P01 - 2013-02-11 FH SA HVAC As-Built_SAN ANTONIO 02-09-13 MECHANICAL AS BUILTS.pdf
PDF 2 MB Posted
- Attached to
- Replace Fisher House 1 HVAC System
- Solicitation number
- 36C25726Q0864
About this file
This file contains architectural and mechanical drawings for a multi-floor residential or mixed-use building project prepared by The Metalsmith, Inc. for the Fisher House Foundation, Inc. The drawings include detailed floor plans for the first and second floors showing room layouts, mechanical systems, and equipment placement. Supporting details include condenser enclosure schematics (labeled "A" and "B"), a trench section, mechanical equipment room elevation and layout, fire damper details, and a boiler piping schematic with color-coded lines indicating hot water (red), cold water (blue), and return lines (green).
The mechanical plans depict HVAC systems, plumbing infrastructure, and equipment scheduling throughout the building. Key components visible include condensers, boilers, mechanical rooms with elevation views, and comprehensive piping diagrams. The first floor mechanical plan shows integrated systems across multiple zones, while the second floor plan reflects similar infrastructure distribution. The equipment schedule on page two provides specifications for various mechanical components. These plans are construction documents suitable for implementation by contractors and are marked with revision information, drawing titles, and scale references typical of final design documentation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H-1ab (02-09-13)
| H-2ab (02-09-13) |
| H-3 (08-30-12) |
File details come from the government source that posted it. Updated .