This document contains a construction risk assessment and exposure control checklist for project 667-18-104 to repair roofs at various locations within a Veterans Affairs medical center. The checklist identifies potential safety hazards associated with the roof repair work and the corresponding control measures that would be implemented, such as maintaining site security, using appropriate personal protective equipment, implementing traffic control measures as needed, and coordinating work hours with the contracting officer's representative. The related federal contract opportunity posting provides additional details for solicitation number 36C25622R0086 to replace the roof under project 667-18-104. The work will be performed for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Risk Assessment and Exposure Control Checklist

Project: _667-18-104 Repair Roofs, Various Locations Date: _03/29/22_

Hazard Concern (Y/N?)

Control Measure Remarks

Security Issues Site Security Y Contractor to keep work area secure Identification of Contractors Y Contractor to obtain ID’s, 30/10 hr. OSHA & valid ID Appropriate parking Y Stay within laydown area or park off station Storage of Materials Y Within laydown area Change of locks? Access to site Y Secure Site If needed, coordinate w/ COR.

Traffic Control Y As needed Hours of Work Y Coordinate with COR. Coordinate after hours work w/ COR &

User

IH Issues/GEMS/NEPA Asbestos N If other suspect material is found, notify

COR.

Haz Com: Chemicals used/MSDS Required Y Contractor to maintain MSDS Sheets Spills N Monitor, seal any floor penetrations Air Pressure Relationships-Vapors/Fumes N Lead Paint N Respiratory Protection N Unless a specific activity requires it.

Waste disposal Y Use appropriate site waste containers Do not put in VA dumpster at Back Dock.

Recycling Y As appropriate.

NEPA (See NEPA Compliance Checklist) N

Infection Control Issues (see ICRA, Project specific ICRA and precautions provide) Dust Y Water area and debris as needed, cover carts, walk-off mats, etc.

Proximity of air intakes Y Cover air intakes as necessary Proximity of patients N Keep site secure and patients out Water leaks/Mold/Mildew N Monitor, seal any floor penetrations Negative Air N Risk of TB transmission to contractors N Not working in a high-risk patient area.

Potential for potable water contamination N

Patient Safety Issues Access to construction site by patients N Keep site secure and patients out

Engineering Issues Utility Interruption N Coordinate w/ COR & Engineering.

Vibration / Noise Y If disruptive to hospital, work hours need adjustment Electrical Safety Y LOTO Welding/Cutting – Hot Work Y Coordinate with COR Frequency of Inspections Y Always present during work, COR Daily checks. Construction Team Weekly.

Hazard Concern (Y/N?)

Control Measure Remarks

Critical Barriers N Coordination with staff in vicinity Y Coord w/COR, Staff must be aware of any potential impacts

Fire Protection Issues Penetrations Y Fire caulk as appropriate. Provide penetration forms Smoking N Absolutely not allowed.

ILSM (see ILSM Evaluation) Y Ref to ILSM.

Fire watch Y As required for HOT work (Burn Permit) Disruption to fire protection systems N

Safety Issues Trenching/Shoring N Scaffolding N Tool safety Y Always use appropriate PPE & secure Secure tools so that they are inaccessible to patients & employees PPE Y As work activity requires.

Cranes Y OSHA and AHA. Coordinate with COR Fall Protection Y OSHA and AHA Confined space N Hand and Power tools Y As required.

Emergency Response to/from site Y Educate staff on access to & from site.

Signage Y Identify “Construction Area” LOTO N Electrical work, coordinate with COR.

EMS Issues Pest control within construction areas N No food in work area, remove debris daily.

Dust Control Y Neg Air and walk off mats as required.

Waste Disposal Y Remove daily in covered carts.

Specialized Training Requirements

Team Members to Conduct Inspections: D=Daily W=Weekly AN=As needed O=Other Construction Safety Officer D W AN Infection Control D W AN Safety Spec D W AN GEMS D W AN Safety Officer D W AN

Approval Signatures:

Project Manager/M&O/COR/CSO Chief Engineer/Facility Safety Officer

Safety & Occupational Health Specialist VA Police (if required)

Infection Prevention Control Program Manager GEMS (if required)

Patient Safety Manager

2022-03-29T13:00:22-0500
ARCHIE A. LANHAM 244999
2022-04-05T15:14:04-0500
PAUL M. CELLI 3377041
2022-04-14T07:52:27-0500
JOSEPH L. HEDDINGS 3389785