This solicitation document, number 36C25520R0073, is for the expansion and upgrade of Building 42 for laboratory use at the Marion VA Medical Center.

The solicitation involves upgrading an existing building to accommodate new laboratory functions. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the contracting agency. The scope of work includes architectural and structural additions and renovations to the building, as well as associated mechanical, electrical, and plumbing systems work.

Drawings and specifications are provided to outline the required demolition, new construction, interior build-outs, and systems upgrades. The work includes additions, a new stair and elevator tower, interior renovations, and roof replacements or repairs. A deadline of November 8, 2019 is given for questions from bidders, with bids due on an unspecified later date. The location of performance is the Marion VA Medical Center.

This summary focuses on the salient details regarding the scope of work and deadlines. It does not include legal language, terms and conditions, or other non-essential information from the solicitation document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD1012

11 13

Approximate location of existing electrical vault

Approximate location of existing signal vault

Existing Steam Tunnel 20

Approx. location of existing emergency power feeder

Note: Refer to civil sheets for more site demolition

AD101

Existing Wall to be Demolished

Existing Wall to Remain

Existing Door to be Demolished

Existing Door to Remain

Demolition Plan Legend

Scope of Work

No Work This Area - Out of Contract1

Remove Existing Concrete wall, stairs, and associated items. See Plan for Additional Information.

Remove Existing Exterior Door for Installation of new Door inside existing Frame. See Plan for Additonal Information

Remove existing 2" of Exterior Insulation Finishing System (EIFS) and Exterior Sheathing to Existing Metal Studs to prepare for Proposed Addition.

Existing rough opening to be reused. Remove Existing door and frame. See Plan 1/A101A for additional information.

Keynote Legend - Existing Building Demolition Plans

See Civil for site demolition2

Existing Louver to Remain.8

Remove portion of existing roof parapet and coping for new door from 2nd floor of new addition

Existing Roof Parapet to Remain. Remove Existing Roof Coping for installation of new flashing/expansion joint between existing Building 42 and New Lab Building Addition.

Partial demolition of existing tunnel; see building section.11

Remove Retaining wall and associated items12

Exisiting Tunnel to Remain; See Plan for Extents of Demolition Required by New Building

Line of Proposed Addition; See Plan for Additional Information

Remove portion of exterior wall at connection to addition.

Coordinate w/ plan.

Remove portion of existing parapet for existing roof access from the 1st floor. See plan.

Existing louvers to remain17

Remove existing exterior stair and handrails in its entirety.18

Exisitng EIFS to remain19

Existing site utilities are within the safe work setback of excavation. G.C. to provide shoring as required.

Existing site EP to building 42 is encased in concrete. No excavation with heavy impact equipment or tool allowed over E.P. Feeder

Partial demolition of existing tunnel. See plan.22

Ground Floor Level 100'-0"

T.O. Existing Parapet 119'-0"

Tunnel Level 87'-9"

B.2

A500

Ground Floor Level 100'-0"

Tunnel Level 87'-9"

4.5

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:39:27

Main Level Demolition Plan Expand & Upgrade Building 42 for Laboratory

AD101

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/8" = 1'-0"1 Ground Floor Demolition Plan

General Notes - Demolition Plans

A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.

B This demolition plan reflects information gathered from existing conditions drwawings and architects feild observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.

C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.

D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.

E Protect all medical equipment and associated medical items during construction.

F All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

1/8" = 1'-0"2 Elevation - EIFS Demolition - West

Addendum 1

1/4" = 1'-0"3 Building Section - Extent of Tunnel Demolition

E x is ti n g R o o f

Existing Roof

AD1012

A.2A.2

A.6A.6

2.5

2.5

3.5

3.5

4.5

4.5

No Work This Area - Out of Contract1

Remove Existing Concrete wall, stairs, and associated items. See Plan for Additional Information.

Remove Existing Exterior Door for Installation of new Door inside existing Frame. See Plan for Additonal Information

Remove existing 2" of Exterior Insulation Finishing System (EIFS) and Exterior Sheathing to Existing Metal Studs to prepare for Proposed Addition.

Existing rough opening to be reused. Remove Existing door and frame. See Plan 1/A101A for additional information.

Keynote Legend - Existing Building Demolition Plans

See Civil for site demolition2

Existing Louver to Remain.8

Remove portion of existing roof parapet and coping for new door from 2nd floor of new addition

Existing Roof Parapet to Remain. Remove Existing Roof Coping for installation of new flashing/expansion joint between existing Building 42 and New Lab Building Addition.

Partial demolition of existing tunnel; see building section.11

Remove Retaining wall and associated items12

Exisiting Tunnel to Remain; See Plan for Extents of Demolition Required by New Building

Line of Proposed Addition; See Plan for Additional Information

Remove portion of exterior wall at connection to addition.

Coordinate w/ plan.

Remove portion of existing parapet for existing roof access from the 1st floor. See plan.

Existing louvers to remain17

Remove existing exterior stair and handrails in its entirety.18

Exisitng EIFS to remain19

Existing site utilities are within the safe work setback of excavation. G.C. to provide shoring as required.

Existing site EP to building 42 is encased in concrete. No excavation with heavy impact equipment or tool allowed over E.P. Feeder

Partial demolition of existing tunnel. See plan.22

Existing Wall to be Demolished

Existing Wall to Remain

Existing Door to be Demolished

Existing Door to Remain

Demolition Plan Legend

Scope of Work

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:39:29

Existing Roof Demolition Plan Expand & Upgrade Building 42 for Laboratory

AD102

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/8" = 1'-0"1 Existing Roof Demolition Plan

General Notes - Demolition Plans

A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.

B This demolition plan reflects information gathered from existing conditions drwawings and architects feild observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.

C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.

D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.

E Protect all medical equipment and associated medical items during construction.

F All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

U

U

D

D

E x is ti n g W a lk

Existing Walk

E x is ti n g W a lk

New Drive

New walk;

RE: Civil

DN

Emergency Room Addition

Existing Medical Building

Entry

Existing Drive

DN

Existing Passage/Tunnel

Existing CLC Building

Existing Building

N e w

D ri v e

E x is ti n g

New ParkingExisting ParkingExisting Parking

Existing Below Grade Tunnel to Remain, Shown Dashed

Existing Below Grade Tunnel to Remain,Shown Dashed

Proposed Addition

Existing Walk

Note: Refer to civil sheets for more site demolition

Line of existing emergency power duct bank to remain

New Drain Tile

New Drain Tile

New Drain Tile

Existing Building

A001

Existing Drain Tile

New Drain Tile at Existing Tunnel Location

Existing Passage/Tunnel Under Proposed Addition, Shown Dotted

Existing Drive

6" 6" 6"

1'-6"

"Steel Pipe (fill with concrete)

1/2" compressible filler and sealant

Asphalt or concrete (RE: Civil)

Steel pipe sleeve (grout bollard at sleeve)

Bollard cover - caulk at base

Existing Medical Building

New concrete pad; RE: Civil

DN

Entry

Existing Below Grade Steam Tunnel to Remain; Shown Dashed

Proposed Addition

Line of existing emergency power duct bank to remain

New walk - RE Civil

6" Diameter Concrete -Filled steel pipe bollard (with cap);

RE: 3/A001

/8

5'-0" 5'-0" 5'-0" 5'-0" 10'-0"

A001

Line of existing crosswalk

A350

Line of walk to center on existing crosswalk RE: civil

C J

C J E J E JC J

E J E J E J C JC JC JC J

6'-0"

E J

C J

EJ, TYP

1/2" compressible filler and sealant

New drive; RE:

CivilC J C J

EQ. EQ. See Civil

1" minus gravel base compacted to meet side walk compaction

Sidewalk

4"- 8" Thick stepping stones

Provide 1/2" compressible asphaltic membrane between stone and curb/walk.

See Civilsidewalk at entry

4" MIN

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:31

Architectural Site Plan Expand & Upgrade Building 42 for Laboratory

A001

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1" = 20'-0"1 Enlarged Architectual Site Plan @ Addition

1/2" = 1'-0"2 STEEL PIPE BOLLARD DETAIL

N

1" = 10'-0"3 Enlarged Architectural Site Plan @ Entry 1/2" = 1'-0"4 Stepping Stones Section

DN

AA

BB

CC

DD

A301

1'-1 1/4" 10'-11" 5'-10 3/4" 1'-7 1/4" 22'-6" 30'-0" 29'-0 3/8" 25'-5 5/8"

A300

A201

A2011

A500

R a m p U p

:2

M a x

Controlled Access - Single exit door provided

A301

Elevator Machine

Room

ESB004

Tunnel Access

ECSB002

Stair/Elev Vestibule

ECSB001

Line of Concrete Pad

Elevator

EL1

A350

A200 2

A200

6 5/8"

ESB005A

/4

/4

12'-0 1/4" 7'-0 1/4" 82'-0 1/8" 2'-3" 23'-2 5/8" 1'-9 3/8"

A500

A501

A500

Existing Ramp Down

Unfinished Basement

ESB005

Roof Drain

Roof Drain

E S

B

A350

Existing Tunnel

ECSB003

Existing Steam lines below.

See civil drawings.

A501

2.1

B.2B.2

A500

New AdditionExisting Medical Building

8'-11 1/4" 30'-0" 30'-0" 29'-0 3/8" 25'-5 5/8"

85'-10"Lower Level @

E C

S B

Sub Basement

Exist.

Line of floor above

/8

/2

/4

/4

E

D

D

C2

J

E

Concrete Mud Slab at 4" below future finish floor - Unfinished Basement Floor

C

C2

D

D

A521

Existing Exit

A521

2.2

C.2C.2

Unfinished Space

/2

87'-9"

Up

/8

/4

/8

128'-3 5/8"

100'-2 5/8"

/8

8'-0" MAX

7'-0" MIN

New Compressed/Expandable expansion joint seal

1'-6"

C

/8

4'-10"

8'-0"

2'-1 5/8" 7'-0"

6"

G

G

TEMP Ramp DownCorridor

ECSB004

Temporary Corridor

ECSB005

1'-6" 23'-3"

ECSB004

ECSB005TEMP Ramp Down

GWB Expansion Joint with Sealant

Compressed/Expandable Expansion Joint Seal

VIF

7 3/4"

9'-0"

Saw-cut opening in existing tunnel wall for Tunnel Access ECSB002

Saw-cut opening in existing tunnel wall for Corridor ECSB004 access

A.2A.2

A.6A.6

2.5 3.5

3.5

4.5

4.5

New Concrete Knee Wall

VIF

8 3/8"

GC to provide formed shoring to protect existing utility tunnel and vaults for work

Existing utility manhole and vault

Saw-cut opening in existing retaining wall for temp tunnel access

Line of existing ER Addition N.I.C.

Existing Tunnel to remain

Fully recessed Fire Extinguisher Cabinet FEC. At rated partitions provide additional GWB layers behind cabinet or 3M pads to maintain wall rating.

Line of exposed structural bracing. No fire-proofing required on structural bracing.

A100

Main Hospital

Outpatient ClinicDental/S

PD &

Clinics

Dental/S

PD &

Clinics

Canteen/ Clinics P ro p o s e d

A d it io n

Engineering / Safety

East Trailer

SNRF

Project Location

N

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

New concrete foundation wall for stairs used as temp wall.

2x BLKG

1-1/2" DIA. wood handrail held 1-1/2" off wall surface.

3/4" Exterior Grade Plywood sheathing

3-1/2" Treated Wood Studs 16" O.C. w/ 3" batt insulation

4'-4 1/2"

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:35

Overall Lower Level Plan Expand & Upgrade Building 42 for Laboratory

A100

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/8" = 1'-0"1 Basement Plan

Not to Scale

Key Plan

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

E Frame furring at columns as tight as possible to spray-on fire proofing.

1/2" = 1'-0"2 Plan Section

UP

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

A

B

C

D

ER

Addition

3110G

Open Office

E010

PSA

E014

Office

E012

Office

E013

Shared Office

E015

Office

E017 Station

E011

Station

E009

Station

E007

Station

E005

Station

E003

Phlebotomy

E002

Waiting

E001

Corridor

EC028

Main Lab

E019

IT

E025

Bio-Safety Level 3

E019B

Histology

E023

A301

10'-11" 30'-0" 30'-0" 29'-0 3/8" 25'-5 5/8"

Existing Electrical

Room

Acid/Base

E023A

Blood Bank

E021

Conference Room

E026

Matchline See: 1 / A101B

Matchline See: 1 / A101A

A300

A2011

A500

Alcove

E010A

Corridor

E018C

/4

/4

/8

/8

1'-7 1/8" 16'-9 3/4" 24'-1 1/4" 30'-0" 29'-0 3/8" 25'-5 5/8"

A301

A300

A300

Shared Office

E016

A350

A200 2

A200

A500

A501

A120

A500

19'-8" 109'-3 1/2"

128'-9 5/8"

/4

/8

/4

/8

7'-11 3/4" 3'-8 3/4" 14'-0" 46'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 4'-10 7/8"

100'-7 3/8"

E028

A501

A501

A350

E

2.1

B.2

Core / Specimen

E018

Break Room

E024

HAC

E024A

P. Toilet

E006

Toilet

E020

ADA Toilet

E022

P. Toilet

E004

Pyxis Storage

E008

/8

Stair/Elev Vestibule

EC027

Elevator

EL1

Grade Entry

94'-0"

Corridor

E018B

A500

Microbiology

E019A

1 1 1

1'-6"

/4

/8

/8

A350

Matchline See: 1 / A101B

Matchline See: 1 / A101A3

Cooler

E018A

5'-1 1/4"

2.2

C.2

E S

B

A120

/8

M

IN

M

IN3

A.2

A.6

2.5 3.5

3.5

4.5

4.5

/8

/8

4 4 4

Main Hospital

Outpatient ClinicDental/S

PD &

Clinics

Dental/S

PD &

Clinics

Canteen/ Clinics P ro p o s e d it io n

Engineering / Safety

East Trailer

SNRF

Project Location

N

Line of existing ER Addition. N.I.C.1

Existing tunnel to remain2

Fully recessed Fire Extinguisher Cabinet FEC. At rated partitions provide additional GWB layers behind cabinet or 3M pads to maintain wall rating.

Keynote Legend - Overall Ground Floor Plan

Window deduct alternate; omit windows in location noted and in-fill with exterior partition similar to above and below curtain wall.

Line of exposed structural bracing. No fire-proofing required on structural bracing.

Site Bollards; see 4/A001 for Locations and Details6

Line of Control Joint; Coordinate with Structural Drawings7

Line of Foundation Wall Below; RE: Structural Drawings8

Face of existing building.9

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:39

Overall Ground Floor Plan Expand & Upgrade Building 42 for Laboratory

A101

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

E Frame furring at columns as tight as possible to spray-on fire proofing.

N

1/8" = 1'-0"1 Ground Floor Plan

Not to Scale

Key Plan

BB

5 6

A300

A300

Open Office

E010

PSA

E014

Office

E012

Office

E013

Shared Office

E015

Office

E017

Station

E011

Station

E009

Station

E007

Station

E005

Station

E003

Phlebotomy

E002

Waiting

E001

Corridor

EC028

Main Lab

E019

IT

E025

Existing Electrical

Room

CB456

Room

CB457

Acid/Base

E023A

Blood Bank

E021

Conference Room

E026

Alcove

E010A

Corridor

E018C

9 3/8" 20'-7" 8'-0 1/8" 8'-1" 8'-1" 8'-1" 8'-1" 9'-10" 9'-10" 8'-1 1/8" Clear 4 1/4"

2'-0 3/8"

9 3/8"

/8

/8

/8

/8

/8

2'-8 1/2"

8'-0 1/2"

1'-2 1/4" 11 1/4" 19'-3 1/4" 16'-1 5/8" 9'-1" 6'-4 7/8" 8'-10" 14'-10 5/8" 12'-7 3/8"

2'-6 1/4"

Shared Office

E016

A301

A301

E003 E005 E007 E009 E011

E

E016

E014

E012

E010A

E

E

E

E

E018C

A500

A120

C1

B

C1

G

C1

A600 1

A600

A501

A501

B.2

/8

/8

/8

/8

/2

/8

32'-8 1/4" 8'-10 7/8" 6'-4 7/8" 9'-4 1/4" 6'-4 7/8" 8'-10" 9'-4 1/2" 20'-7 3/4" 9 3/8"

Histology

E023

Core / Specimen

E018

/8

/8

/4

/8

/8

/8

/8

/2

/8

/2

/8

/8

/8

/2

/8

/8

Main Lab

E019

A600

J

J

C2

C2

C1

C1

E

G2

G2

C1

E

A

E

E

A

E022 E008A

E020

E

B

C1

C1

C1

E

BB

B

B

H

H

BBB

C1

B

BB

B

B

B

BB

B

B

B G B

BB

G

B

B

B

B

B

B

B

G1G1

C1

A2011

A500

A350

Matchline See: 1 / A101B

New AdditionExisting Medical Building

E028

Break Room

E024

GG

3 1 1

2'-6 3/8" 14'-10" 2'-9 3/4"

E002

P. Toilet

E004

P. Toilet

E006

E004 E006

Corridor

E018B

E008B

G

G

E

G

G

A350

DN

G

GG

G

A601 1

12'-10 7/8"

7 1/8" 1'-10 7/8"

G

" 2'-0" 4'-0" 2'-0"

6'-10" 8'-9"

E026B

HAC

E024A

Pyxis Storage

E008

Toilet

E020

ADA Toilet

E022

A601

A120

14 1513

2'-1"

2'-6"

1'-0 3/4"

/4

13 14

A600 3

B

B

H

B

G2

J

G2

G2K

5"

Align

GG

A300

A.2

A.6

3.5

3.5

4.5

4.5

G2

SOUTH

NORTH

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

Cased pass thru. See elevation for heights1

Existing tunnel to remain2

Fully recessed fire extinguisher cabinet3

Frame furring tight to fireproofing4

Mop Sink, Re: MEP5

Frame tight to lateral bracing. Field Verify.6

Provide 2" Minimum between panel and face of wall7

Stainless Steel Corner Guard 2" x 48" H. Reinforce Corner Framing with 20 GA. MTL Studs; See Finish Plan for Additional Information

Keynote Legend - 1st Floor Plan

PVC Snap over Corner Guard 2 1/2" x 48" H; See Finish Plan for Additional Information

Handrail; See Finish Plan for Additional Information10

Built-In Bench with Cushions; See Elevations11

Curved Partial Height Wall with 1/2" Tempered Glass Partition; See Elevation and Details

Built-in Countertop Sink; See P-Series for Additional Information

Base Cabinet and Countertop. See Elevations and Details for Additional Information

Upper Wall-Hung Cabinets; See Elevations and Details for Additional Information

Prefabricated Walk-in Cooler.16

Solid Surface Countertop. Provide Wall Cleats & Metal Support Brackets @ 4'-0" OC MAX

Existing louver to remain.18

Existing column to remain.19

Provide FT wood blocking or 18 GA sheet metal and data (see ELEC). Provide a mock up and/or review room layout with user.

Expansion Joint Cover - Re: Spec.21

Metal base cabinets and 30" deep counter at 36" AFF per spec.

25" deep work counter at 30" AFF per spec23

Filler Panel and extended counter top per spec.24

Line of exposed structural bracing. No fire-proofing required on structural bracing.

Window deduct alternate; omit windows in location noted and in-fill with exterior partition similar to above and below curtain wall.

Safety shower, RE; P-Series drawings26

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:43

Partial First Floor Plan - North Expand & Upgrade Building 42 for Laboratory

A101A

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/4" = 1'-0"1 Ground Floor Plan

N

Not to Scale

Key Plan - North

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

Addendum 1

CC

DD

2 3 4 5 6

A301

A300

A500

Stair/Elev Vestibule

EC027

Open Office

E010

PSA

E014

Corridor

EC028

Microbiology

E019A

Main Lab

E019

IT

E025

Bio-Safety Level 3

E019B

Histology

E023

Existing Electrical

Room

CB456

Acid/Base

E023A

Blood Bank

E021

Conference Room

E026

Corridor

E018C

2'-8 1/2" 8'-0 1/2" 4 7/8" 7'-10 3/4" 16'-3 3/8"

4 7/8"

8'-7 1/2" 27'-2 7/8" 3'-0 1/2" 2'-11 3/4" 6'-10" 8'-9" 6'-7 3/4" 2'-3 1/4"

23'-0" 2'-6" 9 3/8"

/8

/4

/4

/4

/8

A300

E

E023A

E

E019B

E018C

Shared Office

E016

A501

C1

C1

A350

A601 1617

A500

E

E028

A6007

A600 5

A600

A600

A600

E

Core / Specimen

E018

2.1

2.1

B.2B.2

1'-1 5/8" 18'-4 3/8" 22'-3 3/4" 86'-4 3/8"

7 1/2"

ADA Toilet

E022

Pyxis Storage

E008

1'-1 5/8" 4'-2 3/8"

6" 4'-2"

1 1/2"

7 5/8" 8'-10 3/8"

/4

/4

/8

/4

/8

/8

/8

A600

A60114 13

A60112 15

A601

A6018

A601

Grade Entry

94'-0"

100'-0"

EE

DDD

J

J

J

J B

C1

C1

G

C1

E

A

E

E022

E

B B

C1

B

C1

C1 B

C1

E

E008A

E

B

A520

A520

A520

A2011

A201

A200 2

2'-6" 10'-9 3/8" 6'-0" 2'-6"

4 7/8"

2'-6" 5'-6" 2'-6"

A601 4 A6013

A520

G

A601 16

B

G

GG

K

A60117

H

B

GG

E

A

E

B

B

GG

G

G2

GG

BB

G2 G

B

BB BB

B

Cooler

E018A

/2

8'-0"

8 8

E019A6

/4

G

21'-9 7/8"

2'-1"

Clos.

E021A

ECSB001

2.2

2.2

C.2C.2

G

G1

GG

2'-6" 39'-11 3/8" 2'-1" 5'-11 1/4" 2'-6" 7 1/2"

2'-2 1/4"

2'-10 7/8"

5'-10 7/8" 5'-4 7/8" 6'-1 1/4"

B

B

A601

9 SIM.

SIM.

19'-6"

6'-0" 13'-6" 5'-7 7/8"

C2

C2

2.5

2.5 3.5 4.5

27 27 27

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

SOUTH

NORTH

Cased pass thru. See elevation for heights1

Existing tunnel to remain2

Fully recessed fire extinguisher cabinet3

Frame furring tight to fireproofing4

Mop Sink, Re: MEP5

Frame tight to lateral bracing. Field Verify.6

Provide 2" Minimum between panel and face of wall7

Stainless Steel Corner Guard 2" x 48" H. Reinforce Corner Framing with 20 GA. MTL Studs; See Finish Plan for Additional Information

Keynote Legend - 1st Floor Plan

PVC Snap over Corner Guard 2 1/2" x 48" H; See Finish Plan for Additional Information

Handrail; See Finish Plan for Additional Information10

Built-In Bench with Cushions; See Elevations11

Curved Partial Height Wall with 1/2" Tempered Glass Partition; See Elevation and Details

Built-in Countertop Sink; See P-Series for Additional Information

Base Cabinet and Countertop. See Elevations and Details for Additional Information

Upper Wall-Hung Cabinets; See Elevations and Details for Additional Information

Prefabricated Walk-in Cooler.16

Solid Surface Countertop. Provide Wall Cleats & Metal Support Brackets @ 4'-0" OC MAX

Existing louver to remain.18

Existing column to remain.19

Provide FT wood blocking or 18 GA sheet metal and data (see ELEC). Provide a mock up and/or review room layout with user.

Expansion Joint Cover - Re: Spec.21

Metal base cabinets and 30" deep counter at 36" AFF per spec.

25" deep work counter at 30" AFF per spec23

Filler Panel and extended counter top per spec.24

Line of exposed structural bracing. No fire-proofing required on structural bracing.

Window deduct alternate; omit windows in location noted and in-fill with exterior partition similar to above and below curtain wall.

Safety shower, RE; P-Series drawings26

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:46:53

Partial First Floor Plan - South Expand & Upgrade Building 42 for Laboratory

A101B

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/4" = 1'-0"1 Ground Floor Plan - South

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

AA

BB

CC

DD

A301

A301

A300

A300

A201

A500

Mechanical Room

E102

10'-11" 7'-1 7/8" 22'-10 1/8" 30'-0" 29'-0 3/8" 25'-5 5/8"

/8

/4

/4

/8

A301

A301

A300

A300

A200 2

A200

A500

A501

A350

12'-0 1/4"

A500

Elevator

EL1

A501

A501

B.2B.2

128'-11 1/2"

A500

Stair/ Elev Vestibule

EC101

2.2

2.2

C.2C.2

E102A

E102B

A.2A.2

A.6A.6

2.5

2.5

3.5

3.5

4.5

4.5

Demo existing parapet accommodate new cantilever steel and enclosure.

Typical refer to MEP drawings for penetration extent to coordinate with trades

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:50

Overall Interstitial Level Floor Plan Expand & Upgrade Building 42 for Laboratory

A102

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/8" = 1'-0"1 1st Floor Interstitial

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

BB

CC

DD

A301

A301

A300

A300

A500

Roof Drain

Roof Drain

Roof Drain

Roof Drain

Roof Drain

S L O

P E

/4

P

E R

F O

O T

S L O

P E

/4

P

E R

F O

O T

High Point

High Point

High Point

High Point

High Point

H ig h P o in t

H ig h P o in t

H ig h P o in t

H ig h P o in t

H ig h P o in t

SLOPE 1/4"

PER FOOT

S L O

P E

/4

P

E R

F O

O T

SLOPE 1/4"

PER FOOT

S L O

P E

/4

P

E R

F O

O T

A301

A301

A300

A300

A500

S L O

P E

/4

P

E R

F O

O T

/4

A500

A501

A501

2.1

B.2B.2

H ig h P o in t

A500

High Point

2.2

C.2C.2

Scuppers - see Detail on A550

1 1

1 1

A.2A.2

A.6A.6

2.5 3.5

3.5

4.5

4.5

Typical refer to MEP drawings for penetration extent to coordinate with trades for roof penetrations. RE: details 3 and 5/A103

MTL FLANGE

BONDING ADHESIVE

TPO MEMBRANE OR FLASHING

SEAM FASTENING PLATE MAX 12" OC

TPO MEMBRANE

TPO MEMBRANE

M

IN

INSUL 1/8" MIN. - 1/2" MAX.

NOTES:

1. POLYMER SEAM PLATES ARE REQD IN LIEU OF SEAM FASTENING PLATES

FOR MECHANICALLY - FASTENED ROOFING SYSTEMS OVER STEEL DECKS

2. IF VERTICAL SPLICE IS NOT LOCATED AT CORNER, 6" WIDE PRESSURE -

SENSITIVE ELASTOFORM FLASHING MUST BE CENTERED OVER FIELD SPLICE

AT ANGLE CHANGE

3. FASTENING PLATES MAY BE INSTALLED VERTICALLY

4. LAP SEALANT IS REQD ON CUT EDGES OF REINFORCED MEMBRANE

CURED TPO

MEMBRANE

FLASH ALL

OUTSIDE CORNERS

3" MIN.

4 LB, PRE-MANUFACTURED

LEAD, PRIMED BOTH SIDES.

SOIL PIP RE: PLUMBING

DRAWINGS

SEALANT

SBS FLASHING SET IN

TYPE IV ASPHALT

SET LEAD IN COLD MASTIC

METAL ROOF DECK

NOTE: EXTEND SOIL PIPE

AS REQ'D TO ACHIEVE

MIN.8" HEIGHT. USE

NO HUB FITTING AND

PVC PIPE.

9"

M

IN

4" RIGID INSULATION

1/2" RECOVERY BOARD

A-AA-A

ROOF SIDE

22 GA CONT MTL

STRIP FASTEN

TO PLATE @ 8" OC

SECTION A-

A

1/2" SLOPE

TREATED WD

BLOCKING OR (2)

LAYERS OF 3/4"

TREATED PLYWD

CONT TREATED WD

TOP PLATE

EJ COVER @ 24'-0" OC

SHALL BE FILLED W/

MASTIC

WALL MEMBRANE TO FLASH

OVER ROOF MEMBRANE W/

TERMINATION BAR FASTENED

W/ SCREWS & NEOPRENE

WASHERS @ 6" O.C.

FULLY ADHERED 60 MIL TPO

MEMBRANE ON 1/2" DENS

DECK SHEATHING

2" OVERFLOW DRAIN (RE:

PLUMBING)

OVERLFOW DRAIN

(RE: PLUMBING)

ROOFING MEMBRANE

MEMBRANE FLASHING

ROOF DRAIN STRAINER AND

CLAMPING RING (RE:

PLUMBING)

TAPER INSULATION

DOWN TO DRAIN

COORDINATE WITH PLUMBING

4'-0" TYPICAL

ROOFING MEMBRANE ON MIN. 4" RIGID

INSULATION ON STRUCTURAL METAL DECK

(RE: STRUCTURAL)

MEMBRANE FLASHING

METAL ROOF DECK (RE: STRUCTURAL)

PROVIDE STEEL AS REQUIRED TO SUPPORT

ROOF DRAIN (RE: STRUCTURAL)

CL CL

1'-0" 1'-0"

Slope the roof to drains 1/4"/1'-0 Max.1

Keynote Legend - Roof Plan

Infill exisitng scupper drain to match existing construction.2

Roof

Roof

Roof

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:53

Overall Roof Plan Expand & Upgrade Building 42 for Laboratory

A103

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

N

1/8" = 1'-0"1 Roof Plan

3" = 1'-0"3 Detail - Roof Curb Flashing

1 1/2" = 1'-0"5 Detail - Pipe Penetration

1 1/2" = 1'-0"6 Detail - Sheet Metal Coping

1 1/2" = 1'-0"7 Detail - Termination Bar

1 1/2" = 1'-0"9 Detail - Roof Drain and Overflow Drain

N

Not to Scale

Key Plan

Addendum 1

Typical; REf: Details 6/A103

Typical; RE: Details 9/A103

Typical; RE: Details 7/A103

Typical; RE: Details 7/A103

Existing Wall

New Wall

New Door

Existing Door

Floor Plan Legend

A120

A120

A120

C

D

D

C

D

C

A120

P. Toilet

E004

P. Toilet

E006

Toilet

E020

ADA Toilet

E022

E

A

E

E022

E020

E006E004

E026B

E

A

F

A

F

C

D

F

A

F

Break Room

E024

HAC

E024A Conference

Room

E026

Phlebotomy

E002

Corridor

E018B

Corridor

E018C

6'-0 5/8"

9'-1 5/8" 1'-7 5/8" 4'-5" 11 1/2" 8'-8 1/8" 4 7/8"

11 1/2" 8'-6" 4 7/8" 6'-0" 4 7/8" 8'-4 3/4" 11 1/2"

/8

/2

/8

/8 " 2

/8

/8

/8

/8

7'-10" 1'-4"

E Q

E Q

3'-5 3/4" 5'-3"

1 1

EQ EQ

E Q

E Q

2 2

/4

A601

A120

6 6

P2

P2

L V

T

W S

F

WSF2T1

WSF2T1

WSF1T1 T1WSF1

WP14

TR1

TR1

TR1TR1

A

A

7'-9" 1'-4"

2'-6"

2'-6"

2'-6"

2'-6"

E

E

E

E

H H

H

H I

I

I I

A Paper Towel Dispenser

-- -- Per MFGR Instructions 1

B Toilet Tissue Dispenser

-- -- Per MFGR Instructions 1

C Grab Bar Bobrick B-5806 x 36 Stainless

Steel Wall Mounted Top of Bar 3'-0" AFF

D Grab Bar Bobrick B-5806 x 42 Stainless

Steel Wall-To-Floor Mounted Top of Bar 3'-0" AFF

I Soap Dispenser -- -- Per MFGR Instructions 1

F Mirror Bobrick B-165 x 2436 -- Bottom of Reflective

Surface @ 40" AFF

G Bio-harzardous Waste Receptacle

-- -- -- 1

H Trash Receptacle -- -- -- 1

Restroom Accessory Schedule

Remarks - Restroom Accessory Schedule:

1. Provided and Installed by Owner (VA)

2. Provided and Installed by GC

General Notes - Restroom Accessory Schedule:

A. Specific manufacturer items listed are basis of design.

Description Manufacturer/Model Finish Mounting RemarksKey

Floor Mounted Toilet

-- -- -- 1, 2

Wall Hung Hand Sink

-- -- -- 1, 2

Description Manufacturer/Model Finish Mounting RemarksKey

Plumbing Fixture Schedule

Faucet - Automatic

-- -- -- 1, 2

Remarks - Plumbing Fixture Schedule:

1. Provided and Installed by GC

2. See Plumbing Drawings for more information.

General Notes - Restroom Accessories & Plumbing Fixtures:

A. All accessories and fixtures specified are for design intent only.

B. Hot water & drain pipes under lavatories shall be insulated or otherwise configured to protect against contact.

C. Mounting and location of accessories in accordance with ADA accessible accessories.

Flush Valve - Manual

-- -- -- 1, 2

E Grab Bar Bobrick B-5806 x 18 Stainless

Steel Wall-To-Floor Mounted Top of Bar 3'-0" AFF

DC

T2T2T2

TR3

EQ 3'-3" EQ

3'-3"

E

D

C

TR3

EQ 3'-3" EQ

2'-3"1'-0"

3'-6"

E

D

C

T2T2 T2

TR3

1'-0" 2'-3"

3'-6"

EQ 3'-3" EQ

E

D

C

T2 T2T2

TR3

F

EQ 3'-3" EQ

1'-6"1'-3"

3'-0" 6"

/8

A

E

I

C

D

T2T2 T2

1'-6"1'-3"

F

EQ 3'-3" EQ

3'-0" 6"

A

E

I

DC

T2 T2

TR3

F

3'-4 1/4"2'-7 3/4"

3'-0" 6"

1'-3" 1'-6"

A

E

D

C

T2 T2 T2

TR3

3'-3"

EQ 3'-3" EQ

Large Format Wall Tile Grout Lines

E

C

D

TR3

6'-9 1/8"

/8

A

F

EQ 3'-3" EQ

T2 T2 T2

1'-6"

6" 3'-0"

E

I

Countertop & Casework; See Elevation1

Lavatory in Countertop; See P-Series Drawings for Additional Information

Tall Cabinet; See Elevation for Additional Information3

Mop Sink; RE: P-Series Drawings for Additional Information

Keynote Legend - Enlarged Restroom Plan

Stainless Steel Corner Guard; See Finish Plans for Additional Information

3/4" Radius Corner6

Flooring Installation Direction7

1" 1'-3"

ADA BASE

2'-6"1'-3"

1" 2'-6"2'-6"

REF.

SS11

A650

A650

A650

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:36:59

Enlarged Restroom Plan and Interior Elevations

Expand & Upgrade Building 42 for Laboratory

A120

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

General Notes - Floor Plans

A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.

B All Partitions to be type "B" unless otherwise noted.

C All dimensions are from column center line to face of partition UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.

D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

E Frame furring at columns as tight as possible to spray-on fire proofing.

N

1/2" = 1'-0"1 EP - Main Level - North - Enlarged Restrooms

1/2" = 1'-0"2 P. Toilet E006 - South Elevation

1/2" = 1'-0"7 ADA Toilet E022 - North Elevation 1/2" = 1'-0"8 Toilet E020 - North Elevation

1/2" = 1'-0"3 P. Toilet E006 - East Elevation

1/2" = 1'-0"6 ADA Toilet E022 - West Elevation 1/2" = 1'-0"9 Toilet E020 - West Elevation

1/2" = 1'-0"4 P. Toilet E004 - South Elevation 1/2" = 1'-0"5 P. Toilet E004 - West Elevation

T2T2 T2

TR3

1/2" = 1'-0"10 Break Room E024 - North Elevation

RE: SCHEDULE FOR BASE

PL2

PL2

Ground Floor Level 100'-0"

T.O. Existing Parapet 119'-0"

1st Floor/Interstitial 117'-2 1/2"

23456 1

A300

T.O. Parapet 137'-6"

Roof Level 135'-10"

Stair Roof 150'-8 1/2"

T.O. Stair Tower Parapet 152'-0"

South Entry Ground Level 94'-0"

A300

Ground Floor Lab Parapet 117'-11 1/2"

EXISTING

MEDICAL

BUILDING

A501

2.1

14'-0"

EQ EQ EQ

4'-0"

2'-6 1/2"4'-0" 6'-0" 4'-0" 6'-0"

1 1 1 33

1'-2 1/4" 2'-6 1/2"

2.2

E019

4'-9"5'-1 7/8"5'-1 3/4"4'-7 3/8"

5'-4" 5'-4"4'-10 7/8" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 3'-8 3/4"

4'-0"7'-0"7'-0"7'-0" CJ

CJ

2.53.54.5

Ground Floor Level 100'-0"

T.O. Existing Parapet 119'-0"

Lower Level 85'-10"

1st Floor/Interstitial 117'-2 1/2"

Existing Lower Level 91'-9"

A B C D

T.O. Parapet 137'-6"

Roof Level 135'-10"

Stair Roof 150'-8 1/2"

T.O. Stair Tower Parapet 152'-0"

South Entry Ground Level 94'-0"

A301

Ground Floor Lab Parapet 117'-11 1/2"

A501

EXISTING

MEDICAL

BUILDING

A500

Return EIFS to exisiting wall. F.V.

Existing parapet to remain

Expansion Joint and joint cover Re: spec

B.2

A500

C.2

ECSB001

E102B13

8'-4 5/8" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 6'-7 3/4" 6'-0" 5'-7" 4'-3 1/8" 2'-6" 4'-4 3/8" 6'-4" 1'-9 7/8"

/4

/2

A.2 A.6

4'-7 1/2" 4'-7 1/2"

Exterior Insulation and Finishing System (EIFS)1

Metal Coping2

Vertical Expansion Joint Re: Spec3

Louvers4

Aluminum Composite Panel5

Spandral Glass Panel6

2 1/2" x 7 1/2" clear anodized aluminum Curtainwall system - thermally broken with 1 1/4" laminated insulating glass. System to meet level 3 blast requirements

Exisitng steam tunnel - location to be determined8

Keynote Legend - Exterior Elevations

Existing building beyond9

Existing tunnel to remain10

EIFS control joint. See detail, this sheet.11

Scupper- see detail 4/A55012

Emergency Access stair to existing roof below. See 9 & 10 A510 for more information

New 70" x 70" Louver. RE MEP drawings14

Overflow drain re: plumbing drawings15

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th Street Carmel, IN 46032

Tel Fax

317.580.0402 317.582.0766

Structural

Asaturian Eaton & Assoc.

1440 Old West Main Carbondale, IL 62901

Tel Fax

618.529.3414 618.529.3423

Civil

John A Jurgiel & Assoc.

123 N. Main Street St. Charles, MO 63301

Tel 636.757.3060 636.757.3064

Industrial Hygenist

Heapy Engineering 1400 W. Dorothy Lane Dyton OH 45409

Tel 618.529.5262

Electrical

11/7/2019 15:37:04

Exterior Elevations Expand & Upgrade Building 42 for Laboratory

A200

657-502

Marion, IL

11-08-2019

Bid Documents

RD AJS

1/8" = 1'-0"1 Exterior Elevation - North

1/8" = 1'-0"2 Exterior Elevation - West

Addendum 1 Addendum 1

T.O. Existing Parapet 119'-0"

Lower Level 85'-10"

1st Floor/Interstitial 117'-2 1/2"

Existing Lower Level 91'-9"

ABCD

A301

T.O. Parapet 137'-6"

Roof Level 135'-10"

Stair Roof 150'-8 1/2"

T.O. Stair Tower Parapet 152'-0"

South Entry Ground Level 94'-0"

A301

Ground Floor Lab Parapet 117'-11 1/2"

A500

A501

B.2

6'-2 7/8"

2 1/2"

4'-9 1/2"

2 1/2"

4'-9 1/2"

2 1/2"

4'-9 1/2"

2 1/2"

4'-9 1/2"

2 1/2"

3'-5 7/8"

2 1/2"

C.2

EC201

CJ

CJCJ

CJ CJ CJ

4'-4 5/8" 3/8" 7'-0" 7'-0" 7'-0" 7'-0"

1'-0" 1'-0"

7'-0" 7'-0" 7'-0" 7'-0"

1'-0" 1'-0"

7'-0" 7'-0" 7'-0" 7'-0"

1'-2" 2'-4"

5'-0" 5'-0" 5'-0" 5'-0" 5'-0"

2'-9 1/8"

CJ

CJ

A.2A.6

Ground Floor Level 100'-0"

T.O. Existing Parapet 119'-0"

1st Floor/Interstitial 117'-2 1/2"

2 3 4

A300

T.O. Parapet 137'-6"

Roof Level 135'-10"

Stair Roof 150'-8 1/2"

T.O. Stair Tower Parapet 152'-0"

A500

A351

South Entry Ground Level 94'-0"

A300

Ground Floor Lab Parapet 117'-11 1/2"

A351

A501

2.1 2.2

CJ CJ CJ CJ

CJ CJ CJCJ

1'-7 1/8"

7 1/4"

5'-0" 5'-0"

3 3/4"

5'-10 3/4"

1'-2 1/8"

5 1/8"

5'-11 3/8" 7'-9" 7'-9 1/2"

1'-0 1/8" 11 7/8"

7'-0 1/8" 7'-0" 7'-0" 7'-0"

1'-0" 1'-0"

7'-0" 7'-0" 7'-0" 7'-0"

3/8" 2'-5"

7'-0" 7'-0" 7'-0" 4'-6"

1'-11 3/8"

2'-3"

CJ

CJ

2'-5 7/8"

2.5 3.5 4.5

CONTINUOUS

V-GROOVE

3/4"

/2

EIFS

1/2" CONTINUOUS BACKER

ROD AND SEALANT

(SLOPE EIFS TO EXTERIOR

AT BOTTOM OF

HORIZONTAL JOINTS)

EIFS

Exterior Insulation and Finishing System (EIFS)1

Metal Coping2

Vertical Expansion Joint Re: Spec3

Louvers4

Aluminum Composite Panel5

Spandral Glass Panel6

2 1/2" x 7 1/2" clear anodized aluminum Curtainwall system - thermally broken with 1 1/4" laminated insulating glass. System to meet level 3 blast requirements

Exisitng steam tunnel - location to be determined8

Keynote Legend - Exterior Elevations

Existing building beyond9

Existing tunnel to remain10

EIFS control joint. See detail, this sheet.11

Scupper- see detail 4/A55012

Emergency Access stair to existing roof below. See 9 & 10 A510 for more information

New 70" x 70" Louver. RE MEP drawings14

Overflow drain re: plumbing drawings15

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

42-AdditionApproved: Associate Director

Approved: Chief of Staff

Approved: Chief Engineer

Approved: Infection Control

Approved: Safety Officer

Approved: Chief, Police & Security o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

1 Memorial Dr. STE 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

220 N College Ave Indianapolis, IN 46202

Tel Fax

317.464.9090 317.464.9393

Office of Facilities

ManagementMcComas Engineers 1717 E 116th…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .