Exhibit_C_As_Built_Prints,_Clarifier_No._4_(Revised).pdf
PDF 35 MB Posted
- Solicitation number
- IFB- 25 - 257
- Issued by
- Pinellas County, Florida
About this file
The document is an exhibit of as-built prints for Clarifier No. 4 at the Northwest Water Reclamation Facility (NWWRF) in St. Petersburg, Florida, consisting of multiple technical sheets (M1-M4 and S1-S2) detailing mechanical and structural components of the clarifier rehabilitation project. The project involves comprehensive rehabilitation of Clarifier #4, including removal and replacement of the existing clarifier mechanism, replacement of submerged and non-submerged components, and restoration of interior vertical masonry wall surfaces and metal supports.
The rehabilitation project is designed to ensure continued performance and reliability of the plant's secondary treatment process, with a focus on reducing mechanical failure risks and extending structural life. The scope includes surface preparation according to SSPC standards, application of a Tnemec epoxy protective coating system, and an owner-directed contingency allowance for potential unforeseen structural or surface repair conditions. The work will be carefully coordinated with ongoing plant operations to minimize disruption, and will involve manufacturer oversight, qualified application personnel, and strict quality control procedures to meet specification standards and provide long-term asset protection.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet M1 NWWRF Clarifier No. 4
| Sheet M2 NWWRF Clarifier No. 4 |
| Sheet M3 NWWRF Clarifier No. 4 |
| Sheet M4 NWWRF Clarifier No. 4 |
| Sheet S1 NWWRF Clarifier No. 4 |
| Sheet S2 NWWRF Clarifier No. 4 |
File details come from the government source that posted it. Updated .