Solicitation No:
FSR 29 MP 10.6 Culvert Replacement
Table of Contents
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES .................................................................. Error! Bookmark not defined.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATION
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
C.4 TECHNICAL SPECIFICATIONS
SECTION D--PACKAGING AND MARKING
D.1 PACKING AND MARKING ............................................... Error! Bookmark not defined.
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE . Error! Bookmark not defined.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES .............................................................................. Error! Bookmark not defined.
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
F.2 OTHER REQUIREMENTS
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES .............................................................................. Error! Bookmark not defined.
H.2 OTHER REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES .............................................................................. Error! Bookmark not defined.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS ........................................................................ Error! Bookmark not defined.
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L.1 PROVISIONS ........................................................................ Error! Bookmark not defined.
L.2 QUOTE PREPARATION INSTRUCTIONS: ................... Error! Bookmark not defined.
SECTION M--EVALUATION FACTORS FOR AWARD .............. Error! Bookmark not defined.
M.1 PROVISIONS ........................................................................ Error! Bookmark not defined.
M.2 QUOTE EVALUATION ...................................................... Error! Bookmark not defined.
M.3 TECHNICAL EVALUATION FACTORS ......................... Error! Bookmark not defined.
PART I – THE SCHEDULE
SECTION A—PROJECT GENERAL INFORMATION
A.1 CONTACT INFORMATION:
Doug Bladek 509-684-7239 COR/Technical Contact Telephone No.
A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN
THESE DOCUMENTS
FY23 FRS 29 MP 10.6 Culvert Replacement Pacific Ranger District Olympic National Forest Clallam County
PART I—SCHEDULE OF ITEMS
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
Contract Line-Item 0001
Forest Road 29 Culvert Replacement
ITEM
NO. DESCRIPTION MEASUREMENT QTY UNIT
PRICE
TOTAL
COST METHOD UNIT
15103 Mobilization LSQ Lump Sum 1 $ $
15206 Construction Surveying & Staking Method I, Tolerance B LSQ Lump
Sum 1 $ $
15407 Contractor Testing LSQ Lump Sum 1 $ $
15716 Soil Erosion LSQ Lump Sum 1 $ $
20109 Clearing & Grubbing, Disposal of Tops & Limbs J, Logs J, Stumps J
LSQ Lump Sum 1 $ $
20308 Removal of Existing Culvert LSQ Lump Sum 1 $ $
20417 Excavation CQ Cubic Yard 2,253 $ $
25101 Placed Riprap, Class IV CQ Cubic Yard 633 $ $
32410 Aggregate Base, Compaction D CQ Cubic Yard 462 $ $
40319 Asphalt Pavement CQ Ton 81
60307
19’ Span, 17’3” Rise Corrugated Aluminum Multi-Plate Underpass Pipe, 0.175” minimum thickness
AQ
Linear Foot
94.5
62201 Equipment Rental - Hydraulic Excavator, 150 min hp with thumb Hour Hour 8 $ $
62530 Seeding & Mulching, Dry Method CQ Lump Sum 1 $ $
63501 Temporary Traffic Control CQ Lump Sum 1 $ $
70408 Select Granular Backfill CQ Cubic Yard. 1,250 $ $
TOTAL COST
*Denotes Contract Quantity
B.2 SCHEDULE NOTES
1. AQ = Actual Quantities, CQ = Design (Contract) Quantities, LSQ = Lump Sum Quantities
2. Road construction equipment must be cleaned prior to entering the work area. Cleaning of this equipment is incidental to pay item 15101.
3. Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price
Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
4. Payments will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
The project consists of the following major items of work:
Clearing and grubbing, removal of a roadway fill and an existing, installing a new 19’0” Span, 17’3” Rise Corrugated Aluminum Multi-Plate Underpass Pipe, 0.175” minimum thickness (including all bedding material), suitable borrow screening and sorting, constructing a new roadway fill with a riprap headwall, rock stabilized slope and outlet spillway, supplying & installing new roadway surfacing, sampling & testing, compaction testing, haul of excavated material & borrow and seeding and mulching.
C.2 PROJECT LOCATION
This project is located on the Pacific Ranger District of the Olympic National Forest, Section 2, Township 28N, R12W, near Forks, Washington. It may be reached by traveling North on HWY 101 for approximately 2 miles out of Forks, Washington, then take a right at the Junction with Forest Service Road 29. The project is located at approximately mile post 10.6.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Between $500,000 and $1, 000,000
C.4 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN
THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.210-3)
(APR 1984)
Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:
Specification Address Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units
Research & Technology Product Distribution Center Report.center@dot.gov 814-239-1160 https://highways.dot.gov/federal-lands/specs
ASTM Standards American Society for Testing and Materials P.O. Box C700 100 Bar Harbor Drive West Conshohocken, PA 19428-2959 (610) 832-9585 http://www.astm.org mailto:Report.center@dot.gov http://www.astm.org/
AASHTO Standards American Association of State Highway and Transportation Officials 444 North Capitol Street, NW Suite 249 Washington, D.C., 20001
(206) 624- 5800 http://www.aashto.org
C.5 TECHNICAL SPECIFICATIONS
(a) Applicable Specifications References to Standard Specifications in the contract refer to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units.
Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.
The Forest Service Supplemental Specifications to the FP-14 are also given on the Specification List and are physically attached in Section J. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.
(b) Product Substitution
Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions shall be requested by the Contractor only after award of the contract has been made. No approvals will be made prior to award.
(c) Shop Drawings Submittals
The following shop drawings shall be submitted on this project (4 sets unless noted):
Title Referenced by Specification No.
Time Allowed for Govt. Review After
Submittal 19’ Span, 17’3” Rise Corrugated Aluminum Multi-Plate Underpass Pipe, 0.175” Minimum Thickness
60210 15 days
(d) Material Certification, Testing Reports and Submittals
Brief Title Basic Reference Specification
Detailed Regulations Specification
#Copies To Submit
Time for Government Approval After Receipt by CO
Construction Schedule 155 H.2 1 14 Erosion Control Plan 157 104.3 1 21 Dewatering Plan 208 HPA/MOU 1 14 Select Borrow 204 704.06 or 1 21 Riprap Rock 251 705.02 or 1 21 http://www.aashto.org/
Aggregate Base & Surfacing 301 703-2, Grading D 1 21
Hot Mix Asphalt 400 1 21 Aluminum Pipe Structures
603 707.02 1 21
Straw (Weed Free) 713 713.13 1 21
Note:
*Requirement for the above submittals to be transmitted to the governement before the Post Award Conference.
Allowable time for Governement Approval is in Working Days.
Time to submit to Government is in Calendar Days
(e) General Guidelines for Submittals
Submittals are required by their corresponding specifications (basic reference & detailed requirement). Work covered on requiring submittals shall not begin until submittals have been approved.
Submittals shall include the following:
• Date and Revision Dates.
• Project Name and Contract Number.
• Names of Contractor, Subcontractor, Supplier, and Manufacturers.
• Field Dimensions and Relation to Adjacent Structures.
• Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.
Samples:
Physical samples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.
Manufacturer's requirements:
Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.
Approval or Rejection Time Allowance:
Submittals will be reviewed and either approved or rejected within 14, calendar days of their receipt by the Contracting Officer or COR.
C.6 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (AGAR 452.211-73)
(FEB 1988)
The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.
SECTION D--PACKAGING AND MARKING
(Refer to Base IDIQ for Applicable Clauses and Terms)
SECTION E--INSPECTION AND ACCEPTANCE
SECTION F--DELIVERIES OR PERFORMANCE
(The Below Clauses and Terms are Supplemental to the Base IDIQ)
F.1 CLAUSES
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within _30__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __120 calendar days_. The time stated for completion shall include final cleanup of the premises.
F.2 OTHER REQUIREMENTS
MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (AGAR 452.236-75)
(NOV 1996)
(a) Within 7 working days after receipt of the notice to proceed, the Contractor must submit the preliminary progress schedule (as required by FAR clause 52.236-15, Schedules for Construction Contracts)in writing for approval. The progress schedule shall show the sequence in which the contractor proposes to perform the work, and the dates on which the contractor plans to start and finish major portions of the work, including dates for shop drawings and other submittals, and for acquiring materials and equipment.
The scheduling of construction is the responsibility of the Contractor and is included in the contract to assure adequate planning and execution of the work. The schedule will be used to evaluate progress of the work for payment. The schedule shall show the Contractor’s planned order and interdependence of activities, and sequence of work.
Contractor shall utilize and comply with the Progress Schedule. As directed by the CO, Contractor shall submit an updated Progress Schedule at its own expense indicating actual progress. If, in the opinion of the CO, Contractor is not in conformance with the Progress Schedule, Contractor shall take such steps as are necessary to bring the actual completion dates of its work activities into conformance with the Progress Schedule, and if directed by the CO, Contractor shall submit a corrective action plan or revise the Progress Schedule to reconcile with the actual progress of the work.
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved for daytime work is Monday through Friday, 6:00 a.m. to 7:00 p.m; with 30-minute delays and a minimum open period of no less than 10 minutes. Any proposed nighttime work can be done with a full, and continuous, road closure from 9:00 p.m. to 4:00 a.m on Sunday night, Monday night, Tuesday night, Wednesday night or Thursday night. The road must be open, and unrestricted in both directions, from Friday night through Sunday evening.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held via Microsoft Team on
TBD.
G.2 GOVERNMENT-FURNISHED PROPERTY
Property to be Furnished Delivery Point Time of Delivery Item No. 62530 (seed only) FSR 29 MP 10.6 Jobsite To be Determined
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 SUPPLEMENTAL INFORMATION
CULVERT DESIGN
Structural design of the multi-plate structure shall be completed by the Contractor’s engineer, licensed in the state of Washington. All design work shall be in conformance with the current edition of the AASHTO criteria, either LRFD, LFD, or ASD. Design details not covered by the AASHTO Specifications shall be by Contractor’s engineer. Structural Design shall comply with the USFS Handbook – Road Preconstruction Handbook.
The Contractor shall provide for review and comment, complete designs to the C.O. in accordance with Part II Section C.4. Contractor shall be responsible for ensuring that all materials and procedures used during construction comply with the design.
DISPOSAL OF EXISTING STRUCTURES
Existing structures found within the excavation limits shall become the property of the Contractor and Disposed of off-site in accordance with local, state, and federal regulations.
H.2 LANDSCAPE PRESERVATION AND EROSION CONTROL MEASURES
EROSION CONTROL
(a) Contractor shall minimize sediment laden water from entering the stream. Install check dams and sediment fences as necessary to minimize the entry of silt-laden water into streams or other water bodies.
(b) Dewater any live streams prior to culvert removal or other in stream work.
(c) Seed and mulch all disturbed areas within 7 days of completing the project.
LANDSCAPE PRESERVATION
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.
(b) The Contractor shall receive written approval from the CO prior to removing any conifer tree larger than 18 inches in dimeter at breast height (measured 4.5 feet above the adjacent ground surface).
H.3 SPECIAL EQUIPMENT CLEANING REQUIREMENTS
CLEANING OF OFF-ROAD EQUIPMENT
Cleaning of all off-road equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement shall be made for Forest Service to inspect each piece of equipment prior to it being placed into service. The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. The Contractor shall certify in writing, compliance with the above requirements. “Off-road Equipment” includes all machinery other than log truck, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis.
H.4 USE OF PREMISES
(a) Camping Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman.
(b) Storage A storage site will be permitted at a designated site within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.
(c) Temporary Electrical When the Contractor’s operations require a temporary electrical power distribution system, the system shall comply with the National Electrical Code, applicable local codes and utility regulations. The Contractor shall make all arrangements with the serving utility for temporary power and shall pay the serving utility for all applicable fees and power consumed.
(d) Sanitary Facilities Potable water and sanitary facilities are not available for use during construction.
(e) Authorized Roads
The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract.
Road No. Road Termini Authorizations, Restrictions or Requirements
Maintenance Required
29 0.00 – 10.6 None *Restore to pre-project conditions 2900110 Disposal Site Access None *Restore to pre-project conditions
*Spot Rock and Blade Access Roadway to restore to pre-project conditions
Federal regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State and Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may be otherwise provided in the contract.
Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload permits. Forest Service overload permit application forms for this project may be obtained from the COR. Submit an overload permit application for approval 30 days prior to the planned activity.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1 PHYSICAL DATA (FAR 52.236-4)(APR 1984)
a) Existing Conditions The indications of existing conditions on the drawings and specifications are the result of on-site facilities inspections, and reviews of incomplete construction and maintenance records.
b) Weather Conditions Weather conditions suitable for ground excavation are normally expected in July through November. Rain, sometimes heavy, is normal throughout the winter, with periods of light to moderate snowfall. Night freezing is common throughout the winter and several periods of weeklong freezes are likely.
c) Operating Season Inclusive dates during which operations are permissible are as follows:
Activity Start Date
End Date Restrictions
Construction Season 06/01 09/30 All construction activities must be completed by 09/30/2024
Hand Tools 06/01 09/30 Power Tools / 2 Chainsaws 06/01 09/30 Machinery / Car Traffic 06/01 09/30 Heavy Machinery 06/01 09/30
Time of Day Restriction
06/01
09/30
Operations restricted to between 2 hours after sunrise and 2 hours before sunset
In-Stream Work Dates 06/15 09/30
INDUSTRIAL FIRE PRECAUTION LEVELS
The Contractor shall comply with the operations restrictions in accordance with the Washington State Industrial Fire Precaution Level (IFPL) system as defined by Washington Administrative Code (WAC) 332-24-301. The IFPL system is used to help prevent wildfires by regulating work in the woods during the summer fire season. Contractor shall also comply with applicable spark emitting equipment requirements detailed in WAC 332-24-405.
The US Forest Service and the Washington State Department of Natural Resources (DNR) use the four-level industrial regulation system.
IFPL Precaution Levels:
Level I Closed Fire Season Fire equipment and fire watch service is required.
Level II Partial Hoot Owl Limits certain activities to between the hours of
8 p.m. and 1 p.m.
Level III Partial Shutdown Prohibits some activities altogether and limits other activities to between the hours of 8 p.m. and 1 p.m.
Level IV General Shutdown All operations prohibited.
Operation: Power Saws:
Precaution Level Landing Tractor/Skidder Other Woods Saws I. Closed Season Fire Watch Fire Watch Fire Watch II. Partial Hoot Owl Fire Watch Hoot Owl Hoot Owl III. Partial Shutdown Hoot Owl Hoot Owl Prohibited IV. General Shutdown Prohibited Prohibited Prohibited
Other Operations Precaution Level Loading Blasting Welding I. Closed Season Fire Watch Fire Watch Fire Watch II. Partial Hoot Owl Fire Watch Hoot Owl Hoot Owl III. Partial Shutdown Hoot Owl Hoot Owl Hoot Owl IV. General Shutdown Prohibited Prohibited Prohibited
This project is located in one of the following zones:
652NE - Northern portion of the Hood Canal RD 652SE - Southern portion of the Hood Canal RD 652NW Northern portion of the Pacific RD 652SW - Southern portion of the Pacific RD
The Fire Precaution Class can be found at: https://www.dnr.wa.gov/ifpl or by calling 1-800-527- 3305.
http://www.dnr.wa.gov/ifpl
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER
ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
Title Pages
1. FSR 29 MP 10.6 Standard Specifications 60
2. FS 29 Road Repair Maps, Plans/Drawings 11
3. Fire Plan - Industrial Fire Precautions Schedule/Level (IFPL) 11
4. DOL Wage Determination WA20230001 MOD 02032023 47
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
OR RESPONDENTS
L-1 SITE VISIT (FAR 52.236-27)(CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) No pre-bid or site visit is planned. Site visits may be arranged during normal duty hours by contacting COR (Doug Bladek).
L.2 SOLICITATION IN ADVANCE OF FUNDING
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
The notice regarding timely definitization of equitable adjustments for change orders under construction contracts required by FAR Subpart 36.211(b) is located at:
Notice Regarding Construction Contract Administration under the heading Small Business Information and Resources, Procurement Information.
https://www.fs.usda.gov/business/small-business/?tab=
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 PROPOSAL EVALUATION
Evaluation will be conducted in accordance with FAR 15.305 Proposal Evaluation as supplemented by information in this solicitation. The government will evaluate proposals and assess their relative qualities solely on the evaluation factors specified in this solicitation.
This solicitation serves as a seed task order in conjunction with the 2023 Road Construction Indefinite Delivery Indefinite Quantity (IDIQ) contract. Due to the technical evaluations being accomplished at the IDIQ level, the sole evaluation criteria for this solicitation is price.
Factor 1. Price
The proposed price will be evaluated for reasonableness in accordance with FAR 15.404-1(b).
Note: All offerors must be able to meet the bonding requirements.
| PART I – THE SCHEDULE |
| SECTION A—PROJECT GENERAL INFORMATION |
| A.1 CONTACT INFORMATION: |
| A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS |
| PART I—SCHEDULE OF ITEMS |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 SCHEDULE OF ITEMS |
| B.2 SCHEDULE NOTES |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| C.1 DESCRIPTION OF WORK |
| C.2 PROJECT LOCATION |
| C.3 MAGNITUDE OF CONSTRUCTION PROJECT |
| C.4 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.210-3) (APR 1984) |
| C.5 TECHNICAL SPECIFICATIONS |
| C.6 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (AGAR 452.211-73) (FEB 1988) |
| SECTION D--PACKAGING AND MARKING |
| SECTION E--INSPECTION AND ACCEPTANCE |
| SECTION F--DELIVERIES OR PERFORMANCE |
| F.1 CLAUSES |
| F.2 OTHER REQUIREMENTS |
| SECTION G--CONTRACT ADMINISTRATION DATA |
| G.1 CLAUSES |
| G.2 GOVERNMENT-FURNISHED PROPERTY |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS |
| H.1 SUPPLEMENTAL INFORMATION |
| H.2 LANDSCAPE PRESERVATION AND EROSION CONTROL MEASURES EROSION CONTROL |
| H.3 SPECIAL EQUIPMENT CLEANING REQUIREMENTS |
| H.4 USE OF PREMISES |
| PART II--CONTRACT CLAUSES |
| SECTION I--CONTRACT CLAUSES |
| I-1 PHYSICAL DATA (FAR 52.236-4)(APR 1984) |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J--LIST OF ATTACHMENTS |
| J.1 ATTACHMENTS |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L-1 SITE VISIT (FAR 52.236-27)(CONSTRUCTION) (FEB 1995) |
| L.2 SOLICITATION IN ADVANCE OF FUNDING |
| SECTION M--EVALUATION FACTORS FOR AWARD |
| M.1 PROPOSAL EVALUATION |
File details come from the government source that posted it. Updated .