Attachment_2_-_Draft_Task_Order_1_PWS_-__Program_Management.pdf

PDF 161 KB Posted

Attached to
Operations, Maintenance, and Sustainment Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document is a Request for Information (RFI) issued by the National Oceanic and Atmospheric Administration (NOAA) to assess the marketplace for an upcoming Operations, Maintenance, and Sustainment (OMS) contract. NOAA anticipates awarding a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide OMS requirements for multiple NESDIS systems over a base year plus four option years.

The RFI requests responses by December 15, 2017 to include company information, capabilities and experience statements, and any questions or concerns regarding the draft Performance Work Statement (PWS) attached. Capabilities statements should address program management, timely delivery of goods and services, maintenance and license agreements, assessments, improvements, IT security processes, and recommended transition periods. Experience statements should include relevant details on scope, period of performance, value, clients, and other information relevant to the OMS requirement.

NOAA plans to release a draft RFP on January 5, 2018 and host an Industry Day at its Silver Spring campus on January 17, 2018. The RFI is for information and planning purposes only and does not constitute a solicitation.

Draft Task Order 1 PWS - Program Management

View the file

Other files for this federal contract opportunity

Other files attached to Operations, Maintenance, and Sustainment, newest first.
File Type Posted
OMS Acquisition Library Master Reference List.pdf PDF
OMS NDA Library.docx DOCX document
OMS DRAFT RFP Q&A.pdf PDF
OMS NDA Library.docx DOCX document
OMS NDA Library.docx DOCX document
OMS DRAFT RFP Q&A.pdf PDF
Attachment J-8 OMS Task Order 4 Products and Applications PWS Terms and Conditions.pdf PDF
Task Order 1 PWS for Program Management.pdf PDF
Attachment J-5 OMS Task Order 1 Program Management PWS Terms and Conditions.pdf PDF
Task Order 4 PWS for Products Services and Applications.pdf PDF
Attachment J-7 OMS Task Order 3 Sustainment PWS Terms and Conditions.pdf PDF
Attachment J-6 OMS Task Order 2 Operations and Maintenance PWS Terms and Conditions.pdf PDF
Task Order 2 PWS for O&M.pdf PDF
Task Order 3 PWS for Sustainment.pdf PDF
Attachment J-11 Risk Report Template.pdf PDF
Attachment J-3 Draft DD-254.pdf PDF
Attachment J-4 Subcontracting Plan Template.pdf PDF
Attachment J-16 Task Order 4 Pricing Breakdown.pdf PDF
Attachment J-15 Task Order 3 Pricing Breakdown.pdf PDF
Attachment J-9 - RFP Question and Comment Template.pdf PDF
Attachment J-17 - DRAFT RFP Question and Comment Template.xlsx XLSX spreadsheet
Attachment J-13 Task Order 1 Pricing Breakdown.pdf PDF
DRAFT OMS Request for Proposal.pdf PDF
Attachment J-14 Task Order 2 Pricing Breakdown.pdf PDF
Attachment J-12 Small Business Participation Commitment Template.pdf PDF
Attachment J-10 Past Performance Questionnaire.pdf PDF
Attachment J-2 Labor Category Descriptions.pdf PDF
Attachment J-1 OMS IDIQ PWS.pdf PDF
Attachment_5_-_Draft_PWS_FBO_Comment_Sheet.Version2.0.xlsx XLSX spreadsheet
Attachment_1_-_Draft_OMS_IDIQ_PWS.pdf PDF
Attachment_3_-_Draft_Task_Order_2_PWS_O&M.pdf PDF
Attachment_4_-_Draft_Task_Order_4_PWS_-_Products_and_Applications.pdf PDF
Attachment_3_-_Draft_Task_Order_2_PWS_O&M.pdf PDF
Attachment_4_-_Draft_Task_Order_4_PWS_-_Products_and_Applications.pdf PDF
Attachment_2_-_Draft_Task_Order_1_PWS_-__Program_Management.pdf PDF
Attachment_5_-_Draft_PWS_FBO_Comment_sheet.xlsx XLSX spreadsheet
Attachment_1_-_Draft_OMS_IDIQ_PWS.pdf PDF
OMS_Industry_Day_Webinar_Attendance.pdf PDF
OMS_Industry_Day_Slides_15_March_2018.pdf PDF
OMS_Industry_Day_Attendees_15_March_2018.pdf PDF
Draft_Agenda.pdf PDF
OMS_Task_Order_3_PWS_for_Sustainment_-_Draft_03-07-2018.pdf PDF
OMS_Task_Order_2_PWS_for_O_M_-_Draft_03-07-2018.pdf PDF
OMS_Task_Order_1_PWS_for_Program_Management_-Draft_03-07-2018.pdf PDF
OMS_IDIQ_PWS_-_Draft_03-07-2018.pdf PDF
OMS_Industry_Day_Notice_CORRECTED.pdf PDF
OMS_Industry_Day_Notice.pdf PDF
RFI.docx DOCX document
OMS_IDIQ_PWS__Nov_30_2017_DRAFT.docx DOCX document
OMS_IDIQ_PWS__Appendices_Nov_30_2017_DRAFT.docx DOCX document
Show all 50

Operations, Maintenance, and Sustainment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Environmental Satellite, Data, and Information Service (NESDIS)

Office of Satellite and Product Operations (OSPO) and

Office of Satellite Ground Services (OSGS)

Draft Operations, Maintenance, and Sustainment (OMS) Task Order 01

Performance Work Statement (PWS)

August 5, 2019

DRAFT OPERATIONS, MAINTENANCE, AND SUSTAINMENT (OMS)

TASK ORDER 1 PWS - PROGRAM MANAGEMENT

Source Selection Information – See FAR 2.101 and 3.104-4 2

Table of Contents

1.0 Overview 3

2.0 Scope 3

2.1 Program Management 3

2.1.1 Systems Engineering Management 7

2.1.2 Configuration and Asset Management 7

2.1.3 Property Management / Property Contact 10

2.1.4 Quality Assurance 10

2.1.5 Risk Management 11

2.1.6 Training 11

2.1.7 Cyber Security Program Management 11

2.1.7.1 Cyber Security Awareness & Training 12

2.1.7.2 Cyber Security Assessment & Authorization 12

2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A) 12

2.1.7.2.2 Plans of Action & Milestones (POA&M) Management 12

2.1.7.2.3 System Interconnection 12

2.1.7.2.4 System Security Documentation 12

2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management 13

2.1.7.4 Cyber Security Management and Oversight 13

2.2 Contract Transition 13

3.0 Performance Requirements Summary 15

Appendix A. Deliverables 16

Appendix B. Meetings 19

Appendix C. Acronym Listing 212

Source Selection Information – See FAR 2.101 and 3.104-4 3

1.0 Overview

The Office of Satellite and Product Operations (OSPO) and the Office of Satellite Ground Services (OSGS) have shared responsibilities in managing satellite ground systems and product processing systems. The Task Order 01 Performance Work Statement (PWS) specifies the OMS program management requirements applicable to NESDIS ground systems support functions.

2.0 Scope

The Task Order 01 PWS specifies the Program Management requirements to support operations, maintenance, and sustainment of the assigned NESDIS ground segments within the OMS contract. Program management responsibilities include: project management, conducting program management reporting and review packages, schedule, delivery of products and services, financial operations and cost management, staffing management, configuration management, data management, systems engineering support, asset and property management with related inventories/ audits, purchasing and hardware/software license management, quality management, risk process management, training requirements, and contract transition management.

The work locations for Task Order 1 include:

● NOAA Satellite Operations Facility (NSOF) located in Suitland, MD

● OSGS Program Offices located in Greenbelt MD and Silver Spring MD

● NOAA Center for Weather and Climate Prediction (NCWCP) located in College Park, MD

2.1 Program Management

PWS-TO1-PM01: The Contractor shall provide program/project management services, personnel, and various documentation required to execute all requirements set forth in the IDIQ contract and all task orders). The Contractor shall:

● Create and maintain a comprehensive Program Management Plan (PMP) that shall cover programmatic activities for the OMS IDIQ contract and all task orders; the PMP plan shall be updated to cover new scope (i.e., new or modified task orders, as required) [Deliverable].

● Develop and submit all programmatic documentation deliverables (see Appendix 1, Deliverables).

● Deliver a monthly Program Review Status Package [Deliverable] containing a program Integrated Milestone Schedule (IMS) [Deliverable], detailed technical status, personnel

Source Selection Information – See FAR 2.101 and 3.104-4 4 status and updates, financial baseline plan vs. actual, and variance report, current ODC status/plan/ forecast, maintenance plan status, and table containing all required contract metrics.

● Deliver a monthly Consolidated Contract Financial Report [Deliverable].

● Conduct programmatic meetings to provide status of contract activities covering technical, schedule, financial activities, monthly program review, and regularly scheduled status meetings (e.g., tag up meetings, risk management, change control and any other ad hoc special topic or technical interchange meetings, phone calls, and response to data calls (when required) that are requested by the Government program office).

PWS-TO1-PM02: The Contractor shall provide and maintain a monthly Integrated Milestone Schedule (IMS) to include all task orders. The IMS shall be submitted with the monthly report and include all deliverables and monthly invoice and monthly Contract Funds Status reporting dates. The IMS is required to include linked milestones for all contract transitions and task orders, procurement activities (as predecessors to sustainment activities), and all external dependencies. The IMS shall be included in the monthly program management review status package. The contractor shall support additional schedule updates, when requested, supporting such activities as estimation of new, or modified activities, and developing impact assessments.

PWS-TO1-PM03: The Contractor shall provide a Contract Funds Status Report to the Government (monthly) for each task order [Deliverable]. The contractor may submit a consolidated contract funds status for the program covering all task orders.

PWS-TO1-PM04: The Contractor shall submit to the Government monthly invoices for each individual task order [Deliverable].

PWS-TO1-PM05: The Contractor shall provide and maintain an annual Spend Plan for Government approval [Deliverable]. The Spend Plan shall run from 01 October through 30 September of the following fiscal year and have monthly increments and milestones. The spending in the plan shall be presented in Work Year Equivalents (WYE) for labor and dollars in thousands to one decimal place for material purchases. The Spend Plan shall be updated monthly.

PWS-TO1-PM06: The Contractor shall provide a weekly Program Status Report (work status and plan) covering Monday through Sunday for each task order no later than the close of business (COB) the previous Friday [Deliverable].

PWS-TO1-PM07: The Contractor shall support the Government use of the Enterprise Configuration Management Tool (ECMT) to estimate work hours. The Government uses ECMT to monitor work hours for operations, maintenance, and sustainment support. ECMT is used cooperatively to accurately estimate work hours needed for helpdesk tickets, work requests, and configuration changes.

Source Selection Information – See FAR 2.101 and 3.104-4 5

PWS-TO1-PM08: The Contractor shall perform Engineering Assessments (EA) [Deliverable] identified and approved by the COR that include details related to system performance analysis, capacity planning, and cost estimates over the performance period. Deliverables from engineering assessments may result in technical direction letters or contract modifications depending on the scope and magnitude of the request.

PWS-TO1-PM09: The Contractor shall provide and maintain a weekly contract Staffing Plan [Deliverable]. The Staffing Plan shall include a Contractor Organization chart, and identified roles and responsibilities. Updated organizational charts shall be provided when significant personnel or organizational changes to the Contractor’s organization occur, or change. Further, advance notification of 10 days shall be provided in the event of personnel changes. Contractor personnel shall possess the requisite professional and technical certifications, or comparable experience, commensurate with their responsibilities. The Contractor shall provide personnel that qualify under the condition of Suitability Assessment On-Site Service Support.

PWS-TO1-PM10: The Contractor shall maintain a list of all training taken by the Contract staff, relevant to, or required by, work performed on the Contract. The Contractor shall report changes to this as a part of their weekly status briefings. This list shall include at a minimum, the Contract staff members, name, position, training taken, date and the training relevance to the Contract or mandate it fulfills. The Contractor shall also produce and deliver to the Government, an updated list when requested for a data call.

PWS-TO1-PM11: The Contractor shall provide meeting management services to the Government. These services include scheduling meetings, creating meeting agendas, documenting meeting minutes for all attended meetings, tracking action items, distributing agendas, schedules, minutes and action items [Deliverable] and posting any documentation to the Government-designated location.

PWS-TO1-PM12: The Contractor shall provide trained staff to support the Government in the use of enterprise tools listed in Table 2.1-1.

The Government will provide to the Contractor’s personnel on-site familiarization with the Government’s implementation of the enterprise tools.

Table 2.1-1 Government Furnished Enterprise Tools

Function / Guidance Tool(s) [Vendor/Basis]

Requirements Management / OSGS 5820.03A Requirements Management

Process

Dynamic Object Oriented Requirements System (DOORS) [IBM Rational]

Source Selection Information – See FAR 2.101 and 3.104-4 6

Risk Management / OSGS 5820.04A Risk, Issue and Opportunity Management

Process Document

Active Risk Manager (ARM) [Sword – ActiveRisk]

Configuration Control / OSGS 5820.02A Change and Configuration Management

Process Document

Sunflower Systems Enterprise Configuration Management Tool

(ECMT) [IBM ClearCase/ClearQuest]

Enterprise Help Desk Enterprise Scheduler System Customer Relationship Management

(CRM) Solution

Network Monitoring Solarwinds

Asset / Patch Management Altiris / BigFix

Log Management Tripwire / ArcSight

Web Management WebInspect

Vulnerability Management NESSUS

Document Management SharePoint / Google Docs

PWS-TO1-PM13: The Contractor shall provide completed travel request forms for non-emergency travel to the COR no less than 14 business days prior to the first day of planned travel. Travel must be deemed necessary and authorized by submission and subsequent approval of a travel request by the COR in order to be paid for by the Government.

PWS-TO1-PM14: The Contractor, as required by the COR or CO, shall travel to OMS work sites to support project activities, continuity of operations, and maintenance and sustainment activities and/or meetings/site visits as required by individual task orders. The Contractor shall comply with the following:

● All OMS contract-related travel shall be planned, coordinated, and approved in writing by the COR in advance.

Source Selection Information – See FAR 2.101 and 3.104-4 7

● Travel shall be in accordance with the Federal Travel Regulation.

● The Contractor shall submit travel request forms for non-emergency travel at least 14 business days prior to the first day of planned travel.

● The Contractor shall submit travel costs on its monthly invoices within 30 days of travel.

● Submit any program requested travel for other Government Funded travel (e.g., support conferences, workshops, etc.) per submission processes to obtain any additional levels of Government approval required.

2.1.1 Systems Engineering Management

PWS-TO1-SE01: The Contractor shall provide an initial Systems Engineering Management Plan (SEMP) [Deliverable] with the proposal response, and maintain it as required. The SEMP shall describe how the Contractor will apply Systems Engineering Tools (SET) and principles to the execution of operations, maintenance and sustainment of the assigned systems, as well as technical review processes, and process improvement efforts. SEMPs shall comply with NESDIS Systems Engineering Processes and Procedures.

PWS-TO1-SE02: The Contractor shall support the Government’s Engineering Review Board (ERB) by providing an Executive Secretary experienced with the Engineering Review process to create, maintain, and track completion of agendas, minutes, and action items.

PWS-TO1-SE03: The Contractor shall provide Technical Writing Services to the Government.

These include text and graphics, formatting, editing, proofreading, printing, faxing, copying and file conversion.

2.1.2 Configuration and Asset Management

The Government performs Configuration Control and Configuration Management following the guidelines provided in the NOAA/NESDIS/OSGS 5820.02A Change and Configuration Management Process Document. The Government will provide a Configuration Management (CM) tool. IBM Rational ClearCase / ClearQuest based Enterprise Configuration Management Tool (ECMT) is currently being used to track hardware and software configuration items (CI).

PWS-TO1-CM01: The Contractor shall support the Government daily in operating and maintaining ECMT for all OSPO systems. An ECMT Standard Operating Procedure (SOP) describing the support and processes will be provided in the OMS document library.

PWS-TO1-CM02: The Contractor shall submit Configuration Change Requests (CCRs) with all required documentation for all changes made during operations, maintenance, and sustainment of any hardware or software. The Government will provide a Microsoft SharePoint based document management system for creating or modifying documentation describing the maintenance and

Source Selection Information – See FAR 2.101 and 3.104-4 8 operations of hardware or software and provides information in general about hardware or software. The contractor shall provide current metrics on CCRs. 90% of CCRs shall have no open problem reports (PRs) at operational readiness review (ORR); any open PRS shall have an approved resolution plan.

PWS-TO1-CM03: The Contractor shall utilize the Government’s enterprise Microsoft SharePoint tool. Sharepoint will be the enterprise tool for OMS program documentation repository and technical documentation library for all OSPO systems.

PWS-TO1-CM04: The Contractor shall manage and maintain the NSOF Library in accordance with the NSOF Library Standard Operating Procedure (SOP).

PWS-TO1-CM05: The Contractor shall provide one or more Contractor resources as the responsible party for maintaining each, operating procedure, document, diagram, data set, configuration file or technical data package used in the operations, maintenance and sustainment of all assigned systems.

The responsible party will track configuration change requests (CCR) to their assigned materials and make recommendations to the Government for when they should issue a new revision of the materials.

PWS-TO1-CM06: The Contractor shall submit CCR’s for Document Change Requests.

Operations, Maintenance and Sustainment documentation is varied and extensive. It includes operating procedures, documents, diagrams, data sets, configuration files, build forms, network diagrams, operational event logs, data flow diagrams, computer room rack layouts, operations checklists, program descriptions, security audit logs, firewall rules, system descriptions, interface control documents, system security plans, software and hardware inventories, IT security artifacts, memoranda, maintenance manuals, contractual documentation and technical data packages.

PWS-TO1-CM07: The Contractor shall support the Government Configuration Control Board by providing an Executive Secretary experienced with Configuration Control and Management processes to create, maintain, and track completion of agendas, minutes, and action items.

PWS-TO1-CM08: Within 30 days of contract award, the Contractor shall perform a Physical Configuration Audit (PCA) at the CI level for Assigned System assets under each Task Order.

Subsequent audits shall apply to all applicable task orders under the OMS contract and be delivered per applicable task order deliverables list.

PWS-TO1-CM09: Within 60 days of PCA completion, the Contractor shall reconcile the PCA results of all Assigned Systems with existing property management tracking tool (AKA

Source Selection Information – See FAR 2.101 and 3.104-4 9

Sunflower), System Boundary inventories, and the Technical Architecture Infrastructure Reference Model.

PWS-TO1-CM10: Within 60 days of PCA completion (and annually thereafter), the Contractor shall reconcile the PCA results of all Assigned Systems with existing software license management lists, IT software inventories, and the Technical Architecture Applications Reference Model in the Contractor's Reconciled Configuration Management Baseline (CMB) [Deliverable].

The Configuration Management Baseline (CMB) shall be managed and tracked in a Configuration Management Report thirty days following the initial CMB, and monthly thereafter [Deliverable].

PWS-TO1-CM11: The Contractor shall reconcile the CMB against monthly security scans and the ECMT of the assigned systems.

PWS-TO1-CM12: The Contractor shall reconcile the CMB against the annual Property Inventory Report. The initial Property Inventory Report shall be submitted within sixty days of contract award and annually thereafter [Deliverable].

PWS-TO1-CM13: The Contractor shall maintain the CMB in the ECMT.

PWS-TO1-CM14: The Contractor shall support the Government in the management of software licenses and software support agreements. These activities include maintaining a current software license and support agreement inventory, period of performance, renewal/replacement/ warranty dates such that there are no gaps in service, and entering related data in the Government provided tool.

PWS-TO1-CM15: The Contractor shall support the Government in the management of all OMS hardware warranty and support agreements. These activities are part of each system inventory (CI Database) and include maintaining a current inventory, period of performance, renewal/replacement/ warranty dates such that there are no gaps in service, and entering related data in the Government provided tool.

PWS-TO1-CM16: The contractor shall maintain (and develop, as required) a comprehensive set of Government-owned contract documentation. The maintenance of this contract documentation shall include the following tasks:

● Provide/report a log of all documents created or modified. The list of modified documentation shall be reported monthly.

● Create or modify contract documentation while maintaining the required government /contract markings.

Source Selection Information – See FAR 2.101 and 3.104-4 10

○ Contractor markings (i.e. corporate identifiers/logos, proprietary, internal use only etc.) are not permitted on OMS contract documentation

○ Contractor markings allowed include company name, address, telephone number, email address and website (on a single page inside the cover of multi-page documents, or on a single slide or frame at the beginning of a multimedia presentation).

● Maintain the current document format.

2.1.3 Property Management / Property Contact

PWS-TO1-CM16: The Contractor shall perform shipping and receiving functions for all equipment, spare parts and items for return to vendors, suppliers and repair facilities.

Shipping and Receiving activities include assembling items, containers, boxes and crates to be shipped and prepare identifying information and shipping instructions; unpack and route items received to appropriate storage areas; and shipment of packages to required locations using Government-provided carrier shipping accounts.

PWS-TO1-CM17: The designated Contractor Property Contact shall provide assistance in the management of acquiring, determining inventory, and disposing of NOAA property assigned to the custodial area.

PWS-TO1-CM18: The Contractor shall provide Property Management support which includes:

records maintenance; labeling and processing documentation related to personal property and/or ensuring property use for official purposes only; support to the annual property inventory;

identify excess property; assist and record reconciliation of physical inventories; and assist with property recovery for outbound employees. [NOAA Property _Bulletin_001_FY2016]

2.1.4 Quality Assurance

PWS-TO1-QA01: The Contractor shall provide their methods and processes for how they plan to ensure processes are carried out as planned while meeting all contract requirements in a Quality Assurance Plan (QAP) [Deliverable]. The QAP shall be included in the proposal submission and be updated as required. This plan explicitly describes Contractor processes, and measures for subcontractor/ vendor performance and their accountability in executing on their contract with the OMS contractor.

PWS-TO1-QA02: The Contractor shall provide a Quality Assurance SOP [Deliverable] within 60 days of the start of the contract and update it annually or as requested by the CO.

PWS-TO1-QA03: The Contractor shall provide, report, and track contract performance metrics as part of the monthly program management review. Metrics shall cover all task orders. Metrics

Source Selection Information – See FAR 2.101 and 3.104-4 11 shall be mutually agreed at the start of the contract, and may include modified or new metrics, as required, to accurately reflect contract performance.

PWS-TO1-QA04: The Contractor shall participate in the Government’s process improvement activities.

The Government will provide a SharePoint-based Action Information Management System (AIMS) for organizing its data calls.

PWS-TO1-QA05: The Contractor shall support organizational data call requests.

2.1.5 Risk Management

PWS-TO1-RM01: The Contractor shall comply with the OSPO Risk Management Plan.

PWS-TO1-RM02: The Contractor shall prepare a Risk Report [Deliverable] listing the Contractor’s view of initial OMS risks for review and consideration by the Government with recommended mitigations as part of its proposal submission. Subsequent updates to be coordinated with the Government monthly.

PWS-TO1-RM03: The Contractor shall support the Government in the risk management activities and maintaining risk related data in the Government-provided risk management tool, Active Risk Manager (ARM).

PWS-TO1-RM04: The Contractor shall collaborate with the Government on Risk Management activities and report risk status at the Monthly Contract Reviews.

2.1.6 Training

PWS-TO1-TR01: The Contractor shall provide personnel that are trained and experienced in the activities they support.

PWS-TO1-TR02: The Contractor shall assist the Government in identifying training for Government and Contractor personnel that will improve operations, maintenance and sustainment of assigned systems.

PWS-TO1-TR03: The Contractor shall provide training and any corresponding training materials to Government personnel on substantive changes made to assigned systems in the course of the contract.

2.1.7 Cyber Security Program Management

Source Selection Information – See FAR 2.101 and 3.104-4 12

2.1.7.1 Cyber Security Awareness & Training

PWS-TO1-ICS01: Contractor personnel shall complete all NOAA required training, including, but not limited to: No FEAR Act Training, NOAA Safety Awareness Training, NOAA Safety and Environment Awareness Training, and NOAA IT Security Awareness Training.

PWS-TO1-ICS02: All Contractor staff shall complete required Role-Based Security Training 30 days before the NOAA required deadline each fiscal year.

2.1.7.2 Cyber Security Assessment & Authorization

2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A)

PWS-TO1-ICS03: The Contractor shall support security related processes required to be compliant with Government security mandates, and obtain/maintain an Authority to Operate (ATO) for each system.

PWS-TO1-ICS04: The Contractor shall submit assigned Security Control Assessment (SCA) [Deliverable] artifacts yearly for each assigned system per the agreed schedule.

2.1.7.2.2 Plans of Action & Milestones (POA&M) Management

PWS-TO1-ICS05: The Contractor shall manage technical POA&M milestones using OSPO’s Configuration Management tool, including automated tools.

2.1.7.2.3 System Interconnection

PWS-TO1-ICS06: The Contractor shall provide data for information requests for all system Interconnection Security Agreements (ISA).

PWS-TO1-ICS07: The Contractor shall review and implement any and all interfaces per system Interface Control Documents (ICDs). Discrepancies or changes shall be reported to the Government for follow up.

2.1.7.2.4 System Security Documentation

PWS-TO1-ICS08: The Contractor shall support information requests for Security Authorization Packages for all assigned OSPO systems, including all required documents, and additional information when updates are made to DOC, NOAA, NESDIS, or OSPO policies, and Information & Cyber Security Support procedures.

Source Selection Information – See FAR 2.101 and 3.104-4 13

2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management

PWS-TO1-ICS09: The Contractor shall comply with configuration management requirements per section 3.5.3.3 of the OMS IDIQ PWS.

2.1.7.4 Cyber Security Management and Oversight

PWS-T01-ICS10: The contractor shall provide management for each OMS Task Order to ensure the Cyber Security requirements specified in the OMS IDIQ PWS are compliant. The details of the responsibilities are specified in the OMS IDIQ PWS, Section 3.5- Information & Cyber Security Support, and Appendix B- OMS Information & Cyber Security Support Task Accountability Matrix. The typical tasks for cyber security management and oversight include:

● Perform activities, as coordinated between the OMS contract and OSPO IT Security Compliance Office

● Attend ISSO briefings to be cognizant of IT Security tasks requiring O&M input, to report progress of ongoing IT Security tasks such as vulnerability remediation, POAM activities, and SCA activities

● Maintain current set of required artifacts for auditors for each IT Security boundary and control, and providing artifacts per schedule. Key audits shall be reflected in the OMS schedule.

● Support and manage audit activities, including interviews of O&M personnel during audits

● Lead maintenance activities of IT Security Inventory, and investigate and resolve discrepancies

● Ensure, monitor, and report completion of all IT security required training (including all users and position-specific support positions)

● Lead O&M-related readiness and execution of the annual COOP exercises and deployments

● Lead disaster recovery activities, ensure routine disaster recovery backups are tested and fully functional in advance to ensure their functionality

● Report status of O&M security activities to the Government

● Perform risk management activities for the OMS contract to the Risk Management Board

● Lead Contractor activities for investigating IT security incidents

2.2 Contract Transition

The transition of an expiring contracts scope to the OMS contract is a programmatic activity managed by the OMS Contractor and incumbent contractor, in coordination with the Government. The OMS Contractor shall accurately and effectively capture (document), and

Source Selection Information – See FAR 2.101 and 3.104-4 14 manage the transition of all activities contained in OMS task orders in a transition plan. A separate transition plan is required for each individual transition to the OMS contract.

PWS-TO1-CT01: The Contractor shall provide a contract Phase-In Transition Plan with a checklist of all required tasks and activities to complete the transition successfully. The initial Phase-in Transition Plan shall be submitted with the proposal response, and a final 30 days after contract award [Deliverable].

PWS-TO1-CT02: The Contractor shall transition work performance from any incumbent contractor(s) to itself for any assigned system. The Contractor shall manage the transition with no interruption in ongoing services. Typical activities occurring in transition include:

● Staffing

● Training

● Transfer of operations, inventory, and assets

● Transfer of accounts, passwords, and permissions

● Monitoring of maintenance and sustainment activities

● Configuration control, administration, Book Boss custodianship of data sets, software scripts, documentation, procedures, and checklists

● IT Security activities

● Hardware and software license management, and warranty activity

PWS-TO1-CT03: The Contractor shall document and report verbally the Phase-In Transition status report to the Government PMO weekly and monthly at the OMS program review meeting.

PWS-TO1-CT04: The Contractor shall deliver a Contract Phase-Out Transition Plan [Deliverable TO1-21] outline one year prior to the end of the contract to the PMO to include:

● Staffing

● Training

● Transfer of operations, inventory, and assets

● Transfer of accounts, passwords, and permissions

● Monitoring of maintenance and sustainment activities

● Configuration control, administration, Book Boss custodianship of data sets, software scripts, documentation, procedures, and checklists

● IT Security activities

● Hardware and software license management, and warranty activity

Source Selection Information – See FAR 2.101 and 3.104-4 15

3.0 Performance Requirements Summary

PWS Section

Performance

Objectives

Minimum Acceptable Quality Level (AQL)

Monitoring Method Incentive/Disincentive

TBD TBD TBD TBD TBD

Source Selection Information – See FAR 2.101 and 3.104-4 16

Appendix A. Deliverables All deliverables shall be emailed to the individuals listed in the distribution column of the table below.

Deliverable

ID #

Deliverable Frequency Distribution PWS Reference

TBD Program Management Plan

Initial with proposal submission, final one (1) month after contract award.

Subsequent updates delivery shall be mutually agreed

COR, CO

2.1 Program

Management

(PWS-TO1-PM01)

TBD

Program Review Status Package

Monthly CO,COR,PM 2.1 Program Management (PWS-

TO1-PM01)

TBD

Integrated Milestone Schedule

(IMS)

Initial with proposal submission, updates monthly thereafter.

CO,COR,PM 2.1 Program Management (PWS-

TO1-PM01)

(PWS-TO1-PM02)

TBD

Consolidated Contract Financial Report

Monthly CO,COR,PM 2.1 Program Management (PWS-

TO1-PM01)

TBD Contract Funds Status Report

Monthly CO, COR, PMO

2.1 Program

(PWS-TO1-PM02)

(PWS-TO1-PM03)

TBD Invoices Monthly CO, COR, PMO

2.1 Program

Management

(PWS-TO1-PM04)

TBD Annual Spend Plan Initial with proposal submission, updated monthly thereafter

CO, COR,

PMO

2.1 Program

(PWS-TO1-PM05)

Source Selection Information – See FAR 2.101 and 3.104-4 17

TBD Program Status Report (work status and plan covering Monday through Sunday for each task order)

Weekly COR, CO, PMO, Operations Manager

2.1 Program

Management

(PWS-TO1-PM06)

TBD Engineering Assessments As required COR, PMO 2.1 Program Management

(PWS-TO1-PM08)

TBD Staffing Plan Initial with proposal, final within 5 business days after award, updated weekly thereafter, and upon issuance of task order(s);

COR, PMO 2.1 Program Management

(PWS-TO1-PM09)

TBD

Meeting minutes, agendas, action item lists, lessons learned, etc

As required per required meetings established by the Government

Area Leads, PMO

2.1 Program

Management

(PWS-TO1-PM11)

TBD Systems Engineering Management Plan

Initial with proposal response, updated as required

COR

2.1.1 Systems

Engineering Management

(PWS-TO1-SE01)

TBD Reconciled Configuration Management Baseline Report Within 60 days of PCA, then annually thereafter

COR

2.1.2 Configuration and

Asset Management

(PWS-TO1-CM10)

TBD Configuration Management Report Initial 30 days after Configuration

Management Baseline (CMB), monthly thereafter

PMO, COR,

CO 2.1.2 Configuration and

Asset Management

(PWS-TO1-CM10)

TBD Reconciled Property Inventory Report Within 60 days after contract award, then annually thereafter

COR

2.1.2 Configuration and

Asset Management

Source Selection Information – See FAR 2.101 and 3.104-4 18

(PWS-TO1-CM12)

TBD Quality Assurance Plan (QAP) Initial with proposal, updated as required (with issuance of any new task order)

COR

2.1.4 Quality Assurance

(PWS-TO1-QA01)

TBD

Quality Assurance Standard Operating Procedure (SOP)

60 days after Contract start, updated annually, or requested by CO

PMO, CO,

COR 2.1.4 Quality Assurance

(PWS-TO1-QA02)

TBD

Risk Report

Initial report (Initial contractor risk list and proposed mitigation) with proposal.

Subsequent updates (coordinated w/ Contractor and Government) monthly

COR, PMO

2.1.5 Risk Management

(PWS-TO1-RM02;

PWS-TO1-RM04)

TBD

Security Control Assessment (SCA) Artifacts

Yearly for each assigned system per the agreed schedule

(SCA occurs yearly at a time chosen by NSOF. The artifacts are designated by the security assessors at the time of the assessment)

2.1.7.2.1 Continuous

Monitoring and Assessment & Authorization (A&A)

(PWS-TO1-ICS04)

TBD Phase-in Transition Plan Initial plan submitted covering all task orders, Final plan 30 days after contract award

Subsequent plans for new task orders - Initial at task order proposal response, final 2 weeks after task order start

COR, CO 2.2 Contract Transition

(PWS-TO1-CT01)

TBD Phase-out Transition Plan Outline

Due one (1) year prior to the end of contract

COR, CO 2.2 Contract Transition

(PWS-TO1-CT04)

Source Selection Information – See FAR 2.101 and 3.104-4 19

Appendix B. Meetings

Meeting Frequency Medium/Format Submit To Agenda Topics Description

The Contractor shall participate in daily Help Desk Meetings

Daily In person COR Help Desk Daily Logs ECMT Ticket Status Change Log and Actions Report

The Help Desk Manager facilitates the Daily Help Desk meetings through providing Daily Logs, Ticket Reports, and Change Log reports for any planned System/ Network updates scheduled within 24 hours that may impact operations

The Contractor shall participate in daily SOCC Ticket Meeting

Daily In person COR Specific SOCC tickets

The Help Desk Manager facilitates the SOCC Ticket review/analysis process for ticket completion and to determine whether additional information or action is appropriate for ticket closure

The Contractor shall participate in daily SOCC Meeting

Daily In person COR SOCC issues, Wallops, Fairbanks, CDA, NSOF, NDE, GOES, POES, Jason 2

(Overview of SOCC and other satellite stations)

The SOCC Branch Chief facilitates this meeting and provides a status of daily/major activities that occur in

SOCC

The Contractor shall participate in weekly OMS Tech Doc Meeting

Weekly In person COR Technical documentation dashboard and outstanding tasks

The QA facilitates this meeting daily to address status on tasks assigned to the technical writers

The Contractor shall participate in weekly CCBs (Configuration Change Board)

Weekly – designated days for ESPC, DMSP, GOES, Polar

In person COR Reviews ECMT Requests

The CM Manager facilitates these CCBs:

To review and disposition ESPC, DMSP,GOES, Polar, and Common ECMT tickets (CCRs, and WRs)

Source Selection Information – See FAR 2.101 and 3.104-4 20

The Contractor shall participate in weekly OMS Weekly Contract Meeting

Weekly In person COR Staffing, Program Management, Operations and Maintenance, System Engineering, Products and Applications, IT Security, POA&Ms and A&As

The Quality Manager facilitates this meeting to provide weekly status on planning for OMS tasks

The Contractor shall participate in weekly ISSO POA&M Status Meetings.

Weekly designated

Days for , for

GOES, POES,

ESPC, NJGS

In person COR A&A and POA&Ms

This meeting is held to secure a status of A&A and POA&Ms for systems

The Contractor shall participate in bi-weekly Help Desk Working Group

Bi-weekly. In person COR Review :

Procedures and update accordingly

The Help Desk Manager facilitates this meeting with the objective to improving the process and procedures used at the ESPC Help Desk

The Contractor shall participate in monthly ERB (Executive Review Board)

Monthly In person COR TBA by leader The PAL facilitates this meeting on an as-needed basis to resolve issues that cannot be resolved by the CCB.

The ERB shall also be responsible for the re-allocation of resources, establishing division priorities, and actions within the respective Divisions relating to change management and maintaining the operational integrity of the OSPO operating environment.

The Contractor shall participate in quarterly CM Technical Activities Working Group Meeting

Quarterly or as needed

In person COR TBA by leader The PAL facilitates this meeting on an as-needed basis to adjudicate the CM Process Improvements Forms/Pending requests

Source Selection Information – See FAR 2.101 and 3.104-4 21

The Contractor shall participate in bi-weekly CM Tools Working Group

Bi-weekly

In person COR ECMT status, tickets, WRs and CCRs

The primary function and responsibility of the Configuration Management Tools Working Group (CMTWG) is managing stakeholder needs and requirements for Change and Configuration Management tools running (ECMT) on the NSOF Mission Support LAN

(NOAA5044).

The Contractor shall participate in monthly SOCC Risk Meeting

Monthly In person COR Open Risks Monthly meeting to review and provide status on all SOCC risks

The Contractor shall participate in Monthly MOD Issues meeting

Monthly In person COR Open Risks Monthly meeting to review and provide status on all Maintenance and Operations Division (MOD) issues

The Contractor shall participate in weekly Inventory Review Board

Weekly In person COR Inventory reviews and approvals

Inventory Improvements

The ESPC Network Engineer facilitates this meeting and reviews the updates on Altiris/ESPC and SOCC HW and SW inventories

Source Selection Information – See FAR 2.101 and 3.104-4 22

Appendix C. Acronym Listing AIMS Action Information Management System

AQL Acceptable Quality Level

ARM Active Risk Manager

ATO Authority to Operate

CCR Configuration Change Request

CI Configuration Item

CO Contracting Officer

COB Close of Business

COR Contracting Officer Representative

CRM Customer Relationship Management

CS Contract Specialist

EA Engineering Assessments

ECMT Enterprise Configuration Management Tool

ERB Engineering Review Board

FAR Federal Acquisition Regulation

FTR Federal Travel Regulations

IAW In Accordance/Agreement With

IBM International Business Machines

ICD Interface Control Document

IDIQ Indefinite Delivery Indefinite Quantity

IMS Integrated Master Schedule

ISA Interconnection Security Agreements

IT Information Technology

Source Selection Information – See FAR 2.101 and 3.104-4 23

MD Maryland

NCWCP NOAA Center for Weather and Climate Prediction

NESDIS National Environmental Satellite, Data, and Information Service

NOAA National Oceanic and Atmospheric Administration

NSOF NOAA Satellite Operations Facility

OMS Operations Maintenance Sustainment

OSGS Office of Satellite Ground Services

OSPO Office of Satellite Product Operations

PCA Physical Configuration Audit

PM Program Manager

PMO Program Management Office

POA&Ms Plan of Action and Milestones

PWS Performance Work Statement

QAP Quality Assurance Plan

SCA Security Control Assessment

SEMP Systems Engineering Management Plan

SOP Standard Operating Procedure

WYE Work Year Equivalents

1.0 Overview
2.0 Scope
2.1 Program Management
2.1.1 Systems Engineering Management
2.1.2 Configuration and Asset Management
2.1.3 Property Management / Property Contact
2.1.4 Quality Assurance
2.1.5 Risk Management
2.1.6 Training
2.1.7 Cyber Security Program Management
2.1.7.1 Cyber Security Awareness & Training
2.1.7.2 Cyber Security Assessment & Authorization
2.1.7.2.1 Continuous Monitoring and Assessment & Authorization (A&A)
2.1.7.2.2 Plans of Action & Milestones (POA&M) Management
2.1.7.2.4 System Security Documentation
2.1.7.3 Security Support for Systems Engineering and Change & Configuration Management
2.1.7.4 Cyber Security Management and Oversight

2.2 Contract Transition

3.0 Performance Requirements Summary
Appendix A. Deliverables
Appendix B. Meetings
Appendix C. Acronym Listing