P09 657-502 Bid Drawings Part 7 of 10 Plumbing-16 pages.pdf
PDF 4 MB Posted
- Attached to
- Expand and Upgrade Building 42 for Laboratory
- Solicitation number
- 36C25520R0073
About this file
This solicitation document, number 36C25520R0073, is for the expansion and upgrade of Building 42 at the Marion VA Medical Center to accommodate laboratory functions. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the contracting agency. Products and services required include architectural, structural, mechanical, electrical, and plumbing work. The response due date is November 8, 2019 and the period of performance is 365 calendar days following award. Pricing will be fixed price. There are no set-asides indicated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet List
Sheet Number Sheet Name Sheet Order
FP001
FP101 FIRE PROTECTION FLOOR PLANS
FIRE PROTECTION DETAILS
SPRINKLER HEAD LOCATION DETAIL
NO SCALE
CL
SPRINKLER BRANCHCLEVIS HANGER
FUSIBLE JOINT
CEILING PLATE
ROOF BEAMS
SPRINKLER SYSTEM NOTES
CONCEALED SPRINKLER HEAD INSTALLATION
NO SCALE
(TYPICAL FOR ALL AREAS OF EXPOSED STRUCTURE CONSTRUCTION)
4 ft to less than 4 ft 6 in
UPRIGHT SPRINKLER INSTALLATION
4 ft 6 in to less than 5 ft 5 ft to less than 5 ft 6 in
NO SCALE
SPRINKLER HEAD
RISER NIPPLE
SPRINKLER BRANCH
Less than 1 ft 1 ft to less than 1 ft 6 in 1 ft 6 in to less than 2 ft 2 ft to less than 2 ft 6 in 2 ft 6 in to less than 3 ft 3 ft to less than 3 ft 6 in 3 ft 6 in to less than 4 ft
DISTANCE TO BEAM
ABOVE BEAM
(SEE TABLE)
MAXIMUM DISTANCE
0 in.
22" MAX
21/2 in.
31/2 in.
51/2 in.
71/2 in.
91/2 in.
12 in.
14 in.
161/2 in.
18 in.
6 ft 6 in to less than 6 ft 6 ft to less than 6 ft 6 in
20 in.
24 in.
6 ft 6 in to less than 7 ft 7 ft to less than 7 ft 6 in
30 in.
35 in.
(TYPICAL FOR ALL AREAS OF FINISHED CEILING CONSTRUCTION)
SPRINKLER HEAD LEGEND
FULLY CONCEALED SPRINKLER HEAD WITH WHITE CEILING PLATE
(165°F TEMPERATURE RATING-U.O.N.)
UPRIGHT PENDENT SPRINKLER HEAD ON EXPOSED PIPE
(165°F TEMPERATURE RATING U.O.N.)
CONCEALED DRY-PENDENT (NON-FREEZE) SPRINKLER HEAD
(135°F TEMPERATURE RATING)
DRY SIDEWALL SPRINKLER HOA
PENDENT TYPE
SPK. HD. LOCATION
2' X 4' ACOUSTIC
CEILING TILE
PENDENT TYPE
SPK. HD. LOCATION
2' X 4' ACOUSTIC
CEILING TILE
PENDENT TYPE
SPK. HD. LOCATION
2' X 2' ACOUSTIC
CEILING TILE
PENDENT TYPE
SPK. HD. LOCATION
PARTIAL ACOUSTIC
CEILING TILE
18" MIN. CLEAR FROM ALL FIXTURE'S
AND STOCK UNIT,ETC. VERIFY WITH
ARCHITECT'S DWG'S.
SPRINKLERS TO BE LOCATED IN
CENTER OF 2' X 2' CEILING TILES.
SEISMIC BRACE
RECESED SPRINKLER
Maximum Allowable Distance Deflector above Bottom of BeamDistance from Sprinkler to
Side of Beam
2'-0"1'-0"
1'-0" 1'-0"
SEISMIC BRACING NOTES:
A) ALL PIPING 2-1/2 IN. NOMINAL DIAMETER AND LARGER MUST
BE BRACED.
B) TRANSVERSE AND VERTICAL BRACING SHALL OCCUR AT 40 FT.
INTERVALS (MAX) AND LONGITUDINAL BRACING AT 80 FT.
INTERVALS (MAX).
C) BRACING IS NOT REQUIRED FOR PIPING SUSPENDED BY
HANGERS 12 IN. OR LESS IN LENGTH AS MEASURED FROM
THE TOP OF THE PIPE TO THE BOTTOM OF THE SUPPORT
WHERE THE HANGER IS ATTACHED.
1. FIRE PROTECTION CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND FULLY
FAMILIARIZE HIMSELF WITH THE BUILDING CONDITIONS. ANY DEVIATIONS OR
DISCREPANCIES BETWEEN THESE DRAWINGS AND ACTUAL EXISTING CONDITIONS SHALL
BE PROMPTLY BROUGHT TO THE ATTENTION OF THE COR FOR
CLARIFICATION. BID SHALL INCLUDE ALL COSTS DUE TO EXISTING CONDITIONS.
2. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL OWNER
SPECIFIC DESIGN AND INSTALLATION REQUIREMENTS, AND SHALL INCLUDE ALL COSTS
DUE TO THOSE REQUIREMENTS IN THE BASE BID.
3. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL THE REQUIRED NEW SYSTEM
OR MODIFICATIONS TO THE EXISTING HYDRAULICALLY CALCULATED WET PIPE SPRINKLER
SYSTEM FOR THE ENTIRE DEMISED SPACE INDICATED HEREIN THESE DOCUMENTS. THE
SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS
OF NFPA-13 FOR ORDINARY HAZARD (GROUP 2) OCCUPANCY, PROVIDING A
SPRINKLER DENSITY OF .20 GPM SQFT OVER THE MOST REMOTE 1500 SQ.FT.
SPRINKLER HEAD SPACING SHALL NOT EXCEED 130 SQ.FT. PER HEAD.
4. FIRE PROTECTION CONTRACTOR SHALL PREPARE AND FILE SPRINKLER SHOP DRAWINGS
AND HYDRAULIC CALCULATIONS WITH THE VA COR, THE OWNERS'S INSURANCE RATING
AGENCY, THE ARCHITECT, AND ALL STATE, LOCAL AND MUNICIPAL AUTHORITIES IN
JURISDICTION, AND SHALL RECEIVE ALL NECESSARY APPROVALS PRIOR TO
COMMENCEMENT OF ANY INSTALLATION WORK.
5. CONSTRUCTION DOCUMENTS FOR FIRE PROTECTION / SPRINKLER SYSTEMS ARE TO BE
SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION BY SPRINKLER CONTRACTOR UNDER
SEPARATE PERMIT APPLICATION. FIRE PROTECTION SYSTEMS ARE TO BE MAINTAINED IN
ACCORDANCE WITH ORIGINAL INSTALLATION STANDARDS. REQUIRED FIRE PROTECTION
SYSTEM SHALL BE MODIFIED AS NECESSARY TO MAINTAIN PROTECTION WHENEVER
BUILDING IS ALTERED.
6. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FLOW
TEST DATA AND PREPARING HYDRAULIC CALCULATIONS.
7. NEW SPRINKLER HEADS SHALL BE APPROVED FULLY CONCEALED TYPES, PENDENT AND UPRIGHT, AND DESIGNED FOR ORDINARY HAZARD COVERAGE. CHROME PLATED "TYCO", "GRINNELL", "VIKING", "STAR" OR EQUAL. SEE PLANS FOR SPRINKLER HEAD TYPES.
8. ALL SPRINKLER WORK SHALL COMPLY WITH ALL NFPA-13 RECOMMENDATIONS, AND
SHALL BE PERFORMED IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE V.A.,
OWNER, LOCAL FIRE RATING ORGANIZATION, FIRE AND/OR BUILDING DEPARTMENTS AND
ALL AUTHORITIES IN JURISDICTION.
9. ALL SPRINKLER SYSTEM WORK SHALL BE SUBJECT TO THE ACCEPTANCE AND
APPROVAL OF THE OWNER'S INSURERS AND SHALL BE DESIGNED TO SECURE THE
BEST POSSIBLE INSURANCE RATES ON THE BUILDING AND IT'S CONTENTS.
10. FIRE PROTECTION CONTRACTOR SHALL FILE FOR, OBTAIN, AND PAY FOR ALL REQUIRED
PERMITS AND INSPECTIONS.
11. FIRE PROTECTION CONTRACTOR SHALL ARRANGE FOR ANY SHUTDOWNS OF THE EXISTING
SYSTEM WITH THE OWNER AND LOCAL FIRE DEPARTMENT REPRESENTATIVE, AND SHALL
SECURE IN WRITING PRIOR TO SHUTDOWN, APPROVALS FROM SAME. ADDITIONALLY, THE
FIRE PROTECTION CONTRACTOR SHALL PAY FOR ANY LABOR, MATERIALS, AND FEES
NECESSARY FOR SHUTDOWN.
12. IN THE EVENT OF THE FIRE PROTECTION SYSTEM BEING "OUT OF SERVICE", THE FIRE
DEPARTMENT & LOCAL CODE OFFICIAL SHALL BE NOTIFIED IMMEDIATELY, AND IF
REQUIRED BY CODE OFFICIAL, SAID BUILDING TO BE EVACUATED OR PROVIDED WITH
AN APPROVED FIRE WATCH SYSTEM WILL BE PROVIDED FOR ALL UNPROTECTED
OCCUPANTS UNTIL SYSTEM IS RETURNED TO SERVICE.
13.WHEN UTILIZED, FIRE WATCHES SHALL BE PROVIDED W/ MIN. OF ONE APPROVED
MEANS OF NOTIFICATION OF THE FIRE DEPT. THE ONLY DUTY OF THE FIRE WATCH IS
TO PERFORM CONSTANT PATROLS OF THE PREMISES AND KEEP WATCH FOR FIRES.
14.FIRE PROTECTION CONTRACTOR SHALL CAREFULLY EXAMINE ALL EXISTING SPRINKLER
SYSTEM PIPING AND COMPONENTS, AND SHALL REPAIR OR REPLACE ANY LEAKING OF
DEFECTIVE PIPING OR COMPONENTS.
15.SPRINKLER PIPE MATERIAL AND INSTALLATION SHALL MATCH EXISTING.
16.FIRE PROTECTION CONTRACTOR SHALL PROVIDE ALL REQUIRED TEST AND DRAIN
CONNECTIONS, WHETHER OR NOT THEY ARE INDICATED HEREON THESE PLANS.
17.FIRE PROTECTION CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY ALARM
INITIATING DEVICES AND SUPERVISORY DEVICES, AND SHALL COORDINATE THE
ELECTRICAL REQUIREMENTS FOR THEM WITH THE E.C. AND/OR FIRE ALARM
CONTRACTOR FOR THEIR CONNECTION TO THE FIRE ALARM SYSTEM.
18. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES TO ANY PORTION
OF THE EXISTING SPRINKLER SYSTEM ON ANY PORTION OF THE BUILDING INCURRED
BY HIM DURING CONSTRUCTION.
19. UPON COMPLETION OF THE INSTALLATION, FIRE PROTECTION CONTRACTOR SHALL
DEMONSTRATE TO THE SATISFACTION OF THE AUTHORITIES IN JURISDICTION AND THE
LANDLORD'S INSURANCE UNDERWRITERS, THE OPERATION OF THE ENTIRE PROTECTION
SYSTEM, INCLUDING ALL ALARM INITIATING DEVICES AND SYSTEM SUPERVISORY DEVICES.
20. FIRE PROTECTION SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH CURRENT CODES
LISTED. WHEN REQUIRED THE TESTS SHALL BE CONDUCTED IN THE PRESENCE OF THE
BUILDING OFFICIAL. TESTS SHALL BE CONDUCTED AT THE EXPENSE OF THE LANDLORD.
IT WILL BE UNLAWFUL TO OCCUPY PORTIONS OF THE STRUCTURE UNTIL SYSTEMS ARE
TESTED AND APPROVED.
21. PRIOR TO REQUESTING FINAL APPROVAL, THE SPRINKLER CONTRACTOR SHALL FURNISH
A WRITTEN STATEMENT TO THE CODE OFFICIAL INDICATING THAT THE FIRE PROTECTION
SYSTEM HAS BEEN INSTALLED PER APPROVED PLANS, AND HAS BEEN TESTED AS
REQUIRED, ANY EXCEPTIONS FROM THE D DESIGN STANDARDS SHALL BE NOTED AND
COPIES OF APPROVALS ATTACHED TO THE FORE MENTIONED WRITTEN STATEMENT.
FLEXIBLE STAINLESS
STEEL HOSE AND
FITTINGS LIKE FLEXHEAD;
SEE DETAIL D/FP001
FLEXHEAD DETAIL
NO SCALE
TYP. 304 SS SCH. 40 PIPE
A
B
C
WELD
WELD
WELD
304 SS PIPE
TYP. 304 SS BRAID SLEEVE
TYP. 304 SS BRAID SLEEVE
TYP. 304 SS BRAID
TYP. 304 SS CORRUGATED
FLEXIBLE METAL HOSE, 0.010
WALL THICKNESS
TYP 304 SS OUTLET SPUD 1/2
& 3/4 INCH FEMALE NPT WIYH
FOLLOWING INFO STAMPED:
FLEXHEAD C UL US 2004 FLOW
M# 20xx LISTED 175 PSI 370F
72YM
2024I 24 3 8.0
MODEL # A (in) B (in) C (in)
3 8.0
3 8.0
3 8.0
3 8.0
2036I 36
2048I 48
2060I 60
2072I 72
FLEXIBLE SPRINKLER HOSE FITTINGS FOR FIRE PROTECTION SERVICE
A. Manufacturer: Flexhead Industries, Inc.
1. Contact: 56 Lowland Street, Holliston, MA 01746; Telephone: (800) 829-6975;
Fax: ( 508) 893-6020; Email: sales1@flexhead.com; website:
www.flexhead.com.
B. Description: Flexible Sprinkler Hose Fittings for use in concrete walls and ceilings.
1. Regulatory Requirements:
a. In accordance with NFPA 13.
C. Product Performance Criteria:
1. FM Approved for its intended use pursuant to FM 1637 Approval Standard for
Flexible Sprinkler Hose with Threaded End Fittings.
2. UL Listed for its intended use pursuant to UL 2443 Standard for Flexible
Sprinkler Hose with Fittings for Fire Protection Service.
D. Materials: Flexhead Institutional Sprinkler Connections.
1. Flexhead Flexible Hose Assemblies and End Fittings:
a. Composition: 100% type 304 Stainless Steel.
b. Hose Assembly Lengths: {2ft length, Model #2024I} {3ft length, Model #2036I}
{4ft length, Model #2048I} {5ft length, Model #2060I} {3ft length, Model #2072I}.
1. {1/2 inch} {3/4 inch} outlet.
2. {175 psi} { 300 psi} maximum rated pressure.
3. Fully welded non-mechanical fittings, braided, leak-tested with minimum 1 inch true-bore internal corrugated hose diameter.
2. FlexHead Bracket:
a. Composition: type G90 Galvanized Steel.
b. Type: Retaining flange with set screw for attaching flexible hose.
1' -0
1' -0
1' -0
A
FP001
B
FP001
C
FP001
D
SP0
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel
Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel
Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 Old West Main Carbondale, IL 62901
Tel
Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel
Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel
Fax
618.529.5262 618.457.8991
Geotechnical
11/8/2019 10:52:35 AM
Fire Protection Details Expand & Upgrade Building 42 for Laboratory
FP-001
657-502
Marion, IL
11-07-2019
Bid Document
DH BZ
N
AA
BB
CC
DD
2.1
B.2B.2
2.2
C.2C.2
DN
Roof below
C100
Open Office
PSA
Office
Office
Shared Office
Office
Station
Station
Station
Station
Station
Phlebotomy
Waiting
Corridor
C100
Microbiology
Main Lab
IT
Bio-Safety Level 3
127A
Histology
Acid/Base
121A
Blood Bank
Conf
Alcove
Corridor
Shared Office
Core / Specimen
Break Room
HAC
P. Toilet
Toilet
ADA Toilet
P. Toilet
Pyxis Storage
Elevator Lobby
Elevator
EL1
Corridor
120B
Microbiology
Mechanical Room
Elevator
EL1
A
B
C
D
E
2.2
B.2
AA
BB
CC
DD
EE
2.2
2.2
B.2B.2
UP
UP
DN
UP
N
EXISTING TO REMAIN.
321 1/16" = 1'-0"
Inerstitial Level Fire Protection
LIGHT HAZARD CLASSIFICATION.
ORDINARY HAZARD GROUP 1 CLASSIFICATION.
ORDINARY HAZARD GROUP 2 CLASSIFICATION.
AREA TO BE PROTECTED BY DRY PIPE SYSTEM OR HEADS.
EXISTING SPRINKLER SYSTEM IN TUNNEL TO REMAIN.
FULLY CONCEALED HEADS IN THIS AREA.
UPRIGHT/PENDANT HEADS IN THIS AREA.
PROVIDE A SEPARATE FIRE ZONE, ZONE VALVE AND FLOW
SWITCH FOR THIS ROOM.
MODIFY SPRINKLER PIPING AS REQUIRED FOR STRUCTURAL AND
ARCHITECTURAL WORK IN THIS AREA.
PLAN NOTES:
1/16" = 1'-0"
Main Level Fire Protection Plan 1/16" = 1'-0"
Lower Level Fire Protection Plan N
NOTE:
MAXIMUM SPRINKLER SPACING - 1 HEAD PER 130 SQ.FT.
0.2 GPM OVER THE MOST REMOTE 1500 SQ.FT.
ORDINARY HAZARD (GROUP 2) OCCUPANCY
MAXIMUM STORAGE HEIGHT: 8 FT.
SPRINKLER DESIGN CRITERIA :
THIS SPRINKLER DRAWING IS INTENDED FOR
PRICING PURPOSES ONLY. THE FIRE
PROTECTION CONTRACTOR SHALL PREPARE A
COMPLETE SET OF WORKING FIRE PROTECTION
DRAWINGS IN ACCORDANCE WITH NFPA-13 VA
STANDARDS, AND ALL STATE AND LOCAL
REQUIREMENTS. PIPE SIZES SHALL BE
DETERMINED BY HYDRAULIC CALCULATIONS
USING THE CURRENT SITE SPECIFIC FLOW
DATA.
DRAWINGS AND CALCULATIONS
1. THE SPRINKLER CONTRACTOR SHALL PREPARE SUBMITTAL
DRAWINGS AND HYDRAULIC CALCULATIONS FOR THE SPACE IN
ACCORDANCE WITH VA STANDARDS, AND LOCAL FIRE AUTHORITY
REQUIREMENTS.
2. THE SPRINKLER SYSTEM SHALL BE DESIGNED FOR ORDINARY
HAZARD OCCUPANCY, PROVIDING A DENSITY OF 0.2 GPM/SF
OVER THE MOST REMOTE 1500 SQUARE FOOT AREA.
SPRINKLER SPACING SHALL NOT EXCEED 130 SQUARE FOOT
PER HEAD.
3. THE SPRINKLER CONTRACTOR SHALL SECURE FLOW TEST DATA
FROM THE HYDRANT(S) NEAREST THE PROJECT SITE. IF
RECENT FLOW TEST DATA IS NOTE AVAILABLE FROM LANDLORD
OR CITY RECORDS, PERFORM THE NECESSARY FLOW TESTS AS
REQUIRED BY NFPA STANDARDS TO DETERMINE THE CHARACTER
OF THE AVAILABLE WATER SUPPLY, AND SUBMIT THAT DATA
WITH THE CALCULATIONS.
MAXIMUM SPRINKLER SPACING - 1 HEAD PER 130 SQ.FT.
0.2 GPM OVER THE MOST REMOTE 1500 SQ.FT.
ORDINARY HAZARD (GROUP 1) OCCUPANCY
MAXIMUM STORAGE HEIGHT: 8 FT.
LAB DESIGN CRITERIA :
SLAB ON GRADE
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel
Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel
Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 Old West Main Carbondale, IL 62901
Tel
Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel
Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel
Fax
618.529.5262 618.457.8991
Geotechnical
11/8/2019 10:52:37 AM
Second Floor Mezzanine-Fire Protection Floor Plan
Expand & Upgrade Building 42 for Laboratory
FP-101
657-502
Marion, IL
11-07-2019
PLUMBING Sheet List
Sheet Number Sheet Name
Sheet Order
PQ001 PLUMBING SCHEDULES & ABBREVIATIONS
PLUMBING DETAILS
LOWER LEVEL SANITARY PLAN
FIRST FLOOR SANITARY PLAN
PLUMBING DETAILSPQ002
PQ003
PQ004 PLUMBING DETAILS
PL101
PL102
PP201
PP202
SECOND FLOOR MEZZANINE SANITARY PLANPL104
PP203
LOWER LEVEL DOMESTIC PIPING PLAN
FIRST FLOOR DOMESTIC PIPING PLAN
SECOND FLOOR MEZZANINE DOMESTIC PIPING PLAN
PL201
PL301 ISOMETRIC PLANS
PLUMBING ROOF PLAN
FIRE PROTECTION NOTES
FIRE PROTECTION PLANS
FP100
FP101
PL103
LOWER LEVEL PLUMBING STORM PLAN
AV
MA
V
CR
FE
CO
PLUMBING GENERAL PROJECT NOTES:
PLUMBING FIXTURE SCHEDULE
NOTE:
TYPE
1. INSTALL ADA PLUMBING FIXTURES PER ANSI 117.1 GUIDELINES.
2. PROVIDE TRAP PRIMER FROM NEAREST LAV OR SINK; SPEC 22-13-00, TP-2
3. TRAPS, SUPPLIES, ETC TO BE CHROME.
4. PROVIDE ADA OFFSET GRID STRAINER AND PADDED SUPPLIES AND DRAIN.
5. VERIFY LOCATION OF FLOOR DRAIN AND SIZE REQUIRED.
6. SANITARY WASTE LINE SIZE AS INDICATED ON PLANS.
7. PROVIDE 0.5 GPM LAMINAR FLOW AERATOR ON FAUCET.
DOMESTIC
CW
FIXTUREMARK
--WATER
METER
WM-1 BADGER METER
SYMMONSMIX-1 ST-5-120-CKX
POINT OF
USE MIXING
VALVE
- - WITH SEPARATE STOPS SET
110°F DISCHARGE TEMP
M170
WITH BADGER HRE ENCODER
FOR NETWORK CONNECTION
PL105
BALL VALVE
CHECK VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
YCO YARD CLEANOUT
YH YARD HYDRANT
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
FIXTURE UNIT
WHA-A
MARK
3/4"
600 SERIES
WATER HAMMER ARRESTOR SCHEDULE
I.P.S.
WHA-B 1'
WHA-C
WHA-D
WHA-E
RATING
WHA-F
1-11
12-32
33-60
61-113
114-154
155-330
1'
1'
1'
1'
SIOUX CHIEF MODEL NO.
600 SERIES
600 SERIES
600 SERIES
600 SERIES
600 SERIES
A. ALL WORK SHALL CONFORM TO FEDERAL, STATE AND LOCAL
MECHANICAL AND PLUMBING CODES AND REGULATIONS, NFPA CODES.
B. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF PIPING AND
EQUIPMENT SHALL BE COORDINATED WITH BUILDING STRUCTURE
EQUIPMENT FURNISHED, EXISTING CONDITIONS, ARCHITECTURAL
DRAWINGS AND ALL OTHER TRADES PRIOR TO INSTALLATION. ANY
CONTRACTOR INSTALLING WORK WITHOUT PRIOR COORDINATION
SHALL RELOCATE THE WORK AT THEIR EXPENSE TO ALLOW PROPER
INSTALLATION OF ANY AND ALL TRADES WORK.
C. ALL PIPING SHALL BE CAPPED DURING CONSTRUCTION TO PREVENT
ENTRY OF FOREIGN MATERIAL.
D. PROVIDE BLOCKING FOR ALL PLUMBING ROUGH-IN. COPPER PIPE
SOLDERED TO METAL STUDS WILL NOT BE ACCEPTED.
E. PROVIDE PLASTIC ISOLATION SEPARATORS FOR ALL COPPER PIPING
RUNNING THRU METAL STUDS. INSULATE PIPING BETWEEN STUDS
AND IN WALL WITH 1/2" RIGID FIBERGLASS PIPE INSULATION.
F. PROVIDE SHOCK ABSORBERS AT EACH GROUP OF FIXTURES. SIZE
PER MANUFACTURER'S REQUIREMENTS.
G. UNLESS OTHERWISE NOTED ALL PIPING SHALL BE CONCEALED
WHEREVER POSSIBLE. PROVIDE CHROME ESCUTHEON AT EACH
PENETRATION OF A FINISHED SURFACE.
H. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE ELECTRICAL
GEAR OR IN THE SERVICE SPACE REQUIRED BY THE NATIONAL
ELECTRIC CODE.
I. ALL INVERTS, STATED OR NOT, NEW OR EXISTING SHALL BE
CONFIRMED AND COORDINATED IN THE FIELD. VERIFY EXISTING
INVERTS PRIOR TO STARTING WORK.
J. ALL FIXTURES SHALL HAVE SHUT-OFF STOP VALVES IN AN
ACCESSIBLE LOCATION. PIPING BEYOND THE STOP VALVES IN
EXPOSED OCCUPIED SPACES SHALL BE CHROME-PLATED. ANY NOTED
SHUT-OFF VALVES ARE IN ADDITION TO THIS REQUIREMENT.
K. ALL WALL AND SLAB PENETRATIONS OF MASONRY OR CONCRETE
CONSTRUCTION SHALL BE SLEEVED.
L. ALL PIPING SHALL BE COORDINATED WITH OUTSIDE AIR INTAKES TO
PROVIDE 25'-0" CLEARANCE IN ALL DIRECTIONS FROM VENTS THRU
ROOF TO OUTSIDE AIR INTAKES.
M. PLUMBING CONTRACTOR RESPONSIBLE FOR BUILDING AND 5'-0"
OUTSIDE OF BUILDING UNLESS OTHERWISE NOTED. ALSO, MAKE
CONNECTIONS TO SERVICE PROVIDED BY SITE WORK CONTRACTOR.
REFER TO SITE WORK UTILITY CIVIL ENGINEERING DOCUMENTS FOR
EXTERIOR WORK, TRENCHING, BACK FILLING, ETC.
N. THE PLUMBING SUBCONTRACTOR SHALL VERIFY UTILITY LOCATIONS
AT SITE AND SHALL MAKE CONNECTION TO STUBS ON SITE.
O. THE PLUMBING SUBCONTRACTOR SHALL FILL FLOOR DRAINS WITH
WATER UPON COMPLETION OF WORK AND TESTING.
P. COORDINATE THE PLUMBING WORK WITH THE ARCHITECTURAL,
ELECTRICAL, MECHANICAL, AND OTHER PLANS AND DETAILS RELATED
TO THIS PROJECT FOR WORK OF ALL OTHER TRADES.
DRAWING SYMBOLS
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
PLUMBING VALVE SYMBOLS
W WASTE
V VENT
VAC VACUUM
UPC UNIFORM PLUMBING CODE
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTC NOT TO SCALE
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
PLUMBING ABBREVIATIONS
A/E ARCHITECT / ENGINEER
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
(C ) CHEMICAL SANITARY PIPE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWR DOMESTIC WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
PLUMBING ABBREVIATIONS
PLUMBING EQUIPMENT SCHEDULE
DESCRIPTIONMODEL NOTES
HP V/PH
ELECTRICALMARK
NO. MANUFACTURER
ORIONNT-1
MAXIMUM PIPE/TUBING SUPPORT SPACING, FEET
NOM. SIZE THRU 3/4" 1 2 3 4 5 6 8 10 12 14 16 18 20
PIPE
TUBING
7 FT.
5 FT.
22 23 25 27 28 30 32
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
1-1/4 1-1/2 2-1/2
DOMESTIC
HW
SANITARY
WASTE
SANITARY
VENT
SPECIFICATION
SECTION NOTES
STYLE 7 NEUTRALIZATION TANK - - WITH TANK EXTENSION, HEAVY PEDESTRIAN
BOLTED TOP WITH BOLTED MANWAY.
PLUMBING FIXTURE SCHEDULE
TYPE
DOMESTIC
CW
FIXTUREMARK
DOMESTIC
HW
SANITARY
WASTE
SANITARY
VENT
SPECIFICATION
SECTION NOTES
221400-- ---- -ROOF DRAINRD-1
22-40-00
SINK TRIM WITH FOOT
PEDALS
GENERAL
USE
1-1/2"2"----FLOOR DRAINFD-2
P-529
221300 22-40-00
22-40-00
FLOOR
MOUNT
CORNER
WALL
MOUNT
SENSOR
OPERATION
--1-1/2"1-1/2"
2"
WALL
MOUNT
MECH
ROOMS
-- -- 1-1/2"2"FLOOR DRAIN 2,5,6
FD-1
1,4,71-1/2"3/8"3/8"
LAVATORY
2"3"
WATER CLOSET
ADA
1" -- 1,3
P-502 MOP SINK 2"1/2"1/2"
P-112
P-401
(FD-B)
(FD-D)
OD-1 OVERFLOW DRAIN -- ----
-- -221400
221300 2,5,6
P-609 22-40-00WALL HUNGEWC 1,31-1/2"2"1/2" 1-1/2"-
- --1/2"
22-40-00
22-40-00
SINGLE
FAUCET
NON-
FREEZE
HOSE BIBB 1/2"
WALL HYDRANT
-P-801
P-804 - --
NOTE:
1. INSTALL ADA PLUMBING FIXTURES PER ANSI 117.1 GUIDELINES.
2. PROVIDE TRAP PRIMER FROM NEAREST LAV OR SINK; SPEC 22-13-00, TP-2
3. TRAPS, SUPPLIES, ETC TO BE CHROME.
4. PROVIDE ADA OFFSET GRID STRAINER AND PADDED SUPPLIES AND DRAIN.
5. VERIFY LOCATION OF FLOOR DRAIN AND SIZE REQUIRED.
6. SANITARY WASTE LINE SIZE AS INDICATED ON PLANS.
7. STAINLESS STEEL HOSE BOX LIKE ACORN 8170-SSLF; STAINLESS STEEL LEAD FREE.
MEDICAL AIR CONNECTION/OUTLET
VACCUM CONNECTION/OUTLET
OXYGEN CONNECTION/OUTLET
THIS SYMBOL SHOWS THE APPROXIMATE POINT WHERE NEW WORK STARTS AND
EXISTING IS TO REMAIN. FOR DEMOLITION THIS SYMBOL SHOW THE
APPROXIMATE POINT WHERE DEMOLITION STOPS AND EXISTING IS TO REMAIN
FOR REVISED WORK.
E.T.R.
CROSS HATCHED AREAS ARE NOT IN
CONTRACT AND ARE EXISTING TO REMAIN,
UNLESS SPECIFICALLY NOTED OR SHOWN
OTHERWISE.
GENERAL PLUMBING SYMBOLS
HOSE BIB
CLEAN OUT
PIPE DOWN
PIPE UP
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING
FLOW ELEMENT
STRAINER
THERMOMETER
PRESSURE GAGE
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
DIRECTION OF PIPE PITCH (DOWN)
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
SIDE CONNECTION
DIRECTION OF FLOW
REDUCER OR INCREASER
ANCHOR
PIPE DOWN
FFF
GGG GAS PIPING (BLACK STEEL)
PIPE UP
FIRE (SPRINKLER) PIPING
DOMESTIC HWR PIPING (COPPER)
DOMESTIC HW PIPING (COPPER)
DOMESTIC CW PIPING (COPPER)
STORM PIPING (SCHD 40 PVC)
VENT PIPING (SCHD 40 PVC)
WASTE PIPING (SCHD 40 PVC)
PIPING & SYMBOLS LEGEND
P-530 73/8"3/8"3/8"
SINK TRIM
2" 1-1/2"-
8. PROVIDE WITH INSINKERATOR GARBAGE DISPOSER.
AAA AIR PIPING
22-40-00
1,422-40-00- -1-1/4" 1"FREE
STANDING
SAFETY SHOWERP-707
22-40-00S.S. SINK
SINGLE COMP.
DROP-IN
21"x22"
1,3,7,81-1/2"2"3/8"3/8" 1-1/2"3/8"3/8"P-528
73/8"3/8"3/8" 2" 1-1/2"- 22-40-00
NZ
FD-3
(FD-P)
FLOOR DRAIN
OVERFLOW NOZZLE -- ---- -- -- -221400
221300 2,5,61-1/2"2"----ACID
RESISTANT
MANUFACTURERMARK
NO.
PLUMBING EQUIPMENT SCHEDULE
ELECTRICAL
V/PHHP
NOTESMODEL DESCRIPTION
TACODHW-1 1/2 120/ 1�1915
HWR PUMP
10 gpm @ 25
FT HD
TACODCW-1 120/ 1�
CWR PUMP
10 gpm @ 25
FT HD
P-531 9-1/2"
DI FAUCET
- -GOOSE
NECK
22-40-00
9. PVDF RESIGN PER ASTM D3222, LIKE ORION GNF 30-STD.
HB-1 SUPPLY BOX -- -- --1/2"
S.S.
RECESSED
HOSE BOX
7224000
1/21915
WITH VFD ATV12H037F1
WITH VFD ATV12H037F1
P-532 EYE WASH
TRIM
FAUCET
MOUNTED
ALL ROOF DRAINS PANS AND HORIZONTAL STORM PIPING
ABOVE GRADE SHALL HAVE 1" INSULATION AS INDICATED IN
SPECIFICATIONS
Q.
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel
Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel
Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 Old West Main Carbondale, IL 62901
Tel
Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel
Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel
Fax
618.529.5262 618.457.8991
Geotechnical
11/8/2019 10:54:10 AM
PLUMBING SCHEDULES &
ABBREVIATIONS
Expand & Upgrade Building 42 for Laboratory
PQ-001
657-502
Marion, IL
11-07-2019
P-112 WATER CLOSET DETAIL - SENSOR OPERATED
NTS
B
PQ002
A
PQ002
C
PQ002
D
PQ002
E
PQ002
F
PQ002
G
PQ002
DETAIL OF P-401 LAVATORY
NOT TO SCALE
NOT TO SCALE
WALL CLEANOUT DETAIL ELEVATION
PIPE HANGERS
ANGLE STOP
ANGLE VALVE
VALVE HANDLE
LAVATORY MOUNTING DETAIL
NO SCALE
12" VERTICAL
CARRIER
CARRIER
8" HORIZONTAL
OUTLINE OF
FLUSH VALVE
4x2 SHORT
REDUCER
(4")1/6 BEND
CONNECT TO W.C.
A
B
2"
2" C.O. PLUG
OPTIONS:
A
B
LOCATION OF WALL CLEANOUTS WHERE LAVATORY
AND MIRROR OCCURS
LOCATION OF WALL CLEANOUTS WHERE WATERCLOSET
OCCURS
HANGER ROD
INSULATION
WELD
SADDLE
ADJUSTABLE ROLLER HANGER TYPE 43
ADJUSTABLE CLEVIS HANGER TYPE 1
TRAPEZE HANGER FOR UP TO
1000 POUND UNIFORM LOAD
[4 m m
2' -9
[8 m m
2' -7
[7 m m
SENSOR
10"x16" [254x406mm] STAINLESS
STEEL ACCESS DOOR WITH
KEY-OPERATED CYLINDER
LOCK. MOUNT ELECTRONIC
WITHIN. SENSOR & MOR SHALL
OPERATE THROUGH ACCESS
DOOR.
SOLENOID OPERATED FLUSH
VALVEGRAB BAR, SEE ARCH. DRAWINGS
GRAB BAR SUPPORT (TYPICAL)
BACK CHECK
ANGLE STOP
FINISHED
FLOOR
FINISHED
WALL
TRANSFORMER IN JUNCTION
BOX
SOLENOID
MANUAL OVER-RIDE BUTTON
D R
AW
IN
G S
S E E
AR
C H
IT
EC
TU
R
AL
FO
R
FI
X
TU
R E
H E
IG
H
TS
TYPICAL DI TANK SCHEMATIC
NO SCALE
LAVATORY
4%%204"
FINISHED FLOOR
2" MIN.
4" MAX.
14"
SET SCREWS
SET SCREWS
CAPPED LEVELING
SCREWS
LOCKING
DEVICE
FINISHED
WALL
HANGER ROD
INSULATION (VAPOR BARRIER
TYPE REQ'D FOR LOW TEMP PIPE)
PROVIDE HIGH COMPRESSIVE STRENGTH
INSULATION. INSERT BLOCKS UNDER
INSULATION SHIELD
INSULATION SHIELD AT HANGER
BAND
1/2" DIA. HANGER RODS
W/36" MAX. SPACING ON
EACH CHANNEL
10" 12 GAGE CHANNEL
OR 2"x 2"x 1/4" ANGLE1"MAX.
PROVIDE INSULATION SHIELD
AND INSERT FOR ALL PIPING
8" MAX.
FLOOR
PUMP
DI TO
SINK
CARTRIDGE
FILTER
TEST
SENSOR
MIXING
FILTER BED
ANTION
TANK
CARBON
FILTER
CATION
TANK
CW IN
PRESSURE
REGULATOR
CHECK
VALVE
RECIRCULATION LINEPRESSURE GAUGE; TYPICAL
BALL VALVE; TYPICAL
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel
Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel
Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 Old West Main Carbondale, IL 62901
Tel
Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel
Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel
Fax
618.529.5262 618.457.8991
Geotechnical
11/8/2019 10:54:11 AM
PLUMBING DETAILS Expand & Upgrade Building 42 for Laboratory
PQ-002
657-502
Marion, IL
11-07-2019
DISCHARGE
ECCENTRIC REDUCER
SHUT-OFF VALVE
SUCTION
Y-STRAINER
BALANCING VALVE
CHECK VALVE
GAUGE COCK
PRESSURE GAUGE
ECCENTRIC REDUCER
PRESSURE GAUGE
INLINE PUMP
SHUT-OFF VALVE
INLINE PUMP DETAIL
NTS
ROOF DRAIN DETAIL
NTS
ROOF OVERFLOW NOZZLE
NO SCALE
A
PQ003
PRESSURE/ TEMPERATURE
PLUG
B
PQ003
D
PQ003
TANK ANCHOR FLANGE
CONCRETE PAD
(BY OTHERS) HOLD DOWN
ANCHORS; TYPICAL
(BY OTHERS)
CONTINUOUS ELECTRONIC
DATA LOGGING W/ 9 PIN SERIAL
CONNECTION FOR PC
(STANDARD FOR
NEUTRAGUARD DATA LOGGING)
ORION
PH
NEUTRAGUARD
CONTROL PANEL
(STANDARD)
DUAL PH DISPLAY
(OPTIONAL)
CONTACTS FOR
WIRING OF EXTERNAL
ALARMS (STANDARD)
EXTERNAL ALARM
(BY OTHERS)
ETHERNET LAN CONNECTION
(OPTIONAL FOR NEUTRAGUARD
DATA LOGGING)
TANK HIGH LEVEL
ALARM (OPTIONAL)
OUTLET PH PROBE
ASSEMBLY AND
SAMPLING TANK
(STANDARD)
NEUTRAGUARD MONITOR DETAIL
NTS
C
PQ003
a nsi3130.0000000000000000.000000000000000No
DRAIN LINE, AS NOTED ON
DRAWINGS
MINIMUM 1" THICK PIPE
INSULATION FULL LENGTH OF
PIPING
MINIMUM 1" THICK PAN
INSULATION
"O" RING GASKET
FLAT NEOPRENE GASKET
UNDERDECK CLAMP
METAL ROOF DECK
ROOF INSULATION
POLYETHYLENE DOME
ADJUSTABLE EXTENSION SLEEVE
COMBINED FLASHING CLAMP
AND GRAVEL STOP
STAINLESS STEEL GRAVEL STOP
ROOF DRAIN WITH
BODY EXTENSION
6"6"
EXTERIOR WALL
ENLARGED SECTION
VIEW OF 3940
THREADED
ADAPTER
NICKLE BRONZE DOWNSPOUT
FLANGE
SEALANT
ANCHORS
ENLARGED
FRONT VIEW OF
METAL DECK SUMP PAN
COMPOSITE DECK OVER STEEL BEAM.
SEE STRUCTURAL FOR MORE INFO
P.V.C. ROOF LEADER SEE PLANS FOR SIZE
MBR FLASHING CEMENT
ROOF MEMBRANE
CLAMPING RING
2" INSULATION
INSULATION TAPERED
TO DRAIN
PROTECTION BOARD
OVERFLOW ROOF DRAIN
SPLASHBLOCK ON
GRADE BY G.C.
EXTERIOR WALL
METAL DECK SUMP PAN
P.V.C. ROOF LEADER SEE PLANS FOR SIZE
MBR FLASHING CEMENT
ROOF MEMBRANE
CLAMPING RING
2" INSULATION
INSULATION TAPERED
TO DRAIN
PROTECTION BOARD
STRAINER BASKET
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1 Memorial Dr. STE 1800 Saint Louis, MO 63102
Tel
Fax
314.621.4343 314.621.0261
220 N College Ave Indianapolis, IN 46202
Tel
Fax
317.464.9090 317.464.9393
Office of Facilities
ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032
Tel
Fax
317.580.0402 317.582.0766
Structural
Asaturian Eaton & Assoc.
1440 Old West Main Carbondale, IL 62901
Tel
Fax
618.529.3414 618.529.3423
Civil
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel
Fax
636.757.3060 636.757.3064
Industrial Hygenist
Holcomb Foundation 393 Wood Road Carbondale, IL 62901
Tel
Fax
618.529.5262 618.457.8991
Geotechnical
11/8/2019 10:54:13 AM
PLUMBING DETAILS Expand & Upgrade Building 42 for Laboratory
PQ-003
657-502
Marion, IL
11-07-2019
C
PQ004
B P004
C P004
A P004
Purpose
The efficacy of biocides on suppressing or killing waterborne pathogens is dependent on multiple factors such as water quality, organic and inorganic contaminants, pH levels, disinfectant concentrations, and contact time. Water entering the building shall be continuously monitored for the following by means of gauges, sensors, and a grab sample port:
Temperature, Oxidant level (water disinfectant), pH, and Pressure
Water systems within the building shall be monitored as follows in the table below. Temperature and oxidant levels are the two primary engineering controls to limit bacterial growth. Oxidant levels shall be measured continuously as water enters the building and through grab samples taken from building plumbing fixtures. Temperature shall be measured throughout the domestic water system (hot and cold). In addition to being a primary control measure, temperature can be a secondary indicator of flow since temperature of stagnant water will lower for hot water and rise for cold water.
Background
Legionella is a bacterium that causes respiratory diseases collectively referred to as Legionellosis that includes Legionella pneumonia. Legionella pneumonia is also known as Legionnaires Disease (LD). Legionella bacteria are found naturally in water and have been associated with disease from building water distribution systems. LD occurs after inhalation or aspiration of contaminated water. Legionella bacteria are not transmitted from person to person. The elderly and persons with immune compromised systems are most at risk. Legionella bacteria growth increases in tepid water in a range from
20 deg C [68 deg F] to 50 deg C [123 deg F].
Given the various factors and complexities associated with LD, 100% prevention of LD is likely not possible. However, prevention and control practices can be implemented to reduce the risk of exposing people to Legionella in building water distribution systems. The following are engineering controls that will suppress Legionella growth. More than one control may be necessary for successful inhibition of Legionella growth.
(a) Temperature
· Maintenance of appropriate water temperatures is required. Water above 51.1 deg. C [124 deg. F] inhibits growth of Legionella in hot water systems. Precautions for the prevention of scalding shall be included in the hot water distribution system.
· Cold water temperatures below 19.4 deg. C [67 deg. F] inhibit the growth of Legionella.
(a) Flow
· Recirculation of water distribution systems is a means of limiting Legionella growth due to low flow or non-use periods. Recirculation aids in maintaining required water temperatures. Hot and cold water distribution systems shall be continuously circulated and piping insulated.
(a) Oxidant (Disinfectant)
· Maintenance of disinfectant at a sufficient level to control Legionella growth may be required. The minimum level required to suppress bacterial growth will vary from building to building and by the type of oxidant (disinfectant) used. Monitoring of levels is required.
Piping Installation Guidelines for Legionella Mitigation:
· The need to chill or cool the domestic cold water supply shall be evaluated at the schematic phase. Legionella can propagate in temperatures exceeding 20 deg C [67 deg F]. The domestic cold water distribution system shall have a recirculation system. For cold water systems, although circulation back to the source location for the building is ideal, for renovation efforts, recirculation within the department (or floor) area of renovation would be acceptable.
· Ice maker water supply lines shall be copper and insulated. Avoid routing water lines near source of heat such as the compressor system of the ice maker.
· Cold and hot water piping systems shall be insulated in accordance with the latest version of ASHRAE 90.1.
· To enable thermal eradication and emergency shock chlorination, consider providing taps for connection of temporary booster heaters. Provide adequate electrical connections.
· PVC pipe shall not be used for sanitary and vent lines because of the high temperature water during thermal eradication. Cast iron shall be used.
· Aerators are prohibited in order to reduce exposure to Legionella contaminated water.
· Piping materials shall be in accordance with VA Master Spec 22 11 00 Facility Water Distribution.
· Piping and components must be cleaned and protected from accumulation of debris and contamination prior to and during installation.
· Ensure that newly installed piping and components are flushed of debris and disinfected prior to being placed into service.
Supplemental Water Disinfection Methods
In addition to maintaining the appropriate water temperatures, minimum concentrations of various biocides (e.g. oxidizing agents such as chlorine) can inhibit the growth of Legionella in building potable water distribution systems. When considering the use of supplemental water disinfection methods for the prevention of Legionella, plumbing designers and the VA project manager (in collaboration with other facility stakeholders such as infectious diseases and infection prevention and control) shall review the merits of the many types of supplemental systems available prior to making a final selection. The
Engineer recognizes United States (U.S.) Environmental Protection Agency (EPA) approved oxidants (chlorine, monochloramine, and chlorine dioxide) as acceptable disinfectants for use in potable water distribution systems.
Selection of the necessary equipment, piping and controls and adequate space for the maintenance and operations, are a must. The EPA regulates contaminant levels and disinfectant treatment for use under the Safe Drinking Water Act. Usually, the EPA delegates primacy to States for the regulation and enforcement of the Act within individual State boundaries. Systems must be specifically approved or recognized for the intended use by the State regulatory water authority. Federal and state safety regulations and permitting shall be followed. Designers shall coordinate permitting requirements with the local authority having jurisdiction. The facility must consult with the State (or its delegated local water authority) for regulating drinking water for guidance on system selection, achieving an appropriate biocide residual level at building outlets for Legionella growth suppression, system design, system operation, and ensuring compliance with regulations regarding water treatment system(s) and safety. Once a type of system is selected, either the State (or its delegated local water authority) or the manufacturer of the system must provide the minimum and maximum outlet biocide levels in writing for both hot and cold water.
Design parameters to evaluate for supplemental water disinfection include:
· Potential impact of supplemental disinfectant on special use water systems.
· Need for emergency power.
· System may need to be duplex for redundancy and maintenance.
· Spare parts may need to be purchased and stored locally.
· Federal and state safety regulations and permitting must be observed.
· Interaction of supplemental disinfection if shock chlorination is used as an emergency remediation method.
· Ensure enough maintenance access is provided around equipment.
· Provide sample points throughout the system to monitor effectiveness. Some critical points should be provided with automated data collection and alarm.
· Operational and maintenance requirements must be maintained to ensure system effectiveness.
· System must be equipped with automated features to ease of use and proper maintenance and operation.
· Requirements for off gassing associated with the specific chemicals (for example Sodium hypochlorite).
· Chemical spill containment systems must be provided.
· Chemical storage requirements.
Emergency Water Disinfection Methods
Emergency disinfection is the process of implementing immediate, temporary actions to reduce the amount of Legionella in a water distribution system.
Thermal Eradication
Requires potable water in the system to be raised to 71 - 77 deg C [160 - 170 deg F] and flushed through every fixture for 30 minutes. Some design considerations are as follows:
· Central water heating equipment must be capable of raising water temperature to 82 deg C [180 deg F].
· Master thermostatic mixing valve located in the hot water distribution system may have to be bypassed to allow hot water to circulate in the distribution system.
· Select point-of-use thermostatic mixing valves that are amenable to thermal eradication procedures. See VA Master Specification 22 05 23 for required mixing valves.
· Provide taps for a connection of temporary booster heater to facilitate thermal eradication.
· Provide adequate electrical connections for temporary booster heaters. Coordinate with electrical engineer.
· All equipment and appurtenances in the system will need to be reviewed for operation at elevated temperature (e.g. ensure water supply stops can withstand required temperatures).
· Means of tempering discharge will need to be considered to accommodate code requirements on discharge to sanitary sewer (max temp of 60 deg C
[140 deg F]). Ensure discharge is compliant with the local requirements.
Shock Chlorination
Installation of a chlorinator is required. Shock chlorination involves the addition of chlorine to the water system in one of the forms listed above.
Some design considerations are as follows:
· Provide taps for connection of temporary equipment.
· All equipment and appurtenances in the system will need to be reviewed for operation at elevated oxidant levels.
Special Use Water Systems (e.g., hemodialysis, laboratory, pharmacy compounding )
It is important to consider the implications of Legionella mitigation strategies on special use water systems within the building. Special use water systems include: Hemodialysis, Laboratory Service, Pharmacy Compounding, and Supply Process Service (SPS). Water treatment strategies and chemical disinfectants may result in the introduction of products into, or the formation of disinfection byproducts in, the building water supply at concentrations that may be toxic to patients on hemodialysis. Accordingly, the impact of mitigation strategies must account for potential toxicity, methods for removal of the chemical agent and byproducts from the special use water system, and availability of assay methods to measure the chemical agent and byproducts for assuring patient safety. VA authorities responsible for the oversight of special use water systems are to be consulted during design development of the project and prior to any final decisions regarding water treatment strategies for Legionella.
INSPECTIONS AND WITNESS OF TESTS
The inspection plan needs the approval of the project Engineer. Frequency and requirements for inspections and testing must be added to the construction documents. Regarding inspections and test witnessing, the plumbing drawings and specifications shall coordinate with the best practices on Systems
Commissioning and the project's commissioning specifications.
Ensure that newly installed piping and distribution system components are flushed of debris and disinfected prior to being placed into service. Piping and components must be cleaned and protected from accumulation of debris and contamination prior to and during installation. Documentation of flushing and disinfection must be maintained. Disinfection for new installations or maintenance of piping, equipment, and components shall be conducted in accordance with the requirements of the Plumbing code, American Water Works Association (AWWA C651-05), and VA Master Construction Specifications.
WATER DISTRIBUTION SYSTEMS
Water Storage Tanks: Provide adequate space for maintenance access to clean the interior of all water storage tanks. Tanks shall be provided with a man way access to allow for inspection, maintenance and cleaning. Tanks shall be constructed to minimize stagnation and thermal gradients. Mechanical cooling may be needed to maintain water temperature.
Measuring and Indicating Devices
Analog gauge and electronic sensors/devices shall be used in tandem as much as is practicable. The gauge device will provide a local or immediate indicator of current conditions for troubleshooting and verification purposes. The electronic sensor/device will be used for continuous monitoring of water conditions and shall be connected to the building automation system. All electrical devices shall be on emergency power. All measuring devices shall be calibrated in accordance with the manufacturer's recommendations.
Domestic Cold Water Sequence of Operation
See schematic A/ P003 & B/P003
Water will flow as required for fixture use as measured by CF-1. Water temperature will be measured at a minimum of three locations: CT-1 at the meter; CT-2 near the first plumbing fixture; and CT-3 on the return pipe.
Once all fixture use has stopped as measured by flow meter CF-1, the flow meter will send a signal to the Domestic Cold Water Pump to start. Pump will circulate domestic cold water until flow meter CF-1 senses fixture usage and pump will stop.
Pressure shall be measured before RPZ by pressure sensor CP-1 and after RPZ and pressure reducing valve by CP-2.
Pressure shall also by measured before pump DCP-2 by CP-3.
Domestic Hot Water Sequence of Operation
See schematic C/P002
Water will flow as required for fixture use. Water temperature will be measured at a minimum of four locations: HT-1 near the water heating source; HT-2 after 50 feet; and HT-3 near the middle of the domestic hot water piping; and HT-4 at the farthest point from the heating source. Domestic hot water piping will be looped to feed all fixtures before returning back to the water heating source.
Domestic Hot Water Return Pump shall circulate hot water continuously (no shut down or aqua sensor). Water flow shall be monitored by HF-1. Once flow stops, HF-1 shall send a signal to the Building Control System indicating a flow failure.
Pressure shall be measured after water heating sources by pressure sensor HP1
NOTE: ALL DOMESTIC COLD AND HOT WATER PIPES SHALL BE INSULATED WITH 1" FIBERGLASS INSULATION WITH OUTER
JACKET. THIS INCLUDES ALL PIPING IN WALLS.
Water quality sensor CQ-1 shall measure water quality and send a signal to EMS.
T
T F
T
CT-2
CF-1
CT-1
CT-3
INCOMING DOMESTIC WATER
SERVICE; SEE DETAIL A/P0.03
NO SCALE
DOMESTIC COLD WATER SCHEMATIC
T T F
HT-2 HF-1HT-4
NO SCALE
DOMESTIC HOT WATER SCHEMATIC
T
HT-3
DOMESTIC HOT WATER
RETURN PUMP DHW-1
DOMESTIC COLD WATER
RETURN PUMP DCW-1
HOSE END BALL VALVE
WITH GASKET CAP AND
CHAIN
T
HT-1
T QP P F
T
PT
NO SCALE
BUILDING WATER SERVICE
HOSE-END BALL VALVE;
TYPICAL
FLOW METER; TYPICAL
DOMESTIC COLD WATER
MAIN (RISER)
DOMESTIC COLD WATER
SUPPLY TO BUILDING
CP-2 CF-1
CT-2
DOMESTIC COLD WATER
RETURN PUMP (NOT A
BOOSTER PUMP) DCW-1
CHECK VALVE; TYPICAL
BALL VALVE; TYPICAL
CT-3 CP-3
TEMPERATURE METER;
TYPICAL
PRESSURE METER;
TYPICAL
FLOW ARROW; TYPICAL
DOMESTIC COLD
WATER RETURN
CP
-1
CT
-1
CQ
-1
STRAINER WITH
HOSE END BLOW
DOWN
THEMOMETER;
TYPICAL
TO HW BUILDING MAIN
P
HP-1
24" MIN.
FROM FIXTURES TO FIXTURE
PLACE IN PIPE FOR INSTALLING
SILVER IONIZATION
DISINFECTION SYSTEM (FUTURE)
M
GATE VALVE,
RISING STEM
TO HWR BUILDING MAIN
ENGINEERS
T A
TE
OF I L L
NO
I S
ER
AW
LUOBEDAW
LRAE
I
062-044274
REGISTERED
PROFESSIONAL
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
42-AdditionApproved: Associate Director
Approved: Chief of Staff
Approved: Chief Engineer
Approved: Infection Control
Approved: Safety Officer
Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .