P09 520 23 106_JACC Enclosure Project Final Full Set 08_10_2023.pdf
PDF 33 MB Posted
- Attached to
- Renovate Interior Space JACC Federal contract opportunity
- Solicitation number
- 520-23-106
About this file
This document summarizes a federal solicitation to renovate interior space at a Joint Ambulatory Care Center. The solicitation number is 520-23-106 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. It seeks offers to complete interior renovations including upgrades to finishes, fixtures, casework and mechanical/electrical systems. The solicitation was released on August 10, 2023 and responses are due by September 15, 2023. Award is expected to be made by October 31, 2023 to a small business contractor. The work must be completed within 180 calendar days of the award date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25623R0109 0003.pdf | ||
| 00 01 10 - Table of Contents - Redacted.docx | DOCX document | |
| 36C25623R0109 RFI Responses.docx | DOCX document | |
| VOL 1 BINDER.pdf | ||
| VHA ICRA 2023-1.0_Final Template_0.docx | DOCX document | |
| 01 00 00 - General Requirements rev2.docx | DOCX document | |
| VOL 2 BINDER.pdf | ||
| VOL 3 BINDER.pdf | ||
| S04 Site Visit Sign in Sheet 520-23-106 8.24.23.pdf | ||
| 36C25623R0109 0002.pdf | ||
| 36C25623R0109 0001.pdf | ||
| P03 - Brand Name JA JACC CO Signed - R1_Redacted.pdf | ||
| 36C25623R0109 EXHIBIT A.docx | DOCX document | |
| 36C25623R0109 EXHIBIT D.docx | DOCX document | |
| Specs 4 14 2023.pdf | ||
| 36C25623R0109 EXHIBIT B.docx | DOCX document | |
| 36C25623R0109 EXHIBIT C.docx | DOCX document | |
| WD FL20230203 Mod 1 dtd 01.13.2023.txt | TXT text file | |
| Final SOW Renovate interior spaces.pdf | ||
| 36C25623R0109 EXHIBIT E.docx | DOCX document | |
| 36C25623R0109 EXHIBIT F.docx | DOCX document | |
| ICRA Contacting Only.pdf | ||
| 36C25623R0109 Final.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLICABLE BUILDING CODES AND CONSTRUCTION STANDARDS
• ALL BUILDING DESIGN AND CONSTRUCTION STANDARDS AS OUTLINED IN THE VA
TECHNICAL INFORMATION LIBRARY (https://www.cfm.va.gov/til/).
• 2021 NFPA 101 LIFE SAFETY CODE.
• 2018 INTERNATIONAL BUILDING CODE (IBC).
• 2018 INTERNATIONAL MECHANICAL CODE (IPC).
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
• 2017 NATIONAL ELECTRICAL CODE (NEC).
• 2018 INTERNATIONAL PLUMBING CODE (IPC).
• ASME CODE FOR PRESSURE PIPING.
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318).
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC).
• ENERGY POLICY ACT OF 2005 (EPACT).
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU).
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY,
AND TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01 00 00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD
62.1-2016; MEDICAL SPACES - ASHRAE 170-2013, NON-MEDICAL SPACES ASHRAE
62.1-2016.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15–2013.
• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021).
***SPECIAL NOTE***
THESE DRAWINGS SUPPLEMENT THE WRITTEN SCOPE OF WORK AND SPECIFICATIONS
SUPPLIED WITH THE TASK ORDER SOLICITATION. THE DRAWINGS ARE PROVIDED TO
GRAPHICALLY CLARIFY THE OVERALL INTENT OF THE IMPROVEMENTS NEEDED TO THE
VARIOUS SPACES WITHIN THE CLINIC. IT IS IMPORTANT FOR THE BIDDER TO
UNDERSTAND THAT NOT ALL WORK REQUIRED TO COMPLETE THE MODIFICATIONS
ARE CLEARLY SHOWN IN THE DRAWINGS OR SPECIFICALLY OUTLINED IN THE SCOPE
OF WORK NARRATIVE. HOWEVER, THE SCOPE OF WORK NARRATIVE IN
CONJUNCTION WITH THE DRAWINGS AND SPECIFICATIONS PROVIDE SUFFICIENT
INFORMATION FOR THE GENERAL CONTRACTOR TO PROPERLY BID AND COMPLETE
THE WORK. THE CONTRACTOR SHALL ANTICIPATE AND PERFORM ANY ADDITIONAL
WORK AS WOULD BE TYPICAL FOR THESE TYPES OF INTERIOR IMPROVEMENTS AND
BID THE WORK ACCORDINGLY. CONTRACTOR SHALL REQUEST CLARIFICATIONS TO
THE SCOPE PRIOR TO BIDDING. IF A REQUEST FOR INFORMATION/CLARIFICATION IS
NOT SUBMITTED PRIOR TO BIDDING, IT IS ASSUMED THE GENERAL CONTRACTOR
FULLY UNDERSTANDS THE INTENT OF THE WORK REQUIRED AND HAS BID
ACCORDINGLY.
ONLY 'NON-TYPICAL' OR 'MAJOR' UNFORESEEN CONDITIONS ENCOUNTERED THAT ARE
NOT INDICATED OR ANTICIPATED WILL BE CONSIDERED OUT OF SCOPE AND WARRANT
A CHANGE OF SCOPE AMENDMENT TO THE CONTRACT.
GENERAL NEW CONSTRUCTION (PROJECT) NOTES
A. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE ALL REQUIRED WORK BETWEEN ALL CONSTRUCTION TRADES: ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL. ALL WORK SHALL BE COMPLETED TO MEET OR EXCEED ALL APPLICABLE BUILDING CODES AND CONSTRUCTION STANDARDS.
ANY DISCREPANCIES OR CLARIFICATION NEEDED SHALL BE DIRECTED TO THE VA COR PRIOR TO CONSTRUCTION
OR INSTALLATION.
B. CONTRACTOR SHALL FOLLOW ALL MANUFACTURER REQUIREMENTS, INSTRUCTIONS, AND RECOMMENDATIONS FOR INSTALLATION AND WARRANTY OF ALL MATERIALS USED IN THIS PROJECT. MANUFACTURER WARRANTIES SHALL BE ISSUED WHERE WARRANTIES ARE AVAILABLE. ALL PROJECT WORK SHALL BE USE MANUFACTURER APPROVED AND COMPATIBLE MATERIALS AND METHODS, INCLUDING ADHESIVES, SEALANTS, SOLVENTS, ETC.
C. CONTRACTOR SHALL SEND IN ALL SUBMITTALS TO VA COR PRIOR TO COMMENCEMENT OF THE WORK. WORK STARTED WITHOUT REVIEWED SUBMITTALS AND SHOP DRAWINGS SHALL BE DONE AT THE CONTRACTOR'S OWN RISK. ALL SUCH WORK IS SUBJECT TO REJECTION AND THE CONTRACTOR BEARS ALL LIABILITY FOR ALL COSTS AND DELAYS THAT RESULT. CONTRACTOR SHALL NOT BE ENTITLED COMPENSATION AS A RESULT OF INCORRECT OR UNACCEPTABLE WORK EXECUTED WITH REVIEWED AND APPROVED SHOP DRAWINGS RETURNED FROM THE VA COR. CONTRACTOR SHALL MAKE ALL SUBMITTALS AVAILABLE TO THE VA COR IN A TIMELY MANNER AND SHALL ALLOW REASONABLE TIME FOR THE VA COR TO REVIEW AND RETURN TO THE CONTRACTOR.
D. ALL SERVICE INTERRUPTIONS TO THE EXISTING FACILITY (IN NECESSARY) MUST BE SCHEDULED AT LEAST 3 WEEKS IN ADVANCE AND KEPT TO A MINIMUM. COORDINATE ALL DISRUPTIVE WORK AND OUTAGES WITH VA COR.
E. IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL STOP WORK IN THE AFFECTED AREA, REMOVE ALL EQUIPMENT, TOOLS, MATERIALS, AND OTHER ITEMS THAT ACT AS A BARRIER TO EGRESS FROM THE BUILDING.
F. FIRE PROTECTION / ALARM - ALL FIRE PROTECTION WORK SHALL MEET ALL REQUIREMENTS OF THE VA FIRE PROTECTION DESIGN MANUAL. ALL FIRE ALARM PROVISIONS SHALL BE IN ACCORDANCE WITH NFPA 101. ANY FIRE ALARM SYSTEM MODIFICATIONS REQUIRED IN AN AREA BEING REMODELED SHALL BE COMPLETED BY A CERTIFIED FIRE ALARM MAINTENANCE CONTRACTOR AS APPROVED BY VA COR. ALL MODIFICATIONS/ADDITIONS SHALL BE FULLY TESTED AND CERTIFIED BY APPROVED THIRD PARTY FIRE ALARM INSPECTOR PRIOR TO ACCEPTANCE. REQUIRED FIRE PROTECTION SYSTEMS SHALL REMAIN OPERATIONAL FOR OCCUPIED AREAS FOR THE DURATION OF THE PROJECT. ANY MODIFICATION TO EXISTING FIRE PROTECTION SYSTEM SHALL BE
DESIGNED BY A PROFESSIONAL FIRE-SAFETY ENGINEER AND BE APPROVED BY VA COR.
G. FIRE RATED WALLS - CONTRACTOR TO VALIDATE ALL AND VERIFY ALL NECESSARY FIRE RATED AND/OR SMOKE WALLS AND ASSEMBLIES INDICATED ON PLANS IN THE WORK AREA(S). PROVIDE ALL REQUIRED PENETRATION DETAILING FOR PIPING, DUCTWORK, OR OTHER UTILITIES THAT MUST TRAVERSE FIRE/SMOKE WALLS.
FIRE/SMOKE WALLS SHALL BE CONSTRUCTED FULL HEIGHT TO DECK WITH U.L. CERTIFIED WALL ASSEMBLY AND AS APPROVED BY VA COR. WALLS SHALL BE FULLY CAULKED TOP AND BOTTOM WITH APPROVED FIRE- CAULKING MATERIAL. COORDINATE PENETRATIONS WITH MECHANICAL, ELECTRICAL, AND PLUMBING
REQUIREMENTS.
H. CONNECTIONS OF ALL NEW ARCHITECTURAL BRACING, MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO THE EXISTING BUILDING STRUCTURE SHALL BE DESIGNED BY THE CONTRACTOR AND SUBMITTED TO THE VA COR FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. THE EXISTING STRUCTURE SHALL NOT BE COMPROMISED IN ANY WAY AS A RESULT OF CONSTRUCTION OF ANY PART OF THIS PROJECT. ANY DAMAGE TO EXISTING BUILDING STRUCTURE OR SYSTEMS SHALL BE REPAIRED IMMEDIATELY AT CONTRACTOR'S EXPENSE IN
A MANNER AS APPROVED BY VA COR.
I. REUSE EXISTING (UNDAMAGED OR STAINED) CEILING GRID AND TILES AS ABLE.
J. REUSE EXISTING LIGHT FIXTURES AS ABLE. REWORK CEILING LAYOUT AS SHOWN.
K. REUSE EXISTING HVAC SUPPLY AND EXHAUST GRILLES/DIFFUSERS AS ABLE.
L. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BIDDING AND DURING CONSTRUCTION. REPORT ANY DISCREPANCIES OR CLARIFICATIONS NEEDED TO THE VA COR PRIOR TO PERFORMING ANY WORK. ANY
MODIFICATIONS NEEDED SHALL BE AS APPROVED BY VA CO.
M. ANY FLOOR, WALL, OR CEILING, CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS PROJECT SHALL BE
PATCHED, PAINTED, AND RETURNED TO MATCH EXISTING CONDITIONS AND FINISHES.
T. ANY CUTTING OR WELDING WILL REQUIRE DAILY HOT WORK PERMIT TO BE OBTAINED BY/COORDINATED WITH VA COR.
SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
U. 'TYPICAL' DOOR FRAME CLEARANCE TO ADJACENT PERPENDICULAR WALLS IS TYPICALLY 4". VERIFY WITH VA COR IF
CLARIFICATION IS NEEDED.
V. TEMPORARY BRACING OR SHORING MAY BE NECESSARY AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
W. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS, OR PENETRATIONS RESULTING FROM THE INSTALLATION OF EQUIPMENT, PIPING, DUCTWORK, ETC. ALL WALLS, FLOORS, AND/OR ROOF ASSEMBLY INTEGRITIES
SHALL BE MAINTAINED.
X. GYPSUM BOARD AND STUD FRAMING REQUIRED TO BE REMOVED FOR PLACEMENT/INSTALLATION OF NEW PLUMBING, WIRING, CONDUIT, RECEPTACLES, FIXTURES, EQUIPMENT, AND OR SYSTEMS, SHALL BE REPLACED AND FINISHED TO
MATCH EXISTING ADJACENT IN ALL RESPECTS, INCLUSIVE OF WALL RATING AND FINISH.
Y. PAINTING WORK SHALL INCLUDE ALL TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING AND FINISHING AS REQUIRED BY STANDARD PRACTICE. SCOPE OF PAINTING ALSO INCLUDES CLEANUP AND REMOVAL OF OVER-SPRAY, DRIPS AND SPLATTERS. EXCEPT AS NOTED OTHERWISE, CONTRACTOR SHALL PAINT ALL INTERIOR EXPOSED WALL AND ADJACENT AFFECTED BUILDING SURFACES TO ENSURE A COMPLETE AND LIKE-NEW (COMPLETE)
APPEARANCE.
Z. COVER AND PROTECT DOORS, FRAMES, AND WALLS AS NECESSARY TO PREVENT PAINT BRUSH OR ROLLER OVER-
SPRAY, PAINT DROPS, DAMAGE OR SOILING OF ANY KIND AS A RESULT OF CONSTRUCTION.
AA. REQUIRED CONCRETE EMBEDMENT (CONDUITS, PIPES, SLEEVES, ETC.) OF ANY MATERIAL NOT HARMFUL TO CONCRETE SHALL BE PERMITTED WITH APPROVAL OF THE VA COR, PROVIDED THEY ARE NOT CONSIDERED TO
STRUCTURALLY REPLACE THE DISPLACED CONCRETE.
BB. CONTRACTOR SHALL PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN DISSIMILAR
METALS.
CC. WHERE JOB CONDITIONS REQUIRE CHANGE FROM THE DRAWINGS THAT DOES NOT CHANGE THE SCOPE OR NATURE OF THE WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE VA.
NO CHANGE IN SCOPE MAY BE MADE WITHOUT WRITTEN PERMISSION FROM THE CONTRACTING OFFICER.
DD. ALL VA BUILDINGS AND PROPERTIES ARE NON-SMOKING FACILITIES. NO SMOKING OR TOBACCO USE OF ANY KIND WILL BE ALLOWED AT ANY TIME THROUGHOUT THE PROJECT. CONTRACTOR SHALL ADHERE TO VA POLICY AND
REGULATION CONCERNING TOBACCO USE.
EE. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL LEAVE THE ENTIRE PROJECT SITE IN A CLEAN, NEW, FINISHED AND USABLE CONDITION WITH ALL DISTURBED AREAS COVERED WITH MATERIALS AS OUTLINED IN THE
SCOPE THE SCOPE OF WORK.
N. RESTORE / REPAIR ADJACENT FINISHES AT ALL LOCATIONS BETWEEN EXISTING AND NEW WORK AS REQUIRED FOR
SEAMLESS/LIKE NEW TRANSITIONS.
O. GENERAL CONTRACTOR SHALL COORDINATE ALL REQUIRED MECHANICAL AND ELECTRICAL DUCT SIZES AS NEEDED FOR MOST EFFICIENT AND LOGICAL CONNECTIONS TO EXISTING INFRASTRUCTURE AND AS APPROVED BY VA COR.
P. ALL REQUIRED MEANS OF EGRESS FROM ALL BUILDING LOCATIONS SHALL BE MAINTAINED THROUGHOUT THE
CONSTRUCTION PROCESS.
Q. WALL OUTLETS, SWITCHES, RELOCATED OR NEW THERMOSTATS, ETC. SHALL BE INSTALLED LEVEL AND PLUMB.
R. THE WORK INDICATED IN THE DRAWINGS AND NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK NECESSARY AND REQUIRED TO FULLY COMPLETE SCOPE. ANY QUESTIONS OR CLARIFICATIONS NEEDED TO FULLY UNDERSTAND AND EXECUTE THE WORK SHALL BE SUBMITTED IN WRITING TO
THE VA COR PRIOR TO PERFORMING THE WORK.
S. COORDINATE ALL SITE OPERATIONS WITH THE VA COR, INCLUDING STAGING AREAS, MATERIAL STORAGE, ACCESS TO
WORK, NOISY OPERATIONS, OR INTERRUPTION OF UTILITIES.
AC. ACOUSTICAL
A/C AIR CONDITIONING
A.T. ACOUSTICAL TILE
A.F.F. ABOVE FINISHED FLOOR
ADJ. ADJUSTABLE
ALT. ALTERNATE
& AND
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
A.D. AREA DRAIN
ASPH. ASPHALT
@ AT
∠ ANGLE
BM. BEAM
B.M. BENCH MARK
BIT. BITUMINOUS
BLK. BLOCKING
BD. BOARD
B.O.C. BOTTOM OF CURB
BOT. BOTTOM
BLDG. BUILDING
B.U. or B/U BUILT UP
CPT. CARPET
C.B. CATCH BASIN
C.O. CLEAN OUT
CLG. CEILING
CEM. CEMENT
℄ or CL. CENTERLINE
C.T. CERAMIC TILE
CH. CHANNEL
COL. COLUMN
CONC. CONCRETE
C.M.U. CONCRETE MASONRY UNIT
CONT. CONTINUOUS
C.J. CONTROL JOINT
CONF. CONFERENCE
DP. DAMPROOFING
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DS. DOWNSPOUT
DWGS. DRAWINGS
E.R.D. EMERGENCY ROOF DRAIN
E. ELEVATOR
EA. EACH
ELEC. ELECTRICAL
E.I.F.S. EXTERIOR INSULATION AND FINISH
SYSTEM
ELEV. or EL. ELEVATION E.J. or EXP JT. EXPANSION JOINT
EQ. EQUAL
EQUIP EQUIPMENT
EXP. EXPANSION
EXST. EXISTING
EXT. EXTERIOR
FIN. FINISH
FIN. FL. FINISHED FLOOR
F.H.C. FIRE HOSE CABINET
F.H. FIRE HYDRANT
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FL. FLOOR
F.D. FLOOR DRAIN
FTG. FOOTING
FURR FURRING
FIN. FINISH
FIN. FL. FINISHED FLOOR
F.H.C. FIRE HOSE CABINET
F.H. FIRE HYDRANT
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FL. FLOOR
F.D. FLOOR DRAIN
FTG. FOOTING
FURR FURRING
HCP. or H/C HANDICAPPED
HDW. HARDWARE
HGT. or HT. HEIGHT
H.C. HOLLOW CORE
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
H.B. HOSE BIBB
I.D. INSIDE DIAMETER (DIMENSION)
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JAN. JANITOR
J.B. JOIST BEARING
JT. JOINT
LAM. LAMINATE
LAM. LAMINATE
L.A.T. LAY-IN-ACOUSTICAL TILE
LT. WT. LIGHT WEIGHT
MTL. METAL
M.H. MOP HANGER
M.H. MANHOLE
M.O. MASONRY OPENING
MAX. MAXIMUM
MECH. MECHANICAL
MEMB. MEMBRANE
MISC. MISCELLANEOUS
M.R.GYP.BD. MOISTURE RESISTANT GYPSUM BOARD
MTD. MOUNTED
NOM. NOMINAL
N.I.C. NOT IN CONTRACT
NO. or # NUMBER
N.T.S. NOT TO SCALE
O.C. ON CENTER
OPNG. OPENING
OH. OVERHEAD
OPP. OPPOSITE
O.D. OUTSIDE DIAMETER (DIMENSION)
PTD. PAINTED
PR. PAIR
PTN. PARTITION
PVMT. PAVEMENT
PLAS. PLASTER
PL. PLATE
POL. POLISHED
LBS. POUNDS
P.I.P. POURED-IN-PLACE
PRE-FAB. PRE-FABRICATED
PC. CONC. PRECAST CONCRETE
P.T.D. PAPER TOWEL DISPENSER
P. LAM. PLASTIC LAMINATE
PWD. PLYWOOD
P.L. PROPERTY LINE
RAD. RADIUS
REF. REFERENCE
R.C.P. REINFORCED CONCRETE PIPE
REINF. REINFORCEMENT
REQ. REQUIRED
RESIL. RESILIENT
R. RISER
R.D. ROOF DRAIN
RM. ROOM
RD. ROUND
R.B. RUBBER BASE
S.N.D. SANITARY NAPKIN DISPENSER
SLT. SEALANT
SEC. SECURITY
SEC. GL. SECURITY GLASS
S.H.M. SECURITY HOLLOW METAL
SER. S. SERVICE SINK
SCHD. SCHEDULED
SHT. SHEET
S.V. SHEET VINYL
SIM. SIMILAR
S.D. SOAP DISPENSER
S.C. SOLID CORE
SPEC. SPECIFICATION
SQ. SQUARE
SQ. FT. SQUARE FEET
STD. STANDARD
S.ST. STAINLESS STEEL
STL. STEEL
STOR. STORAGE
ST.DR. STORM DRAIN
STRUCT. STRUCTURAL
SUSP. SUSPENDED
SYM. SYMMETRICAL
TELE. TELEPHONE
T'HOLD THRESHOLD
TLT. TOILET
T.P.H. TOILET PAPER HOLDER
T.O.C. TOP OF CURB
T.O.S. TOP OF STEEL
T.B. TOWEL BAR
T. TREAD
TRT'D TREATED
TYP. TYPICAL
T.O.W. TOP OF WALL
U.N.O. UNLESS OTHERWISE NOTED
V.B. VINYL BASE
V.C.T. VINYL COMPOSITION TILE
V.W.C. VINYL WALL COVERING
VERT. VERTICAL
VEST. VESTIBULE
V.T.R. VENT THRU ROOF
W.H. WATER HEATER
W.P. WATER PROOF
W.W.M. WELDED WIRE MESH
W.GL. WIRE GLASS
W.C. WATER CLOSET
W/ WITH
W/O WITHOUT
WSCT. WAINSCOT
WT. WEIGHT
WD. WOOD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs
PENSACOLA VA CLINIC
790 VETERANS WAY, PENSACOLA, FL 32507
520-23-106
RENOVATE VARIOUS INTERIOR SPACES TO IMPROVE PRIMARY
CARE AND OTHER SPECIALTY SERVICES, JACC
G0104-12-2023 RCC RCC/LB
Construction Documents
PENSACOLA BAY
292 - GULF BEACH HWY
I-110HW
Y 29
HWY 98
PROJECT LOCATION
HW
Y 90
PAR
KIN
G
PARKING
PARKING
PARKING
RETENTION
RETENTION
RETENTION
VE
TE
R
AN
S W
AY
US HIGHWAY 98
LOADING DOCK
MECHANICAL YARD2
SOUTH ENTRANCE3
NORTH ENTRANCE4
VEHICLE INSPECTION LANE5
CONTRACTOR STAGING AREA6
SHEET INDEX
Sheet Number Sheet Name
G01 Coversheet A01 First Floor Improvement Locations A02 Second Floor Improvement Locations A03 First Floor - Demolition A04 Second Floor - Demolition A05 First Floor - Architectural A06 Second Floor - Architectural
FP01 Fire Protection Notes FP02 First Floor Fire Protection FP03 Second Floor Fire Protection M01 First Floor - HVAC - Bravo M02 First Floor - HVAC - Charlie/Radiology M03 Second Floor - HVAC - EMPU M04 Second Floor - HVAC - Eye Clinic/India/Juliet M05 HVAC Schedules E01 First Floor - Electrical E02 Second Floor - Electrical
N
VICINITY MAP
NTS
CAMPUS REFERENCE MAP
NTS
N
COMMON ABBREVIATIONS
LOCATION MAP
NTS
N
US HWY 98
S
ST
A
VE
W NAVY BLVD
S FAIRFIELD DR
CHIEF'S
WAY
PROJECT LOCATION
Revisions: Date:
520-23-106 zz
RENOVATE VARIOUS INTERIOR SPACES TO
IMPROVE PRIMARY CARE AND OTHER
SPECIALTY SERVICES, JACC
PENSACOLA VA CLINIC
790 VETERANS WAY
PENSACOLA, FL 32507
COVER SHEET - SHEET INDEX - LOCATION MAPS
GENERAL PROJECT NOTES
VA CAPITAL ASSET MANAGEMENT
TEAM RM
CONS.
TEAM RM
CONS.
OFFICE
OFFICE
OFFICE
OFFICE
A05
A05
A05
A03
A03
A03
DEMO
NEW
DEMO
NEW
DEMO
NEW
POLICE
CANTEEN
ENGINEERING
LOGISTICS
EMS
PHARMACY
DIAGNOSTIC MEDICINE
ORTHOPEDICS
PHYSICAL THERAPY
PROSTHETICS
NAVY
PRIMARY CARE
PRIMARY CARE
MEDICAL ADMIN
PUBLIC AFFAIRS
LOADING
DOCK
MAIN ENTRANCE
REAR ENTRANCE
PRIMARY CARE
EC
H
O
FO
XT
R
O T
G O
LF
HO
TE
L
AL
PH
A
BR
AV
O
CH
AR
LI
E
DE
LT
A
11 12
CLOSET
PROJECT PHASING
a. THIS PROJECT SHALL BE COMPLETED IN PHASES TO ENSURE LEAST AMOUNT OF
DISRUPTION TO VETERANS AND STAFF AND TO ENSURE LIFE SAFETY REQUIREMENTS
REMAIN WITHIN REQUIRED LIMITS THROUGHOUT THE ENTIRE CONSTRUCTION
PROCESS.
b. TWO PHASES ARE RECOMMENDED FOR THE WORK:
a. PHASE 1 TO INCLUDE:
• FIRST FLOOR - BRAVO AREA (PRIMARY CARE)
• SECOND FLOOR - LIMA AREA (EYE CLINIC)
• SECOND FLOOR - INDIA (VACCINE CLINIC)
• SECOND FLOOR - OSCAR (SURGERY TEAM ROOM 2D164-2D165)
b. PHASE 2 TO INCLUDE:
• FIRST FLOOR - CHARLIE AREA (PRIMARY CARE)
• SECOND FLOOR - OSCAR (SURGERY TEAM ROOM 2F101-2F102)
• SECOND FLOOR - JULIET - NEW OFFICE SPACE ADJACENT TO 2C167.
• SECOND FLOOR - INDIA - NEW CONSULT SPACE
c. AT CONTRACTOR'S DISCRETION:
• FIRST FLOOR - FOXTROT - NEW APC CLOSET
O ffi ce of
Fac ilit ie s
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
BUILDING / LOCATION INFORMATION: DRAWING TITLE:
BUILDING NUMBER:
CAMPUS:
ADDRESS:
FLOOR # (IF APPLICABLE):
ROOM # / SUITE DESCRIPTION:
SHEET NUMBER:
ADDITIONAL DRAWING INFORMATION:
SHEET OF
Project Title:
520-23-106
RENOVATE VARIOUS INTERIOR SPACES TO IMPROVE
PRIMARY CARE AND OTHER SPECIALTY SERVICES, JACC
Veterans Affairs - Engineering
Drawings Prepared By:
Drawing Date:
GULF COAST VETERANS HEALTH CARE SYSTEM
400 VETERANS AVENUE, BILOXI, MS 39531
zz
FIRST FLOOR
VARIOUS
Pensacola VA Clinic
790 Veterans Way, Pensacola, FL 32507
OVERALL IMPROVEMENT FLOOR PLANS
FIRST FLOOR
04-12-2023
A01 A01 6
1" = 20'-0" First Floor Improvement Locations
N
EXISTING PIC 01 - FIRST FLOOR EXISTING PIC 02 - FIRST FLOOR
EXISTING PIC 03 - FIRST FLOOR EXISTING PIC 04 - FIRST FLOOR
EXISTING PIC 05 - FIRST FLOOR EXISTING PIC 06 - FIRST FLOOR
EXISTING PIC 07 - FIRST FLOOR EXISTING PIC 08 - FIRST FLOOR
EXISTING PIC 09 - FIRST FLOOR EXISTING PIC 10 - FIRST FLOOR
EXISTING PIC 11 - FIRST FLOOR EXISTING PIC 12 - FIRST FLOOR
PHASE 1
PHASE 2
PHASE 1 OR 2
A06
A06
A06
A06
A04
A04
A04
A04
DEMO
NEW
DEMO
NEW
DEMO
NEW
DEMO
NEW
A04
A06
DEMO NEW
EYE CLINIC
AUDIOLOGY
DENTAL
OUTPATIENT SURGERY
OUTPATIENT
MENTAL HEALTH
SPECIALTY
CARE
SPECIALTY
CARE
SPECIALTY
CARE
CLINIC ADMIN
LI
M
A M
IK
E
N O
VE
M
B
ER
O
SC
AR
IN
D
IA
JU
LI
ET
K
IL
O
OFF
VACCINE CLINIC
CONS
TEAM
RM
TEAM
RM
MAS
EXPANSION
PROJECT PHASING
a.
b.
THIS PROJECT SHALL BE COMPLETED IN PHASES TO ENSURE LEAST AMOUNT OF
DISRUPTION TO VETERANS AND STAFF AND TO ENSURE LIFE SAFETY REQUIREMENTS
REMAIN WITHIN REQUIRED LIMITS THROUGHOUT THE ENTIRE CONSTRUCTION
PROCESS.
TWO PHASES ARE RECOMMENDED FOR THE WORK:
a. PHASE 1 TO INCLUDE:
• FIRST FLOOR - BRAVO AREA (PRIMARY CARE)
• SECOND FLOOR - LIMA AREA (EYE CLINIC)
• SECOND FLOOR - INDIA (VACCINE CLINIC)
• SECOND FLOOR - OSCAR (SURGERY TEAM ROOM 2D164-2D165)
b. PHASE 2 TO INCLUDE:
• FIRST FLOOR - CHARLIE AREA (PRIMARY CARE)
• SECOND FLOOR - OSCAR (SURGERY TEAM ROOM 2F101-2F102)
• SECOND FLOOR - JULIET - NEW OFFICE SPACE ADJACENT TO 2C167.
• SECOND FLOOR - INDIA - NEW CONSULT SPACE
c. AT CONTRACTOR'S DISCRETION:
• FIRST FLOOR - FOXTROT - NEW APC CLOSET
O ffi ce of
Fac ilit ie s
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
BUILDING / LOCATION INFORMATION: DRAWING TITLE:
BUILDING NUMBER:
CAMPUS:
ADDRESS:
FLOOR # (IF APPLICABLE):
ROOM # / SUITE DESCRIPTION:
SHEET NUMBER:
ADDITIONAL DRAWING INFORMATION:
SHEET OF
Project Title:
520-23-106
RENOVATE VARIOUS INTERIOR SPACES TO IMPROVE
PRIMARY CARE AND OTHER SPECIALTY SERVICES, JACC
Veterans Affairs - Engineering
Drawings Prepared By:
Drawing Date:
GULF COAST VETERANS HEALTH CARE SYSTEM
400 VETERANS AVENUE, BILOXI, MS 39531
zz
SECOND FLOOR
VARIOUS
Pensacola VA Clinic
790 Veterans Way, Pensacola, FL 32507
OVERALL IMPROVEMENT FLOOR PLANS
SECOND FLOOR
04-12-2023
A02 A02 6
1" = 20'-0" Second Floor Improvement Locations
N
EXISTING PIC 01 - SECOND FLOOR EXISTING PIC 02 - SECOND FLOOR EXISTING PIC 03 - SECOND FLOOR
EXISTING PIC 04 - SECOND FLOOR EXISTING PIC 05 - SECOND FLOOR EXISTING PIC 06 - SECOND FLOOR
EXISTING PIC 07 - SECOND FLOOR EXISTING PIC 08 - SECOND FLOOR EXISTING PIC 09 - SECOND FLOOR
EXISTING PIC 10 - SECOND FLOOR EXISTING PIC 11 - SECOND FLOOR
EXISTING PIC 12 - SECOND FLOOR EXISTING PIC 13 - SECOND FLOOR
EXISTING PIC 14 - SECOND FLOOR EXISTING PIC 15 - SECOND FLOOR
VACCINE CLINIC
PHASE 1
PHASE 2
OFFICE
PHASE 2
PHASE 1
PHASE 2
PHASE 1
EXAM
ROOM
1C202
EXAM
ROOM
1C204
TOILET
1C206
TOILET
1C207
OFFICE
1C208
TOILET
1C209
TOILET
1C210
LOBBY
1G103
LOBBY /
WAITING
ROOM
1C211
CORRIDOR
C1-31
EXAM
ROOM
1C205
CORRIDOR
C1-28
EXAM
ROOM
1C203
EXAM
ROOM
1C178
VITALS
1C177
CORRIDOR
C1-27
C&P Storage 1C176
CORRIDOR
C1-24
EXAM
ROOM
1C179
EXAM
ROOM
1C167
VITALS
1C169
NURSING
TRIAGE
1C171
CORRIDOR
C1-23
EXAM
ROOM
1C168
NURSING
TRIAGE
1C170
NURSING
GROUP
CONSULT
1C172
ELECTRICAL
1C173
STAIRWELL
1STR4
LOBBY /
WAITING
ROOM
1C174
MAS
RECEPTION
1C175
1, 2
13' - 0" 11' - 4"
3'
8'
0" 5'
0"
8'
0"
6' - 1"
2' - 0"
8' - 6" 7' - 8"
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
6 6
A*
CONSTRUCT ICRA BARRIER AS
REQUIRED TO ADD TEMP. ACCESS
DOOR AND WALL. COORDINATE WITH
VA COR.
PROTECT EXISTING
MILLWORK AND FURR-DOWN
ABOVE TO BE RETURNED TO
USE AT CONCLUSION OF
CONSTRUCTION
DEMOLISH EXISTING WALL. PATCH
AND PAINT TO MAKE SUITABLE FOR
STAFF TO PASS INTO MAS AREA
DURING CONSTRUCTION.
REWORK CEILING GRID AND TILES
AS REQUIRED. WALL TO BE
RECONSTRUCTED IN SAME PLACE.
CLOSE, LOCK AND SEAL DOOR DURING
CONSTRUCTION - NO THROUGH ACCESS
4' - 0"
3' - 1"
CONSTRUCT ICRA BARRIER AS
REQUIRED TO ADD TEMP. ACCESS
DOOR AND WALL. COORDINATE WITH
VA COR.
1, 2
3 3
EXISTING LAY-IN CEILING TO
REMAIN ADJACENT TO DEMO'D.
REWORK EXISTING TO REMAIN TO
DIE INTO NEW WALL
EXISTING LAY-IN CEILING TO
REMAIN ADJACENT TO DEMO'D.
REWORK EXISTING TO REMAIN
TO DIE INTO NEW WALL
13' - 0" 11' - 4"
8'
0"
6' - 1"
2' - 0"
8' - 1" 8' - 1"
3'
0"
0"
A*
PROTECT EXISTING
MILLWORK AND FURR-DOWN
ABOVE TO BE RETURNED TO
USE AT CONCLUSION OF
CONSTRUCTION
CONSTRUCT ICRA BARRIER AS
REQUIRED TO ADD TEMP. ACCESS
DOOR AND WALL. COORDINATE WITH
VA COR.
DEMOLISH EXISTING WALL. PATCH
AND PAINT TO MAKE SUITABLE FOR
STAFF TO PASS INTO MAS AREA
DURING CONSTRUCTION. REWORK
CEILING GRID AND TILES AS
REQUIRED. WALL TO BE
RECONSTRUCTED IN SAME PLACE.
EMPLOYEE
HEALTH
1C133
CORRIDOR
C1-19
LOBBY /
WAITING
ROOM
1C134
CORRIDOR
C1-16
VITALS
1C132
VITALS
1C130
CORRIDOR
C1-12
OFFICE
1C105
NURSING
OFFICE
1C103
LOBBY /
WAITING
ROOM
1C100
MAS
RECEPTION
1C131
4 6 6
6 6
1, 2
1, 2
8' - 4"
2' - 3"
13' - 1"
2' - 10"
4'
6"
9' - 10"
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
STOP TEMP WALL JUST WITHIN ICRA-
ENCLOSURE - FULLY SEAL ALL
AROUND -
COORDINATE EXACT LOCATION WITH
VA COR.
1' - 6" 1' - 8"
CONSTRUCT ICRA BARRIER AS
REQUIRED TO ADD TEMP. ACCESS
DOOR AND WALL. COORDINATE WITH
VA COR.
1, 2
3 3
3 3
EXISTING LAY-IN CEILING TO REMAIN
ADJACENT TO DEMO'D. REWORK EXISTING
TO REMAIN TO DIE INTO NEW WALL
EXISTING LAY-IN CEILING TO REMAIN
ADJACENT TO DEMO'D. REWORK EXISTING
TO REMAIN TO DIE INTO NEW WALL
4'
0"
A*
STOP TEMP WALL JUST WITHIN ICRA-
ENCLOSURE - FULLY SEAL ALL
AROUND -
COORDINATE EXACT LOCATION WITH
VA COR.CONSTRUCT ICRA BARRIER AS
REQUIRED TO ADD TEMP. ACCESS
DOOR AND WALL. COORDINATE WITH
VA COR.
TOILET
1D141
LOCKERS
1D137
TOILET
1D140
CORRIDOR
C1-77
X-RAY
1D125
BLOOD
DRAW 4
1D109D
BLOOD
DRAW 3
1D109C
BLOOD
DRAW 2
1D109B
DRESSING
ROOM
1D132 1, 2
13' - 7"
5'
6"
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
1, 2 5'
6"
13' - 7"
A*
GENERAL DEMOLITION NOTES
A. ALL WORK SHALL ADHERE TO OSHA, MDEQ, AND VA SAFETY GUIDELINES
AND REQUIREMENTS FOR APPLICABLE WORK IN PROGRESS.
B. ALL DEMOLITION AND CONSTRUCTION WORK WILL TAKE PLACE OUTSIDE
OF NORMAL HOSPITAL OPERATING HOURS AND ON WEEKENDS. THE
WORK SCHEDULE WILL BE COORDINATED AND AGREED UPON BY THE
COR PRIOR TO BEGINNING THE WORK AND SHOULD BE SIGNED OFF
ACCORDINGLY.
C. SMOKE DETECTORS AND FIRE ALARM DEVICES IN THE WORK AREA SHALL
REMAIN AND BE PROTECTED. RECONNECTION OF ALL FIRE ALARM
DEVICES, IF REQUIRED, SHALL BE COORDINATED WITH THE OWNER'S
EXISTING FIRE ALARM SYSTEM AND FIRE SAFETY OFFICER.
D. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK BETWEEN ALL
DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER
SPECIFICATIONS. VA COR MAY REQUEST SOME ITEMS BE SALVAGED.
ANY SUCH ITEMS WILL BE IDENTIFIED DURING THE PRE-CONSTRUCTION
WALK-THROUGH.
E. THROUGHOUT CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR
PROTECTING ALL EXISTING MATERIALS & UTILITIES WITHIN THE
CONSTRUCTION AREA. ANY DAMAGE TO EXISTING BUILDING
STRUCTURAL, MATERIALS, OR UTILITIES CAUSED BY CONSTRUCTION
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE AND APPROVED BY THE VA COR.
F. EXISTING SPRINKLER HEADS, IN AREAS WHERE CEILINGS ARE BEING
TEMPORARILY OR PERMANENTLY REMOVED, SHALL BE TURNED UPWARD
WITH LENGTHS AND HEADS ADJUSTED TO FULLY PROTECT THE AREAS
PER NFPA. IN AREAS WHERE NEW CEILINGS ARE BEING INSTALLED,
SPRINKLER HEADS SHALL BE TURNED DOWN AND INSTALLED IN THE
CENTER OF THE CEILING TILES WITH LENGTHS AND HEADS ADJUSTED TO
FULLY PROTECT THE AREAS.
G. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
H. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR
PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF
EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE
WALL, FLOOR, AND/OR ROOF ASSEMBLY.
I. USE OF ANY PLUMBING FIXTURE (SINK,TOILET, FLR. DRAIN, OR CATCH
BASIN, ETC.) FOR WASH-UP DISPOSAL OF THERE WASTE FROM, OR IS
SPENT STRICTLY LIQUIDS, PROHIBITED. PAINT P
J. CONTRACTOR SHALL PROTECT ALL BUILDING UTILITIES AND SYSTEMS
INCLUDING BUT NOT LIMITED TO EXISTING ELECTRICAL EQUIPMENT, FIRE
PROTECTION, PLUMBING FIXTURES, PIPING, DUCTING, MECHANICAL
EQUIPMENT, COMMUNICATION SYSTEMS (WIRELESS AND HARD WIRED)
AND ALARM SYSTEMS DURING DEMOLITION AND CONSTRUCTION. ANY
ITEMS OR SYSTEMS DAMAGED AS A RESULT OF THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR OR REPLACE AT
NO COST TO THE OWNER.
K. EACH AND EVERY INDIVIDUAL LOCATION OR ITEM NEEDED TO BE
DEMOLISHED OR MODIFIED MAY NOT BE REFLECTED OR DELINEATED IN
THE DRAWINGS. AMOUNTS AND QUANTITIES SHALL BE FIELD VERIFIED
AND CLARIFIED BY THE VA COR PRIOR TO DEMOLITION OR
CONSTRUCTION.
L. ANY EXISTING FLOOR DRAINS, CLEAN OUTS, AND THEIR ASSOCIATED
PIPING SYSTEMS SHALL BE COVERED DURING ALL DEMOLITION AND NEW
PROJECT WORK. COVER AND PIPING SYSTEMS SHALL BE COVERED
DURING ALL DEMOLITION AND NEW PROJECT WORK. COVER AND UN-
COVER AS REQUIRED TO PREVENT INFILTRATION OF DEMOLITION OR
CONSTRUCTION DEBRIS THROUGH EACH SHIFTS WORK DAILY
THROUGHOUT DURATION OF THE PROJECT. CONTRACTOR SHALL NOT
LEAVE FLOOR DRAINS COVERED AT THE END OF A DAYS SHIFT OR WHEN
NO WORK IS IN PROGRESS.
M. WALL MOUNTED FIRE EXTINGUISHERS SHALL REMAIN WITHIN 60" OF
ORIGINAL LOCATION THROUGHOUT ALL WORK IN THE PROJECT.
CONTRACTOR SHALL VERIFY WORKING ORDER AND CHARGE AT ALL
TIMES THROUGHOUT PROJECT WORK.
N. CONTRACTOR SHALL NOT STORE OR STAGE ANY MATERIALS,
DEMOLISHED OR NEW, IN EXISTING MAIN CORRIDORS, ADJACENT ROOMS,
OR ANY OTHER AREAS, INCLUDING TOOLS, EQUIPMENT, LADDERS, ETC.
UNLESS COORDINATED AND APPROVED BY THE VA COR.
O. ANY PIPING, DUCTWORK, SYSTEMS, ETC. TO BE PERMANENTLY
ABANDONED OVERHEAD, IN WALLS OR FLOOR SLABS, SHALL BE SEALED,
CAPPED, AND TESTED, BEFORE SEALING OR COVERING IN NEW WALLS OR
BACK-FILLED IN SLABS.
P. CARE MUST BE TAKEN WHEN REMOVING OR RELOCATING AND ALL
CONDUIT AND WIRING. THE CONTRACTOR SHALL VERIFY THE POWER
SOURCE HAS BEEN DISABLED PRIOR TO ELECTRICAL DEMOLITION OR
CONSTRUCTION. VA COR SHALL BE NOTIFIED IMMEDIATELY SHOULD AN
ELECTRICAL, MECHANICAL, DATA OR OTHER ISSUE ARISE.
Q. AT AREAS WHERE FLOORING IS DEMOLISHED, REMOVE SYSTEM IN ITS
ENTIRETY TO DECK. FULLY PREPARE CONCRETE SLAB FOR INSTALLATION
OF NEW FLOORING. ADHERE TO MANUFACTURER REQUIREMENTS AND
TOLERANCES FOR NEW INSTALLATION. IF REQUIRED, GRIND AND/OR
APPLY SELF-LEVELING COMPOUND TO ENSURE REQUIRED FLATNESS.
KEYNOTES - DEMOLITION
1. HATCHED AREA DENOTES APPROXIMATE EXTENT OF DEMOLITION
REQUIRED. COORDINATE FULL EXTENT OF DEMOLITION WITH NEW WORK.
2. FULLY REMOVE PARTITIONS, DOORS, CEILINGS, FLOORING, BASE,
FIXTURES, ASSOCIATED CONDUIT, ETC. WITHIN HATCHED AREA AND
PREPARE AREA FOR NEW WORK. DIRECT ANY CLARIFICATIONS NEEDED
TO VA COR.
3. DEMO PORTION OF GYPSUM BD. FURR-DOWN INCL. FIXTURES WITHIN. -
PORTION OF FURR-DOWN TO REMAIN - ENSURE FIXTURE IN THIS PORTION
REMAINS OPERATIONAL.
4. FULLY REMOVE ALL BASE AND WALL CABINETS.
5. DEMO AND REMOVE NURSE-CALL PANEL BOX. NEATLY BUNDLE AND
SECURE ASSOCIATED WIRING ABOVE CEILING FOR REMOVAL IN FUTURE
PROJECT.
6. DEMO MAS WORKSTATION MILLWORK COMPLETELY. TAKE CARE TO
ENSURE PORTION TO REMAIN CAN BE NEATLY TRIMMED TO NEW WALL
WITH LIKE-NEW APPEARANCE.
7. REMOVE WOOD DOOR AND H.M. FRAME. PREP OPENING FOR INFILL.
8. REMOVE PARTITION, WOOD DOOR, AND H.M. FRAME
9. PARTIAL DEMOLITION OF EXISTING COLUMN FURRING MAY BE REQUIRED.
FIELD VERIFY AND CONSULT WITH VA COR AS NEEDED.
10. REMOVE AND DISPOSE OF ALL RESTROOM FIXTURES. CAREFULLY CAP
EXISTING UTILITIES WITHIN WALL CAVITY FOR FUTURE USE. EXISTING SINK
TO REMAIN WHERE INDICATED ON PLAN.
11. REMOVE EXISTING H.M. DOOR AND FRAME. PREP OPENING TO RECEIVING
NEW OPPOSITE HAND H.M. FRAME AND WOOD DOOR.
12. DEMOLISH PORTION OF GYPSUM BOARD FURR-DOWN SHOWN DASHED.
13. TAKE CARE WHEN REMOVING PORTION OF WALL AT CEILING FURR-DOWN.
FURR-DOWN IS TO REMAIN AND BE INFILLED, PATCHED, FINISHED AND
PAINTED TO MATCH REST OF EXISTING FURR-DOWN FOR LIKE-NEW
APPEARANCE
15. REMOVE BASE AND UPPER CABINETS COMPLETELY. PREPARE AREA FOR
NEW FINISHES.
16. TAKE SPECIAL CARE WHEN DEMOLISHING PORTION OF EXISTING WALLS
ADJACENT TO FURR-DOWN. FURR-DOWN TO REMAIN AND BE EXPANDED
OVER TOP OF REWORKED CHECK-IN MILLWORK BELOW.
17. CUT OPENING AND INSTALL 3'-0" x 7'-0" TEMP H.M.F. WOOD DOOR FOR
STAFF USE DURING CONSTRUCTION. DEMOLISH TEMP DOOR AND FRAME
AND INFILL, PATCH, PAINT, REWORK BASE BOTH SIDES OF WALL AS
REQUIRED FOR NEW APPEARANCE.
18. DEMOLISH EXISTING MILLWORK RECEPTION DESK AND FURR-DOWN
ABOVE. LIGHTING AND CEILING GRID ABOVE TO BE REWORKED AS
REQUIRED.
19. REMOVE FLOATING WALL AND ADJACENT FURR-DOWN.
20. REWORK LOBBY LVT FLOORING WHERE WALL REMOVED FOR SEAMLESS
APPEARANCE.
21. REMOVE PORTION OF FURR-DOWN AND REWORK LOBBY-SIDE TO NEW
WALL.
22. REMOVE PARTIAL GRID AND TILES OF SUSPENDED CEILING. (CEILING GRID
TO BE REWORKED TO EXTEND OVER ENLARGED RECEPTION AREA).
23. REMOVE UPPER PORTION OF MILLWORK CABINETRY. EXISTING
RECEPTION WORKING SURFACE IS TO BE EXTENDED AS SHOWN ON
IMPROVEMENT PLAN.
24. DEMOLISH PNEUMATIC TUBE SYSTEM AND CHASE. PREP AREA FOR
INCLUSION INTO USABLE SPACE.
25. CONSTRUCT TEMPORARY WALL TO JUST BELOW CEILING WITH 3'0"x7'0"
ACCESS DOOR FOR MAS PERSONNEL TO USE DURING CONSTRUCTION.
GASKET T.O.W. TO CEILING. WALL AND DOOR SHOULD BE PAINTED FOR
PRESENTABLE APPEARANCE CONSTRUCTION. PROVIDE REQUIRED STAFF
ELECTRONIC ACCESS CONTROL KEYPAD. COORDINATE WITH VA COR.
UPON COMPLETION OF CONSTRUCTION AND REMOVAL OF ICRA BARRIERS,
ETC. THAT PROHIBIT STAFF FROM ACCESSING THEIR SPACE FROM
PRIMARY CARE, REMOVE TEMPORARY WALL/DOOR. REPAIR/REPLACE
FLOORING/BASE AS REQUIRED IN WAITING ROOM AS NECESSARY FOR
NEW APPEARANCE. WALL SHOULD BE REMOVED AND AREA RETURNED TO
USABLE CONDITION AFTER HOURS OR OVER A WEEKEND. COORDINATE
WITH VA COR.
14. TAKE SPECIAL CARE WHEN DEMOLISHING PORTION OF EXISTING CEILING
GRID AND TILES. EXISTING GRID AND TILES CAN BE REUSED AS ABLE
WHEN REWORKING CEILING TO NEW WALL LAYOUT. REPLACE GRID AND
TILES AS NEEDED TO ENSURE LIKE-NEW APPEARANCE.
INFECTION CONTROL (ICRA) NOTES
Note: Rated ICRA Barriers not required for Fire Protection / Life Safety.
A. THE CONTRACTOR SHALL PROVIDE, COORDINATE, AND MAINTAIN ALL INFECTION
CONTROL / AIR QUALITY CONTROL MEASURES TO MEET THE ESTABLISHED CLASS
RATING AS REQUIRED BY THE INFECTION CONTROL OFFICER.
B. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
C. COORDINATE ALL DEMOLITION/CONSTRUCTION DEBRIS PATH OF TRAVEL AND
INTERIM LIFE SAFETY MEASURES WITH VA COR.
D. IMMEDIATELY REPLACE ANY DISPLACED CEILING TILES IN AREAS ACTIVELY USED BY
VETERANS OR STAFF FOR VISUAL INSPECTION.
E. AS ABLE, EXECUTE WORK BY METHODS TO MINIMIZE DUST GENERATED BY
CONSTRUCTION OPERATIONS. PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE
DUST FROM DISPERSING INTO ATMOSPHERE. I.E. WATER-MIST WORK SURFACES
TO CONTROL DUST WHILE CUTTING.
F. SEAL UNUSED DOORS WITH TAPE
G. WIPE SURFACES AND WET MOP WITH DISINFECTANT. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
H. CONSTRUCT ALL REQUIRED ICRA CONSTRUCTION BARRIERS PRIOR TO BEGINNING
WORK. CONSTRUCTION AREAS SHALL REMAIN ISOLATED FROM OTHER AREAS OF
THE MEDICAL CLINIC. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO
PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM. NO RETURN AIR OR
EXHAUST SHALL PASS INTO AREAS OUTSIDE OF THE CONSTRUCTION AREA. BLOCK
OFF AND SEAL ALL AIR VENTS. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT SERVICES.
I. AFTER PROJECT INSPECTION AND ACCEPTANCE BY VA SAFETY, INFECTION
CONTROL, ENGINEERING AND COR, CONSTRUCTION BARRIERS CAN BE REMOVED.
PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND
REMOVE ISOLATION OF HVAC SYSTEM.
J. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREAS AT ALL TIMES FOR
THE DURATION OF CONSTRUCTION USING HEPA-FILTERED FILTRATION UNITS. SEAL
ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND CONDUITS
APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST PROTECTION AND NEGATIVE
PRESSURE.
K. WORK AREA SHALL BE KEPT CLEAN AND ORDERLY. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER
TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
L. SIGNAGE SHALL BE USED TO REDIRECT ALL MEDICAL CENTER PERSONNEL,
PATIENTS, AND VISITORS SO THEY DO NOT PASS THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS AND INTO CONSTRUCTION AREA THAT READS:
"CONSTRUCTION AREA - DO NOT ENTER".
M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND
SHALL BE MONITORED TO MAKE SURE THEY REMAIN EFFECTIVE.
N. CONTRACTOR AND SUBCONTRACTORS SHALL CONSULT VA COR AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO ALL WORK TO BE PERFORMED IN AREAS
OUTSIDE OF CURRENT WORK AREAS.
O. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED
IMMEDIATELY. MAINTAIN STAFFING AND EQUIPMENT NECESSARY FOR CLEANING
DUST/DEBRIS FROM FLOORS AND ADJACENT OCCUPIED AREAS AS REQUIRED
INCLUDING DUST MOPS, WET MOPS, BROOMS, BUCKETS, CLEAN WIPE RAGS, ETC.
P. AFTER COMPLETION OF THE WORK, CONSTRUCTION AREA SHALL BE FULLY
VACUUMED WITH HEPA FILTERED VACUUM AND WET MOPPED WITH DISINFECTANT.
CLASS III ICRA REQUIREMENTS INCLUDE:
Q. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS
ROOM SO THEY CAN BE VACUUMED USING A HEPA-FILTERED VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS
THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
R. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS.
CLASS IV ICRA REQUIREMENTS INCLUDE ALL OF ITEMS A-P ABOVE
PLUS THE FOLLOWING:
CONSTRUCTION ACTIVITY TYPE C:
ACTIVITY GENERATES MODERATE TO HIGH
LEVELS OF DUST, REQUIRES GREATER THAN 1
WORK SHIFT FOR COMPLETION.
IC RISK GROUP:
GROUP 3: MEDIUM / HIGH RISK
GROUP 4: HIGH RISK
ICRA LEGEND
SUGGESTED ICRA BOUNDARY LOCATION - FIELD VERIFY
EXACT LOCATION(S) IN FIELD WITH VA COR PRIOR TO
INSTALLATION.
A* CONSTRUCTION ACCESS
LOCATION - SEE PLAN -
PROVIDE TACKY MATS
BOTH INSIDE AND OUTSIDE
OF BARRIER
O ffi ce of
Fac ilit ie s
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
BUILDING / LOCATION INFORMATION: DRAWING TITLE:
BUILDING NUMBER:
CAMPUS:
ADDRESS:
FLOOR # (IF APPLICABLE):
ROOM # / SUITE DESCRIPTION:
SHEET NUMBER:
ADDITIONAL DRAWING INFORMATION:
SHEET OF
Project Title:
520-23-106
RENOVATE VARIOUS INTERIOR SPACES TO IMPROVE
PRIMARY CARE AND OTHER SPECIALTY SERVICES, JACC
Veterans Affairs - Engineering
Drawings Prepared By:
Drawing Date:
GULF COAST VETERANS HEALTH CARE SYSTEM
400 VETERANS AVENUE, BILOXI, MS 39531
zz
FIRST FLOOR
VARIOUS
Pensacola VA Clinic
790 Veterans Way, Pensacola, FL 32507
ENLARGED IMPROVEMENT PLANS - DEMOLITION / ICRA
FIRST FLOOR
04-12-2023
A03 A03 6
1/8" = 1'-0"1 First Floor - Enlarged Partial Plan - CHARLIE - Demolition
1/8" = 1'-0"2 First Floor - Enlarged Partial Plan - BRAVO - Demolition
1/8" = 1'-0"3 First Floor - Enlarged Partial Plans - Equipment Room - Demolition
NOTE: REFER TO SHEETS FP02 AND FP03 FOR SMOKE BARRIER
LOCATIONS AND DESIGNATIONS AND ENSURE PROPER
CONSTRUCTION OF NEW REQUIRED BARRIERS PER THE
REQUIREMENTS ON SHEET FP01.
MEDICATION
ROOM
2C173
LOBBY /
WAITING
ROOM
2C170
LOBBY /
WAITING
ROOM
2G100
LOBBY /
WAITING
ROOM
2G107
STAIR 4
2STR4
ELECTRICAL
2C169
SOILED
UTILITY
2C166
CORRIDOR
C2-26
WOMEN'S
HEALTH
OFFICE
2C165
GASTRO
EXAM
ROOM
2C133
SOILED
UTILITY
2C135
CORRIDOR
C2-22
NURSE
TEAM
ROOM
2C131
TOILET
2C130
TOILET
2C129
LOBBY /
WAITING
ROOM
2C128
RHEUMATOLOGY
PROVIDER
2C136
MEDICATION
ROOM
2C126
LOBBY /
WAITING
ROOM
2C127
SOCIAL
WORK
OFFICE
2C167
WOMEN'S
HEALTH
EXAM
ROOM
2C164
15' - 8" 17' - 6"
9'
6"
12' - 11"
6' - 8"
10' - 0" 11' - 5"
1,2
1,210 10
20' - 4"
7 7
REWORK LVT FLOORING
EXISTING SINK
TO REMAIN
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
CLOSE, LOCK AND
SEAL DOORS DURING
CONSTRUCTION - NO
THROUGH ACCESS
A*
OIT/COMM
2A137
CORRIDOR
C2-08
LOBBY /
WAITING
ROOM
2A136
LOBBY /
WAITING
ROOM
2G104
GROUP
ROOM/SHARED
MED
APPTS
2A135
LOBBY /
WAITING
ROOM
2C100
12' - 7"
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
CLOSE, LOCK AND
SEAL DOOR DURING
CONSTRUCTION - NO
THROUGH ACCESS
A*
PREP/RECOVERY
2F112
STORAGE
2F112A
TOILET
2F115
ONCOLOGY
INFUSION
CLINIC
2F119
MEDICATION
ROOM
2D167
ONCOLOGY
INFUSION
CLINIC
2D169
CORRIDOR
C2-65
CORRIDOR
C2-66
CORRIDOR
C2-64
STORAGE
ALCOVE
2D163
CLEAN
UTILITY
2D162
SOILED
UTILITY
2D166
MINOR
PROCEEDURE
ROOM
2D142
SCRUB
C2-66A
MINOR
PROCEEDURE
ROOM
2D138
13' - 0"
1"
6'
4"
1, 2
NOTES:
1. ICRA - TYPE C / GROUP 4 / CLASS IV
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
LOBBY /
WAITING
ROOM
2G103
LOBBY /
WAITING
ROOM
2B100
MULTIPURPOSE
ROOM
2B125
MAS
Reception
2B101
CORRIDOR
C2-82
EXAM /
TREATMENT
ROOM
2B123
DIALATION
WAITING
2B103
CORRIDOR
C2-83
10' - 3"
0"
NOTES:
1. ICRA - TYPE C / GROUP 3 / CLASS III
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
A*
1, 2
1, 2
12 13
6' - 8"11
17' - 11"
9'
6" 3'
3"
12' - 11" 19' - 0"
1, 2
12' - 0"
4'
0"
A*
CLOSE, LOCK AND
SEAL DOORS DURING
CONSTRUCTION - NO
THROUGH ACCESS
A*
12' - 7"
" 1, 2
CLOSE, LOCK AND
SEAL DOOR DURING
CONSTRUCTION - NO
THROUGH ACCESS
A*
1, 2
121214
13' - 0"
A*
1, 2
A*
A*
GENERAL DEMOLITION NOTES
A. ALL WORK SHALL ADHERE TO OSHA, MDEQ, AND VA SAFETY GUIDELINES
AND REQUIREMENTS FOR APPLICABLE WORK IN PROGRESS.
B. ALL DEMOLITION AND CONSTRUCTION WORK WILL TAKE PLACE OUTSIDE
OF NORMAL HOSPITAL OPERATING HOURS AND ON WEEKENDS. THE
WORK SCHEDULE WILL BE COORDINATED AND AGREED UPON BY THE
COR PRIOR TO BEGINNING THE WORK AND SHOULD BE SIGNED OFF
ACCORDINGLY.
C. SMOKE DETECTORS AND FIRE ALARM DEVICES IN THE WORK AREA SHALL
REMAIN AND BE PROTECTED. RECONNECTION OF ALL FIRE ALARM
DEVICES, IF REQUIRED, SHALL BE COORDINATED WITH THE OWNER'S
EXISTING FIRE ALARM SYSTEM AND FIRE SAFETY OFFICER.
D. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK BETWEEN ALL
DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER
SPECIFICATIONS. VA COR MAY REQUEST SOME ITEMS BE SALVAGED.
ANY SUCH ITEMS WILL BE IDENTIFIED DURING THE PRE-CONSTRUCTION
WALK-THROUGH.
E. THROUGHOUT CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR
PROTECTING ALL EXISTING MATERIALS & UTILITIES WITHIN THE
CONSTRUCTION AREA. ANY DAMAGE TO EXISTING BUILDING
STRUCTURAL, MATERIALS, OR UTILITIES CAUSED BY CONSTRUCTION
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE AND APPROVED BY THE VA COR.
F. EXISTING SPRINKLER HEADS, IN AREAS WHERE CEILINGS ARE BEING
TEMPORARILY OR PERMANENTLY REMOVED, SHALL BE TURNED UPWARD
WITH LENGTHS AND HEADS ADJUSTED TO FULLY PROTECT THE AREAS
PER NFPA. IN AREAS WHERE NEW CEILINGS ARE BEING INSTALLED,
SPRINKLER HEADS SHALL BE TURNED DOWN AND INSTALLED IN THE
CENTER OF THE CEILING TILES WITH LENGTHS AND HEADS ADJUSTED TO
FULLY PROTECT THE AREAS.
G. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
H. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR
PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF
EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE
WALL, FLOOR, AND/OR ROOF ASSEMBLY.
I. USE OF ANY PLUMBING FIXTURE (SINK,TOILET, FLR. DRAIN, OR CATCH
BASIN, ETC.) FOR WASH-UP DISPOSAL OF THERE WASTE FROM, OR IS
SPENT STRICTLY LIQUIDS, PROHIBITED. PAINT P
J. CONTRACTOR SHALL PROTECT ALL BUILDING UTILITIES AND SYSTEMS
INCLUDING BUT NOT LIMITED TO EXISTING ELECTRICAL EQUIPMENT, FIRE
PROTECTION, PLUMBING FIXTURES, PIPING, DUCTING, MECHANICAL
EQUIPMENT, COMMUNICATION SYSTEMS (WIRELESS AND HARD WIRED)
AND ALARM SYSTEMS DURING DEMOLITION AND CONSTRUCTION. ANY
ITEMS OR SYSTEMS DAMAGED AS A RESULT OF THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR OR REPLACE AT
NO COST TO THE OWNER.
K. EACH AND EVERY INDIVIDUAL LOCATION OR ITEM NEEDED TO BE
DEMOLISHED OR MODIFIED MAY NOT BE REFLECTED OR DELINEATED IN
THE DRAWINGS. AMOUNTS AND QUANTITIES SHALL BE FIELD VERIFIED
AND CLARIFIED BY THE VA COR PRIOR TO DEMOLITION OR
CONSTRUCTION.
L. ANY EXISTING FLOOR DRAINS, CLEAN OUTS, AND THEIR ASSOCIATED
PIPING SYSTEMS SHALL BE COVERED DURING ALL DEMOLITION AND NEW
PROJECT WORK. COVER AND PIPING SYSTEMS SHALL BE COVERED
DURING ALL DEMOLITION AND NEW PROJECT WORK. COVER AND UN-
COVER AS REQUIRED TO PREVENT INFILTRATION OF DEMOLITION OR
CONSTRUCTION DEBRIS THROUGH EACH SHIFTS WORK DAILY
THROUGHOUT DURATION OF THE PROJECT. CONTRACTOR SHALL NOT
LEAVE FLOOR DRAINS COVERED AT THE END OF A DAYS SHIFT OR WHEN
NO WORK IS IN PROGRESS.
M. WALL MOUNTED FIRE EXTINGUISHERS SHALL REMAIN WITHIN 60" OF
ORIGINAL LOCATION THROUGHOUT ALL WORK IN THE PROJECT.
CONTRACTOR SHALL VERIFY WORKING ORDER AND CHARGE AT ALL
TIMES THROUGHOUT PROJECT WORK.
N. CONTRACTOR SHALL NOT STORE OR STAGE ANY MATERIALS,
DEMOLISHED OR NEW, IN EXISTING MAIN CORRIDORS, ADJACENT ROOMS,
OR ANY OTHER AREAS, INCLUDING TOOLS, EQUIPMENT, LADDERS, ETC.
UNLESS COORDINATED AND APPROVED BY THE VA COR.
O. ANY PIPING, DUCTWORK, SYSTEMS, ETC. TO BE PERMANENTLY
ABANDONED OVERHEAD, IN WALLS OR FLOOR SLABS, SHALL BE SEALED,
CAPPED, AND TESTED, BEFORE SEALING OR COVERING IN NEW WALLS OR
BACK-FILLED IN SLABS.
P. CARE MUST BE TAKEN WHEN REMOVING OR RELOCATING AND ALL
CONDUIT AND WIRING. THE CONTRACTOR SHALL VERIFY THE POWER
SOURCE HAS BEEN DISABLED PRIOR TO ELECTRICAL DEMOLITION OR
CONSTRUCTION. VA COR SHALL BE NOTIFIED IMMEDIATELY SHOULD AN
ELECTRICAL, MECHANICAL, DATA OR OTHER ISSUE ARISE.
Q. AT AREAS WHERE FLOORING IS DEMOLISHED, REMOVE SYSTEM IN ITS
ENTIRETY TO DECK. FULLY PREPARE CONCRETE SLAB FOR INSTALLATION
OF NEW FLOORING. ADHERE TO MANUFACTURER REQUIREMENTS AND
TOLERANCES FOR NEW INSTALLATION. IF REQUIRED, GRIND AND/OR
APPLY SELF-LEVELING COMPOUND TO ENSURE REQUIRED FLATNESS.
KEYNOTES - DEMOLITION
1. HATCHED AREA DENOTES APPROXIMATE EXTENT OF DEMOLITION
REQUIRED. COORDINATE FULL EXTENT OF DEMOLITION WITH NEW WORK.
2. FULLY REMOVE PARTITIONS, DOORS, CEILINGS, FLOORING, BASE,
FIXTURES, ASSOCIATED CONDUIT, ETC. WITHIN HATCHED AREA AND
PREPARE AREA FOR NEW WORK. DIRECT ANY CLARIFICATIONS NEEDED
TO VA COR.
3. DEMO PORTION OF GYPSUM BD. FURR-DOWN INCL. FIXTURES WITHIN. -
PORTION OF FURR-DOWN TO REMAIN - ENSURE FIXTURE IN THIS PORTION
REMAINS OPERATIONAL.
4. FULLY REMOVE ALL BASE AND WALL CABINETS.
5. DEMO AND REMOVE NURSE-CALL PANEL BOX. NEATLY BUNDLE AND
SECURE ASSOCIATED WIRING ABOVE CEILING FOR REMOVAL IN FUTURE
PROJECT.
6. DEMO MAS WORKSTATION MILLWORK COMPLETELY. TAKE CARE TO
ENSURE PORTION TO REMAIN CAN BE NEATLY TRIMMED TO NEW WALL
WITH LIKE-NEW APPEARANCE.
7. REMOVE WOOD DOOR AND H.M. FRAME. PREP OPENING FOR INFILL.
8. REMOVE PARTITION, WOOD DOOR, AND H.M. FRAME
9. PARTIAL DEMOLITION OF EXISTING COLUMN FURRING MAY BE REQUIRED.
FIELD VERIFY AND CONSULT WITH VA COR AS NEEDED.
10. REMOVE AND DISPOSE OF ALL RESTROOM FIXTURES. CAREFULLY CAP
EXISTING UTILITIES WITHIN WALL CAVITY FOR FUTURE USE. EXISTING SINK
TO REMAIN WHERE INDICATED ON PLAN.
11. REMOVE EXISTING H.M. DOOR AND FRAME. PREP OPENING TO RECEIVING
NEW OPPOSITE HAND H.M. FRAME AND WOOD DOOR.
12. DEMOLISH PORTION OF GYPSUM BOARD FURR-DOWN SHOWN DASHED.
13. TAKE CARE WHEN REMOVING PORTION OF WALL AT CEILING FURR-DOWN.
FURR-DOWN IS TO REMAIN AND BE INFILLED, PATCHED, FINISHED AND
PAINTED TO MATCH REST OF EXISTING FURR-DOWN FOR LIKE-NEW
APPEARANCE
15. REMOVE BASE AND UPPER CABINETS COMPLETELY. PREPARE AREA FOR
NEW FINISHES.
16. TAKE SPECIAL CARE WHEN DEMOLISHING PORTION OF EXISTING WALLS
ADJACENT TO FURR-DOWN. FURR-DOWN TO REMAIN AND BE EXPANDED
OVER TOP OF REWORKED CHECK-IN MILLWORK BELOW.
17. CUT OPENING AND INSTALL 3'-0" x 7'-0" TEMP H.M.F. WOOD DOOR FOR
STAFF USE DURING CONSTRUCTION. DEMOLISH TEMP DOOR AND FRAME
AND INFILL, PATCH, PAINT, REWORK BASE BOTH SIDES OF WALL AS
REQUIRED FOR NEW APPEARANCE.
18. DEMOLISH EXISTING MILLWORK RECEPTION DESK AND FURR-DOWN
ABOVE. LIGHTING AND CEILING GRID ABOVE TO BE REWORKED AS
REQUIRED.
19. REMOVE FLOATING WALL AND ADJACENT FURR-DOWN.
20. REWORK LOBBY LVT FLOORING WHERE WALL REMOVED FOR SEAMLESS
APPEARANCE.
21. REMOVE PORTION OF FURR-DOWN AND REWORK LOBBY-SIDE TO NEW
WALL.
22. REMOVE PARTIAL GRID AND TILES OF SUSPENDED CEILING. (CEILING GRID
TO BE REWORKED TO EXTEND OVER ENLARGED RECEPTION AREA).
23. REMOVE UPPER PORTION OF MILLWORK CABINETRY. EXISTING
RECEPTION WORKING SURFACE IS TO BE EXTENDED AS SHOWN ON
IMPROVEMENT PLAN.
24. DEMOLISH PNEUMATIC TUBE SYSTEM AND CHASE. PREP AREA FOR
INCLUSION INTO USABLE SPACE.
25. CONSTRUCT TEMPORARY WALL TO JUST BELOW CEILING WITH 3'0"x7'0"
ACCESS DOOR FOR MAS PERSONNEL TO USE DURING CONSTRUCTION.
GASKET T.O.W. TO CEILING. WALL AND DOOR SHOULD BE PAINTED FOR
PRESENTABLE APPEARANCE CONSTRUCTION. PROVIDE REQUIRED STAFF
ELECTRONIC ACCESS CONTROL KEYPAD. COORDINATE WITH VA COR.
UPON COMPLETION OF CONSTRUCTION AND REMOVAL OF ICRA BARRIERS,
ETC. THAT PROHIBIT STAFF FROM ACCESSING THEIR SPACE FROM
PRIMARY CARE, REMOVE TEMPORARY WALL/DOOR. REPAIR/REPLACE
FLOORING/BASE AS REQUIRED IN WAITING ROOM AS NECESSARY FOR
NEW APPEARANCE. WALL SHOULD BE REMOVED AND AREA RETURNED TO
USABLE CONDITION AFTER HOURS OR OVER A WEEKEND. COORDINATE
WITH VA COR.
14. TAKE SPECIAL CARE WHEN DEMOLISHING PORTION OF EXISTING CEILING
GRID AND TILES. EXISTING GRID AND TILES CAN BE REUSED AS ABLE
WHEN REWORKING CEILING TO NEW WALL LAYOUT. REPLACE GRID AND
TILES AS NEEDED TO ENSURE LIKE-NEW APPEARANCE.
1, 2
11' - 3"
Corr.
C2-62
Corr.
C2-60
TLT.
2F101
TLT.
2F102
A*
1, 2
1, 2
11' - 3"
NOTES:
1. ICRA - TYPE C / GROUP 4 / CLASS IV
2. DIMENSIONS ARE APPROX. AND MUST BE
FIELD VERIFIED IN ALL CASES.
A*
INFECTION CONTROL (ICRA) NOTES
Note: Rated ICRA Barriers not required for Fire Protection / Life Safety.
A. THE CONTRACTOR SHALL PROVIDE, COORDINATE, AND MAINTAIN ALL INFECTION
CONTROL / AIR QUALITY CONTROL MEASURES TO MEET THE ESTABLISHED CLASS
RATING AS REQUIRED BY THE INFECTION CONTROL OFFICER.
B. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
C. COORDINATE ALL DEMOLITION/CONSTRUCTION DEBRIS PATH OF TRAVEL AND
INTERIM LIFE SAFETY MEASURES WITH VA COR.
D. IMMEDIATELY REPLACE ANY DISPLACED CEILING TILES IN AREAS ACTIVELY USED BY
VETERANS OR STAFF FOR VISUAL INSPECTION.
E. AS ABLE, EXECUTE WORK BY METHODS TO MINIMIZE DUST GENERATED BY
CONSTRUCTION OPERATIONS. PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE
DUST FROM DISPERSING INTO ATMOSPHERE. I.E. WATER-MIST WORK SURFACES
TO CONTROL DUST WHILE CUTTING.
F. SEAL UNUSED DOORS WITH TAPE
G. WIPE SURFACES AND WET MOP WITH DISINFECTANT. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
H. CONSTRUCT ALL REQUIRED ICRA CONSTRUCTION BARRIERS PRIOR TO BEGINNING
WORK. CONSTRUCTION AREAS SHALL REMAIN ISOLATED FROM OTHER AREAS OF
THE MEDICAL CLINIC. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO
PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM. NO RETURN AIR OR
EXHAUST SHALL PASS INTO AREAS OUTSIDE OF THE CONSTRUCTION AREA. BLOCK
OFF AND SEAL ALL AIR VENTS. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT SERVICES.
I. AFTER PROJECT INSPECTION AND ACCEPTANCE BY VA SAFETY, INFECTION
CONTROL, ENGINEERING AND COR, CONSTRUCTION BARRIERS CAN BE REMOVED.
PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL AND
REMOVE ISOLATION OF HVAC SYSTEM.
J. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREAS AT ALL TIMES FOR
THE DURATION OF CONSTRUCTION USING HEPA-FILTERED FILTRATION UNITS. SEAL
ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND CONDUITS
APPROPRIATELY AND IMMEDIATELY TO MAINTAIN DUST PROTECTION AND NEGATIVE
PRESSURE.
K. WORK AREA SHALL BE KEPT CLEAN AND ORDERLY. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER
TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
L. SIGNAGE SHALL BE USED TO REDIRECT ALL MEDICAL CENTER PERSONNEL,
PATIENTS, AND VISITORS SO THEY DO NOT PASS THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS AND INTO CONSTRUCTION AREA THAT READS:
"CONSTRUCTION AREA - DO NOT ENTER".
M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND
SHALL BE MONITORED TO MAKE SURE THEY REMAIN EFFECTIVE.
N. CONTRACTOR AND SUBCONTRACTORS SHALL CONSULT VA COR AND INFECTION
CONTROL REPRESENTATIVE PRIOR TO ALL WORK TO BE PERFORMED IN AREAS
OUTSIDE OF CURRENT WORK AREAS.
O. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED
IMMEDIATELY. MAINTAIN STAFFING AND EQUIPMENT NECESSARY FOR CLEANING
DUST/DEBRIS FROM FLOORS AND ADJACENT OCCUPIED AREAS AS REQUIRED
INCLUDING DUST MOPS, WET MOPS, BROOMS, BUCKETS, CLEAN WIPE RAGS, ETC.
P. AFTER COMPLETION OF THE WORK, CONSTRUCTION AREA SHALL BE FULLY
VACUUMED WITH HEPA FILTERED VACUUM AND WET MOPPED WITH DISINFECTANT.
CLASS III ICRA REQUIREMENTS INCLUDE:
Q. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS
ROOM SO THEY CAN BE VACUUMED USING A HEPA-FILTERED VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS
THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
R. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS.
CLASS IV ICRA REQUIREMENTS INCLUDE ALL OF ITEMS A-P ABOVE
PLUS THE FOLLOWING:
CONSTRUCTION ACTIVITY TYPE C:
ACTIVITY GENERATES MODERATE TO HIGH
LEVELS OF DUST, REQUIRES GREATER THAN 1
WORK SHIFT FOR COMPLETION.
IC RISK GROUP:
GROUP 3: MEDIUM / HIGH RISK
GROUP 4: HIGH RISK
ICRA LEGEND
SUGGESTED ICRA BOUNDARY LOCATION - FIELD VERIFY
EXACT LOCATION(S) IN FIELD WITH VA COR PRIOR TO
INSTALLATION.
A* CONSTRUCTION ACCESS
LOCATION - SEE PLAN -
PROVIDE TACKY MATS
BOTH INSIDE AND OUTSIDE
OF BARRIER
O ffi ce of
Fac ilit ie s
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
BUILDING / LOCATION INFORMATION: DRAWING TITLE:
BUILDING NUMBER:
CAMPUS:
ADDRESS:
FLOOR # (IF APPLICABLE):
ROOM # / SUITE DESCRIPTION:
SHEET NUMBER:
ADDITIONAL DRAWING INFORMATION:
SHEET OF
Drawing Prepared By:
ENGINEERING - ACTIVATIONS OFFICE
SPACE COMMITTEE
CAPITAL ASSET MANAGEMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .