This document is a table of contents for construction specifications for the renovation of interior spaces at the Gulf Coast Veterans Healthcare System under solicitation number 520-23-106 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. Key specifications include demolition, concrete, masonry, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, mechanical, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and commissioning requirements. The specifications cover renovations to existing conditions, structure, building envelope, interiors, fire protection, plumbing, HVAC, electrical systems, and associated site work.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gulf Coast Veterans Healthcare System Addition & Renovation
Table of Contents
SECTION 00 01 10
| SECTIONS | DIVISION AND SECTION TITLES | DATE |
| Division 00 — Special Sections | ||
| 00 01 10 | Table of Contents | 06-2021 |
| 00 01 15 | List of Drawing Sheets | 06-2020 |
| Division 01 — General Requirements | ||
| 01 00 00 | General Requirements | 11-2021 |
| 01 33 23 | Shop Drawings, Product Data, and Samples | 06-2021 |
| 01 33 24 | Electronic Submittal Procedures | |
| 01 35 26 | Safety Requirements | 07-2020 |
| 01 42 19 | Reference Standards | 11-2020 |
| 01 45 00 | Quality Control | 05-2021 |
| 01 45 29 | Testing Laboratory Services | 11-2011 |
| 01 45 35 | Special Inspections | 06-2021 |
| 01 45 35.01 | Schedule of Special Inspections Template | 04-2018 |
| 01 57 19 | Temporary Environmental Controls | 01-2021 |
| 01 58 16 | Temporary Interior Signage | 07-2015 |
| 01 74 19 | Construction Waste Management | 01-2021 |
| 01 81 13 | Sustainable Construction Requirements | 10-2017 |
| 01 91 00 | General Commissioning Requirements | 10-2015 |
| Division 02 — Existing Conditions | ||
| 02 21 13 | Site Surveys | 01-2021 |
| 02 41 00 | Demolition | 08-2017 |
| Division 03 — Concrete | ||
| 03 30 00 | Cast-In-Place Concrete | 01-2021 |
| Division 04 — Masonry | ||
| 04 01 00 | Maintenance of Masonry | 01-2021 |
| 04 05 13 | Masonry Mortaring | 10-2017 |
| 04 05 16 | Masonry Grouting | 01-2021 |
| 04 20 00 | Unit Masonry | 08-2017 |
| 04 72 00 | Cast Stone Masonry | 01-2021 |
| Division 05 — Metals | ||
| 05 12 00 | Structural Steel Framing | 11-2018 |
| 05 21 00 | Steel Joist Framing | 11-2018 |
| 05 31 00 | Steel Decking | 01-2021 |
| 05 36 00 | Composite Metal Decking | 01-2021 |
| 05 40 00 | Cold-Formed Metal Framing | 01-2021 |
| 05 50 00 | Metal Fabrications | 08-2018 |
| Division 06 — Wood, Plastics, and Composites | ||
| 06 10 00 | Rough Carpentry | 10-2017 |
| 06 16 63 | Cementitious Sheathing | 01-2021 |
| 06 20 00 | Finish Carpentry | 01-2021 |
| Division 07 — Thermal and Moisture Protection | ||
| 07 01 50.19 | Preparation for Re-Roofing | 01-2021 |
| 07 13 52 | Modified Bituminous Sheet Waterproofing | 01-2021 |
| 07 18 13 | Pedestrian Traffic Coatings | 01-2021 |
| 07 21 13 | Thermal Insulation | 01-2021 |
| 07 22 00 | Roof and Deck Insulation | 01-2021 |
| 07 24 00 | Exterior Insulation and Finish Systems | 01-2021 |
| 07 27 27 | Fluid-Applied Membrane Air Barrier, Vapor Retarding | 01-2021 |
| 07 40 00 | Roofing and Siding Panels | 01-2021 |
| 07 52 16.12 | Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing | 01-2021 |
| 07 60 00 | Flashing and Sheet Metal | 01-2021 |
| 07 71 00 | Roof Specialties | 01-2021 |
| 07 72 00 | Roof Accessories | 01-2021 |
| 07 81 00 | Applied Fireproofing | 10-2017 |
| 07 84 00 | Firestopping | 01-2021 |
| 07 92 00 | Joint Sealants | 10-2017 |
| 07 95 13 | Expansion Joint Cover Assemblies | 01-2021 |
| Division 08 — Openings | ||
| 08 11 13 | Hollow Metal Doors and Frames | 01-2021 |
| 08 14 00 | Interior Wood Doors | 01-2021 |
| 08 41 13 | Aluminum-Framed Entrances and Storefronts | 01-2021 |
| 08 51 13 | Aluminum Windows | 01-2021 |
| 08 56 19 | Pass Windows | 01-2021 |
| 08 71 00 | Door Hardware | 01-2021 |
| 08 80 00 | Glazing | 01-2021 |
| 08 90 00 | Louvers and Vents | 01-2021 |
| Division 09 — Finishes | ||
| 09 05 16 | Subsurface Preparation for Floor Finishes | 01-2021 |
| 09 06 00 | Schedule for Finishes | 01-2021 |
| 09 22 16 | Non-Structural Metal Framing | 06-2018 |
| 09 29 00 | Gypsum Board | 04-2020 |
| 09 30 13 | Ceramic Porcelain Tiling | 01-2021 |
| 09 51 00 | Acoustical Ceilings | 12-2018 |
| 09 54 23 | Linear Metal Ceilings | 01-2021 |
| 09 65 13 | Resilient Base and Accessories | 01-2021 |
| 09 65 16 | Resilient Sheet Flooring | 05-2018 |
| 09 65 19 | Resilient Tile Flooring | 05-2018 |
| 09 91 00 | Painting | 01-2021 |
| Division 10 — Specialties | ||
| 10 14 00 | Signage | 01-2021 |
| 10 21 23 | Cubicle Curtain Tracks | 01-2021 |
| 10 26 00 | Wall and Door Protection | 01-2021 |
| 10 28 00 | Toilet, Bath, and Laundry Accessories | 01-2021 |
| 10 44 13 | Fire Extinguisher Cabinets | 08-2018 |
| Division 11 — Equipment | ||
| 11 41 21 | Walk-In Coolers and Freezers | 01-2021 |
| 11 53 23 | Laboratory Refrigerators | 01-2021 |
| 11 53 71 | Solution Warming Cabinets | 01-2021 |
| 11 71 02 | Laboratory Washing and Sterilizing Equipment | 01-2021 |
| Division 12 — Furnishings | ||
| 12 24 00 | Window Shades | 08-2017 |
| 12 32 00 | Manufactured Wood Casework | 01-2021 |
| 12 34 00 | Modular Laminate Casework | 01-2021 |
| 12 36 00 | Countertops | 12-2018 |
| Division 13 — Special Construction | ||
| 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | 01-2021 |
| Division 14 — Conveying Equipment |
NOT USED
Division 20 — Mechanical Support
NOT USED
| Division 21 — Fire Suppression | ||
| 21 08 00 | Commissioning of Fire Suppression System | 11-2016 |
| 21 13 13 | Wet-Pipe Sprinkler Systems | 06-2015 |
| Division 22 — Plumbing | ||
| 22 05 11 | Common Work Results for Plumbing | 09-2020 |
| 22 05 12 | General Motor Requirements for Plumbing Equipment | 09-2020 |
| 22 05 19 | Meters and Gauges for Plumbing Piping | 09-2020 |
| 22 05 23 | General-Duty Valves for Plumbing Piping | 09-2020 |
| 22 07 11 | Plumbing Insulation | 09-2019 |
| 22 08 00 | Commissioning of Plumbing Systems | 11-2016 |
| 22 11 00 | Facility Water Distribution | |
| 22 13 00 | Facility Sanitary and Vent Piping | 09-2020 |
| 22 14 00 | Facility Storm Drainage | 09-2015 |
| 22 15 00 | General Service Compressed-Air Systems | 09-2020 |
| 22 40 00 | Plumbing Fixtures | |
| 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | 09-2015 |
| 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | 09-2015 |
| 22 66 00 | Chemical-Waste Systems for Laboratory and Healthcare Facilities | 09-2020 |
| Division 23 — Heating Ventilating and Air Conditioning | ||
| 23 05 11 | Common Work Results for HVAC | 02-2020 |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | 02-2020 |
| 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | 02-2020 |
| 23 05 93 | Testing, Adjusting, and Balancing for HVAC | 02-2020 |
| 23 07 11 | HVAC, Plumbing, and Boiler Plant Insulation | 02-2020 |
| 23 08 00 | Commissioning of HVAC Systems | 02-2020 |
| 23 08 11 | Demonstrations and Tests for Boiler Plant | 08-2017 |
| 23 09 23 | Direct-Digital Control System for HVAC | 08-2020 |
| 23 21 13 | Hydronic Piping | 02-2020 |
| 23 21 23 | Hydronic Pumps | 02-2020 |
| 23 22 13 | Steam and Condensate Heating Piping | 02-2020 |
| 23 22 23 | Steam Condensate Pumps | 04-2020 |
| 23 23 00 | Refrigeration Piping | 02-2020 |
| 23 25 00 | HVAC Water Treatment | 02-2020 |
| 23 31 00 | HVAC Ducts and Casings | 02-2020 |
| 23 34 00 | HVAC Fans | 02-2020 |
| 23 36 00 | Air Terminal Units | 02-2020 |
| 23 37 00 | Air Outlets and Inlets | 02-2020 |
| 23 40 00 | HVAC Air Cleaning Devices | 03-2020 |
| 23 65 00 | Cooling Towers | 03-2020 |
| 23 73 00 | Indoor Central-Station Air-Handling Units | 03-2020 |
| 23 81 00 | Decentralized Unitary HVAC Equipment | 03-2020 |
| 23 81 43 | Air-Source Unitary Heat Pumps | 03-2020 |
| 23 82 16 | Air Coils | 03-2020 |
| Division 25 — Integrated Automation |
NOT USED
| Division 26 — Electrical | ||
| 26 05 11 | Requirements for Electrical Installations | 01-2016 |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | 01-2017 |
| 26 05 26 | Grounding and Bonding for Electrical Systems | 01-2017 |
| 26 05 33 | Raceway and Boxes for Electrical Systems | 01-2018 |
| 26 05 73 | Overcurrent Protective Device Coordination Study | 01-2018 |
| 26 08 00 | Commissioning of Electrical Systems | 11-2016 |
| 26 09 23 | Lighting Controls | 01-2018 |
| 26 22 00 | Low-Voltage Transformers | 01-2018 |
| 26 24 16 | Panelboards | 01-2018 |
| 26 27 26 | Wiring Devices | 01-2018 |
| 26 29 11 | Motor Controllers | 01-2018 |
| 26 29 21 | Enclosed Switches and Circuit Breakers | 01-2017 |
| 26 41 00 | Facility Lightning Protection | 01-2017 |
| 26 43 13 | Surge Protective Devices | 01-2017 |
| 26 51 00 | Interior Lighting | 01-2018 |
| 26 56 00 | Exterior Lighting | 01-2018 |
| Division 27 — Communications | ||
| 27 05 11 | Requirements for Communications Installations | 09-2019 |
| 27 05 26 | Grounding and Bonding for Communications Systems | 06-2015 |
| 27 05 33 | Raceways and Boxes for Communications Systems | 10-2018 |
| 27 08 00 | Commissioning of Communications Systems | 11-2016 |
| 27 10 00 | Control, Communication and Signal Wiring | 06-2015 |
| 27 11 00 | Communications Equipment Room Fittings | 06-2015 |
| 27 15 00 | Communications Structured Cabling | 01-2016 |
| 27 51 16 | Public Address and Mass Notification Systems | 10-2018 |
| 27 52 23 | Nurse Call and Code Blue Systems | 12-2020 |
| Division 28 — Electronic Safety and Security | ||
| 28 05 00 | Common Work Results for Electronic Safety and Security | 04-2018 |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | 10-2018 |
| 28 05 26 | Grounding and Bonding for Electronic Safety and Security | 09-2011 |
| 28 05 28.33 | Conduits and Backboxes for Electronic Safety and Security | 09-2011 |
| 28 08 00 | Commissioning of Electronic Safety and Security Systems | 11-2016 |
| 28 13 00 | Physical Access Control System | 10-2011 |
| 28 13 53 | Security Access Detection | 09-2011 |
| 28 23 00 | Video Surveillance | 09-2011 |
| 28 31 00 | Fire Detection and Alarm | 10-2011 |
| Division 31 — Earthwork | ||
| 31 20 11 | Earthwork (Short Form) | 10-2012 |
| 31 23 19 | Dewatering | 10-2012 |
| 31 23 23.33 | Flowable Fill | 10-2012 |
| Division 32 — Exterior Improvements | ||
| 32 05 23 | Cement and Concrete for Exterior Improvements | 08-2016 |
| 32 12 16 | Asphalt Paving | 09-2015 |
| 32 17 23 | Pavement Markings | 08-2016 |
| 32 84 00 | Planting Irrigation | 08-2016 |
| 32 90 00 | Planting | 08-2016 |
| Division 33 — Utilities | ||
| 33 08 00 | Commissioning of Site Utility Systems | 11-2016 |
| 33 40 00 | Storm Sewer Utilities | 12-2017 |
| Division 34 — Transportation |
NOT USED
Division 35 — Waterways and Marine Construction
NOT USED
Division 40 — Process Interconnections
NOT USED
Division 41 — Material Processing and Handling Equipment
NOT USED
Division 42 — Process Heating, Cooling, and Drying Equipment
NOT USED
Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment
NOT USED
Division 44 — Pollution Control Equipment
NOT USED
Division 45 — Industry-Specific Manufacturing Equipment
NOT USED
Division 46 — Water and Wastewater Equipment
NOT USED
Division 48 — Electrical Power Generation
Renovate Various Interior Spaces, JACC Project #: 520-23-106
NOT USED
00 01 10 - 1 This page intentionally left blank.