided.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--631-23-014 Replace Roof Building 7, newest first.
File Type Posted
010000 General Requirements Rev1.docx DOCX document
36C24123R0183 0002.docx DOCX document
Replace Roof B7 - SOW Rev1.docx DOCX document
S06_H-103-Roof Plan_Rev1.pdf PDF
36C24123R0183 0001.docx DOCX document
P03 SSJ Best Locks signed CR.pdf PDF
P09 Past Performance Questionnaire.docx DOCX document
P09_Combined Attached Forms.pdf PDF
P03 SSJ NEI signed CR.pdf PDF
P09_Past Performance Information Form for Contractors.docx DOCX document
P07_Wage Determination_MA20230003 09-15-2023.pdf PDF
P09_631-23-014 SOW_SPEC_Drawing Package.pdf PDF
36C24123R0183.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

631-23-014

REPLACE ROOF BUILDING 7

VA CWM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Approved Date:

Approved Title:

Approved Name:

GR

AP

HI

C

SC

AL

E:

1/

4"

1' -0

4' 2'

1' 8'

0'

GR

AP

HI

C

SC

AL

E:

1/

2"

1' -0

2' 1'

6" 4'

0'

GR

AP

HI

C

SC

AL

E:

1/

8"

1' -0

8' 4'

2'

GR

AP

HI

C

SC

AL

E:

3/

8"

1' -0

4' 2'

6'

1' 6"

GR

AP

HI

C

SC

AL

E:

3/

4"

1' -0

2' 1'

6" 3'

0' 3"

GR

AP

HI

C

SC

AL

E:

1"

1'

-0

2' 1'

1/2

0'

GR

AP

HI

C

SC

AL

E:

3"

1'

-0

1' 6"

3" 0'

9" 11 2"

GR

AP

HI

C

SC

AL

E:

1-

1/2

1' -0

2' 1'

6" 0'

3"

# Date:Revision Description:

7-AE-103

ROOF PLAN

REVISION 1 11/03/2023

ROOF NOTES:

1. REMOVE & REPLACE ROOF SHEATHING WHERE DAMAGED & ROTTING. REPLACE w/ SOLID

WOOD SHEATHING TO MATCH THICKNESS OF EXISTING ADJACENT SHEATHING TO REMAIN. FOR

PURPOSES OF BIDDING, CONTRACTOR SHALL ASSUME A TOTAL OF 1500 S.F. OF AREA TO BE

REPLACED. AREA MAY BE CONTIGUOUS OR RANDOM.

3. AT SLATE ROOF PROVIDE NEW ROOF FLASHING AT ALL ROOF PENETRATIONS. INSTALL

FLASHINGS PER THE REQUIREMENTS & RECOMMENDATION OF THE LATEST EDITION OF THE

SLATE ROOFS DESIGN AND INSTALLATION MANUAL BY THE NATIONAL SLATE ASSOCIATION.

5. SLATE INSTALLATION TO BE COMPLETE IN ACCORDANCE WITH THE REQUIREMENTS &

RECOMMENDATION PER THE LATEST EDITION OF THE SLATE ROOFS DESIGN AND

INSTALLATION MANUAL BY THE NATIONAL SLATE ASSOCIATION.

6. GC TO CONFIRM ALL ROOF PENETRATIONS IN FIELD. REMOVE ALL UNUSED PIPE AND DUCT

PENETRATIONS AND CAP OFF BELOW ROOF DECK. INFILL OPENINGS AT REMOVED ITEMS w/

NEW SHEATHING TO MATCH THICKNESS OF EXISTING SUBSTRATE.

COMPLETELY REMOVE EXISTING ROOF ACCESS HATCH & CURB. REFRAME & ENLARGE

OPENING TO ACCOMMODATE NEW ROOF HATCH. PROVIDE NEW PREFINISHED INSULATED

ROOF ACCESS HATCH w/ INSULATED CURB. HATCH TO CLEAR INSIDE DIMENSION TO BE 30"x54". FLASH TO ROOF AS RECOMMENDED BY HATCH MANUFACTURE & MEMBRANE ROOF

MANUFACTURER. REFER TO DETAIL 3/7-AE-301. MODIFY LOCATION OF DUCT WORK &

SPRINKLER PIPE TO ACCOMMODATE NEW HATCH AND LADDER.

ROOF KEY NOTES:

REMOVE EXISTING VALLEY FLASHING AND REPLACE w/ NEW 36" WIDE 20 OZ. COPPER VALLEY w/ 12" EXPOSED. REFER TO DETAIL 1&6/7-AE-503 FOR ADDITIONAL DETAILS.

COMPLETELY REMOVE EXISTING ROOFING & FLASHINGS TO EXPOSE EXISTING SUBSTRATE.

PROVIDE NEW TPO ROOF ON NEW ROOF RECOVERY BOARD w/ NEW FLASHINGS. REFER TO

DETAIL 3/7-AE-503 FOR ADDITIONAL INFORMATION.

NEW SLATE MITERED HIP. REFER TO DETAIL 5/7-AE-503 FOR ADDITIONAL INFORMATION.

ROOF PLAN

1/8" = 1'-0"1

5 AT THE EXISTING SLOPED ROOFS, COMPLETELY REMOVE EXISTING SLATE ROOF SHINGLES,

ROOF UNDERLAYMENT & FLASHINGS TO EXPOSE EXISTING ROOF SHEATHING. SALVAGE

SLATE ROOF SHINGLES FOR RE-INSTALLATION AT LOCATION INDICATED. INSTALL NEW SLATE

SHINGLE ROOFING w/ NEW UNDERLAYMENT & COPPER FLASHINGS OVER THE ENTIRE

EXISTING ROOF.

642 4 2

2. AT THE EXISTING ROOF, PROVIDE NEW 20 OZ. COPPER ROOF FLASHING AT ALL ROOF

PENETRATIONS AND REPLACE AT ALL EXISTING LOCATIONS. INSTALL FLASHINGS PER SLATE

ROOFS DESIGN AND INSTALL MANUAL, 2010 EDITION BY THE NATIONAL SLATE ASSOCIATION.

GC TO CONFIRM ALL ROOF PENETRATIONS IN FIELD. REMOVE ALL UNUSED PIPE AND DUCT

PENETRATIONS AND CAP OFF BELOW ROOF DECK. INFILL OPENINGS AT REMOVED ITEMS w/

NEW SHEATHING TO MATCH THICKNESS OF EXISTING SUBSTRATE.

4.

6 NEW COPPER RIDGE CAP. REFER TO DETAIL 4/7-AE-503.

642 4 2

NEW COPPER GUTTER & DOWN SPOUTS. REFER TO BUILDING ELEVATIONS FOR DOWN

SPOUT LOCATIONS.

NEW 36" WIDE ROOF WALKWAY PAD ADHERED TO MEMBRANE ROOFING.

NEW SNOW RETENTION. PROVIDE DESIGN OF SNOW RETENTION TO ADEQUATELY RESIST

SNOW SLIDES. MANUFACTURER TO DETERMINE ATTACHMENT METHOD & QUANTITY OF

ROWS w/ FIELD CONDITIONS. SUBMIT SHOP DRAWINGS SIGN BY LICENSED PROFESSIONAL

ENGINEER LICENSED IN MASSACHUSETTS.

6 6

EXISTING MEMBRANE ROOF TO REMAIN. NO WORK.

7. ALL TAPERED ROOF BOARD TO SLOPE AT 1/4" PER 12" MINIMUM. COORDINATE ROOF DRAIN LOCATIONS w/ ROOF INSULATION SHOP DRAWINGS.

REPLACE MISSING RIDGE CAP w/ NEW

ROOF CAP TO MATCH EXISTING.

8. REMOVE ALL ROOF VENTILATION DEVICES AND INFILL OPENING PRIOR TO RE-ROOFING AND

INSULATING OF THE ATTIC SPACE. NEW ROOF DECKING TO MATCH THICKNESS OF EXISTING

AND SECURED TO STRUCTURE.

Sheets and Views
7-AE-103

File details come from the government source that posted it. Updated .