1240BH23R0005 RC IDIQ Amendment 02.pdf
PDF 2 MB Posted
- Solicitation number
- 1240BH23R0005
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH23R0005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
1240BH23R000506/29/2023
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/01/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1240BH23R0005 ROAD CONSTRUCTION IDIQ Amendment 02 is to address multiple items and the closing date has not changed and remains 7/7/2023 0900 PT. Please see attached for additional details.
Period of Performance: 08/15/2023 to 08/15/2028
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JUSTIN C. HOLDER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1240BH23R0005 ROAD CONSTRUCTION IDIQ
AMENDMENT 02
In this amendment you will find the following:
SF-30 Amendment 02 Cover page
Amendment 02 Purcell Creek Culvert Replacement o Benefits to the Local Community Form A (add to Section J) o Addition of site photos o Site Visit Monday July 3rd, 1030 am at Cowitz Vally Ranger District;
10024 US Hwy 12 Randle, Washington 98377
Amendment 02 Pre-bid meeting Summary including questions and answers
Offeror shall provide the following information on the benefit of Offeror’s proposal to Lewis County:
Purcell
Lewis
Lewis
Purcell Creek Site Photos
Gifford Pinchot National Forest, Cowlitz Valley Ranger District
NFSR 4612 MP 1.30
Taken by Isaiah Krutak
7 September 2022
Figure 1 Site during fire suppression operations
Figure 2 Trash Rack before suppression operations
Figure 3 Site during suppression operations
Figure 4 Excavated material from suppression operations
1240BH23R0005 Road Construction IDIQ Pre-Bid Meeting Summary 06/28/2023
ATTENDEES
FS:
Stevonne Fuller - CO Susie Felton - CS Melissa Jolley Isaiah Krutak
Contractors:
Peter Farrish - JamesCo Pro Bryan Mydera - Northwest Venessa - Conway Construction
ADMINISTRATIVE STATEMENT
• New IDIQ in place to replace the current.
• No emergency services – no hourly rates.
• This IDIQ will have a higher dollar threshold.
• New IDIQ is solely construction and not a blend of construction and service items like the current IDIQ.
• Did an overview of the submittal instructions o Business/Price Proposal o Technical Proposal
• Strongly encouraged interested Contractors to thoroughly read/review Sections L and M to ensure they are submitting everything required to be considered a complete proposal.
QUESTIONS AND ANSWERS
Administrative:
Question 1: *Questionnaire returned directly to who?
Answer 1: Return directly to Contracting Officer from the Evaluator.
Question 2: Can you submit a proposal for the IDIQ without bidding on a seed task order? Or do you need to submit an offer on all seed task orders to be considered for the new IDIQ?
Answer 2: Contractors are required to bid on at least one seed project. See Pg 62 of the solicitation.
Question 3: Do the seed task orders have their own solicitation number?
Answer 3: No. They are tied to the Base IDIQ solicitation. However, they will be awarded as individual task orders under the IDIQ.
Technical:
Forest Road 90:
*No questions
Purcell Creek:
Question 4: *Is there any more to the plan set, more detail as far as dimensions go?
Question 4: Site picture will be included in amendment two and a site visit.
Question 5: *Can you clarify pay item 15401 for contractor testing?
Answer 5: Material testing is a professional service where a certified tester analyzes the backfill material, and comes to the site for compaction testing, per FP-14 specifications. Per section 208, when compacting the structural backfill, testing is required to ensure 95% of maximum density. Pay item 15401 is to ensure this testing is performed.
Question 6: *Is there access to Purcell Creek for a site visit?
Answer 6: Currently, Purcell Creek is in a Fire Closure area, so a site visit has been coordinated for 7/3/23.
Meet at 10:30am at the Cowlitz Valley Ranger District in Randle, WA. From there we will drive to the project site.
29 Road:
Question 7: *Gate installed just before 28 day closure. Looks like there is a contractor in there. Will they be out of there and all material/scrap be removed from site prior to work or would that be part of this seed project to remove the material and clean up?
Answer 7: No cleaning of the existing material. Contractor will be out or move equipment prior to this project. Pile of asphalt will remain but not part of the seed project. Design was completed and after design completed road blew out.
Question 8: *Two culvert 60” and 40” looks recently installed the shallow one. Road extremely narrow. Concerned about overall quantities. Just looking for what went on?
Answer 8: Design was completed and then road blew out after the fact and now they completed a temporary repair to get across.
Matheny Creek *No questions
CLOSING REMARKS
• Solicitation closes on July 7th at 0900 PT.
• Be mindful that if you’re submitting offers on multiple seed task orders, that you have the bonding capacity to cover each seed task order’s bonding requirements.
• Second amendment will be sent out tomorrow morning June 29th .
• Another site visit for Purcell will be taking place on July 3rd. Meet at the Cowlitz Valley Ranger District at
10:30 am on July 3rd, Address 10024 US Highway 12, Randle, WA 98377.
| R0005_GP Seed TO 1 FR90 Roadway CvrPg and SOW.pdf |
| (GP) Seed TO 1 FR90 Roadway Repair_.pdf |
| PART I – THE SCHEDULE |
| SECTION A—PROJECT GENERAL INFORMATION |
| A.1 CONTACT INFORMATION: |
| A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS |
| PART I – SCHEDULE OF ITEMS |
| SECTION B – SUPPLIES, SERVICES AND PRICES |
| B.1 SCHEDULE OF ITEMS |
| SCHEDULE NOTES: |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| C.1 DESCRIPTION OF WORK |
| C.2 PROJECT LOCATION |
| C.3 MAGNITUDE OF CONSTRUCTION PROJECT |
| C.4 PROSECUTION OF WORK |
| C.5 APPLICABLE SPECIFICATIONS AND MATRIAL CETIFICATIONS |
| C-6 SUBMITTALS |
| C.7 CONSTRUCTION PLANS |
| SECTION D--DELIVERIES OR PERFORMANCE |
| SECTION E – INSPECTION AND ACCEPTANCE (Refer to Base IDIQ for Applicable Clauses and Terms) |
| SECTION F--DELIVERIES OR PERFORMANCE |
| F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) |
| F.2 OTHER REQUIREMENTS |
| SECTION G--CONTRACT ADMINISTRATION DATA |
| G.1 CLAUSES |
| G.2 GOVERNMENT-FURNISHED PROPERTY |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS |
| H.1 SUPPLEMENTAL INFORMATION |
| H.2 EROSION CONTROL MEASURES |
| H.3 LANDSCAPE PRESERVATION – SPILL PREVENTION |
| H.4 POLLUTION AND EROSION CONTROL |
| H.5 SPECIAL EQUIPMENT CLEANING REQUIREMENTS |
| H.6 USE OF PREMISES |
| H.7 FISH REQUIREMENTS |
| H.8 DEWATERING AND REWATERING |
| H.9 HEAVY EQUIPMENT |
| H.10 OTHER REQUIREMENTS |
| PART II--CONTRACT CLAUSES |
| SECTION I--CONTRACT CLAUSES |
| I.1 CLAUSES |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J--LIST OF ATTACHMENTS |
| J.1 ATTACHMENTS |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L-1 FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) |
| L.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) |
| SECTION M--EVALUATION FACTORS FOR AWARD |
| M.1 PROVISIONS |
| M.2 PROPOSAL EVALUATION |
| R0005_GP Seed TO 2 Purcell Creek Culvert CvrPg SOI SOW Attchmnts.pdf |
| (GP)Seed TO 2 Purcell Creek Culvert Replacement_.pdf |
| PART I – THE SCHEDULE |
| SECTION A—PROJECT GENERAL INFORMATION |
| PART I—THE SCHEDULE |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 SCHEDULE OF ITEMS |
| SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| SECTION D – PACKAGING AND MARKING |
| SECTION E – INSPECTION AND ACCEPTANCE |
| SECTION F - DELIVERIES AND PERFORMANCE |
(The Below Clauses and Terms are Supplemental to the Base IDIQ)
| SECTION G – CONTRACT ADMINISTRATION DATA |
| SECTION H – SPECIAL CONTRACT REQUIREMENTS |
| PART II – CONTRACT CLAUSES |
| SECTION I – CONTRACT CLAUSES |
| PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J – LIST OF ATTACHMENTS |
| PART IV – REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L.1 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO |
| ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) |
| SECTION M – EVALUATION FACTORS FOR AWARD |
| M.1 PROPOSAL EVALUATION |
| 02_FSSS_Purcell Culvert_amended.pdf |
| Preface |
| 101 - Terms¸ Format¸ and Definitions |
| 101.01 Meaning of Terms. |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid¸ Award¸ and Execution of Contract |
| Delete Section 102. |
| 103 - Scope of Work |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. |
| 104 - Control of Work |
| Delete Subsections 104.01, 104.02, 104.04. |
| 104.06 Use of Roads by Contractor. |
| 105 - Control of Material |
| 105.02(a) Government-provided sources. |
| 105.02(c) Contractor-located sources. |
| 105.05 Use of Material Found in the Work. |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements. |
| 106.02 Visual Inspection. |
| 107 - Legal Relations and Responsibility to the Public |
| Delete Subsection 107.05. |
| 108 - Prosecution and Progress |
| Delete Section 108. |
| 109 - Measurement and Payment |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. |
| 109.01 Measurement of Work. |
| 109.02 Measurement Terms and Definitions. |
| 152 - Construction Survey and Staking |
| 152.04 General. |
| 152.05 Survey and Staking Requirements. |
| Table 152-1 Construction Survey and Staking Tolerances |
| 153 - Contractor Quality Control |
| 153.02 Qualifications. |
| 153.07 Records and control charts. |
| 153.10 Project Submittals. |
| 155 - Schedules for Construction Contracts |
| Delete Section 155. |
| 156 - Public Traffic |
| Section 156. – PUBLIC TRAFFIC |
| 157 - Soil Erosion and Sediment Control |
| 157.04 General. |
| 204 - Excavation and Embankment |
| Section 204. — EXCAVATION AND EMBANKMENT |
| 208 - Structure Excavation and Backfill for Selected Major Structures |
| 208.07 Dewatering. |
| 209 - Structure Excavation and Backfill |
| 209.09 Backfill. |
| 209.10 Compacting. |
| 301 - Untreated Aggregate Courses |
| 301.03 General. |
| 301.05 Compacting. |
| 302 - Minor Crushed Aggregate |
| 302.04 Placing Crushed Aggregate. |
| 302.05 Compacting and Finishing Crushed Aggregate |
| 625 - Turf Establishment |
| Section 625. — TURF ESTABLISHMENT |
| 703 - Aggregate |
| 703.05 Subbase, Base, Surface Course, and Screened Aggregate. |
| 201 FSSS.pdf |
| 201 - Clearing and Grubbing |
| 201.06 Disposal. |
| R0005_OLY Seed TO 1 Matheny Creek Culvert CvrPg SOW.pdf |
| (OLY) Seed TO 1 Matheny Creek Culvert Replacement_FRS 2100 MP 6.9_060123__.pdf |
| PART I – THE SCHEDULE |
| SECTION A—PROJECT GENERAL INFORMATION |
| A.1 CONTACT INFORMATION: |
| A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS |
| PART I—THE SCHEDULE |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 SCHEDULE OF ITEMS |
| B.2 SCHEDULE NOTE |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| C.1 SCOPE OF CONTRACT |
| C.2 PROJECT LOCATION |
| C.3 MAGNITUDE OF CONSTRUCTION PROJECT |
| C.4 52.210-3 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (APR 1984) |
| C.5 TECHNICAL SPECIFICATIONS |
| C.6 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988) |
| SECTION D--PACKAGING AND MARKING |
| SECTION E--INSPECTION AND ACCEPTANCE |
| SECTION F--DELIVERIES OR PERFORMANCE |
| F.1 CLAUSES |
| F.2 OTHER REQUIREMENTS |
| SECTION G--CONTRACT ADMINISTRATION DATA |
| G.1 CLAUSES |
| G.2 GOVERNMENT-FURNISHED PROPERTY |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS |
| H.1 SUPPLEMENTAL INFORMATION |
| H.2 452.236-77 EMERGENCY CONTROL (JUL 1985) MAINTENANCE OF EXISTING FACILITIES |
| H.3 LANDSCAPE PRESERVATION EROSION CONTROL MEASURES |
| H.4 SPECIAL EQUIPMENT CLEANING REQUIREMENTS |
| H.14 USE OF PREMISES |
| PART II--CONTRACT CLAUSES |
| SECTION I--CONTRACT CLAUSES |
| I.2 52.236-4 PHYSICAL DATA (APR 1984) |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J--LIST OF ATTACHMENTS |
| J.1 ATTACHMENTS |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) |
| SECTION M--EVALUATION FACTORS FOR AWARD |
| M.1 PROPOSAL EVALUATION |
| R0005_OLY Seed 2 TO FSR 29 RD MP CvrPg SOW.pdf |
| (OLY)Seed 2 TO FSR 29 RD MP 10.6-SF 060123_.pdf |
| PART I – THE SCHEDULE |
| SECTION A—PROJECT GENERAL INFORMATION |
| A.1 CONTACT INFORMATION: |
| A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS |
| PART I—SCHEDULE OF ITEMS |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 SCHEDULE OF ITEMS |
| B.2 SCHEDULE NOTES |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| C.1 DESCRIPTION OF WORK |
| C.2 PROJECT LOCATION |
| C.3 MAGNITUDE OF CONSTRUCTION PROJECT |
| C.4 52.210-3 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (APR 1984) |
| C.5 TECHNICAL SPECIFICATIONS |
| C.6 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988) |
| SECTION D--PACKAGING AND MARKING |
| SECTION E--INSPECTION AND ACCEPTANCE |
| SECTION F--DELIVERIES OR PERFORMANCE |
| F.1 CLAUSES |
| F.2 OTHER REQUIREMENTS |
| SECTION G--CONTRACT ADMINISTRATION DATA |
| G.1 CLAUSES |
| G.2 GOVERNMENT-FURNISHED PROPERTY |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS |
| H.1 SUPPLEMENTAL INFORMATION |
| H.2 LANDSCAPE PRESERVATION AND EROSION CONTROL MEASURES EROSION CONTROL |
| H.3 SPECIAL EQUIPMENT CLEANING REQUIREMENTS |
| H.4 USE OF PREMISES |
| PART II--CONTRACT CLAUSES |
| SECTION I--CONTRACT CLAUSES |
| I-2 52.236-4 PHYSICAL DATA (APR 1984) |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J--LIST OF ATTACHMENTS |
| J.1 ATTACHMENTS |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L-1 FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) |
| L.2 SOLICITATION IN ADVANCE OF FUNDING |
| SECTION M--EVALUATION FACTORS FOR AWARD |
| M.1 PROPOSAL EVALUATION |
File details come from the government source that posted it. Updated .