This document outlines infection control precautions for a roof replacement project at the Overton Brooks VA Medical Center. During construction, measures such as reducing airborne dust, water misting work surfaces, sealing unused doors, blocking and sealing air vents, installing dust mats at entrances and exits, and removing or isolating exhaust systems within 25 feet of work areas are required. Construction waste must be transported in tightly covered containers and containers without tight lids must be taped before leaving the work area. Only designated construction routes may be used to remove debris. Upon completion, work surfaces must be wiped with cleaner/disinfectant, waste contained and transported as outlined, areas wet mopped and vacuumed with HEPA filters, and any isolated exhaust systems restored. Terminal cleaning is required once work is fully completed. Control measures must remain until all work is finished.
The related federal contract opportunity is solicitation number 36C25622R0086 for project 667-18-104 to replace the roof at the Overton Brooks VA Medical Center. The solicitation is posted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VAMC Infection Control Precautions for Class II Projects
Based on the Infection Control Risk Assessment of this construction/remodel project, the following activities are required.
PROJECT: Roof Replacement 667-18-104 Date: April 13, 2022
During Construction Project Upon Completion of Project
C la ss
II
1. Provide active means to reduce airborne dust from dispersing into atmosphere WITHIN 25 feet of
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents if the HVAC system is removed or isolated.
5. Place dust mat at entrance and exit of work area
6. Remove or isolate Exhaust system in areas within 25 feet of where work is being performed.
7. Construction Waste: if exterior trash chute is NOT used.
a. Transport in tightly covered container,
b. Containers without tight fitting solid lids must have covering taped in place BEFORE transport outside the project area,
c. Outside of containers must be cleaned when visibly soiled
8. When removing construction debris, utilize only the designated construction route.
1. Wipe work surfaces with cleaner/disinfectant.
2. Contain and transport construction waste as outline for “During Construction”.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Upon completion, restore exhaust system where work was performed.
5. Schedule Terminal Clean once work is complete
Maintain control measures until ALL Work is completed. Exceptions must be approved by Infection Prevention on a case by case basis.
Preliminary Final
4/13/2022
X Vickie L Moore Vickie L. Moore Infection Prevention Program Manager Signed by: VICKIE L. MOORE 193380
X Vickie L. Moore MA, CIC, VHA-CM Infection Prevention Program Manager