This document is a Request for Proposal (RFP) issued by the Ontario International Airport Authority (OIAA) for a Ground Power Unit (GPU) Lifecycle Replacement project in Terminal 2 and Terminal 4. The project involves furnishing and installing twenty-four (24) new Aircraft 400 Hz Ground Power Units, specifically twenty-two (22) Narrow Body Group III and Regional Jet Gates, and two (2) Wide Body Group IV and V Gates. The successful bidder will be responsible for scope confirmation, shop drawings, permitting, fabrication, delivery, removal and disposal of existing units, installation, testing, and acceptance of Passenger Boarding Bridge mounted Ground Power Units. The existing units, installed in 1998, have reached the end of their operational life and are being replaced to support sustainability efforts and reduce airport-related emissions.
The project aims to improve airport functionality and contribute to California State Implementation Plan (SIP) emissions reduction goals in the South Coast Air Basin. The bidder must ensure compatibility with existing electrical services, reestablish power and communication connections, and comply with all local, state, and federal codes and ordinances. Work is expected to be completed within airport operating hours, with strict coordination requirements including gate shutdown scheduling, TSA area coordination, and minimal disruption to airport operations. The RFP includes administrative requirements such as SBE/DBE/ACDBE policy compliance, various document submissions, and adherence to federal and state labor requirements, with attachments providing detailed technical specifications, bid forms, and federal provisions.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NoIB Outline HNTB Tasks OIAA Tasks
1. Introduction
1.1. Summary
The successful Bidder will be expected to complete the requested scope, at and under the Authority’s direction, to Furnish and Install Aircraft 400 Hz Ground Power Units in Terminal 2 and Terminal 4. The work shall include scope confirmation, shop drawings, and permitting. Construction work under this contract shall include fabrication, delivery, removal and disposal of existing units, installation, testing, and acceptance of Passenger Boarding Bridge mounted Ground Power Units at Twenty-Two (22) Narrow Body Group III and Regional Jet Gates, and Two (2) Wide Body Group IV and V Gates, which will be identified by the Attachment A-Plan View and Equipment Schedule.
Proposer shall inspect the existing electrical service at each Gate and confirm that the new Ground Power units are compatible with the existing electrical service. Proposer shall be responsible for reestablishing all power and communication connections to the proposed unites to provide a complete and operable installation.
Bidder shall be responsible to ensure that the equipment and installation meet all applicable Local, State, and Federal codes and ordinances.
The existing Ground Power units, installed in 1998, have reached the end of their effective operational lives and are exhibiting signs of failure. Without a Ground Power unit, a gated aircraft’s auxiliary power unit (APU) would generate the energy to operate on-board systems. The OIAA recognizes the need to support sustainability efforts and the reduction of Airport-related emissions. The replacement of Ground Power units would reduce criteria pollutant emissions at ONT by avoiding APU use during gate operations. Reduction in pollutant levels would aid in meeting California State Implementation Plan (SIP) emissions reduction goals in the South Coast Air Basin.
Overall, the Project would improve and allow for the functionality and sustainability of the airport.
1.2. Contact Information
1.3. Timeline (Project proposed schedule and Liquidated damage)
2. Agency Background
3. Pre-Submittal Meeting – In-Person and Virtual
4. Site Visit
5. Scope of Work
5.1. General Description
The successful Bidder will be expected to complete the requested scope, at and under the Authority’s direction, to Furnish and Install Aircraft 400 Hz Ground Power Units in Terminal 2 and Terminal 4. The work shall include scope confirmation, shop drawings, and permitting. Construction work under this contract shall include fabrication, delivery, removal and disposal of existing units, installation, testing, and acceptance of Passenger Boarding Bridge mounted Ground Power Units at Twenty-Two (22) Narrow Body Group III and Regional Jet Gates, and Two (2) Wide Body Group IV and V Gates, by Attachment A-Plan View and Equipment Schedule.
Proposer shall inspect the existing electrical service at each Gate and confirm that the new Ground Power units are compatible with the existing electrical service. Proposer shall be responsible for reestablishing all power and communication connections to the proposed unites to provide a complete and operable installation.
Bidder shall be responsible to ensure that the equipment and installation meet all applicable Local, State, and Federal codes and ordinances.
5.2. Shop Drawings/Designs/Material Selection/Permitting
The successful Proposer shall:
1. Create shop drawings or designs adhering to the Attachments A and B. Note that the successful Proposer shall verify all existing conditions prior to shop drawings and bring any discrepancy between the specifications and the actual condition to the Authority’s attention prior to fabrication.
2. Identify any differences or equal substitutions to functions, materials or equipment that the Proposer intends to provide in place of those called out in Attachments A and B.
3. Proposer shall provide clear and concise information regarding any Proposer Proprietary equipment, materials, or functionality to the system they propose if differing from the performance specification identified in Attachments A and B.
5.3. Removal and Disposal of Existing Equipment
Proposer shall remove and dispose of all equipment and materials being replaced under this contract per all applicable Local, State and Federal requirements. Repair and restore adjacent finishes as needed to match existing conditions or desired finish.
5.4. Work Rules and Required Hours of Operation
On-site work shall at all times be conducted in a way to minimize impact on the public and airport operations. Successful Proposer will be required to coordinate with OIAA to schedule lead time requirements to work within or above TSA or other stakeholder areas of operation.
1. Work is expected to be completed within airport operating hours with OIAA approval.
2. Successful Proposer shall coordinate all work with OIAA Operations and schedule Gate Shutdowns seven (7) days prior to initiating work on each Gate. At no time shall more than one gate be impacted unless approved in writing by OIAA in advance.
3. Successful Proposer is required to notify OIAA before any work has begun within the sterile area on every shift. Where necessary for any other work, Successful Proposer shall coordinate with the TSA through OIAA.
4. OIAA will dictate the exact start and end hours for each shift, including any grace periods for nightly setup and morning clean-up.
5. At no time will the work be allowed to obstruct airport operations, passenger flow, or concession operations.
6. There shall be no materials or equipment left in any public or sterile areas.
a. All materials and equipment shall be stored out of sight or in locations designated by OIAA.
b. No materials shall be left in view of the public within the terminal buildings.
7. All deliveries shall be fully coordinated with OIAA.
8. Proposer shall coordinate with the OIAA Shutdown Coordination Center (SCC) before shutting down any area of the Airport. Proposer will be required to use the most up-to-date versions of the Area Shutdown Requests (ASR) and Utility Shutdown Requests (USR) forms provided by OIAA.
a. No work shall begin before approval of the USR and ASR forms has been obtained.
b. No work shall begin prior to the lead time established within the approved USR or ASR forms.
6. Submission Instructions & Format
6.1. Submission Instructions
6.1.1. Bid Form and Schedule of Work and Prices
6.1.2. List of Subcontractors
6.1.3. Minimum Qualifications (Prime Bidder’s Experience)
6.2. FORMAT
6.2.1. Signing of Bid
6.2.2. Only One Bid Accepted
6.2.3. Joint Ventures or Partnerships
6.2.4. Cost of Bids
6.2.5. Withdrawal of Bids
7. Administrative Requirements
7.1. You acknowledge that you have read and understand the OIAA SBE/DBE/ACDBE policy?
7.2. Upload any SBE/DBE/ACDBE Certification that your organization holds.
7.3. Upload your organizations current W-9 form*
7.4. Affidavit of Non-Collusion*
7.5. Confidentiality and Non-Disclosure Form*
7.6. Supplier Information Form*
7.7. Conflict of Interest Disclosure
7.7.1. Conflict of Interest Disclosure
7.7.2. Upload Completed Conflict of Interest Form*
7.8. Proposal Submittal Checklist
7.8.1. Proposal Submittal Checklist Form*
7.9. Draft Contract Terms
7.9.1. Please download the below documents.*
7.9.2. By selecting the box below, you confirm that you have read and understood the Draft Contract Terms.*
7.9.3. Vendor Documents
8. Bid Evaluation and Awarding
8.1. Information Requested and Not Furnished
8.2. Right to Verify Information
8.3. Evaluation of Bids and Bid Errors
8.4. Mathematical Corrections on Bids
8.5. Incorrect Bid Information
8.6. Prohibition of Alternate Terms and Conditions
8.7. Waiver of Minor Administrative Irregularities
9. Bid Bond
10. Subcontractor List Information Worksheet
11. Prevailing Wage / Certified Payroll
12. Limitations on Use of Public Funds and Airport Revenues
13. Liquidated Damages
14. Protest of Content and Protest of Award
15. General Terms and Conditions
15.1. Interpretations & Clarifications
15.2. Addendum - Responses to Questions
16. OIAA Policies and Agreements
16.1. Validity Period of Bids
16.2. Bid Conditions
16.3. Right to Reject Bids
16.4. Bidder Disqualification for Attempted Improper Influence
16.5. Requirements Prior to the Award of Contract
17. Potential Award of Contract
17.1. Non-Consent / Non-Assignments
17.2. Execution of Contract
17.3. Recommendation for Award of Contract
17.4. Contract Term
18. Additional Legal Information
18.1. Reproduction and Personal Use of Information
18.2. Expense, Ownership, and Disposition
19. Compliance with all laws
20. Federal and State Labor Requirements
20.1. Affirmative Action
20.2. Equal Employment Opportunity
20.3. Prevailing Wage
20.4. Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity
20.5. Civil Rights – Title VI Assurance
20.6. Disadvantaged Business Enterprise (DBE)
20.7. FEDERAL PROVISIONS
21. Equal Opportunity Statement
21.1. Equal Opportunity
21.2. Equal Opportunity Requirements
22. Confidentiality / Public Records Act
Attachments:
A. Plan View and Equipment Schedule B. Technical Specifications C. Prime Bidder’s Experience D. Bid Form E. Cost Proposal F. List of Sub Contractors G. Bid Bond Form H. Bid Form I. Community Workforce Agreement J. Federal Provisions K. FAA General provisions
File details come from the government source that posted it. Updated .