P01 Full Set Drawings Combined.pdf

PDF 8 MB Posted

Attached to
Z1DA--667-22-4-1447-0009 - Project 667-18-104 Replace roof
Solicitation number
36C25622R0086
Issued by

About this file

This solicitation is for project 667-18-104 to replace roofs at various locations at the Main Hospital in Shreveport, Louisiana. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking to replace roofs in areas A, B, C, D, E, F, G and H. Services required include demolition of existing roof systems, installation of new single-ply thermoplastic polyolefin roofs, and asbestos abatement. Drawings and specifications are provided to guide contractors in preparing responses due by June 26, 2020. Award is anticipated shortly thereafter to facilitate work completion.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING TITLE

DWG

NO.

INDEX OF DRAWINGS

DRAWING TITLE

DWG

NO.

REPLACE ROOF, VARIOUS LOCATIONS,

MAIN HOSPITAL

OVERTON BROOKS VA MEDICAL

CENTER

FINAL SUBMITTAL

510 E. STONER AVENUE, SHREVEPORT, LA 71101

510 E. STONER AVENUE,

SHREVEPORT, LA

F

E

C

B

H G

A

D

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FINAL SUBMITTAL

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE ROOF, VARIOUS

LOCATIONS, MAIN HOSPITAL

SHREVEPORT, LA

667-18-104

Building Number Project Director

06/26/2020 AT DPBRevisions: Date:

AutoCAD SHX Text

AutoCAD SHX Text

AREA MAP

AutoCAD SHX Text

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text

AD100

AutoCAD SHX Text A101

AutoCAD SHX Text

OVERALL ROOF PLAN - DEMOLITION WORK

AutoCAD SHX Text G001

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text G002

AutoCAD SHX Text

LEGENDS, ABBREVIATIONS, AND NOTES

AutoCAD SHX Text

ENLARGED ROOF PLANS - ROOF AREAS B, C, D, E AND F

AutoCAD SHX Text

FIRST FLOOR ENTRY

AutoCAD SHX Text

SECOND FLOOR SOUTH

AutoCAD SHX Text

NINTH FLOOR WEST

AutoCAD SHX Text

SECOND FLOOR CANTEEN

AutoCAD SHX Text

TWELFTH FLOOR

AutoCAD SHX Text

SECOND FLOOR CLINICAL ADDITION

AutoCAD SHX Text

SCREEN WALL

AutoCAD SHX Text A102

AutoCAD SHX Text

ENLARGED ROOF PLANS - ROOF AREAS A, G AND H

AutoCAD SHX Text E001

AutoCAD SHX Text E101

AutoCAD SHX Text

LEGEND, DETAILS, AND GENERAL NOTES - ELECTRICAL

AutoCAD SHX Text

REPLACE ROOF PLANS - ELECTRICAL

AutoCAD SHX Text E102

AutoCAD SHX Text

REPLACE ROOF PLANS - ELECTRICAL

AutoCAD SHX Text

AB101

AutoCAD SHX Text

ASBESTOS ABATEMENT - ROOF AREAS B, C, D, E AND F

AutoCAD SHX Text

AB102

AutoCAD SHX Text

ASBESTOS ABATEMENT - ROOF AREAS A, G AND H

AutoCAD SHX Text A501

AutoCAD SHX Text

ROOF DETAILS - DEMOLITION

AutoCAD SHX Text A502

AutoCAD SHX Text

ROOF DETAILS - NEW WORK

AutoCAD SHX Text A503

AutoCAD SHX Text

ROOF DETAILS - NEW WORK

AutoCAD SHX Text A100

AutoCAD SHX Text

OVERALL ROOF PLAN - NEW WORK

AutoCAD SHX Text

ED100

AutoCAD SHX Text

DEMOLITION ROOF PLANS - OVERALL

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

EIGHTH FLOOR WEST

AutoCAD SHX Text

ROOF AREA

AutoCAD SHX Text

AB100

AutoCAD SHX Text

OVERALL ROOF PLAN - ABATEMENT WORK

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text G.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text O.

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text L

ARCHITECTURAL LEGEND

MATERIAL LEGEND ARCHITECTURAL GENERAL NOTES

GENERAL PROJECT NOTES

ARCHITECTURAL ABBREVIATIONS

LEGENDS ABBREVIATIONS AND

NOTES

G002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

FINAL SUBMITTAL

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE ROOF, VARIOUS

LOCATIONS, MAIN HOSPITAL

SHREVEPORT, LA

667-18-104

Building Number Project Director

06/26/2020 AT DPBRevisions: Date:

AutoCAD SHX Text A

AutoCAD SHX Text + 0'-6"

AutoCAD SHX Text F.E.C.

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

KEY NOTE

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

DETAIL CALLOUT

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE DETAIL IS DRAWN

AutoCAD SHX Text

SECTION CALLOUT

AutoCAD SHX Text

VERTICAL ELEVATION

AutoCAD SHX Text

COLUMN CENTERLINE DESIGNATION

AutoCAD SHX Text

DEMOLITION NOTE

AutoCAD SHX Text

SECTION NUMBER

AutoCAD SHX Text

SHEET WHERE SECTION IS DRAWN

AutoCAD SHX Text

EXTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text A301

AutoCAD SHX Text

AutoCAD SHX Text A201

AutoCAD SHX Text

AutoCAD SHX Text

EARTH

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MORTAR, STUCCO CEMENT PLASTER

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

INSULATION RIGID

AutoCAD SHX Text

INSULATION BATT

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WOOD (ROUGH)

AutoCAD SHX Text

INTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. COORDINATE WITH ELECTRICAL DRAWINGS FOR ADDITIONAL COORDINATE WITH ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. B. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. C. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING. D. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS. E. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES. F. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (ROOF, INSULATION, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS RECOMMENDED BY MANUFACTURER PRIOR TO INSTALLATION OF NEW MATERIALS. G. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST TO THE OWNER. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED OR LEFT WITH HOLES BY CONSTRUCTION ACTIVITIES, REPAIR, REPLACE, OR INFILL SUCH MATERIALS AND FINISHES TO MATCH EXISTING IN MATERIAL, SIZE, ALIGNMENT, FINISH, COLOR, TEXTURE, AND QUALITY. ALL SHALL BE REPLACED OR REPAIRED TO MATCH OR EXCEED THE QUALITY THAT EXISTED BEFORE DAMAGE. H. ROOF FLASHING MATERIALS SAVED AND REUSED SHALL BE PROTECTED ROOF FLASHING MATERIALS SAVED AND REUSED SHALL BE PROTECTED AND STORED WITHOUT DAMAGE. I. CONTRACTOR WILL PATCH ALL ABANDONED PENETRATIONS THROUGH CONTRACTOR WILL PATCH ALL ABANDONED PENETRATIONS THROUGH ROOF IDENTIFIED AND APPROVED BY THE VA. J. ALL ROOF DRAINS ARE TO BE MECHANICALLY FASTENED. ALL ROOF DRAINS ARE TO BE MECHANICALLY FASTENED. K. PHASING OF ALL ROOF WORK SHALL BE APPROVED BY THE VA. PHASING OF ALL ROOF WORK SHALL BE APPROVED BY THE VA. L. ALL ROOF DRAINS SHALL BE VERIFIED AND SLOPED CONDITIONS ALL ROOF DRAINS SHALL BE VERIFIED AND SLOPED CONDITIONS IDENTIFIED TO DRAINS VERIFIED. M. ALL ROOFTOP LUMBER AND PLYWOOD TO BE PRESSURE-TREATED. ALL ROOFTOP LUMBER AND PLYWOOD TO BE PRESSURE-TREATED. N. ALL EXISTING CONCRETE ROOF DECKS ARE FLAT. PITCH OF EXISTING ALL EXISTING CONCRETE ROOF DECKS ARE FLAT. PITCH OF EXISTING STEEL ROOF DECKS ARE UNKNOWN.

AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. D. SEE SPECIFICATION SECTION 01 00 00 FOR TEMPORARY CONSTRUCTION SEE SPECIFICATION SECTION 01 00 00 FOR TEMPORARY CONSTRUCTION REQUIREMENTS. E. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES.

AutoCAD SHX Text

AIR CONDITIONING

AutoCAD SHX Text

ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ABOVE FINISH FLOOR

AutoCAD SHX Text

ALUMINUM

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text

BOTTOM OF

AutoCAD SHX Text

CEMENTITIOUS BACKER BOARD

AutoCAD SHX Text

CEMENTITIOUS CRYSTALLINE WATERPROOFING

AutoCAD SHX Text

COLD-FORMED METAL FRAMING

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CERAMIC MOSAIC TILE

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

CASED OPENING

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CONTRACTING OFFICER'S REPRESENTATIVE

AutoCAD SHX Text

CERAMIC TILE

AutoCAD SHX Text

CERAMIC TILE BASE

AutoCAD SHX Text

CARPET

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EXPOSED STRUCTURE

AutoCAD SHX Text

ET CETERA

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXPOSED

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

FIRE HOSE CABINET

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISH

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FACE OF

AutoCAD SHX Text

FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)

AutoCAD SHX Text

FABRIC WALLCOVERING

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

GRANITE

AutoCAD SHX Text

GYPSUM WALL BOARD

AutoCAD SHX Text

HANDICAPPED

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HIGH-PRESSURE DECORATIVE LAMINATE

AutoCAD SHX Text

HEATING VENTILATION AND AIR-CONDITIONING

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MASONRY OPENING

AutoCAD SHX Text

METAL

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OPPOSITE HAND

AutoCAD SHX Text

PORCELAIN BASE

AutoCAD SHX Text

PLASTER

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

PRESSURE TREATED

AutoCAD SHX Text

PAIR

AutoCAD SHX Text

PAINT

AutoCAD SHX Text

QUARRY TILE

AutoCAD SHX Text

RESILIENT BASE

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

RESINOUS FLOORING

AutoCAD SHX Text

RESINOUS EPOXY WALL - CEILING

AutoCAD SHX Text

ROUGH OPENING

AutoCAD SHX Text

RUBBER FLOORING

AutoCAD SHX Text

RECESSED PAPER HOLDER

AutoCAD SHX Text

SEALED HIGH BUILD GLAZED COATING

AutoCAD SHX Text

SOAP DISPENSER

AutoCAD SHX Text

SOLID CORE WOOD

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SANITARY NAPKIN DISPENSER

AutoCAD SHX Text

SPECIAL FACED

AutoCAD SHX Text

STAINLESS STEEL/SOLID SURFACE

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

SUBSTRATE

AutoCAD SHX Text

SHEET VINYL

AutoCAD SHX Text

SOLID VINYL TILE

AutoCAD SHX Text

TACK BOARD

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TOP OF

AutoCAD SHX Text

TOILET PAPER

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VINYL COMPOSITION TILE

AutoCAD SHX Text

VINYL WALL COVERING

AutoCAD SHX Text

WALL COVERING

AutoCAD SHX Text

WATER RESISTANT

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

AC

AutoCAD SHX Text

ACT

AutoCAD SHX Text

AFF

AutoCAD SHX Text

ALUM

AutoCAD SHX Text

BATT

AutoCAD SHX Text

BO

AutoCAD SHX Text

CBB

AutoCAD SHX Text

CCW

AutoCAD SHX Text

CFMF

AutoCAD SHX Text

CG

AutoCAD SHX Text C

AutoCAD SHX Text

CMT

AutoCAD SHX Text

CMU

AutoCAD SHX Text

CO

AutoCAD SHX Text

COMM

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONT

AutoCAD SHX Text

COR

AutoCAD SHX Text

CT

AutoCAD SHX Text

CTB

AutoCAD SHX Text

CP

AutoCAD SHX Text

DIA

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

EQ

AutoCAD SHX Text

ES

AutoCAD SHX Text

ETC

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FF

AutoCAD SHX Text

FIN

AutoCAD SHX Text

FLR

AutoCAD SHX Text

FO

AutoCAD SHX Text

FV

AutoCAD SHX Text

FWC

AutoCAD SHX Text

GA

AutoCAD SHX Text

GRA

AutoCAD SHX Text

GWB

AutoCAD SHX Text

HC

AutoCAD SHX Text

HM

AutoCAD SHX Text

HPDL

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

MATL

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MO

AutoCAD SHX Text

MTL

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NTS

AutoCAD SHX Text

OC

AutoCAD SHX Text

OH

AutoCAD SHX Text

PB

AutoCAD SHX Text

PLS

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PT

AutoCAD SHX Text

PR

AutoCAD SHX Text P

AutoCAD SHX Text

QT

AutoCAD SHX Text

RB

AutoCAD SHX Text

REF

AutoCAD SHX Text

REQ'D

AutoCAD SHX Text

RES

AutoCAD SHX Text

RES-W

AutoCAD SHX Text

RO

AutoCAD SHX Text

RF

AutoCAD SHX Text

RPH

AutoCAD SHX Text

SC

AutoCAD SHX Text

SD

AutoCAD SHX Text

SCW

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SND

AutoCAD SHX Text

SP

AutoCAD SHX Text

SS

AutoCAD SHX Text

STL

AutoCAD SHX Text

SUBS

AutoCAD SHX Text

SV

AutoCAD SHX Text

SVT

AutoCAD SHX Text

TB

AutoCAD SHX Text

TELE

AutoCAD SHX Text

TO

AutoCAD SHX Text

TP

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UNO

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VWC

AutoCAD SHX Text

WC

AutoCAD SHX Text

WR

AutoCAD SHX Text

WD

AutoCAD SHX Text L

AutoCAD SHX Text

SEALED CONCRETE

AutoCAD SHX Text

SCONC

AutoCAD SHX Text

PORCELAIN TILE

AutoCAD SHX Text

POR

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

CJ

AutoCAD SHX Text

GALVANIZED METAL STUD(S)

AutoCAD SHX Text

GMS

AutoCAD SHX Text

OPEN TO STRUCTURE

AutoCAD SHX Text

OTS

AutoCAD SHX Text

BETWEEN

AutoCAD SHX Text

BTW

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text G.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text O.

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text O

L

AREA D

AREA E

AREA D

AREA B

AREA G

AREA H

AREA C

A R

E A

D

AREA F

AREA A

8TH FLOOR

8TH FLOOR

T

H

F

L O

O R

9TH FLOOR

1ST FLOOR

12TH FLOOR

2ND FLOOR

10TH FLOOR

2ND FLOOR

2ND FLOOR

HAZARDOUS MATERIAL

ABATEMENT NOTES

PLAN LEGEND

ABATEMENT LEGEND

OVERALL ROOF PLAN -

ABATEMENT WORK

AB100

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

FINAL SUBMITTAL

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE ROOF, VARIOUS

LOCATIONS, MAIN HOSPITAL

SHREVEPORT, LA

667-18-104

Building Number Project Director

06/26/2020 AT DPBRevisions: Date:

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text

EMER/GEN/ROOF

AutoCAD SHX Text

AB101

AutoCAD SHX Text

AutoCAD SHX Text

AB101

AutoCAD SHX Text

AutoCAD SHX Text

AB101

AutoCAD SHX Text

AutoCAD SHX Text

AB101

AutoCAD SHX Text

AutoCAD SHX Text

AB102

AutoCAD SHX Text

AutoCAD SHX Text

AB102

AutoCAD SHX Text

AutoCAD SHX Text

AB102

AutoCAD SHX Text

AutoCAD SHX Text

AB101

AutoCAD SHX Text

AutoCAD SHX Text

AB100

AutoCAD SHX Text

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text

OVERALL ROOF PLAN - ABATEMENT WORK

AutoCAD SHX Text REMOVE AND DISPOSE OF AS ASBESTOS ALL ASBESTOS CONTAINING ROOF FLASHING MATERIALS AROUND PERIMETER AND ALL EQUIPMENT. REMOVE AND DISPOSE OF AS ASBESTOS ALL BLACK ROOF WALK PADS WITH TAR PRESENT. NO ASBESTOS DETECTED. SEE ASBESTOS SURVEY REPORT.

AutoCAD SHX Text CONTRACTOR SHALL REMOVE ALL OSHA CLASS II AND EPA CATEGORY I NON-FRIABLE ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED ROOFING MATERIALS AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL NOTES, SPECIFIC NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS, AND DISPOSE OF AS ASBESTOS WASTE. 1. IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE MATERIALS ARE MATERIALS ARE ARE ARE COMPRISED OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE I NON-FRIABLE I NON-FRIABLE NON-FRIABLE NON-FRIABLE MATERIALS. CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF APPLY FINE MIST OF APPLY FINE MIST OF FINE MIST OF FINE MIST OF MIST OF MIST OF OF OF AMENDED WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND AND SHALL USE HAND AND SHALL USE HAND SHALL USE HAND SHALL USE HAND USE HAND USE HAND HAND HAND TOOLS AND INTACT REMOVAL TO THE EXTENT FEASIBLE. 2. CONTRACTOR SHALL ESTABLISH A 25' PERIMETER CONTRACTOR SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER A 25' PERIMETER A 25' PERIMETER 25' PERIMETER 25' PERIMETER PERIMETER PERIMETER AROUND EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AND DEMARCATE WITH AND DEMARCATE WITH DEMARCATE WITH DEMARCATE WITH WITH WITH ASBESTOS DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED SIGNS OR APPROVED SIGNS OR APPROVED OR APPROVED OR APPROVED APPROVED APPROVED EQUIVALENT. 3. CONTRACTOR SHALL PLACE A POLYETHYLENE DROP CONTRACTOR SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP A POLYETHYLENE DROP A POLYETHYLENE DROP POLYETHYLENE DROP POLYETHYLENE DROP DROP DROP CLOTH BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND OF 25' AROUND OF 25' AROUND 25' AROUND 25' AROUND AROUND AROUND REGULATED AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD ASBESTOS/LEAD ASBESTOS/LEAD MATERIAL. THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF BE MAINTAINED FREE OF BE MAINTAINED FREE OF MAINTAINED FREE OF MAINTAINED FREE OF FREE OF FREE OF OF OF ACCUMULATION OF ASBESTOS/LEAD MATERIAL. 4. CONTRACTOR SHALL DISPOSE OF ASBESTOS AND CONTRACTOR SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND OF ASBESTOS AND OF ASBESTOS AND ASBESTOS AND ASBESTOS AND AND AND LEAD DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA STATE OF LOUISIANA STATE OF LOUISIANA OF LOUISIANA OF LOUISIANA LOUISIANA LOUISIANA AND EPA REGULATIONS. 5. CONTRACTOR SHALL CLEAN UP AND DISPOSE OF CONTRACTOR SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF UP AND DISPOSE OF UP AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ANY OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND DEBRIS AROUND DEBRIS AROUND AROUND AROUND BUILDING. 6. CONTRACTOR SHALL PROVIDE MANUFACTURER'S CONTRACTOR SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR OFFICER FOR OFFICER FOR FOR FOR REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON PLACING EQUIPMENT ON PLACING EQUIPMENT ON EQUIPMENT ON EQUIPMENT ON ON ON JOB SITE. 7. CONTRACTOR SHALL COORDINATE THIS ASBESTOS CONTRACTOR SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS THIS ASBESTOS THIS ASBESTOS ASBESTOS ASBESTOS AND LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING WITH THE CONTRACTING WITH THE CONTRACTING THE CONTRACTING THE CONTRACTING CONTRACTING CONTRACTING OFFICER TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD WITH STANDARD WITH STANDARD STANDARD STANDARD OPERATING PROCEDURES OF THE FACILITY. 8. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL AND OBTAIN APPROVAL AND OBTAIN APPROVAL OBTAIN APPROVAL OBTAIN APPROVAL APPROVAL APPROVAL OF PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS PHASING FOR SYSTEMS PHASING FOR SYSTEMS FOR SYSTEMS FOR SYSTEMS SYSTEMS SYSTEMS SHUT DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND LEAD REMOVAL AND LEAD REMOVAL AND REMOVAL AND REMOVAL AND AND AND RENOVATION OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER THE CONTRACTING OFFICER THE CONTRACTING OFFICER CONTRACTING OFFICER CONTRACTING OFFICER OFFICER OFFICER PRIOR TO BEGINNING ANY WORK. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTRACTOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR BE RESPONSIBLE FOR BE RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR PHYSICALLY SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO AND OPENINGS TO AND OPENINGS TO OPENINGS TO OPENINGS TO TO TO THE WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS WHERE ASBESTOS WHERE ASBESTOS ASBESTOS ASBESTOS CONTAINING MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE ARE PRESENT SHALL BE ARE PRESENT SHALL BE PRESENT SHALL BE PRESENT SHALL BE SHALL BE SHALL BE BE BE CONSIDERED AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL WORK AREA UNTIL WORK AREA UNTIL AREA UNTIL AREA UNTIL UNTIL UNTIL SUCCESSFUL COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE FINAL CLEARANCE FINAL CLEARANCE CLEARANCE CLEARANCE CRITERIA. 10. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS ASBESTOS ASBESTOS ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED SHALL BE APPROVED SHALL BE APPROVED BE APPROVED BE APPROVED APPROVED APPROVED BY THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF WORK. 11. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE SHALL REMOVE SHALL REMOVE REMOVE REMOVE ACM AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD AND PAINT WITH LEAD AND PAINT WITH LEAD PAINT WITH LEAD PAINT WITH LEAD WITH LEAD WITH LEAD LEAD LEAD PRIOR TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES TRADES TRADES TO PERFORM NEW WORK. 12. ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE ONLY AND ARE ONLY AND ARE AND ARE AND ARE ARE ARE NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE SHALL VISIT SITE SHALL VISIT SITE VISIT SITE VISIT SITE SITE SITE BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND ALL DIMENSIONS AND ALL DIMENSIONS AND DIMENSIONS AND DIMENSIONS AND AND AND WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF CONTRACTING OFFICER OF CONTRACTING OFFICER OF OFFICER OF OFFICER OF OF OF ANY CONFLICTS. 13. AN ASBESTOS SURVEY REPORT FOR THIS PROJECT AN ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT FOR THIS PROJECT FOR THIS PROJECT THIS PROJECT THIS PROJECT PROJECT PROJECT IS AVAILABLE FOR CONTRACTOR USE. 14. CONTRACTOR SHALL ASSUME THAT ALL PAINTED CONTRACTOR SHALL ASSUME THAT ALL PAINTED SHALL ASSUME THAT ALL PAINTED SHALL ASSUME THAT ALL PAINTED ASSUME THAT ALL PAINTED ASSUME THAT ALL PAINTED THAT ALL PAINTED THAT ALL PAINTED ALL PAINTED ALL PAINTED PAINTED PAINTED SURFACES CONTAIN DETECTABLE LEVELS OF LEAD IN THE CONTAIN DETECTABLE LEVELS OF LEAD IN THE CONTAIN DETECTABLE LEVELS OF LEAD IN THE DETECTABLE LEVELS OF LEAD IN THE DETECTABLE LEVELS OF LEAD IN THE LEVELS OF LEAD IN THE LEVELS OF LEAD IN THE OF LEAD IN THE OF LEAD IN THE LEAD IN THE LEAD IN THE IN THE IN THE THE THE PAINT. CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD CONTRACTOR SHALL REMOVE MATERIAL AS LEAD SHALL REMOVE MATERIAL AS LEAD SHALL REMOVE MATERIAL AS LEAD REMOVE MATERIAL AS LEAD REMOVE MATERIAL AS LEAD MATERIAL AS LEAD MATERIAL AS LEAD AS LEAD AS LEAD LEAD LEAD CONTAINING IN ACCORDANCE WITH THE OSHA IN ACCORDANCE WITH THE OSHA IN ACCORDANCE WITH THE OSHA ACCORDANCE WITH THE OSHA ACCORDANCE WITH THE OSHA WITH THE OSHA WITH THE OSHA THE OSHA THE OSHA OSHA OSHA CONSTRUCTION INDUSTRY LEAD STANDARD 29 CFR INDUSTRY LEAD STANDARD 29 CFR INDUSTRY LEAD STANDARD 29 CFR LEAD STANDARD 29 CFR LEAD STANDARD 29 CFR STANDARD 29 CFR STANDARD 29 CFR 29 CFR 29 CFR CFR CFR 1926.62. CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING CONTRACTOR SHALL PERFORM TCLP TESTING SHALL PERFORM TCLP TESTING SHALL PERFORM TCLP TESTING PERFORM TCLP TESTING PERFORM TCLP TESTING TCLP TESTING TCLP TESTING TESTING TESTING TO DETERMINE PROPER DISPOSAL REQUIREMENTS. 15. CONTRACTOR SHALL REMOVE AND DISPOSE OF CONTRACTOR SHALL REMOVE AND DISPOSE OF SHALL REMOVE AND DISPOSE OF SHALL REMOVE AND DISPOSE OF REMOVE AND DISPOSE OF REMOVE AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ASBESTOS CONTAINING MATERIALS IN ACCORDANCE WITH CONTAINING MATERIALS IN ACCORDANCE WITH CONTAINING MATERIALS IN ACCORDANCE WITH MATERIALS IN ACCORDANCE WITH MATERIALS IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH SPECIFICATION SECTION 02 82 13.21 ASBESTOS ROOFING SECTION 02 82 13.21 ASBESTOS ROOFING SECTION 02 82 13.21 ASBESTOS ROOFING 02 82 13.21 ASBESTOS ROOFING 02 82 13.21 ASBESTOS ROOFING 82 13.21 ASBESTOS ROOFING 82 13.21 ASBESTOS ROOFING 13.21 ASBESTOS ROOFING 13.21 ASBESTOS ROOFING ASBESTOS ROOFING ASBESTOS ROOFING ROOFING ROOFING ABATEMENT. 16. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL AND CONTRACTOR SHALL COMPLY WITH ALL FEDERAL AND SHALL COMPLY WITH ALL FEDERAL AND SHALL COMPLY WITH ALL FEDERAL AND COMPLY WITH ALL FEDERAL AND COMPLY WITH ALL FEDERAL AND WITH ALL FEDERAL AND WITH ALL FEDERAL AND ALL FEDERAL AND ALL FEDERAL AND FEDERAL AND FEDERAL AND AND AND STATE OF LOUISIANA REGULATIONS.

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text

EXISTING ROOF DRAINS WITH STRAINERS.

AutoCAD SHX Text

EXISTING ROOFTOP EXPANSION JOINTS.

AutoCAD SHX Text

INDICATES DIRECTION OF DOWNWARD ROOF SLOPE

AutoCAD SHX Text

EXISTING ROOF INSULATION VENT

AutoCAD SHX Text

EXISTING ROOFTOP MECH EQUIPMENT ON EXISTING CURBS

AutoCAD SHX Text

EXISTING ROOFTOP MECH EQUIPMENT RAISED ON EXISTING VERTICAL STEEL POST SUPPORTS

AutoCAD SHX Text

EXISTING ROOFTOP EXHAUST FANS

AutoCAD SHX Text

EXISTING CURBED PENETRATION THROUGH ROOF (VERIFY ABANDONED OPENINGS W/ VA)

AutoCAD SHX Text

EXISTING ROUND PENETRATION THROUGH ROOF. (VERIFY ABANDONED OPENINGS W/ VA)

AutoCAD SHX Text

EXISTING VENT THROUGH EXISTING ROOF

AutoCAD SHX Text

EXISTING PIPE PENETRATION THROUGH ROOF

AutoCAD SHX Text

EXISTING LINEAR EQUIPMENT RAIL SUPPORTS

AutoCAD SHX Text

EXISTING ROOF HATCH OR ABANDONED CURB

AutoCAD SHX Text

EXISTING CHILLED WATER SUPPLY AND RETURN LINES ON LINEAR RAIL SUPPORTS

AutoCAD SHX Text

EXISTING ROOFTOP CONDUIT RAISED ON SUPPORTS

AutoCAD SHX Text

EXISTING ELECT BOX W/ POWER THROUGH ROOF

AutoCAD SHX Text

EXISTING PITCH/SEALANT POCKET

AutoCAD SHX Text

EXISTING VERT EQUIP SUPPORT ON FLAT BASE

AutoCAD SHX Text

EXISTING ROOF PADS FOR EXISTING EQUIPMENT

AutoCAD SHX Text

EXISTING GENERATOR/HOT STACK THROUGH ROOF

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text G.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text O.

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

48'

HAZARDOUS MATERIAL

ABATEMENT NOTES

ABATEMENT LEGEND PLAN LEGEND

AREA F

AREA B

AREA C AREA E

AREA D

ASBESTOS ABATEMENT -

ROOF AREAS B, C, D, E AND F

AB101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

FINAL SUBMITTAL

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE ROOF, VARIOUS

LOCATIONS, MAIN HOSPITAL

SHREVEPORT, LA

667-18-104

Building Number Project Director

06/26/2020 AT DPBRevisions: Date:

AutoCAD SHX Text REMOVE AND DISPOSE OF AS ASBESTOS ALL ASBESTOS CONTAINING ROOF FLASHING MATERIALS AROUND PERIMETER AND ALL EQUIPMENT. REMOVE AND DISPOSE OF AS ASBESTOS ALL BLACK ROOF WALK PADS WITH TAR PRESENT. NO ASBESTOS DETECTED. SEE ASBESTOS SURVEY REPORT.

AutoCAD SHX Text CONTRACTOR SHALL REMOVE ALL OSHA CLASS II AND EPA CATEGORY I NON-FRIABLE ASBESTOS CONTAINING AND ASBESTOS CONTAMINATED ROOFING MATERIALS AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL NOTES, SPECIFIC NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS, AND DISPOSE OF AS ASBESTOS WASTE. 1. IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE IDENTIFIED ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE ASBESTOS CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE CONTAINING MATERIALS ARE MATERIALS ARE MATERIALS ARE ARE ARE COMPRISED OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE OF NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE NESHAP CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE CATEGORY I NON-FRIABLE I NON-FRIABLE I NON-FRIABLE NON-FRIABLE NON-FRIABLE MATERIALS. CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF CONTRACTOR SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF SHALL APPLY FINE MIST OF APPLY FINE MIST OF APPLY FINE MIST OF FINE MIST OF FINE MIST OF MIST OF MIST OF OF OF AMENDED WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND WATER DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND DURING REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND REMOVAL AND SHALL USE HAND AND SHALL USE HAND AND SHALL USE HAND SHALL USE HAND SHALL USE HAND USE HAND USE HAND HAND HAND TOOLS AND INTACT REMOVAL TO THE EXTENT FEASIBLE. 2. CONTRACTOR SHALL ESTABLISH A 25' PERIMETER CONTRACTOR SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER SHALL ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER ESTABLISH A 25' PERIMETER A 25' PERIMETER A 25' PERIMETER 25' PERIMETER 25' PERIMETER PERIMETER PERIMETER AROUND EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH EACH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH REGULATED AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AREA AND DEMARCATE WITH AND DEMARCATE WITH AND DEMARCATE WITH DEMARCATE WITH DEMARCATE WITH WITH WITH ASBESTOS DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED DANGER TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED TAPE, SIGNS OR APPROVED SIGNS OR APPROVED SIGNS OR APPROVED OR APPROVED OR APPROVED APPROVED APPROVED EQUIVALENT. 3. CONTRACTOR SHALL PLACE A POLYETHYLENE DROP CONTRACTOR SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP SHALL PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP PLACE A POLYETHYLENE DROP A POLYETHYLENE DROP A POLYETHYLENE DROP POLYETHYLENE DROP POLYETHYLENE DROP DROP DROP CLOTH BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND BENEATH AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND AT A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND A PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND PERIMETER OF 25' AROUND OF 25' AROUND OF 25' AROUND 25' AROUND 25' AROUND AROUND AROUND REGULATED AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD AREA TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD TO CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD CAPTURE FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD FALLING ASBESTOS/LEAD ASBESTOS/LEAD ASBESTOS/LEAD MATERIAL. THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF THIS AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF AREA SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF SHALL BE MAINTAINED FREE OF BE MAINTAINED FREE OF BE MAINTAINED FREE OF MAINTAINED FREE OF MAINTAINED FREE OF FREE OF FREE OF OF OF ACCUMULATION OF ASBESTOS/LEAD MATERIAL. 4. CONTRACTOR SHALL DISPOSE OF ASBESTOS AND CONTRACTOR SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND SHALL DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND DISPOSE OF ASBESTOS AND OF ASBESTOS AND OF ASBESTOS AND ASBESTOS AND ASBESTOS AND AND AND LEAD DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA DEBRIS IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA IN ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA ACCORDANCE WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA WITH STATE OF LOUISIANA STATE OF LOUISIANA STATE OF LOUISIANA OF LOUISIANA OF LOUISIANA LOUISIANA LOUISIANA AND EPA REGULATIONS. 5. CONTRACTOR SHALL CLEAN UP AND DISPOSE OF CONTRACTOR SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF SHALL CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF CLEAN UP AND DISPOSE OF UP AND DISPOSE OF UP AND DISPOSE OF AND DISPOSE OF AND DISPOSE OF DISPOSE OF DISPOSE OF OF OF ANY OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND OBSERVED PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND PRE-EXISTING ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND ASBESTOS DEBRIS AROUND DEBRIS AROUND DEBRIS AROUND AROUND AROUND BUILDING. 6. CONTRACTOR SHALL PROVIDE MANUFACTURER'S CONTRACTOR SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S SHALL PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S PROVIDE MANUFACTURER'S MANUFACTURER'S MANUFACTURER'S EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR CERTIFICATION TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR TO CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR CONTRACTING OFFICER FOR OFFICER FOR OFFICER FOR FOR FOR REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON AND APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON APPROVAL PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON PRIOR TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON TO PLACING EQUIPMENT ON PLACING EQUIPMENT ON PLACING EQUIPMENT ON EQUIPMENT ON EQUIPMENT ON ON ON JOB SITE. 7. CONTRACTOR SHALL COORDINATE THIS ASBESTOS CONTRACTOR SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS SHALL COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS COORDINATE THIS ASBESTOS THIS ASBESTOS THIS ASBESTOS ASBESTOS ASBESTOS AND LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING LEAD REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING REMOVAL PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING PROJECT WITH THE CONTRACTING WITH THE CONTRACTING WITH THE CONTRACTING THE CONTRACTING THE CONTRACTING CONTRACTING CONTRACTING OFFICER TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD TO MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD MINIMIZE INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD INTERFERENCE WITH STANDARD WITH STANDARD WITH STANDARD STANDARD STANDARD OPERATING PROCEDURES OF THE FACILITY. 8. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SHALL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL SUBMIT AND OBTAIN APPROVAL AND OBTAIN APPROVAL AND OBTAIN APPROVAL OBTAIN APPROVAL OBTAIN APPROVAL APPROVAL APPROVAL OF PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS PROPOSED SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS SCHEDULE AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS AND PHASING FOR SYSTEMS PHASING FOR SYSTEMS PHASING FOR SYSTEMS FOR SYSTEMS FOR SYSTEMS SYSTEMS SYSTEMS SHUT DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND DOWN, ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND ASBESTOS REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND REMOVAL, LEAD REMOVAL AND LEAD REMOVAL AND LEAD REMOVAL AND REMOVAL AND REMOVAL AND AND AND RENOVATION OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER OPERATIONS TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER TO THE CONTRACTING OFFICER THE CONTRACTING OFFICER THE CONTRACTING OFFICER CONTRACTING OFFICER CONTRACTING OFFICER OFFICER OFFICER PRIOR TO BEGINNING ANY WORK. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTRACTOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR SHALL BE RESPONSIBLE FOR BE RESPONSIBLE FOR BE RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR PHYSICALLY SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO SECURING ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ALL ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO ENTRANCES AND OPENINGS TO AND OPENINGS TO AND OPENINGS TO OPENINGS TO OPENINGS TO TO TO THE WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS WORK AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS AREA. ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS ALL AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS AREAS WHERE ASBESTOS WHERE ASBESTOS WHERE ASBESTOS ASBESTOS ASBESTOS CONTAINING MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE MATERIALS ARE PRESENT SHALL BE ARE PRESENT SHALL BE ARE PRESENT SHALL BE PRESENT SHALL BE PRESENT SHALL BE SHALL BE SHALL BE BE BE CONSIDERED AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL AN ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL ASBESTOS REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL REGULATED WORK AREA UNTIL WORK AREA UNTIL WORK AREA UNTIL AREA UNTIL AREA UNTIL UNTIL UNTIL SUCCESSFUL COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE COMPLETION OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE OF PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE PROJECT FINAL CLEARANCE FINAL CLEARANCE FINAL CLEARANCE CLEARANCE CLEARANCE CRITERIA. 10. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS OF DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS DECONTAMINATION SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS SYSTEMS, ASBESTOS ASBESTOS ASBESTOS ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED CONTAINMENT BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED BARRIERS SHALL BE APPROVED SHALL BE APPROVED SHALL BE APPROVED BE APPROVED BE APPROVED APPROVED APPROVED BY THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF THE CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF CONTRACTING OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF OFFICER PRIOR TO START OF PRIOR TO START OF PRIOR TO START OF TO START OF TO START OF START OF START OF OF OF WORK. 11. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE ABATEMENT CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE CONTRACTOR SHALL REMOVE SHALL REMOVE SHALL REMOVE REMOVE REMOVE ACM AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD AND LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD LEAD-BASED PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD PAINT AND PAINT WITH LEAD AND PAINT WITH LEAD AND PAINT WITH LEAD PAINT WITH LEAD PAINT WITH LEAD WITH LEAD WITH LEAD LEAD LEAD PRIOR TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES TO ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES ALLOWING OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES OTHER NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES NON-ASBESTOS/LEAD TRADES TRADES TRADES TO PERFORM NEW WORK. 12. ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ROOF DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE DIAGRAMMATIC ONLY AND ARE ONLY AND ARE ONLY AND ARE AND ARE AND ARE ARE ARE NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE TO BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE BE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE SCALED. CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE CONTRACTOR SHALL VISIT SITE SHALL VISIT SITE SHALL VISIT SITE VISIT SITE VISIT SITE SITE SITE BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND WORK BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND BEGINS TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND TO VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND VERIFY ALL DIMENSIONS AND ALL DIMENSIONS AND ALL DIMENSIONS AND DIMENSIONS AND DIMENSIONS AND AND AND WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF CONDITIONS. NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF NOTIFY CONTRACTING OFFICER OF CONTRACTING OFFICER OF CONTRACTING OFFICER OF OFFICER OF OFFICER OF OF OF ANY CONFLICTS. 13. AN ASBESTOS SURVEY REPORT FOR THIS PROJECT AN ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT ASBESTOS SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT SURVEY REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT REPORT FOR THIS PROJECT FOR THIS PROJECT FOR THIS PROJECT THIS PROJECT THIS PROJECT PROJECT PROJECT IS AVAILABLE FOR CONTRACTOR USE. 14.