This document is a Request for Information (RFI) issued by the National Oceanic and Atmospheric Administration (NOAA) Satellite and Information Acquisition Division on behalf of the National Environmental Satellite, Data, and Information Service (NESDIS). NOAA is seeking information from industry to assess the marketplace in preparation for an upcoming indefinite delivery indefinite quantity (IDIQ) contract to provide operations, maintenance, and sustainment services for multiple NESDIS systems over a five-year period of performance. Responses to the RFI are requested to include administrative information, corporate capabilities and experience relevant to the services detailed in the attached draft IDIQ Performance Work Statement, and any questions or concerns. The anticipated North American Industry Classification System code is 541513. Responses are limited to 10 pages and are due by December 15, 2017. NOAA plans to release a draft RFP on January 5, 2018 with questions due January 18, 2018. An industry day is scheduled for January 17, 2018.
Attach #2
View the file
Other files for this federal contract opportunity
Show all 50
Operations, Maintenance, and Sustainment has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Environmental Satellite, Data, and Information Service (NESDIS)
Office of Satellite and Product Operations (OSPO) and
Office of Satellite Ground Services (OSGS)
Draft Operations, Maintenance, and Sustainment (OMS) Task Order 01
Performance Work Statement (PWS)
August 5, 2019
DRAFT OPERATIONS, MAINTENANCE, AND SUSTAINMENT (OMS)
TASK ORDER 1 PWS - PROGRAM MANAGEMENT
Source Selection Information – See FAR 2.101 and 3.104-4 2
Table of Contents
1.0 Overview 3
2.0 Scope 3
2.1 Program Management 3
2.1.1 Systems Engineering Management 7
2.1.2 Configuration and Asset Management 7
2.1.3 Property Management / Property Contact 10
2.1.4 Quality Assurance 10
2.1.5 Risk Management 11
2.1.6 Training 11
2.1.7 Cyber Security Program Management 11
2.1.7.1 Cyber Security Awareness & Training 12
2.1.7.2 Cyber Security Assessment & Authorization 12
2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A) 12
2.1.7.2.2 Plans of Action & Milestones (POA&M) Management 12
2.1.7.2.3 System Interconnection 12
2.1.7.2.4 System Security Documentation 12
2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management 13
2.1.7.4 Cyber Security Management and Oversight 13
2.2 Contract Transition 13
3.0 Performance Requirements Summary 15
Appendix A. Deliverables 16
Appendix B. Meetings 19
Appendix C. Acronym Listing 212
Source Selection Information – See FAR 2.101 and 3.104-4 3
1.0 Overview
The Office of Satellite and Product Operations (OSPO) and the Office of Satellite Ground Services (OSGS) have shared responsibilities in managing satellite ground systems and product processing systems. The Task Order 01 Performance Work Statement (PWS) specifies the OMS program management requirements applicable to NESDIS ground systems support functions.
2.0 Scope
The Task Order 01 PWS specifies the Program Management requirements to support operations, maintenance, and sustainment of the assigned NESDIS ground segments within the OMS contract. Program management responsibilities include: project management, conducting program management reporting and review packages, schedule, delivery of products and services, financial operations and cost management, staffing management, configuration management, data management, systems engineering support, asset and property management with related inventories/ audits, purchasing and hardware/software license management, quality management, risk process management, training requirements, and contract transition management.
The work locations for Task Order 1 include:
● NOAA Satellite Operations Facility (NSOF) located in Suitland, MD
● OSGS Program Offices located in Greenbelt MD and Silver Spring MD
● NOAA Center for Weather and Climate Prediction (NCWCP) located in College Park, MD
2.1 Program Management
PWS-TO1-PM01: The Contractor shall provide program/project management services, personnel, and various documentation required to execute all requirements set forth in the IDIQ contract and all task orders). The Contractor shall:
● Create and maintain a comprehensive Program Management Plan (PMP) that shall cover programmatic activities for the OMS IDIQ contract and all task orders; the PMP plan shall be updated to cover new scope (i.e., new or modified task orders, as required) [Deliverable].
● Develop and submit all programmatic documentation deliverables (see Appendix 1, Deliverables).
● Deliver a monthly Program Review Status Package [Deliverable] containing a program Integrated Milestone Schedule (IMS) [Deliverable], detailed technical status, personnel
Source Selection Information – See FAR 2.101 and 3.104-4 4 status and updates, financial baseline plan vs. actual, and variance report, current ODC status/plan/ forecast, maintenance plan status, and table containing all required contract metrics.
● Deliver a monthly Consolidated Contract Financial Report [Deliverable].
● Conduct programmatic meetings to provide status of contract activities covering technical, schedule, financial activities, monthly program review, and regularly scheduled status meetings (e.g., tag up meetings, risk management, change control and any other ad hoc special topic or technical interchange meetings, phone calls, and response to data calls (when required) that are requested by the Government program office).
PWS-TO1-PM02: The Contractor shall provide and maintain a monthly Integrated Milestone Schedule (IMS) to include all task orders. The IMS shall be submitted with the monthly report and include all deliverables and monthly invoice and monthly Contract Funds Status reporting dates. The IMS is required to include linked milestones for all contract transitions and task orders, procurement activities (as predecessors to sustainment activities), and all external dependencies. The IMS shall be included in the monthly program management review status package. The contractor shall support additional schedule updates, when requested, supporting such activities as estimation of new, or modified activities, and developing impact assessments.
PWS-TO1-PM03: The Contractor shall provide a Contract Funds Status Report to the Government (monthly) for each task order [Deliverable]. The contractor may submit a consolidated contract funds status for the program covering all task orders.
PWS-TO1-PM04: The Contractor shall submit to the Government monthly invoices for each individual task order [Deliverable].
PWS-TO1-PM05: The Contractor shall provide and maintain an annual Spend Plan for Government approval [Deliverable]. The Spend Plan shall run from 01 October through 30 September of the following fiscal year and have monthly increments and milestones. The spending in the plan shall be presented in Work Year Equivalents (WYE) for labor and dollars in thousands to one decimal place for material purchases. The Spend Plan shall be updated monthly.
PWS-TO1-PM06: The Contractor shall provide a weekly Program Status Report (work status and plan) covering Monday through Sunday for each task order no later than the close of business (COB) the previous Friday [Deliverable].
PWS-TO1-PM07: The Contractor shall support the Government use of the Enterprise Configuration Management Tool (ECMT) to estimate work hours. The Government uses ECMT to monitor work hours for operations, maintenance, and sustainment support. ECMT is used cooperatively to accurately estimate work hours needed for helpdesk tickets, work requests, and configuration changes.
Source Selection Information – See FAR 2.101 and 3.104-4 5
PWS-TO1-PM08: The Contractor shall perform Engineering Assessments (EA) [Deliverable] identified and approved by the COR that include details related to system performance analysis, capacity planning, and cost estimates over the performance period. Deliverables from engineering assessments may result in technical direction letters or contract modifications depending on the scope and magnitude of the request.
PWS-TO1-PM09: The Contractor shall provide and maintain a weekly contract Staffing Plan [Deliverable]. The Staffing Plan shall include a Contractor Organization chart, and identified roles and responsibilities. Updated organizational charts shall be provided when significant personnel or organizational changes to the Contractor’s organization occur, or change. Further, advance notification of 10 days shall be provided in the event of personnel changes. Contractor personnel shall possess the requisite professional and technical certifications, or comparable experience, commensurate with their responsibilities. The Contractor shall provide personnel that qualify under the condition of Suitability Assessment On-Site Service Support.
PWS-TO1-PM10: The Contractor shall maintain a list of all training taken by the Contract staff, relevant to, or required by, work performed on the Contract. The Contractor shall report changes to this as a part of their weekly status briefings. This list shall include at a minimum, the Contract staff members, name, position, training taken, date and the training relevance to the Contract or mandate it fulfills. The Contractor shall also produce and deliver to the Government, an updated list when requested for a data call.
PWS-TO1-PM11: The Contractor shall provide meeting management services to the Government. These services include scheduling meetings, creating meeting agendas, documenting meeting minutes for all attended meetings, tracking action items, distributing agendas, schedules, minutes and action items [Deliverable] and posting any documentation to the Government-designated location.
PWS-TO1-PM12: The Contractor shall provide trained staff to support the Government in the use of enterprise tools listed in Table 2.1-1.
The Government will provide to the Contractor’s personnel on-site familiarization with the Government’s implementation of the enterprise tools.
Table 2.1-1 Government Furnished Enterprise Tools
Function / Guidance Tool(s) [Vendor/Basis]
Requirements Management / OSGS 5820.03A Requirements Management
Process
Dynamic Object Oriented Requirements System (DOORS) [IBM Rational]
Source Selection Information – See FAR 2.101 and 3.104-4 6
Risk Management / OSGS 5820.04A Risk, Issue and Opportunity Management
Process Document
Active Risk Manager (ARM) [Sword – ActiveRisk]
Configuration Control / OSGS 5820.02A Change and Configuration Management
Process Document
Sunflower Systems Enterprise Configuration Management Tool
(ECMT) [IBM ClearCase/ClearQuest]
Enterprise Help Desk Enterprise Scheduler System Customer Relationship Management
(CRM) Solution
Network Monitoring Solarwinds
Asset / Patch Management Altiris / BigFix
Log Management Tripwire / ArcSight
Web Management WebInspect
Vulnerability Management NESSUS
Document Management SharePoint / Google Docs
PWS-TO1-PM13: The Contractor shall provide completed travel request forms for non-emergency travel to the COR no less than 14 business days prior to the first day of planned travel. Travel must be deemed necessary and authorized by submission and subsequent approval of a travel request by the COR in order to be paid for by the Government.
PWS-TO1-PM14: The Contractor, as required by the COR or CO, shall travel to OMS work sites to support project activities, continuity of operations, and maintenance and sustainment activities and/or meetings/site visits as required by individual task orders. The Contractor shall comply with the following:
● All OMS contract-related travel shall be planned, coordinated, and approved in writing by the COR in advance.
Source Selection Information – See FAR 2.101 and 3.104-4 7
● Travel shall be in accordance with the Federal Travel Regulation.
● The Contractor shall submit travel request forms for non-emergency travel at least 14 business days prior to the first day of planned travel.
● The Contractor shall submit travel costs on its monthly invoices within 30 days of travel.
● Submit any program requested travel for other Government Funded travel (e.g., support conferences, workshops, etc.) per submission processes to obtain any additional levels of Government approval required.
2.1.1 Systems Engineering Management
PWS-TO1-SE01: The Contractor shall provide an initial Systems Engineering Management Plan (SEMP) [Deliverable] with the proposal response, and maintain it as required. The SEMP shall describe how the Contractor will apply Systems Engineering Tools (SET) and principles to the execution of operations, maintenance and sustainment of the assigned systems, as well as technical review processes, and process improvement efforts. SEMPs shall comply with NESDIS Systems Engineering Processes and Procedures.
PWS-TO1-SE02: The Contractor shall support the Government’s Engineering Review Board (ERB) by providing an Executive Secretary experienced with the Engineering Review process to create, maintain, and track completion of agendas, minutes, and action items.
PWS-TO1-SE03: The Contractor shall provide Technical Writing Services to the Government.
These include text and graphics, formatting, editing, proofreading, printing, faxing, copying and file conversion.
2.1.2 Configuration and Asset Management
The Government performs Configuration Control and Configuration Management following the guidelines provided in the NOAA/NESDIS/OSGS 5820.02A Change and Configuration Management Process Document. The Government will provide a Configuration Management (CM) tool. IBM Rational ClearCase / ClearQuest based Enterprise Configuration Management Tool (ECMT) is currently being used to track hardware and software configuration items (CI).
PWS-TO1-CM01: The Contractor shall support the Government daily in operating and maintaining ECMT for all OSPO systems. An ECMT Standard Operating Procedure (SOP) describing the support and processes will be provided in the OMS document library.
PWS-TO1-CM02: The Contractor shall submit Configuration Change Requests (CCRs) with all required documentation for all changes made during operations, maintenance, and sustainment of any hardware or software. The Government will provide a Microsoft SharePoint based document management system for creating or modifying documentation describing the maintenance and
Source Selection Information – See FAR 2.101 and 3.104-4 8 operations of hardware or software and provides information in general about hardware or software. The contractor shall provide current metrics on CCRs. 90% of CCRs shall have no open problem reports (PRs) at operational readiness review (ORR); any open PRS shall have an approved resolution plan.
PWS-TO1-CM03: The Contractor shall utilize the Government’s enterprise Microsoft SharePoint tool. Sharepoint will be the enterprise tool for OMS program documentation repository and technical documentation library for all OSPO systems.
PWS-TO1-CM04: The Contractor shall manage and maintain the NSOF Library in accordance with the NSOF Library Standard Operating Procedure (SOP).
PWS-TO1-CM05: The Contractor shall provide one or more Contractor resources as the responsible party for maintaining each, operating procedure, document, diagram, data set, configuration file or technical data package used in the operations, maintenance and sustainment of all assigned systems.
The responsible party will track configuration change requests (CCR) to their assigned materials and make recommendations to the Government for when they should issue a new revision of the materials.
PWS-TO1-CM06: The Contractor shall submit CCR’s for Document Change Requests.
Operations, Maintenance and Sustainment documentation is varied and extensive. It includes operating procedures, documents, diagrams, data sets, configuration files, build forms, network diagrams, operational event logs, data flow diagrams, computer room rack layouts, operations checklists, program descriptions, security audit logs, firewall rules, system descriptions, interface control documents, system security plans, software and hardware inventories, IT security artifacts, memoranda, maintenance manuals, contractual documentation and technical data packages.
PWS-TO1-CM07: The Contractor shall support the Government Configuration Control Board by providing an Executive Secretary experienced with Configuration Control and Management processes to create, maintain, and track completion of agendas, minutes, and action items.
PWS-TO1-CM08: Within 30 days of contract award, the Contractor shall perform a Physical Configuration Audit (PCA) at the CI level for Assigned System assets under each Task Order.
Subsequent audits shall apply to all applicable task orders under the OMS contract and be delivered per applicable task order deliverables list.
PWS-TO1-CM09: Within 60 days of PCA completion, the Contractor shall reconcile the PCA results of all Assigned Systems with existing property management tracking tool (AKA
Source Selection Information – See FAR 2.101 and 3.104-4 9
Sunflower), System Boundary inventories, and the Technical Architecture Infrastructure Reference Model.
PWS-TO1-CM10: Within 60 days of PCA completion (and annually thereafter), the Contractor shall reconcile the PCA results of all Assigned Systems with existing software license management lists, IT software inventories, and the Technical Architecture Applications Reference Model in the Contractor's Reconciled Configuration Management Baseline (CMB) [Deliverable].
The Configuration Management Baseline (CMB) shall be managed and tracked in a Configuration Management Report thirty days following the initial CMB, and monthly thereafter [Deliverable].
PWS-TO1-CM11: The Contractor shall reconcile the CMB against monthly security scans and the ECMT of the assigned systems.
PWS-TO1-CM12: The Contractor shall reconcile the CMB against the annual Property Inventory Report. The initial Property Inventory Report shall be submitted within sixty days of contract award and annually thereafter [Deliverable].
PWS-TO1-CM13: The Contractor shall maintain the CMB in the ECMT.
PWS-TO1-CM14: The Contractor shall support the Government in the management of software licenses and software support agreements. These activities include maintaining a current software license and support agreement inventory, period of performance, renewal/replacement/ warranty dates such that there are no gaps in service, and entering related data in the Government provided tool.
PWS-TO1-CM15: The Contractor shall support the Government in the management of all OMS hardware warranty and support agreements. These activities are part of each system inventory (CI Database) and include maintaining a current inventory, period of performance, renewal/replacement/ warranty dates such that there are no gaps in service, and entering related data in the Government provided tool.
PWS-TO1-CM16: The contractor shall maintain (and develop, as required) a comprehensive set of Government-owned contract documentation. The maintenance of this contract documentation shall include the following tasks:
● Provide/report a log of all documents created or modified. The list of modified documentation shall be reported monthly.
● Create or modify contract documentation while maintaining the required government /contract markings.
Source Selection Information – See FAR 2.101 and 3.104-4 10
○ Contractor markings (i.e. corporate identifiers/logos, proprietary, internal use only etc.) are not permitted on OMS contract documentation
○ Contractor markings allowed include company name, address, telephone number, email address and website (on a single page inside the cover of multi-page documents, or on a single slide or frame at the beginning of a multimedia presentation).
● Maintain the current document format.
2.1.3 Property Management / Property Contact
PWS-TO1-CM16: The Contractor shall perform shipping and receiving functions for all equipment, spare parts and items for return to vendors, suppliers and repair facilities.
Shipping and Receiving activities include assembling items, containers, boxes and crates to be shipped and prepare identifying information and shipping instructions; unpack and route items received to appropriate storage areas; and shipment of packages to required locations using Government-provided carrier shipping accounts.
PWS-TO1-CM17: The designated Contractor Property Contact shall provide assistance in the management of acquiring, determining inventory, and disposing of NOAA property assigned to the custodial area.
PWS-TO1-CM18: The Contractor shall provide Property Management support which includes:
records maintenance; labeling and processing documentation related to personal property and/or ensuring property use for official purposes only; support to the annual property inventory;
identify excess property; assist and record reconciliation of physical inventories; and assist with property recovery for outbound employees. [NOAA Property _Bulletin_001_FY2016]
2.1.4 Quality Assurance
PWS-TO1-QA01: The Contractor shall provide their methods and processes for how they plan to ensure processes are carried out as planned while meeting all contract requirements in a Quality Assurance Plan (QAP) [Deliverable]. The QAP shall be included in the proposal submission and be updated as required. This plan explicitly describes Contractor processes, and measures for subcontractor/ vendor performance and their accountability in executing on their contract with the OMS contractor.
PWS-TO1-QA02: The Contractor shall provide a Quality Assurance SOP [Deliverable] within 60 days of the start of the contract and update it annually or as requested by the CO.
PWS-TO1-QA03: The Contractor shall provide, report, and track contract performance metrics as part of the monthly program management review. Metrics shall cover all task orders. Metrics
Source Selection Information – See FAR 2.101 and 3.104-4 11 shall be mutually agreed at the start of the contract, and may include modified or new metrics, as required, to accurately reflect contract performance.
PWS-TO1-QA04: The Contractor shall participate in the Government’s process improvement activities.
The Government will provide a SharePoint-based Action Information Management System (AIMS) for organizing its data calls.
PWS-TO1-QA05: The Contractor shall support organizational data call requests.
2.1.5 Risk Management
PWS-TO1-RM01: The Contractor shall comply with the OSPO Risk Management Plan.
PWS-TO1-RM02: The Contractor shall prepare a Risk Report [Deliverable] listing the Contractor’s view of initial OMS risks for review and consideration by the Government with recommended mitigations as part of its proposal submission. Subsequent updates to be coordinated with the Government monthly.
PWS-TO1-RM03: The Contractor shall support the Government in the risk management activities and maintaining risk related data in the Government-provided risk management tool, Active Risk Manager (ARM).
PWS-TO1-RM04: The Contractor shall collaborate with the Government on Risk Management activities and report risk status at the Monthly Contract Reviews.
2.1.6 Training
PWS-TO1-TR01: The Contractor shall provide personnel that are trained and experienced in the activities they support.
PWS-TO1-TR02: The Contractor shall assist the Government in identifying training for Government and Contractor personnel that will improve operations, maintenance and sustainment of assigned systems.
PWS-TO1-TR03: The Contractor shall provide training and any corresponding training materials to Government personnel on substantive changes made to assigned systems in the course of the contract.
2.1.7 Cyber Security Program Management
Source Selection Information – See FAR 2.101 and 3.104-4 12
2.1.7.1 Cyber Security Awareness & Training
PWS-TO1-ICS01: Contractor personnel shall complete all NOAA required training, including, but not limited to: No FEAR Act Training, NOAA Safety Awareness Training, NOAA Safety and Environment Awareness Training, and NOAA IT Security Awareness Training.
PWS-TO1-ICS02: All Contractor staff shall complete required Role-Based Security Training 30 days before the NOAA required deadline each fiscal year.
2.1.7.2 Cyber Security Assessment & Authorization
2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A)
PWS-TO1-ICS03: The Contractor shall support security related processes required to be compliant with Government security mandates, and obtain/maintain an Authority to Operate (ATO) for each system.
PWS-TO1-ICS04: The Contractor shall submit assigned Security Control Assessment (SCA) [Deliverable] artifacts yearly for each assigned system per the agreed schedule.
2.1.7.2.2 Plans of Action & Milestones (POA&M) Management
PWS-TO1-ICS05: The Contractor shall manage technical POA&M milestones using OSPO’s Configuration Management tool, including automated tools.
2.1.7.2.3 System Interconnection
PWS-TO1-ICS06: The Contractor shall provide data for information requests for all system Interconnection Security Agreements (ISA).
PWS-TO1-ICS07: The Contractor shall review and implement any and all interfaces per system Interface Control Documents (ICDs). Discrepancies or changes shall be reported to the Government for follow up.
2.1.7.2.4 System Security Documentation
PWS-TO1-ICS08: The Contractor shall support information requests for Security Authorization Packages for all assigned OSPO systems, including all required documents, and additional information when updates are made to DOC, NOAA, NESDIS, or OSPO policies, and Information & Cyber Security Support procedures.
Source Selection Information – See FAR 2.101 and 3.104-4 13
2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management
PWS-TO1-ICS09: The Contractor shall comply with configuration management requirements per section 3.5.3.3 of the OMS IDIQ PWS.
2.1.7.4 Cyber Security Management and Oversight
PWS-T01-ICS10: The contractor shall provide management for each OMS Task Order to ensure the Cyber Security requirements specified in the OMS IDIQ PWS are compliant. The details of the responsibilities are specified in the OMS IDIQ PWS, Section 3.5- Information & Cyber Security Support, and Appendix B- OMS Information & Cyber Security Support Task Accountability Matrix. The typical tasks for cyber security management and oversight include:
● Perform activities, as coordinated between the OMS contract and OSPO IT Security Compliance Office
● Attend ISSO briefings to be cognizant of IT Security tasks requiring O&M input, to report progress of ongoing IT Security tasks such as vulnerability remediation, POAM activities, and SCA activities
● Maintain current set of required artifacts for auditors for each IT Security boundary and control, and providing artifacts per schedule. Key audits shall be reflected in the OMS schedule.
● Support and manage audit activities, including interviews of O&M personnel during audits
● Lead maintenance activities of IT Security Inventory, and investigate and resolve discrepancies
● Ensure, monitor, and report completion of all IT security required training (including all users and position-specific support positions)
● Lead O&M-related readiness and execution of the annual COOP exercises and deployments
● Lead disaster recovery activities, ensure routine disaster recovery backups are tested and fully functional in advance to ensure their functionality
● Report status of O&M security activities to the Government
● Perform risk management activities for the OMS contract to the Risk Management Board
● Lead Contractor activities for investigating IT security incidents
2.2 Contract Transition
The transition of an expiring contracts scope to the OMS contract is a programmatic activity managed by the OMS Contractor and incumbent contractor, in coordination with the Government. The OMS Contractor shall accurately and effectively capture (document), and
Source Selection Information – See FAR 2.101 and 3.104-4 14 manage the transition of all activities contained in OMS task orders in a transition plan. A separate transition plan is required for each individual transition to the OMS contract.
PWS-TO1-CT01: The Contractor shall provide a contract Phase-In Transition Plan with a checklist of all required tasks and activities to complete the transition successfully. The initial Phase-in Transition Plan shall be submitted with the proposal response, and a final 30 days after contract award [Deliverable].
PWS-TO1-CT02: The Contractor shall transition work performance from any incumbent contractor(s) to itself for any assigned system. The Contractor shall manage the transition with no interruption in ongoing services. Typical activities occurring in transition include:
● Staffing
● Training
● Transfer of operations, inventory, and assets
● Transfer of accounts, passwords, and permissions
● Monitoring of maintenance and sustainment activities
● Configuration control, administration, Book Boss custodianship of data sets, software scripts, documentation, procedures, and checklists
● IT Security activities
● Hardware and software license management, and warranty activity
PWS-TO1-CT03: The Contractor shall document and report verbally the Phase-In Transition status report to the Government PMO weekly and monthly at the OMS program review meeting.
PWS-TO1-CT04: The Contractor shall deliver a Contract Phase-Out Transition Plan [Deliverable TO1-21] outline one year prior to the end of the contract to the PMO to include:
● Staffing
● Training
● Transfer of operations, inventory, and assets
● Transfer of accounts, passwords, and permissions
● Monitoring of maintenance and sustainment activities
● Configuration control, administration, Book Boss custodianship of data sets, software scripts, documentation, procedures, and checklists
● IT Security activities
● Hardware and software license management, and warranty activity
Source Selection Information – See FAR 2.101 and 3.104-4 15
3.0 Performance Requirements Summary
PWS Section
Performance
Objectives
Minimum Acceptable Quality Level (AQL)
Monitoring Method Incentive/Disincentive
TBD TBD TBD TBD TBD
Source Selection Information – See FAR 2.101 and 3.104-4 16
Appendix A. Deliverables All deliverables shall be emailed to the individuals listed in the distribution column of the table below.
Deliverable
ID #
Deliverable Frequency Distribution PWS Reference
TBD Program Management Plan
Initial with proposal submission, final one (1) month after contract award.
Subsequent updates delivery shall be mutually agreed
COR, CO
2.1 Program
Management
(PWS-TO1-PM01)
TBD
Program Review Status Package
Monthly CO,COR,PM 2.1 Program Management (PWS-
TO1-PM01)
TBD
Integrated Milestone Schedule
(IMS)
Initial with proposal submission, updates monthly thereafter.
CO,COR,PM 2.1 Program Management (PWS-
TO1-PM01)
(PWS-TO1-PM02)
TBD
Consolidated Contract Financial Report
Monthly CO,COR,PM 2.1 Program Management (PWS-
TO1-PM01)
TBD Contract Funds Status Report
Monthly CO, COR, PMO
2.1 Program
(PWS-TO1-PM02)
(PWS-TO1-PM03)
TBD Invoices Monthly CO, COR, PMO
2.1 Program
Management
(PWS-TO1-PM04)
TBD Annual Spend Plan Initial with proposal submission, updated monthly thereafter
CO, COR,
PMO
2.1 Program
(PWS-TO1-PM05)
Source Selection Information – See FAR 2.101 and 3.104-4 17
TBD Program Status Report (work status and plan covering Monday through Sunday for each task order)
Weekly COR, CO, PMO, Operations Manager
2.1 Program
Management
(PWS-TO1-PM06)
TBD Engineering Assessments As required COR, PMO 2.1 Program Management
(PWS-TO1-PM08)
TBD Staffing Plan Initial with proposal, final within 5 business days after award, updated weekly thereafter, and upon issuance of task order(s);
COR, PMO 2.1 Program Management
(PWS-TO1-PM09)
TBD
Meeting minutes, agendas, action item lists, lessons learned, etc
As required per required meetings established by the Government
Area Leads, PMO
2.1 Program
Management
(PWS-TO1-PM11)
TBD Systems Engineering Management Plan
Initial with proposal response, updated as required
COR
2.1.1 Systems
Engineering Management
(PWS-TO1-SE01)
TBD Reconciled Configuration Management Baseline Report Within 60 days of PCA, then annually thereafter
COR
2.1.2 Configuration and
Asset Management
(PWS-TO1-CM10)
TBD Configuration Management Report Initial 30 days after Configuration
Management Baseline (CMB), monthly thereafter
PMO, COR,
CO 2.1.2 Configuration and
Asset Management
(PWS-TO1-CM10)
TBD Reconciled Property Inventory Report Within 60 days after contract award, then annually thereafter
COR
2.1.2 Configuration and
Asset Management
Source Selection Information – See FAR 2.101 and 3.104-4 18
(PWS-TO1-CM12)
TBD Quality Assurance Plan (QAP) Initial with proposal, updated as required (with issuance of any new task order)
COR
2.1.4 Quality Assurance
(PWS-TO1-QA01)
TBD
Quality Assurance Standard Operating Procedure (SOP)
60 days after Contract start, updated annually, or requested by CO
PMO, CO,
COR 2.1.4 Quality Assurance
(PWS-TO1-QA02)
TBD
Risk Report
Initial report (Initial contractor risk list and proposed mitigation) with proposal.
Subsequent updates (coordinated w/ Contractor and Government) monthly
COR, PMO
2.1.5 Risk Management
(PWS-TO1-RM02;
PWS-TO1-RM04)
TBD
Security Control Assessment (SCA) Artifacts
Yearly for each assigned system per the agreed schedule
(SCA occurs yearly at a time chosen by NSOF. The artifacts are designated by the security assessors at the time of the assessment)
2.1.7.2.1 Continuous
Monitoring and Assessment & Authorization (A&A)
(PWS-TO1-ICS04)
TBD Phase-in Transition Plan Initial plan submitted covering all task orders, Final plan 30 days after contract award
Subsequent plans for new task orders - Initial at task order proposal response, final 2 weeks after task order start
COR, CO 2.2 Contract Transition
(PWS-TO1-CT01)
TBD Phase-out Transition Plan Outline
Due one (1) year prior to the end of contract
COR, CO 2.2 Contract Transition
(PWS-TO1-CT04)
Source Selection Information – See FAR 2.101 and 3.104-4 19
Appendix B. Meetings
Meeting Frequency Medium/Format Submit To Agenda Topics Description
The Contractor shall participate in daily Help Desk Meetings
Daily In person COR Help Desk Daily Logs ECMT Ticket Status Change Log and Actions Report
The Help Desk Manager facilitates the Daily Help Desk meetings through providing Daily Logs, Ticket Reports, and Change Log reports for any planned System/ Network updates scheduled within 24 hours that may impact operations
The Contractor shall participate in daily SOCC Ticket Meeting
Daily In person COR Specific SOCC tickets
The Help Desk Manager facilitates the SOCC Ticket review/analysis process for ticket completion and to determine whether additional information or action is appropriate for ticket closure
The Contractor shall participate in daily SOCC Meeting
Daily In person COR SOCC issues, Wallops, Fairbanks, CDA, NSOF, NDE, GOES, POES, Jason 2
(Overview of SOCC and other satellite stations)
The SOCC Branch Chief facilitates this meeting and provides a status of daily/major activities that occur in
SOCC
The Contractor shall participate in weekly OMS Tech Doc Meeting
Weekly In person COR Technical documentation dashboard and outstanding tasks
The QA facilitates this meeting daily to address status on tasks assigned to the technical writers
The Contractor shall participate in weekly CCBs (Configuration Change Board)
Weekly – designated days for ESPC, DMSP, GOES, Polar
In person COR Reviews ECMT Requests
The CM Manager facilitates these CCBs:
To review and disposition ESPC, DMSP,GOES, Polar, and Common ECMT tickets (CCRs, and WRs)
Source Selection Information – See FAR 2.101 and 3.104-4 20
The Contractor shall participate in weekly OMS Weekly Contract Meeting
Weekly In person COR Staffing, Program Management, Operations and Maintenance, System Engineering, Products and Applications, IT Security, POA&Ms and A&As
The Quality Manager facilitates this meeting to provide weekly status on planning for OMS tasks
The Contractor shall participate in weekly ISSO POA&M Status Meetings.
Weekly designated
Days for , for
GOES, POES,
ESPC, NJGS
In person COR A&A and POA&Ms
This meeting is held to secure a status of A&A and POA&Ms for systems
The Contractor shall participate in bi-weekly Help Desk Working Group
Bi-weekly. In person COR Review :
Procedures and update accordingly
The Help Desk Manager facilitates this meeting with the objective to improving the process and procedures used at the ESPC Help Desk
The Contractor shall participate in monthly ERB (Executive Review Board)
Monthly In person COR TBA by leader The PAL facilitates this meeting on an as-needed basis to resolve issues that cannot be resolved by the CCB.
The ERB shall also be responsible for the re-allocation of resources, establishing division priorities, and actions within the respective Divisions relating to change management and maintaining the operational integrity of the OSPO operating environment.
The Contractor shall participate in quarterly CM Technical Activities Working Group Meeting
Quarterly or as needed
In person COR TBA by leader The PAL facilitates this meeting on an as-needed basis to adjudicate the CM Process Improvements Forms/Pending requests
Source Selection Information – See FAR 2.101 and 3.104-4 21
The Contractor shall participate in bi-weekly CM Tools Working Group
Bi-weekly
In person COR ECMT status, tickets, WRs and CCRs
The primary function and responsibility of the Configuration Management Tools Working Group (CMTWG) is managing stakeholder needs and requirements for Change and Configuration Management tools running (ECMT) on the NSOF Mission Support LAN
(NOAA5044).
The Contractor shall participate in monthly SOCC Risk Meeting
Monthly In person COR Open Risks Monthly meeting to review and provide status on all SOCC risks
The Contractor shall participate in Monthly MOD Issues meeting
Monthly In person COR Open Risks Monthly meeting to review and provide status on all Maintenance and Operations Division (MOD) issues
The Contractor shall participate in weekly Inventory Review Board
Weekly In person COR Inventory reviews and approvals
Inventory Improvements
The ESPC Network Engineer facilitates this meeting and reviews the updates on Altiris/ESPC and SOCC HW and SW inventories
Source Selection Information – See FAR 2.101 and 3.104-4 22
Appendix C. Acronym Listing AIMS Action Information Management System
AQL Acceptable Quality Level
ARM Active Risk Manager
ATO Authority to Operate
CCR Configuration Change Request
CI Configuration Item
CO Contracting Officer
COB Close of Business
COR Contracting Officer Representative
CRM Customer Relationship Management
CS Contract Specialist
EA Engineering Assessments
ECMT Enterprise Configuration Management Tool
ERB Engineering Review Board
FAR Federal Acquisition Regulation
FTR Federal Travel Regulations
IAW In Accordance/Agreement With
IBM International Business Machines
ICD Interface Control Document
IDIQ Indefinite Delivery Indefinite Quantity
IMS Integrated Master Schedule
ISA Interconnection Security Agreements
IT Information Technology
Source Selection Information – See FAR 2.101 and 3.104-4 23
MD Maryland
NCWCP NOAA Center for Weather and Climate Prediction
NESDIS National Environmental Satellite, Data, and Information Service
NOAA National Oceanic and Atmospheric Administration
NSOF NOAA Satellite Operations Facility
OMS Operations Maintenance Sustainment
OSGS Office of Satellite Ground Services
OSPO Office of Satellite Product Operations
PCA Physical Configuration Audit
PM Program Manager
PMO Program Management Office
POA&Ms Plan of Action and Milestones
PWS Performance Work Statement
QAP Quality Assurance Plan
SCA Security Control Assessment
SEMP Systems Engineering Management Plan
SOP Standard Operating Procedure
WYE Work Year Equivalents
| 1.0 Overview |
| 2.0 Scope |
| 2.1 Program Management |
| 2.1.1 Systems Engineering Management |
| 2.1.2 Configuration and Asset Management |
| 2.1.3 Property Management / Property Contact |
| 2.1.4 Quality Assurance |
| 2.1.5 Risk Management |
| 2.1.6 Training |
| 2.1.7 Cyber Security Program Management |
| 2.1.7.1 Cyber Security Awareness & Training |
| 2.1.7.2 Cyber Security Assessment & Authorization |
| 2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A) |
| 2.1.7.2.2 Plans of Action & Milestones (POA&M) Management |
| 2.1.7.2.4 System Security Documentation |
| 2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management |
| 2.1.7.4 Cyber Security Management and Oversight |
2.2 Contract Transition