This document describes interim life safety measures for roof replacement project 667-18-104 at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The project involves replacing approximately 30,000 square feet of roofing on the main hospital building and will require disabling smoke and duct detectors as well as fire watches during work periods each day. Hot work permits will be obtained daily and coordination conducted with safety, engineering, and security personnel. Fire extinguishers and additional notifications are also specified. The related federal contract solicitation is for project 667-18-104 to replace the roof and was posted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of Interim Life Safety Measures (ILSM) Used
Project #: _667-18-104__ Title: Repair Roofs, Various Locations Date: _3/18/2022_
Based on the responses to the evaluation questions, provide a description of the ILSM that will be implemented during the project to compensate for the deficiency or condition. Attach additional sheets if necessary.
Overton Brooks VAMC has a requirement to replace several roofs at various locations (approximately 30,000 SF) on the main hospital, building 1 Shreveport, LA. While replacing the Roof sections, duct detectors, smoke detectors will be disabled during working periods. When complete each day, the detectors will be re-enabled. Fire watches will be in place during working periods. Hot Work permits will be opened and closed daily, coordination through projects section, with Safety and the Boilerplant notified. Fire extinguishers will be made available onsite. Interface Signaling, Boiler Plant, Police Department, Safety department will be notified of additional outages.
Signatures required as indicated below. Completed form will be maintained in the project file.
Project COR: __________________________________ Date: _3/18/2022__
Reviewers:
1. Safety Manager: _______________________________ Date: _____________
2. Chief Engineer: ____________________________ Date: ____________
| 2022-03-29T14:08:20-0500 | |
| ARCHIE A. LANHAM 244999 |
| 2022-04-13T11:08:19-0500 | |
| PAUL M. CELLI 3377041 |
| 2022-04-14T07:52:56-0500 | |
| JOSEPH L. HEDDINGS 3389785 |