Ovivo_Mechanism_&_Component_Info_(Exhibit_A).docx

DOCX document 18 MB Posted

Attached to
Northwest Water Reclamation Facility Clarifier #4 Rehabilitation
Solicitation number
IFB- 25 - 257
Issued by
Pinellas County, Florida

About this file

The document is an exhibit detailing a technical proposal from Ovivo for the City of St. Petersburg's Northwest Water Reclamation Facility, specifically for the supply of a new 135-foot diameter secondary clarifier mechanism (Type C4D-CMD). The project involves replacing an existing clarifier with a comprehensive mechanism that includes both submerged and non-submerged components, featuring a center column, rotating cage, feedwell, sludge raking arms, and skimming design. The proposal includes two field service trips for installation assistance, static torque testing, and operator training. The estimated lead time for submittal drawings is ten weeks after purchase order acknowledgment, with an estimated shipping timeline of twenty-eight weeks after approved drawing receipt.

The proposal includes a detailed breakdown of component specifications, materials (primarily stainless steel), and surface preparation standards using Tnemec coating systems. While specific pricing is not fully disclosed, the total mechanism weight is approximately 54,000 lbs, with the heaviest single component weighing around 6,100 lbs. The related state and local contract opportunity indicates a project budget with a $15,000 contingency allowance, a 240-calendar day project duration, an 11-month warranty period, and a Small Business Enterprise (SBE) goal of 25%. Contractors must have a minimum of five years of experience in municipal or industrial wastewater mechanical rehabilitation, possess a State of Florida General Contractor License, and meet specific insurance coverage requirements.

View the file

Other files

File Type Posted
Northwest_Water_Reclamation_Facility_Clarifier_#4_Rehabilitation_(Addendum_#5_Revision).pdf PDF
Pre-bid_8-21_sign_in_sheet.pdf PDF
Pre-bid_sign_in_sheet.pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4_(revised).docx DOCX document
Exhibit_G_JWC_Environ_Muffin_Monster_Grinder_Pump_Control_Panel.pdf PDF
Exhibit_F_Contract_Plans_Clarifier_No._5_NEWRF_(reference_only_of_similar_project).pdf PDF
Exhibit_E_Photo_Documentation_NE_NW_WAS_Pumping_Station_Pads_(Reference_only_of_similar_installation)_.pdf PDF
Exhibit_C_As_Built_Prints,_Clarifier_No._4_(Revised).pdf PDF
Exhibit_D_Ovivo_Mechanism_Components_(Revised).pdf PDF
Exhibit_B_Coating_Specifications_(Revised).pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4.pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4.pdf PDF
Northwest_Water_Reclamation_Facility_Clarifier_#4_Rehabilitation_(Addendum_#1_Revision).pdf PDF
Pre_Bid_Sign_in_Sheet_Clairifier.pdf PDF
Agreement__Clarifier_#4_Rehabilitation_RM_Comments_8-5-25.docx DOCX document
Ovivo_Mechanism_&_Component_Info_(Exhibit_A).docx DOCX document
200218_NWWRF_Clarifier_4_Technical_Specs.pdf PDF
NWWRF_Clarifer_#4_As_Built_Prints_(Exhibit_B).pdf PDF
09_96_00_Spec_NWWRF_Clarifier_4_(Exhibit_C).docx DOCX document
NWWRF_Clarifier_#4_Rehab_Bid_Proposal_Form.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHWEST WATER RECLAMATION FACILITY

SECONDARY CLARIFIER #4

135’ OVIVO TYPE C4D

REQUEST:

The City of St Petersburg. is requesting the supply of one new replacement secondary clarifier mechanism at the Northwest WRF.

DESIGN:

OVIVO proposes the supply one (1) 135 diameter C4D-CMD type spiral blade clarifier mechanism.

SCOPE OF SUPPLY: ITEM I – SECONDARY CLARIFIER – OVIVO TYPE C4D

Ovivo (formerly EIMCO Water Technologies) proposes mechanisms which are based upon our standard engineering practices and details. Specifics are shown below:

DESIGN CRITERIA AND DRIVE INFORMATION:

Number of Clarifiers
1
Clarifier Type
C4D – Spiral scraper Secondary Clarifier
Clarifier Diameter
135’
SWD
15.15’ (approx.)
Freeboard
2’-0” ft (approx.)
Tank Bottom Slope
1:12
Walkway configuration
Center support w/single side half bridge
AGMA Continuous Design Torque
33,400 ft-lb (Between 14 -18 ft/min tip speed)
Concrete Tank (New or Existing)
exiting

NON-SUBMERGED COMPONENTS (INCLUDED):

COMPONENT TYPE
COMPONENT DESCRIPTION

Walkway Superstructure (Truss Style) 3ft wide walking surface. Half bridge design extending from tank wall to center platform. Truss members to serve as handrail system

Platform Superstructure
9ft square with approximately 24” drive clearance
Walkway walking surface type
ALUMINUM -- 1-1/4" I-Bar grating
Platform walking surface type
ALUMINUM – 11-1/4" I-Bar grating
Handrail design/type
ALUMINUM – Platform ONLY. 1-1/2" diameter 2-rail with 4" toe channel, field/sub-assembled mechanical system. No handrail along walkway. Walkway truss members to serve as handrail system
Non-Submerged construction materials (unless otherwise noted)
Stainless steel

SUBMERGED COMPONENTS (INCLUDED):

COMPONENT TYPE
COMPONENT DESCRIPTION
Center column (Stationary)
48” diameter x ¼” thick with (4) influent port sized at 135% of the column area; with CMD adapter.
Center cage (Rotating)
5ft square.
Feedwell (Rotating)
40ft diameter x 7.5ft depth x 3/16” thick w/ supports from truss rake arms.
EDI (Rotating)
13ft diameter x 3ft depth x 1/4” thick w/ tangential scoop outlet ports.

Sludge raking arms (Rotating) Two (2) full radius and (2) partial radius (square box truss design) with 3/16” thick spiral raking blades and 20 gauge 304 SS attachment squeegees.

Sludge manifold (Rotating)
Approx. 7ft-4in diameter x ¼” thick (Size to be confirmed by tank floor layout).

Skimming Design (Stationary and Rotating) One (1) 8ft scum box(Stationary) with a mechanical flush actuated by an adjustable actuator from the skimmer arm (Rotating) and two (2) skimming blade/mechanism systems (Rotating).

Submerged construction materials (unless otherwise noted)
Stainless steel.

OTHER COMPONENTS, SERVICES AND INFORMATION (INCLUDED):

-Drive Mechanism – C60LT

-Anchor bolts in 316 stainless steel.

-Assembly fasteners in 316 stainless steel.

-Local control panel

-Operation and Maintenance manuals.

-Service trips as noted in the “Field Service” section of this proposal.

-Surface preparation and paint as noted in the “Surface Preparation and Paint” section of this proposal.

-Freight, FCA factory, freight allowed to jobsite.

ITEMS NOT INCLUDED (But not limited to the following):

-Effluent weirs and scum baffles, effluent launder

-Density current baffles

-Electrical controls or control panels, push button stations, alarms, starters, mounting plates or brackets, conduit, wiring, mounting channels, photocells, etc… other than clarifier local control panel.

-Field welding. Minimal field welding will be necessary.

-Anchor templates and grout shield. We provide bolt circle dimensions for the center column and anchor positions.

-Demolition or erection services.

-Finish painting.

-Lamp posts.

-VFD controller.

-Lubricants.

-Weir, launder or baffle cleaning equipment.

-Effluent Trough

-Stairways, access walkways, interconnecting walkways, gratings, etc., outside tank.

-Handrail around tank.

-Scum piping below or flexible connector to scum box stub nozzle.

-Dissimilar metals protection of any kind and for aluminum handrail and grating mounted to steel walkway members. Mastic/sealant/packing is also by others.

-Tank, platform or feedwell covers of any kind.

-Scum spray system

-Any field measurements required for provision of this equipment.

-Anything else not explicitly included in the list of items included above.

WEIGHTS:

APPROXIMATE TOTAL WEIGHT OF ONE (1) MECHANISM 54,000 LBS.

APPROXIMATE WEIGHT OF THE HEAVIEST SINGLE COMPONENT 6,100 LBS.

FIELD SERVICE:

Our proposal includes the service of a qualified service engineer for the following:

-
Two (2) Days / Two (2) Trips at the site to assist in adjusting, servicing, and checking out these mechanisms, and in training the operators in maintenance, troubleshooting, and repair of the equipment. Static torque testing is included in these services.
-
Additional service days can be purchased at the current rate.

SURFACE PREPARATION AND PAINT

COMPONENTS
SURFACE PREP.
PRIME COAT
2ND COAT
3RD COAT
DRIVE UNIT
SSPC-SP-06
Tnemec N69
Tnemec N69
Tnemec Endura-shield 73
GEARMOTOR
STANDARD COATING BY GEARMOTOR MANUFACTURER
SUBMERGED STEEL
Stainless steel
NON-SUBMERGED STEEL
Stainless steel

Please see below for a rough visual representation of a similar unit to the proposed mechanism:

BUDGET PROPOSAL PRICING

ITEM
EQUIPMENT
ESTIMATED SHIP DATE*
PRICE
I
(1) 135ft dia. Spiral blade clarifier

TYPE - C4D-CMD

ESTIMATED LEAD TIMES

*Ovivo’s estimated timeline for submittal drawings is ten (10) weeks after Purchaser’s receipt of Ovivo’s written acknowledgement of an approved purchase order. Ovivo’s estimated timeline to start shipping the products is about twenty-eight (28) weeks after receipt of approved drawings from Purchaser.

image3.png image1.png image2.png

File details come from the government source that posted it. Updated .