The document is an exhibit detailing a technical proposal from Ovivo for the City of St. Petersburg's Northwest Water Reclamation Facility, specifically for the supply of a new 135-foot diameter secondary clarifier mechanism (Type C4D-CMD). The project involves replacing an existing clarifier with a comprehensive mechanism that includes both submerged and non-submerged components, featuring a center column, rotating cage, feedwell, sludge raking arms, and skimming design. The proposal includes two field service trips for installation assistance, static torque testing, and operator training. The estimated lead time for submittal drawings is ten weeks after purchase order acknowledgment, with an estimated shipping timeline of twenty-eight weeks after approved drawing receipt.
The proposal includes a detailed breakdown of component specifications, materials (primarily stainless steel), and surface preparation standards using Tnemec coating systems. While specific pricing is not fully disclosed, the total mechanism weight is approximately 54,000 lbs, with the heaviest single component weighing around 6,100 lbs. The related state and local contract opportunity indicates a project budget with a $15,000 contingency allowance, a 240-calendar day project duration, an 11-month warranty period, and a Small Business Enterprise (SBE) goal of 25%. Contractors must have a minimum of five years of experience in municipal or industrial wastewater mechanical rehabilitation, possess a State of Florida General Contractor License, and meet specific insurance coverage requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHWEST WATER RECLAMATION FACILITY
SECONDARY CLARIFIER #4
135’ OVIVO TYPE C4D
REQUEST:
The City of St Petersburg. is requesting the supply of one new replacement secondary clarifier mechanism at the Northwest WRF.
DESIGN:
OVIVO proposes the supply one (1) 135 diameter C4D-CMD type spiral blade clarifier mechanism.
SCOPE OF SUPPLY: ITEM I – SECONDARY CLARIFIER – OVIVO TYPE C4D
Ovivo (formerly EIMCO Water Technologies) proposes mechanisms which are based upon our standard engineering practices and details. Specifics are shown below:
DESIGN CRITERIA AND DRIVE INFORMATION:
| Number of Clarifiers |
| 1 |
| Clarifier Type |
| C4D – Spiral scraper Secondary Clarifier |
| Clarifier Diameter |
| 135’ |
| SWD |
| 15.15’ (approx.) |
| Freeboard |
| 2’-0” ft (approx.) |
| Tank Bottom Slope |
| 1:12 |
| Walkway configuration |
| Center support w/single side half bridge |
| AGMA Continuous Design Torque |
| 33,400 ft-lb (Between 14 -18 ft/min tip speed) |
| Concrete Tank (New or Existing) |
| exiting |
NON-SUBMERGED COMPONENTS (INCLUDED):
| COMPONENT TYPE |
| COMPONENT DESCRIPTION |
Walkway Superstructure (Truss Style) 3ft wide walking surface. Half bridge design extending from tank wall to center platform. Truss members to serve as handrail system
| Platform Superstructure |
| 9ft square with approximately 24” drive clearance |
| Walkway walking surface type |
| ALUMINUM -- 1-1/4" I-Bar grating |
| Platform walking surface type |
| ALUMINUM – 11-1/4" I-Bar grating |
| Handrail design/type |
| ALUMINUM – Platform ONLY. 1-1/2" diameter 2-rail with 4" toe channel, field/sub-assembled mechanical system. No handrail along walkway. Walkway truss members to serve as handrail system |
| Non-Submerged construction materials (unless otherwise noted) |
| Stainless steel |
SUBMERGED COMPONENTS (INCLUDED):
| COMPONENT TYPE |
| COMPONENT DESCRIPTION |
| Center column (Stationary) |
| 48” diameter x ¼” thick with (4) influent port sized at 135% of the column area; with CMD adapter. |
| Center cage (Rotating) |
| 5ft square. |
| Feedwell (Rotating) |
| 40ft diameter x 7.5ft depth x 3/16” thick w/ supports from truss rake arms. |
| EDI (Rotating) |
| 13ft diameter x 3ft depth x 1/4” thick w/ tangential scoop outlet ports. |
Sludge raking arms (Rotating) Two (2) full radius and (2) partial radius (square box truss design) with 3/16” thick spiral raking blades and 20 gauge 304 SS attachment squeegees.
| Sludge manifold (Rotating) |
| Approx. 7ft-4in diameter x ¼” thick (Size to be confirmed by tank floor layout). |
Skimming Design (Stationary and Rotating) One (1) 8ft scum box(Stationary) with a mechanical flush actuated by an adjustable actuator from the skimmer arm (Rotating) and two (2) skimming blade/mechanism systems (Rotating).
| Submerged construction materials (unless otherwise noted) |
| Stainless steel. |
OTHER COMPONENTS, SERVICES AND INFORMATION (INCLUDED):
-Drive Mechanism – C60LT
-Anchor bolts in 316 stainless steel.
-Assembly fasteners in 316 stainless steel.
-Local control panel
-Operation and Maintenance manuals.
-Service trips as noted in the “Field Service” section of this proposal.
-Surface preparation and paint as noted in the “Surface Preparation and Paint” section of this proposal.
-Freight, FCA factory, freight allowed to jobsite.
ITEMS NOT INCLUDED (But not limited to the following):
-Effluent weirs and scum baffles, effluent launder
-Density current baffles
-Electrical controls or control panels, push button stations, alarms, starters, mounting plates or brackets, conduit, wiring, mounting channels, photocells, etc… other than clarifier local control panel.
-Field welding. Minimal field welding will be necessary.
-Anchor templates and grout shield. We provide bolt circle dimensions for the center column and anchor positions.
-Demolition or erection services.
-Finish painting.
-Lamp posts.
-VFD controller.
-Lubricants.
-Weir, launder or baffle cleaning equipment.
-Effluent Trough
-Stairways, access walkways, interconnecting walkways, gratings, etc., outside tank.
-Handrail around tank.
-Scum piping below or flexible connector to scum box stub nozzle.
-Dissimilar metals protection of any kind and for aluminum handrail and grating mounted to steel walkway members. Mastic/sealant/packing is also by others.
-Tank, platform or feedwell covers of any kind.
-Scum spray system
-Any field measurements required for provision of this equipment.
-Anything else not explicitly included in the list of items included above.
WEIGHTS:
APPROXIMATE TOTAL WEIGHT OF ONE (1) MECHANISM 54,000 LBS.
APPROXIMATE WEIGHT OF THE HEAVIEST SINGLE COMPONENT 6,100 LBS.
FIELD SERVICE:
Our proposal includes the service of a qualified service engineer for the following:
| - |
| Two (2) Days / Two (2) Trips at the site to assist in adjusting, servicing, and checking out these mechanisms, and in training the operators in maintenance, troubleshooting, and repair of the equipment. Static torque testing is included in these services. |
| - |
| Additional service days can be purchased at the current rate. |
SURFACE PREPARATION AND PAINT
| COMPONENTS |
| SURFACE PREP. |
| PRIME COAT |
| 2ND COAT |
| 3RD COAT |
| DRIVE UNIT |
| SSPC-SP-06 |
| Tnemec N69 |
| Tnemec N69 |
| Tnemec Endura-shield 73 |
| GEARMOTOR |
| STANDARD COATING BY GEARMOTOR MANUFACTURER |
| SUBMERGED STEEL |
| Stainless steel |
| NON-SUBMERGED STEEL |
| Stainless steel |
Please see below for a rough visual representation of a similar unit to the proposed mechanism:
BUDGET PROPOSAL PRICING
| ITEM |
| EQUIPMENT |
| ESTIMATED SHIP DATE* |
| PRICE |
| I |
| (1) 135ft dia. Spiral blade clarifier |
TYPE - C4D-CMD
ESTIMATED LEAD TIMES
*Ovivo’s estimated timeline for submittal drawings is ten (10) weeks after Purchaser’s receipt of Ovivo’s written acknowledgement of an approved purchase order. Ovivo’s estimated timeline to start shipping the products is about twenty-eight (28) weeks after receipt of approved drawings from Purchaser.