This solicitation is for project 667-18-104 to replace roofs at various locations at the Main Hospital in Shreveport, Louisiana. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking to replace roofs in areas A, B, C, D, E, F, G and H. Services required include demolition of existing roof systems, installation of new single-ply thermoplastic polyolefin roofs, and asbestos abatement. Drawings and specifications are provided to guide contractors in preparing responses due by June 26, 2020. Award is anticipated shortly thereafter to facilitate work completion.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING TITLE
DWG
NO.
INDEX OF DRAWINGS
DRAWING TITLE
DWG
NO.
REPLACE ROOF, VARIOUS LOCATIONS,
MAIN HOSPITAL
OVERTON BROOKS VA MEDICAL
CENTER
FINAL SUBMITTAL
510 E. STONER AVENUE, SHREVEPORT, LA 71101
510 E. STONER AVENUE,
SHREVEPORT, LA
F
E
C
B
H G
A
D
COVER SHEET
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
FINAL SUBMITTAL
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE ROOF, VARIOUS
LOCATIONS, MAIN HOSPITAL
SHREVEPORT, LA
667-18-104
Building Number Project Director
06/26/2020 AT DPBRevisions: Date:
AutoCAD SHX Text
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
AD100
AutoCAD SHX Text A101
AutoCAD SHX Text
OVERALL ROOF PLAN - DEMOLITION WORK
AutoCAD SHX Text G001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G002
AutoCAD SHX Text
LEGENDS, ABBREVIATIONS, AND NOTES
AutoCAD SHX Text
ENLARGED ROOF PLANS - ROOF AREAS B, C, D, E AND F
AutoCAD SHX Text
FIRST FLOOR ENTRY
AutoCAD SHX Text
SECOND FLOOR SOUTH
AutoCAD SHX Text
NINTH FLOOR WEST
AutoCAD SHX Text
SECOND FLOOR CANTEEN
AutoCAD SHX Text
TWELFTH FLOOR
AutoCAD SHX Text
SECOND FLOOR CLINICAL ADDITION
AutoCAD SHX Text
SCREEN WALL
AutoCAD SHX Text A102
AutoCAD SHX Text
ENLARGED ROOF PLANS - ROOF AREAS A, G AND H
AutoCAD SHX Text E001
AutoCAD SHX Text E101
AutoCAD SHX Text
LEGEND, DETAILS, AND GENERAL NOTES - ELECTRICAL
AutoCAD SHX Text
REPLACE ROOF PLANS - ELECTRICAL
AutoCAD SHX Text E102
AutoCAD SHX Text
REPLACE ROOF PLANS - ELECTRICAL
AutoCAD SHX Text
AB101
AutoCAD SHX Text
ASBESTOS ABATEMENT - ROOF AREAS B, C, D, E AND F
AutoCAD SHX Text
AB102
AutoCAD SHX Text
ASBESTOS ABATEMENT - ROOF AREAS A, G AND H
AutoCAD SHX Text A501
AutoCAD SHX Text
ROOF DETAILS - DEMOLITION
AutoCAD SHX Text A502
AutoCAD SHX Text
ROOF DETAILS - NEW WORK
AutoCAD SHX Text A503
AutoCAD SHX Text
ROOF DETAILS - NEW WORK
AutoCAD SHX Text A100
AutoCAD SHX Text
OVERALL ROOF PLAN - NEW WORK
AutoCAD SHX Text
ED100
AutoCAD SHX Text
DEMOLITION ROOF PLANS - OVERALL
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
EIGHTH FLOOR WEST
AutoCAD SHX Text
ROOF AREA
AutoCAD SHX Text
AB100
AutoCAD SHX Text
OVERALL ROOF PLAN - ABATEMENT WORK
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text G.
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text O.
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text L
ARCHITECTURAL LEGEND
MATERIAL LEGEND ARCHITECTURAL GENERAL NOTES
GENERAL PROJECT NOTES
ARCHITECTURAL ABBREVIATIONS
LEGENDS ABBREVIATIONS AND
NOTES
G002
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
FINAL SUBMITTAL
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE ROOF, VARIOUS
LOCATIONS, MAIN HOSPITAL
SHREVEPORT, LA
667-18-104
Building Number Project Director
06/26/2020 AT DPBRevisions: Date:
AutoCAD SHX Text A
AutoCAD SHX Text + 0'-6"
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
KEY NOTE
AutoCAD SHX Text
WINDOW TYPE
AutoCAD SHX Text
DETAIL CALLOUT
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
SECTION CALLOUT
AutoCAD SHX Text
VERTICAL ELEVATION
AutoCAD SHX Text
COLUMN CENTERLINE DESIGNATION
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
SHEET WHERE SECTION IS DRAWN
AutoCAD SHX Text
EXTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A201
AutoCAD SHX Text
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MORTAR, STUCCO CEMENT PLASTER
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
INSULATION RIGID
AutoCAD SHX Text
INSULATION BATT
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
WOOD (ROUGH)
AutoCAD SHX Text
INTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. COORDINATE WITH ELECTRICAL DRAWINGS FOR ADDITIONAL COORDINATE WITH ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. B. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. C. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING. D. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS. E. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. F. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (ROOF, INSULATION, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS RECOMMENDED BY MANUFACTURER PRIOR TO INSTALLATION OF NEW MATERIALS. G. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST TO THE OWNER. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED OR LEFT WITH HOLES BY CONSTRUCTION ACTIVITIES, REPAIR, REPLACE, OR INFILL SUCH MATERIALS AND FINISHES TO MATCH EXISTING IN MATERIAL, SIZE, ALIGNMENT, FINISH, COLOR, TEXTURE, AND QUALITY. ALL SHALL BE REPLACED OR REPAIRED TO MATCH OR EXCEED THE QUALITY THAT EXISTED BEFORE DAMAGE. H. ROOF FLASHING MATERIALS SAVED AND REUSED SHALL BE PROTECTED ROOF FLASHING MATERIALS SAVED AND REUSED SHALL BE PROTECTED AND STORED WITHOUT DAMAGE. I. CONTRACTOR WILL PATCH ALL ABANDONED PENETRATIONS THROUGH CONTRACTOR WILL PATCH ALL ABANDONED PENETRATIONS THROUGH ROOF IDENTIFIED AND APPROVED BY THE VA. J. ALL ROOF DRAINS ARE TO BE MECHANICALLY FASTENED. ALL ROOF DRAINS ARE TO BE MECHANICALLY FASTENED. K. PHASING OF ALL ROOF WORK SHALL BE APPROVED BY THE VA. PHASING OF ALL ROOF WORK SHALL BE APPROVED BY THE VA. L. ALL ROOF DRAINS SHALL BE VERIFIED AND SLOPED CONDITIONS ALL ROOF DRAINS SHALL BE VERIFIED AND SLOPED CONDITIONS IDENTIFIED TO DRAINS VERIFIED. M. ALL ROOFTOP LUMBER AND PLYWOOD TO BE PRESSURE-TREATED. ALL ROOFTOP LUMBER AND PLYWOOD TO BE PRESSURE-TREATED. N. ALL EXISTING CONCRETE ROOF DECKS ARE FLAT. PITCH OF EXISTING ALL EXISTING CONCRETE ROOF DECKS ARE FLAT. PITCH OF EXISTING STEEL ROOF DECKS ARE UNKNOWN.
AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. D. SEE SPECIFICATION SECTION 01 00 00 FOR TEMPORARY CONSTRUCTION SEE SPECIFICATION SECTION 01 00 00 FOR TEMPORARY CONSTRUCTION REQUIREMENTS. E. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES.
AutoCAD SHX Text
AIR CONDITIONING
AutoCAD SHX Text
ACOUSTICAL CEILING TILE
AutoCAD SHX Text
ABOVE FINISH FLOOR
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
BATT INSULATION
AutoCAD SHX Text
BOTTOM OF
AutoCAD SHX Text
CEMENTITIOUS BACKER BOARD
AutoCAD SHX Text
CEMENTITIOUS CRYSTALLINE WATERPROOFING
AutoCAD SHX Text
COLD-FORMED METAL FRAMING
AutoCAD SHX Text
CORNER GUARD
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CERAMIC MOSAIC TILE
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
CASED OPENING
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
CONTRACTING OFFICER'S REPRESENTATIVE
AutoCAD SHX Text
CERAMIC TILE
AutoCAD SHX Text
CERAMIC TILE BASE
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
EXPOSED STRUCTURE
AutoCAD SHX Text
ET CETERA
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXPOSED
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
FIRE HOSE CABINET
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FACE OF
AutoCAD SHX Text
FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)
AutoCAD SHX Text
FABRIC WALLCOVERING
AutoCAD SHX Text
GAGE
AutoCAD SHX Text
GRANITE
AutoCAD SHX Text
GYPSUM WALL BOARD
AutoCAD SHX Text
HANDICAPPED
AutoCAD SHX Text
HOLLOW METAL
AutoCAD SHX Text
HIGH-PRESSURE DECORATIVE LAMINATE
AutoCAD SHX Text
HEATING VENTILATION AND AIR-CONDITIONING
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MASONRY OPENING
AutoCAD SHX Text
METAL
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
OPPOSITE HAND
AutoCAD SHX Text
PORCELAIN BASE
AutoCAD SHX Text
PLASTER
AutoCAD SHX Text
PLASTIC LAMINATE
AutoCAD SHX Text
PRESSURE TREATED
AutoCAD SHX Text
PAIR
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
QUARRY TILE
AutoCAD SHX Text
RESILIENT BASE
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
RESINOUS FLOORING
AutoCAD SHX Text
RESINOUS EPOXY WALL - CEILING
AutoCAD SHX Text
ROUGH OPENING
AutoCAD SHX Text
RUBBER FLOORING
AutoCAD SHX Text
RECESSED PAPER HOLDER
AutoCAD SHX Text
SEALED HIGH BUILD GLAZED COATING
AutoCAD SHX Text
SOAP DISPENSER
AutoCAD SHX Text
SOLID CORE WOOD
AutoCAD SHX Text
SIMILAR
AutoCAD SHX Text
SANITARY NAPKIN DISPENSER
AutoCAD SHX Text
SPECIAL FACED
AutoCAD SHX Text
STAINLESS STEEL/SOLID SURFACE
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
SUBSTRATE
AutoCAD SHX Text
SHEET VINYL
AutoCAD SHX Text
SOLID VINYL TILE
AutoCAD SHX Text
TACK BOARD
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
TOP OF
AutoCAD SHX Text
TOILET PAPER
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
VINYL COMPOSITION TILE
AutoCAD SHX Text
VINYL WALL COVERING
AutoCAD SHX Text
WALL COVERING
AutoCAD SHX Text
WATER RESISTANT
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
AC
AutoCAD SHX Text
ACT
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ALUM
AutoCAD SHX Text
BATT
AutoCAD SHX Text
BO
AutoCAD SHX Text
CBB
AutoCAD SHX Text
CCW
AutoCAD SHX Text
CFMF
AutoCAD SHX Text
CG
AutoCAD SHX Text C
AutoCAD SHX Text
CMT
AutoCAD SHX Text
CMU
AutoCAD SHX Text
CO
AutoCAD SHX Text
COMM
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONT
AutoCAD SHX Text
COR
AutoCAD SHX Text
CT
AutoCAD SHX Text
CTB
AutoCAD SHX Text
CP
AutoCAD SHX Text
DIA
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
EQ
AutoCAD SHX Text
ES
AutoCAD SHX Text
ETC
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FHC
AutoCAD SHX Text
FF
AutoCAD SHX Text
FIN
AutoCAD SHX Text
FLR
AutoCAD SHX Text
FO
AutoCAD SHX Text
FV
AutoCAD SHX Text
FWC
AutoCAD SHX Text
GA
AutoCAD SHX Text
GRA
AutoCAD SHX Text
GWB
AutoCAD SHX Text
HC
AutoCAD SHX Text
HM
AutoCAD SHX Text
HPDL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
MATL
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MECH
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MO
AutoCAD SHX Text
MTL
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NTS
AutoCAD SHX Text
OC
AutoCAD SHX Text
OH
AutoCAD SHX Text
PB
AutoCAD SHX Text
PLS
AutoCAD SHX Text
PLAM
AutoCAD SHX Text
PT
AutoCAD SHX Text
PR
AutoCAD SHX Text P
AutoCAD SHX Text
QT
AutoCAD SHX Text
RB
AutoCAD SHX Text
REF
AutoCAD SHX Text
REQ'D
AutoCAD SHX Text
RES
AutoCAD SHX Text
RES-W
AutoCAD SHX Text
RO
AutoCAD SHX Text
RF
AutoCAD SHX Text
RPH
AutoCAD SHX Text
SC
AutoCAD SHX Text
SD
AutoCAD SHX Text
SCW
AutoCAD SHX Text
SIM
AutoCAD SHX Text
SND
AutoCAD SHX Text
SP
AutoCAD SHX Text
SS
AutoCAD SHX Text
STL
AutoCAD SHX Text
SUBS
AutoCAD SHX Text
SV
AutoCAD SHX Text
SVT
AutoCAD SHX Text
TB
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TO
AutoCAD SHX Text
TP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UNO
AutoCAD SHX Text
VCT
AutoCAD SHX Text
VWC
AutoCAD SHX Text
WC
AutoCAD SHX Text
WR
AutoCAD SHX Text
WD
AutoCAD SHX Text L
AutoCAD SHX Text
SEALED CONCRETE
AutoCAD SHX Text
SCONC
AutoCAD SHX Text
PORCELAIN TILE
AutoCAD SHX Text
POR
AutoCAD SHX Text
CONTROL JOINT
AutoCAD SHX Text
CJ
AutoCAD SHX Text
GALVANIZED METAL STUD(S)
AutoCAD SHX Text
GMS
AutoCAD SHX Text
OPEN TO STRUCTURE
AutoCAD SHX Text
OTS
AutoCAD SHX Text
BETWEEN
AutoCAD SHX Text
BTW
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text G.
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text O.
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text O
L
AREA D
AREA E
AREA D
AREA B
AREA G
AREA H
AREA C
A R
E A
D
AREA F
AREA A
8TH FLOOR
8TH FLOOR
T
H
F
L O
O R
9TH FLOOR
1ST FLOOR
12TH FLOOR
2ND FLOOR
10TH FLOOR
2ND FLOOR
2ND FLOOR
HAZARDOUS MATERIAL
ABATEMENT NOTES
PLAN LEGEND
ABATEMENT LEGEND
OVERALL ROOF PLAN -
ABATEMENT WORK
AB100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
FINAL SUBMITTAL
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE ROOF, VARIOUS
LOCATIONS, MAIN HOSPITAL
SHREVEPORT, LA
667-18-104
Building Number Project Director
06/26/2020 AT DPBRevisions: Date:
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
EMER/GEN/ROOF
AutoCAD SHX Text
AB101
AutoCAD SHX Text
AutoCAD SHX Text
AB101
AutoCAD SHX Text
AutoCAD SHX Text
AB101
AutoCAD SHX Text
AutoCAD SHX Text
AB101
AutoCAD SHX Text
AutoCAD SHX Text
AB102
AutoCAD SHX Text
AutoCAD SHX Text
AB102
AutoCAD SHX Text
AutoCAD SHX Text
AB102
AutoCAD SHX Text
AutoCAD SHX Text
AB101
AutoCAD SHX Text
AutoCAD SHX Text
AB100
AutoCAD SHX Text
AutoCAD SHX Text 1/16" = 1'-0"
AutoCAD SHX Text
OVERALL ROOF PLAN - ABATEMENT WORK
AutoCAD SHX Text REMOVE AND DISPOSE OF AS ASBESTOS ALL ASBESTOS CONTAINING ROOF FLASHING MATERIALS AROUND PERIMETER AND ALL EQUIPMENT. REMOVE AND DISPOSE OF AS ASBESTOS ALL BLACK ROOF WALK PADS WITH TAR PRESENT. NO ASBESTOS DETECTED. SEE ASBESTOS SURVEY REPORT.
AutoCAD SHX Text CONTRACTOR SHALL REMOVE ALL OSHA CLASS II AND EPA CATEGORY I NON-FRIABLE ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED ROOFING MATERIALS AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL NOTES, SPECIFIC NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS, AND DISPOSE OF AS ASBESTOS WASTE. 1. IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE MATERIALS ARE MATERIALS ARE ARE ARE COMPRISED OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE I NON-FRIABLE I NON-FRIABLE NON-FRIABLE NON-FRIABLE MATERIALS. CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF APPLY FINE MIST OF APPLY FINE MIST OF FINE MIST OF FINE MIST OF MIST OF MIST OF OF OF AMENDED WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND AND SHALL USE HAND AND SHALL USE HAND SHALL USE HAND SHALL USE HAND USE HAND USE HAND HAND HAND TOOLS AND INTACT REMOVAL TO THE EXTENT FEASIBLE. 2. CONTRACTOR SHALL ESTABLISH A 25' PERIMETER CONTRACTOR SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER A 25' PERIMETER A 25' PERIMETER 25' PERIMETER 25' PERIMETER PERIMETER PERIMETER AROUND EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AND DEMARCATE WITH AND DEMARCATE WITH DEMARCATE WITH DEMARCATE WITH WITH WITH ASBESTOS DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED SIGNS OR APPROVED SIGNS OR APPROVED OR APPROVED OR APPROVED APPROVED APPROVED EQUIVALENT. 3. CONTRACTOR SHALL PLACE A POLYETHYLENE DROP CONTRACTOR SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP A POLYETHYLENE DROP A POLYETHYLENE DROP POLYETHYLENE DROP POLYETHYLENE DROP DROP DROP CLOTH BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND OF 25' AROUND OF 25' AROUND 25' AROUND 25' AROUND AROUND AROUND REGULATED AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD ASBESTOS/LEAD ASBESTOS/LEAD MATERIAL. THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF BE MAINTAINED FREE OF BE MAINTAINED FREE OF MAINTAINED FREE OF MAINTAINED FREE OF FREE OF FREE OF OF OF ACCUMULATION OF ASBESTOS/LEAD MATERIAL. 4. CONTRACTOR SHALL DISPOSE OF ASBESTOS AND CONTRACTOR SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND OF ASBESTOS AND OF ASBESTOS AND ASBESTOS AND ASBESTOS AND AND AND LEAD DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA STATE OF LOUISIANA STATE OF LOUISIANA OF LOUISIANA OF LOUISIANA LOUISIANA LOUISIANA AND EPA REGULATIONS. 5. CONTRACTOR SHALL CLEAN UP AND DISPOSE OF CONTRACTOR SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF UP AND DISPOSE OF UP AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ANY OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND DEBRIS AROUND DEBRIS AROUND AROUND AROUND BUILDING. 6. CONTRACTOR SHALL PROVIDE MANUFACTURER'S CONTRACTOR SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR OFFICER FOR OFFICER FOR FOR FOR REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON PLACING EQUIPMENT ON PLACING EQUIPMENT ON EQUIPMENT ON EQUIPMENT ON ON ON JOB SITE. 7. CONTRACTOR SHALL COORDINATE THIS ASBESTOS CONTRACTOR SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS THIS ASBESTOS THIS ASBESTOS ASBESTOS ASBESTOS AND LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING WITH THE CONTRACTING WITH THE CONTRACTING THE CONTRACTING THE CONTRACTING CONTRACTING CONTRACTING OFFICER TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD WITH STANDARD WITH STANDARD STANDARD STANDARD OPERATING PROCEDURES OF THE FACILITY. 8. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL AND OBTAIN APPROVAL AND OBTAIN APPROVAL OBTAIN APPROVAL OBTAIN APPROVAL APPROVAL APPROVAL OF PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS PHASING FOR SYSTEMS PHASING FOR SYSTEMS FOR SYSTEMS FOR SYSTEMS SYSTEMS SYSTEMS SHUT DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND LEAD REMOVAL AND LEAD REMOVAL AND REMOVAL AND REMOVAL AND AND AND RENOVATION OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER THE CONTRACTING OFFICER THE CONTRACTING OFFICER CONTRACTING OFFICER CONTRACTING OFFICER OFFICER OFFICER PRIOR TO BEGINNING ANY WORK. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTRACTOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR BE RESPONSIBLE FOR BE RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR PHYSICALLY SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO AND OPENINGS TO AND OPENINGS TO OPENINGS TO OPENINGS TO TO TO THE WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS WHERE ASBESTOS WHERE ASBESTOS ASBESTOS ASBESTOS CONTAINING MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE ARE PRESENT SHALL BE ARE PRESENT SHALL BE PRESENT SHALL BE PRESENT SHALL BE SHALL BE SHALL BE BE BE CONSIDERED AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL WORK AREA UNTIL WORK AREA UNTIL AREA UNTIL AREA UNTIL UNTIL UNTIL SUCCESSFUL COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE FINAL CLEARANCE FINAL CLEARANCE CLEARANCE CLEARANCE CRITERIA. 10. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS ASBESTOS ASBESTOS ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED SHALL BE APPROVED SHALL BE APPROVED BE APPROVED BE APPROVED APPROVED APPROVED BY THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF WORK. 11. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE SHALL REMOVE SHALL REMOVE REMOVE REMOVE ACM AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD AND PAINT WITH LEAD AND PAINT WITH LEAD PAINT WITH LEAD PAINT WITH LEAD WITH LEAD WITH LEAD LEAD LEAD PRIOR TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES TRADES TRADES TO PERFORM NEW WORK. 12. ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE ONLY AND ARE ONLY AND ARE AND ARE AND ARE ARE ARE NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE SHALL VISIT SITE SHALL VISIT SITE VISIT SITE VISIT SITE SITE SITE BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND ALL DIMENSIONS AND ALL DIMENSIONS AND DIMENSIONS AND DIMENSIONS AND AND AND WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF CONTRACTING OFFICER OF CONTRACTING OFFICER OF OFFICER OF OFFICER OF OF OF ANY CONFLICTS. 13. AN ASBESTOS SURVEY REPORT FOR THIS PROJECT AN ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT FOR THIS PROJECT FOR THIS PROJECT THIS PROJECT THIS PROJECT PROJECT PROJECT IS AVAILABLE FOR CONTRACTOR USE. 14. CONTRACTOR SHALL ASSUME THAT ALL PAINTED CONTRACTOR SHALL ASSUME THAT ALL PAINTED SHALL ASSUME THAT ALL PAINTED SHALL ASSUME THAT ALL PAINTED ASSUME THAT ALL PAINTED ASSUME THAT ALL PAINTED THAT ALL PAINTED THAT ALL PAINTED ALL PAINTED ALL PAINTED PAINTED PAINTED SURFACES CONTAIN DETECTABLE LEVELS OF LEAD IN THE CONTAIN DETECTABLE LEVELS OF LEAD IN THE CONTAIN DETECTABLE LEVELS OF LEAD IN THE DETECTABLE LEVELS OF LEAD IN THE DETECTABLE LEVELS OF LEAD IN THE LEVELS OF LEAD IN THE LEVELS OF LEAD IN THE OF LEAD IN THE OF LEAD IN THE LEAD IN THE LEAD IN THE IN THE IN THE THE THE PAINT. CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD SHALL REMOVE MATERIAL AS LEAD SHALL REMOVE MATERIAL AS LEAD REMOVE MATERIAL AS LEAD REMOVE MATERIAL AS LEAD MATERIAL AS LEAD MATERIAL AS LEAD AS LEAD AS LEAD LEAD LEAD CONTAINING IN ACCORDANCE WITH THE OSHA IN ACCORDANCE WITH THE OSHA IN ACCORDANCE WITH THE OSHA ACCORDANCE WITH THE OSHA ACCORDANCE WITH THE OSHA WITH THE OSHA WITH THE OSHA THE OSHA THE OSHA OSHA OSHA CONSTRUCTION INDUSTRY LEAD STANDARD 29 CFR INDUSTRY LEAD STANDARD 29 CFR INDUSTRY LEAD STANDARD 29 CFR LEAD STANDARD 29 CFR LEAD STANDARD 29 CFR STANDARD 29 CFR STANDARD 29 CFR 29 CFR 29 CFR CFR CFR 1926.62. CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING SHALL PERFORM TCLP TESTING SHALL PERFORM TCLP TESTING PERFORM TCLP TESTING PERFORM TCLP TESTING TCLP TESTING TCLP TESTING TESTING TESTING TO DETERMINE PROPER DISPOSAL REQUIREMENTS. 15. CONTRACTOR SHALL REMOVE AND DISPOSE OF CONTRACTOR SHALL REMOVE AND DISPOSE OF SHALL REMOVE AND DISPOSE OF SHALL REMOVE AND DISPOSE OF REMOVE AND DISPOSE OF REMOVE AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ASBESTOS CONTAINING MATERIALS IN ACCORDANCE WITH CONTAINING MATERIALS IN ACCORDANCE WITH CONTAINING MATERIALS IN ACCORDANCE WITH MATERIALS IN ACCORDANCE WITH MATERIALS IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH SPECIFICATION SECTION 02 82 13.21 ASBESTOS ROOFING SECTION 02 82 13.21 ASBESTOS ROOFING SECTION 02 82 13.21 ASBESTOS ROOFING 02 82 13.21 ASBESTOS ROOFING 02 82 13.21 ASBESTOS ROOFING 82 13.21 ASBESTOS ROOFING 82 13.21 ASBESTOS ROOFING 13.21 ASBESTOS ROOFING 13.21 ASBESTOS ROOFING ASBESTOS ROOFING ASBESTOS ROOFING ROOFING ROOFING ABATEMENT. 16. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL AND CONTRACTOR SHALL COMPLY WITH ALL FEDERAL AND SHALL COMPLY WITH ALL FEDERAL AND SHALL COMPLY WITH ALL FEDERAL AND COMPLY WITH ALL FEDERAL AND COMPLY WITH ALL FEDERAL AND WITH ALL FEDERAL AND WITH ALL FEDERAL AND ALL FEDERAL AND ALL FEDERAL AND FEDERAL AND FEDERAL AND AND AND STATE OF LOUISIANA REGULATIONS.
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
EXISTING ROOF DRAINS WITH STRAINERS.
AutoCAD SHX Text
EXISTING ROOFTOP EXPANSION JOINTS.
AutoCAD SHX Text
INDICATES DIRECTION OF DOWNWARD ROOF SLOPE
AutoCAD SHX Text
EXISTING ROOF INSULATION VENT
AutoCAD SHX Text
EXISTING ROOFTOP MECH EQUIPMENT ON EXISTING CURBS
AutoCAD SHX Text
EXISTING ROOFTOP MECH EQUIPMENT RAISED ON EXISTING VERTICAL STEEL POST SUPPORTS
AutoCAD SHX Text
EXISTING ROOFTOP EXHAUST FANS
AutoCAD SHX Text
EXISTING CURBED PENETRATION THROUGH ROOF (VERIFY ABANDONED OPENINGS W/ VA)
AutoCAD SHX Text
EXISTING ROUND PENETRATION THROUGH ROOF. (VERIFY ABANDONED OPENINGS W/ VA)
AutoCAD SHX Text
EXISTING VENT THROUGH EXISTING ROOF
AutoCAD SHX Text
EXISTING PIPE PENETRATION THROUGH ROOF
AutoCAD SHX Text
EXISTING LINEAR EQUIPMENT RAIL SUPPORTS
AutoCAD SHX Text
EXISTING ROOF HATCH OR ABANDONED CURB
AutoCAD SHX Text
EXISTING CHILLED WATER SUPPLY AND RETURN LINES ON LINEAR RAIL SUPPORTS
AutoCAD SHX Text
EXISTING ROOFTOP CONDUIT RAISED ON SUPPORTS
AutoCAD SHX Text
EXISTING ELECT BOX W/ POWER THROUGH ROOF
AutoCAD SHX Text
EXISTING PITCH/SEALANT POCKET
AutoCAD SHX Text
EXISTING VERT EQUIP SUPPORT ON FLAT BASE
AutoCAD SHX Text
EXISTING ROOF PADS FOR EXISTING EQUIPMENT
AutoCAD SHX Text
EXISTING GENERATOR/HOT STACK THROUGH ROOF
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text G.
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text O.
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text J.
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text 0'
AutoCAD SHX Text
SCALE: 1/16"=1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
48'
HAZARDOUS MATERIAL
ABATEMENT NOTES
ABATEMENT LEGEND PLAN LEGEND
AREA F
AREA B
AREA C AREA E
AREA D
ASBESTOS ABATEMENT -
ROOF AREAS B, C, D, E AND F
AB101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
FINAL SUBMITTAL
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE ROOF, VARIOUS
LOCATIONS, MAIN HOSPITAL
SHREVEPORT, LA
667-18-104
Building Number Project Director
06/26/2020 AT DPBRevisions: Date:
AutoCAD SHX Text REMOVE AND DISPOSE OF AS ASBESTOS ALL ASBESTOS CONTAINING ROOF FLASHING MATERIALS AROUND PERIMETER AND ALL EQUIPMENT. REMOVE AND DISPOSE OF AS ASBESTOS ALL BLACK ROOF WALK PADS WITH TAR PRESENT. NO ASBESTOS DETECTED. SEE ASBESTOS SURVEY REPORT.
AutoCAD SHX Text CONTRACTOR SHALL REMOVE ALL OSHA CLASS II AND EPA CATEGORY I NON-FRIABLE ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED ROOFING MATERIALS AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL NOTES, SPECIFIC NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS, AND DISPOSE OF AS ASBESTOS WASTE. 1. IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE MATERIALS ARE MATERIALS ARE ARE ARE COMPRISED OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE I NON-FRIABLE I NON-FRIABLE NON-FRIABLE NON-FRIABLE MATERIALS. CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF APPLY FINE MIST OF APPLY FINE MIST OF FINE MIST OF FINE MIST OF MIST OF MIST OF OF OF AMENDED WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND AND SHALL USE HAND AND SHALL USE HAND SHALL USE HAND SHALL USE HAND USE HAND USE HAND HAND HAND TOOLS AND INTACT REMOVAL TO THE EXTENT FEASIBLE. 2. CONTRACTOR SHALL ESTABLISH A 25' PERIMETER CONTRACTOR SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER A 25' PERIMETER A 25' PERIMETER 25' PERIMETER 25' PERIMETER PERIMETER PERIMETER AROUND EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AND DEMARCATE WITH AND DEMARCATE WITH DEMARCATE WITH DEMARCATE WITH WITH WITH ASBESTOS DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED SIGNS OR APPROVED SIGNS OR APPROVED OR APPROVED OR APPROVED APPROVED APPROVED EQUIVALENT. 3. CONTRACTOR SHALL PLACE A POLYETHYLENE DROP CONTRACTOR SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP A POLYETHYLENE DROP A POLYETHYLENE DROP POLYETHYLENE DROP POLYETHYLENE DROP DROP DROP CLOTH BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND OF 25' AROUND OF 25' AROUND 25' AROUND 25' AROUND AROUND AROUND REGULATED AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD ASBESTOS/LEAD ASBESTOS/LEAD MATERIAL. THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF BE MAINTAINED FREE OF BE MAINTAINED FREE OF MAINTAINED FREE OF MAINTAINED FREE OF FREE OF FREE OF OF OF ACCUMULATION OF ASBESTOS/LEAD MATERIAL. 4. CONTRACTOR SHALL DISPOSE OF ASBESTOS AND CONTRACTOR SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND OF ASBESTOS AND OF ASBESTOS AND ASBESTOS AND ASBESTOS AND AND AND LEAD DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA STATE OF LOUISIANA STATE OF LOUISIANA OF LOUISIANA OF LOUISIANA LOUISIANA LOUISIANA AND EPA REGULATIONS. 5. CONTRACTOR SHALL CLEAN UP AND DISPOSE OF CONTRACTOR SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF UP AND DISPOSE OF UP AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ANY OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND DEBRIS AROUND DEBRIS AROUND AROUND AROUND BUILDING. 6. CONTRACTOR SHALL PROVIDE MANUFACTURER'S CONTRACTOR SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR OFFICER FOR OFFICER FOR FOR FOR REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON PLACING EQUIPMENT ON PLACING EQUIPMENT ON EQUIPMENT ON EQUIPMENT ON ON ON JOB SITE. 7. CONTRACTOR SHALL COORDINATE THIS ASBESTOS CONTRACTOR SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS THIS ASBESTOS THIS ASBESTOS ASBESTOS ASBESTOS AND LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING WITH THE CONTRACTING WITH THE CONTRACTING THE CONTRACTING THE CONTRACTING CONTRACTING CONTRACTING OFFICER TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD WITH STANDARD WITH STANDARD STANDARD STANDARD OPERATING PROCEDURES OF THE FACILITY. 8. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL AND OBTAIN APPROVAL AND OBTAIN APPROVAL OBTAIN APPROVAL OBTAIN APPROVAL APPROVAL APPROVAL OF PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS PHASING FOR SYSTEMS PHASING FOR SYSTEMS FOR SYSTEMS FOR SYSTEMS SYSTEMS SYSTEMS SHUT DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND LEAD REMOVAL AND LEAD REMOVAL AND REMOVAL AND REMOVAL AND AND AND RENOVATION OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER THE CONTRACTING OFFICER THE CONTRACTING OFFICER CONTRACTING OFFICER CONTRACTING OFFICER OFFICER OFFICER PRIOR TO BEGINNING ANY WORK. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTRACTOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR BE RESPONSIBLE FOR BE RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR PHYSICALLY SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO AND OPENINGS TO AND OPENINGS TO OPENINGS TO OPENINGS TO TO TO THE WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS WHERE ASBESTOS WHERE ASBESTOS ASBESTOS ASBESTOS CONTAINING MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE ARE PRESENT SHALL BE ARE PRESENT SHALL BE PRESENT SHALL BE PRESENT SHALL BE SHALL BE SHALL BE BE BE CONSIDERED AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL WORK AREA UNTIL WORK AREA UNTIL AREA UNTIL AREA UNTIL UNTIL UNTIL SUCCESSFUL COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE FINAL CLEARANCE FINAL CLEARANCE CLEARANCE CLEARANCE CRITERIA. 10. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS ASBESTOS ASBESTOS ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED SHALL BE APPROVED SHALL BE APPROVED BE APPROVED BE APPROVED APPROVED APPROVED BY THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF WORK. 11. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE SHALL REMOVE SHALL REMOVE REMOVE REMOVE ACM AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD AND PAINT WITH LEAD AND PAINT WITH LEAD PAINT WITH LEAD PAINT WITH LEAD WITH LEAD WITH LEAD LEAD LEAD PRIOR TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES TRADES TRADES TO PERFORM NEW WORK. 12. ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE ONLY AND ARE ONLY AND ARE AND ARE AND ARE ARE ARE NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE SHALL VISIT SITE SHALL VISIT SITE VISIT SITE VISIT SITE SITE SITE BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND ALL DIMENSIONS AND ALL DIMENSIONS AND DIMENSIONS AND DIMENSIONS AND AND AND WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF CONTRACTING OFFICER OF CONTRACTING OFFICER OF OFFICER OF OFFICER OF OF OF ANY CONFLICTS. 13. AN ASBESTOS SURVEY REPORT FOR THIS PROJECT AN ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT FOR THIS PROJECT FOR THIS PROJECT THIS PROJECT THIS PROJECT PROJECT PROJECT IS AVAILABLE FOR CONTRACTOR USE. 14.