S06_H-103-Roof Plan_Rev1.pdf

PDF 631 KB Posted

Attached to
Z2DA--631-23-014 Replace Roof Building 7 Federal contract opportunity
Solicitation number
36C24123R0183
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document includes plans for roof abatement on Building 7 of a Department of Veterans Affairs facility. The roofing system contains asbestos and lead materials that require special handling and disposal according to EPA and OSHA regulations. Notable details include:

  • Manual wet methods must be used to control dust during asbestos and non-asbestos material removal. A non-traditional asbestos abatement plan may be required if wet methods are not followed.

  • Visible roofing debris around the building perimeter must be collected and disposed of by the abatement contractor before surface disturbance.

  • OSHA lead regulations apply to any demolition that would disturb painted surfaces or materials containing lead, such as sanding, scraping, cutting or welding. Lead disposal is also subject to EPA RCRA regulations.

  • The related federal contract opportunity is solicitation number 36C24123R0183 from the Department of Veterans Affairs Veterans Health Administration VISN 1 to replace the roof on Building 7 under project number 631-23-014.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--631-23-014 Replace Roof Building 7, newest first.
File Type Posted
010000 General Requirements Rev1.docx DOCX document
36C24123R0183 0002.docx DOCX document
Replace Roof B7 - SOW Rev1.docx DOCX document
36C24123R0183 0001.docx DOCX document
S06_AE103-Roof Plan_Rev 1.pdf PDF
P03 SSJ Best Locks signed CR.pdf PDF
P09 Past Performance Questionnaire.docx DOCX document
P09_Combined Attached Forms.pdf PDF
P03 SSJ NEI signed CR.pdf PDF
P09_Past Performance Information Form for Contractors.docx DOCX document
P07_Wage Determination_MA20230003 09-15-2023.pdf PDF
P09_631-23-014 SOW_SPEC_Drawing Package.pdf PDF
36C24123R0183.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF ABATEMENT NOTES:

1. THE SLATE ROOFING SYSTEM CONTAINS ASBESTOS SLATERS CEMENT AND ASBESTOS PATCHING/REPAIR MATERIALS. MATERIALS CONTAINING ASBESTOS REQUIRE SPECIAL HANDLING AND DISPOSAL IF DISTURBED OR REMOVED. MATERIALS CONTAINING ASBESTOS SHALL BE HANDLED AND

DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE AND EPA REQUIREMENTS.

2. ROOF ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM THE WORK AREA. CONTRACTOR SHALL APPLY TO THE MASSDEP FOR A NON-TRADITIONAL ASBESTOS ABATEMENT PLAN IF WET METHODS

WILL NOT BE FOLLOWED.

3. VISIBLE SLATE ROOFING DEBRIS ON THE GROUND AROUND THE PERIMTER OF THE BUILDING SHALL BE COLLECTED AND DISPOSED OF BY THE

ABATEMENT CONTRACTOR PRIOR TO ANY DISTURBANCE OF THE SURFACE.

4. PAINTED SURFACES AND ROOFING MATERIALS CONTAIN LEAD AND MAY REQUIRE SPECIAL HANDLING AND DISPOSAL. MATERIALS CONTAINING LEAD SHALL BE DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE AND EPA REQUIREMENTS. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

5. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION (I.E. SANDING, SCRAPING, CUTTING, AND WELDING) THAT WOULD DISTURB PAINTED SURFACES WHICH CONTAIN LEAD. OCCUPATIONAL EXPOSURE TO LEAD IS REGULATED BY OSHA (29CFR 1910.1025) AS WELL AS APPLICABLE STATE REGULATIONS. DISPOSAL OF MATERIALS COATED WITH PAINT CONTAINING LEAD IS SUBJECT TO THE USEPA RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) REGULATIONS. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION THAT WOULD DISTURB MATERIALS

CONTAINING LEAD. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

7-H-103

ABATEMENT PLAN

ROOF FLOOR

ECGMFD

Feet 3/16'' = 1'

10.665.330

631-23-014

REPLACE ROOF BUILDING 7

VA CWM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Approved Date:

Approved Title:

Approved Name:

GR

AP

HI

C

SC

AL

E:

1/

4"

1' -0

4' 2'

1' 8'

0'

GR

AP

HI

C

SC

AL

E:

1/

2"

1' -0

2' 1'

6" 4'

0'

GR

AP

HI

C

SC

AL

E:

1/

8"

1' -0

8' 4'

2'

GR

AP

HI

C

SC

AL

E:

3/

8"

1' -0

4' 2'

6'

1' 6"

GR

AP

HI

C

SC

AL

E:

3/

4"

1' -0

2' 1'

6" 3'

0' 3"

GR

AP

HI

C

SC

AL

E:

1"

1'

-0

2' 1'

1/2

0'

GR

AP

HI

C

SC

AL

E:

3"

1'

-0

1' 6"

3" 0'

9" 11 2"

GR

AP

HI

C

SC

AL

E:

1-

1/2

1' -0

2' 1'

6" 0'

3"

# Date:Revision Description:

SCALE:01 ROOF PLAN

3/16"=1'-0"

REVISION 1 11/03/2023

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .