This document is a detailed product specification and proposal from Ovivo for the City of St. Petersburg's Northwest Water Reclamation Facility, specifically addressing the replacement of Secondary Clarifier #4. The project involves supplying one new 135-foot diameter C4D-CMD type spiral blade clarifier mechanism, which includes comprehensive non-submerged and submerged components such as a center column, rotating center cage, feedwell, sludge raking arms, skimming design, and associated infrastructure. Ovivo proposes a mechanism with specific design criteria, including a center support with a single-side half bridge, an AGMA continuous design torque of 33,400 ft-lb, and construction primarily using stainless steel materials. The proposal includes two days of field service for installation assistance, operator training, and static torque testing, with an estimated lead time of ten weeks for submittal drawings and twenty-eight weeks for product shipping.
The proposal includes an approximate total mechanism weight of 54,000 pounds, with the heaviest single component weighing around 6,100 pounds. While the document does not explicitly state pricing, it indicates a budget proposal is available. The related contract opportunity description emphasizes the project's necessity for maintaining the plant's secondary treatment process reliability, including mechanical rehabilitation and protective coating of interior surfaces. The project will be executed with careful coordination to minimize disruption to ongoing treatment processes, and includes an owner-directed contingency allowance for potential unforeseen repairs. The work is located in Florida and focuses on ensuring operational compliance and extending the structural life of the water reclamation facility's clarifier infrastructure.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHWEST WATER RECLAMATION FACILITY
SECONDARY CLARIFIER #4
135’ OVIVO TYPE C4D
REQUEST:
The City of St Petersburg. is requesting the supply of one new replacement secondary clarifier mechanism at the Northwest WRF.
DESIGN:
OVIVO proposes the supply one (1) 135 diameter C4D-CMD type spiral blade clarifier mechanism.
SCOPE OF SUPPLY: ITEM I – SECONDARY CLARIFIER – OVIVO TYPE C4D
Ovivo (formerly EIMCO Water Technologies) proposes mechanisms which are based upon our standard engineering practices and details. Specifics are shown below:
DESIGN CRITERIA AND DRIVE INFORMATION:
| Number of Clarifiers |
| 1 |
| Clarifier Type |
| C4D – Spiral scraper Secondary Clarifier |
| Clarifier Diameter |
| 135’ |
| SWD |
| 15.15’ (approx.) |
| Freeboard |
| 2’-0” ft (approx.) |
| Tank Bottom Slope |
| 1:12 |
| Walkway configuration |
| Center support w/single side half bridge |
| AGMA Continuous Design Torque |
| 33,400 ft-lb (Between 14 -18 ft/min tip speed) |
| Concrete Tank (New or Existing) |
| exiting |
NON-SUBMERGED COMPONENTS (INCLUDED):
| COMPONENT TYPE |
| COMPONENT DESCRIPTION |
Walkway Superstructure (Truss Style) 3ft wide walking surface. Half bridge design extending from tank wall to center platform. Truss members to serve as handrail system
| Platform Superstructure |
| 9ft square with approximately 24” drive clearance |
| Walkway walking surface type |
| ALUMINUM -- 1-1/4" I-Bar grating |
| Platform walking surface type |
| ALUMINUM – 11-1/4" I-Bar grating |
| Handrail design/type |
| ALUMINUM – Platform ONLY. 1-1/2" diameter 2-rail with 4" toe channel, field/sub-assembled mechanical system. No handrail along walkway. Walkway truss members to serve as handrail system |
| Non-Submerged construction materials (unless otherwise noted) |
| Stainless steel |
SUBMERGED COMPONENTS (INCLUDED):
| COMPONENT TYPE |
| COMPONENT DESCRIPTION |
| Center column (Stationary) |
| 48” diameter x ¼” thick with (4) influent port sized at 135% of the column area; with CMD adapter. |
| Center cage (Rotating) |
| 5ft square. |
| Feedwell (Rotating) |
| 40ft diameter x 7.5ft depth x 3/16” thick w/ supports from truss rake arms. |
| EDI (Rotating) |
| 13ft diameter x 3ft depth x 1/4” thick w/ tangential scoop outlet ports. |
Sludge raking arms (Rotating) Two (2) full radius and (2) partial radius (square box truss design) with 3/16” thick spiral raking blades and 20 gauge 304 SS attachment squeegees.
| Sludge manifold (Rotating) |
| Approx. 7ft-4in diameter x ¼” thick (Size to be confirmed by tank floor layout). |
Skimming Design (Stationary and Rotating) One (1) 8ft scum box(Stationary) with a mechanical flush actuated by an adjustable actuator from the skimmer arm (Rotating) and two (2) skimming blade/mechanism systems (Rotating).
| Submerged construction materials (unless otherwise noted) |
| Stainless steel. |
OTHER COMPONENTS, SERVICES AND INFORMATION (INCLUDED):
-Drive Mechanism – C60LT
-Anchor bolts in 316 stainless steel.
-Assembly fasteners in 316 stainless steel.
-Local control panel
-Operation and Maintenance manuals.
-Service trips as noted in the “Field Service” section of this proposal.
-Surface preparation and paint as noted in the “Surface Preparation and Paint” section of this proposal.
-Freight, FCA factory, freight allowed to jobsite.
ITEMS NOT INCLUDED (But not limited to the following):
-Effluent weirs and scum baffles, effluent launder
-Density current baffles
-Electrical controls or control panels, push button stations, alarms, starters, mounting plates or brackets, conduit, wiring, mounting channels, photocells, etc… other than clarifier local control panel.
-Field welding. Minimal field welding will be necessary.
-Anchor templates and grout shield. We provide bolt circle dimensions for the center column and anchor positions.
-Demolition or erection services.
-Finish painting.
-Lamp posts.
-VFD controller.
-Lubricants.
-Weir, launder or baffle cleaning equipment.
-Effluent Trough
-Stairways, access walkways, interconnecting walkways, gratings, etc., outside tank.
-Handrail around tank.
-Scum piping below or flexible connector to scum box stub nozzle.
-Dissimilar metals protection of any kind and for aluminum handrail and grating mounted to steel walkway members. Mastic/sealant/packing is also by others.
-Tank, platform or feedwell covers of any kind.
-Scum spray system
-Any field measurements required for provision of this equipment.
-Anything else not explicitly included in the list of items included above.
WEIGHTS:
APPROXIMATE TOTAL WEIGHT OF ONE (1) MECHANISM 54,000 LBS.
APPROXIMATE WEIGHT OF THE HEAVIEST SINGLE COMPONENT 6,100 LBS.
FIELD SERVICE:
Our proposal includes the service of a qualified service engineer for the following:
| - |
| Two (2) Days / Two (2) Trips at the site to assist in adjusting, servicing, and checking out these mechanisms, and in training the operators in maintenance, troubleshooting, and repair of the equipment. Static torque testing is included in these services. |
| - |
| Additional service days can be purchased at the current rate. |
SURFACE PREPARATION AND PAINT
| COMPONENTS |
| SURFACE PREP. |
| PRIME COAT |
| 2ND COAT |
| 3RD COAT |
| DRIVE UNIT |
| SSPC-SP-06 |
| Tnemec N69 |
| Tnemec N69 |
| Tnemec Endura-shield 73 |
| GEARMOTOR |
| STANDARD COATING BY GEARMOTOR MANUFACTURER |
| SUBMERGED STEEL |
| Stainless steel |
| NON-SUBMERGED STEEL |
| Stainless steel |
Please see below for a rough visual representation of a similar unit to the proposed mechanism:
BUDGET PROPOSAL PRICING
| ITEM |
| EQUIPMENT |
| ESTIMATED SHIP DATE* |
| PRICE |
| I |
| (1) 135ft dia. Spiral blade clarifier |
TYPE - C4D-CMD
ESTIMATED LEAD TIMES
*Ovivo’s estimated timeline for submittal drawings is ten (10) weeks after Purchaser’s receipt of Ovivo’s written acknowledgement of an approved purchase order. Ovivo’s estimated timeline to start shipping the products is about twenty-eight (28) weeks after receipt of approved drawings from Purchaser.