S06_H-103-Roof Plan_Rev1.pdf
PDF 631 KB Posted
- Attached to
- Z2DA--631-23-014 Replace Roof Building 7 Federal contract opportunity
- Solicitation number
- 36C24123R0183
About this file
This document includes plans for roof abatement on Building 7 of a Department of Veterans Affairs facility. The roofing system contains asbestos and lead materials that require special handling and disposal according to EPA and OSHA regulations. Notable details include:
-
Manual wet methods must be used to control dust during asbestos and non-asbestos material removal. A non-traditional asbestos abatement plan may be required if wet methods are not followed.
-
Visible roofing debris around the building perimeter must be collected and disposed of by the abatement contractor before surface disturbance.
-
OSHA lead regulations apply to any demolition that would disturb painted surfaces or materials containing lead, such as sanding, scraping, cutting or welding. Lead disposal is also subject to EPA RCRA regulations.
-
The related federal contract opportunity is solicitation number 36C24123R0183 from the Department of Veterans Affairs Veterans Health Administration VISN 1 to replace the roof on Building 7 under project number 631-23-014.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 010000 General Requirements Rev1.docx | DOCX document | |
| 36C24123R0183 0002.docx | DOCX document | |
| Replace Roof B7 - SOW Rev1.docx | DOCX document | |
| 36C24123R0183 0001.docx | DOCX document | |
| S06_AE103-Roof Plan_Rev 1.pdf | ||
| P03 SSJ Best Locks signed CR.pdf | ||
| P09 Past Performance Questionnaire.docx | DOCX document | |
| P09_Combined Attached Forms.pdf | ||
| P03 SSJ NEI signed CR.pdf | ||
| P09_Past Performance Information Form for Contractors.docx | DOCX document | |
| P07_Wage Determination_MA20230003 09-15-2023.pdf | ||
| P09_631-23-014 SOW_SPEC_Drawing Package.pdf | ||
| 36C24123R0183.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF ABATEMENT NOTES:
1. THE SLATE ROOFING SYSTEM CONTAINS ASBESTOS SLATERS CEMENT AND ASBESTOS PATCHING/REPAIR MATERIALS. MATERIALS CONTAINING ASBESTOS REQUIRE SPECIAL HANDLING AND DISPOSAL IF DISTURBED OR REMOVED. MATERIALS CONTAINING ASBESTOS SHALL BE HANDLED AND
DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE AND EPA REQUIREMENTS.
2. ROOF ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM THE WORK AREA. CONTRACTOR SHALL APPLY TO THE MASSDEP FOR A NON-TRADITIONAL ASBESTOS ABATEMENT PLAN IF WET METHODS
WILL NOT BE FOLLOWED.
3. VISIBLE SLATE ROOFING DEBRIS ON THE GROUND AROUND THE PERIMTER OF THE BUILDING SHALL BE COLLECTED AND DISPOSED OF BY THE
ABATEMENT CONTRACTOR PRIOR TO ANY DISTURBANCE OF THE SURFACE.
4. PAINTED SURFACES AND ROOFING MATERIALS CONTAIN LEAD AND MAY REQUIRE SPECIAL HANDLING AND DISPOSAL. MATERIALS CONTAINING LEAD SHALL BE DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE AND EPA REQUIREMENTS. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
5. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. OCCUPATIONAL EXPOSURE TO LEAD IS REGULATED BY OSHA (29CFR 1910.1025) AS WELL AS APPLICABLE STATE REGULATIONS. DISPOSAL OF MATERIALS COATED WITH PAINT CONTAINING LEAD IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) REGULATIONS. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION THAT WOULD DISTURB MATERIALS
CONTAINING LEAD. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
7-H-103
ABATEMENT PLAN
ROOF FLOOR
ECGMFD
Feet 3/16'' = 1'
10.665.330
631-23-014
REPLACE ROOF BUILDING 7
VA CWM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Approved Date:
Approved Title:
Approved Name:
GR
AP
HI
C
SC
AL
E:
1/
4"
1' -0
4' 2'
1' 8'
0'
GR
AP
HI
C
SC
AL
E:
1/
2"
1' -0
2' 1'
6" 4'
0'
GR
AP
HI
C
SC
AL
E:
1/
8"
1' -0
8' 4'
2'
GR
AP
HI
C
SC
AL
E:
3/
8"
1' -0
4' 2'
6'
1' 6"
GR
AP
HI
C
SC
AL
E:
3/
4"
1' -0
2' 1'
6" 3'
0' 3"
GR
AP
HI
C
SC
AL
E:
1"
1'
-0
2' 1'
1/2
0'
GR
AP
HI
C
SC
AL
E:
3"
1'
-0
1' 6"
3" 0'
9" 11 2"
GR
AP
HI
C
SC
AL
E:
1-
1/2
1' -0
2' 1'
6" 0'
3"
# Date:Revision Description:
SCALE:01 ROOF PLAN
3/16"=1'-0"
REVISION 1 11/03/2023
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .