1240BH23R0005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
1240BH23R000507/06/2023
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/06/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1240BH23R0005 ROAD CONSTRUCTION IDIQ Amendment 03 is to address multiple items and the closing date has not changed and remains 7/7/2023 0900 PT. Please see attached for additional details.
Period of Performance: 08/15/2023 to 08/15/2028
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JUSTIN C. HOLDER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1240BH23R0005 Road Construction IDIQ Pre-Bid Purcell Creek Site Visit Summary 07/03/2023
ATTENDEES
FS:
Isaiah Krutak - USFS Joey Anderson - USFS
Contractors:
Len King - Q King Trucking and Construction, Inc.
Peter Farrish - Jamesco Pro, Inc.
Tom Farrish - Jamesco Pro, Inc.
Larry Fitzgerald - Fitzgerald General Contracting Teresa Fitzgerald - Fitzgerald General contracting
We met at the Cowlitz Valley Ranger District at 10:30, then drove to mp 1.3 on NFSR 4612. Attached is a clearing and grubbing typical, per request, and below is a summary of questions asked.
Purcell Creek Culvert Replacement Questions and Answers
Question 1: Is there a government source for aggregate or riprap?
Answer 1: Outside of the site itself, there isn’t an established government source for material. Lava
Creek Quarry (4600062) is the closest pit, but it isn’t developed and is currently designated only as a waste site.
Question 2: What are the clearing limits for pay item 20103 Clearing and Grubbing?
Answer 2: Attached is a plan sheet showing the horizontal clearing limits. Follow FP-14 section 201 for the clearing height (20’). The first 1.3 miles of NFSR 4612 will have light clearing and grubbing, since it has been traveled by the public more recently, and it has been thinned during suppression activities. However, the remaining 1.2 miles, leading up to Bluff Lake Trailhead, hasn’t been maintained since it washed out in 2011.
Question 3: After award, if the pipe is ordered now can it be stored on or close to the site?
Answer 3: We have done that on other projects, so yes, you can store the pipe close to the site until it is ready to be installed.
Question 4: Where do the quantities come from, is 100’ of pipe enough?
Answer 4: During the fire last season, in an effort to gain emergency access to the Bluff Lake
Trailhead, heavy equipment excavated material down to within working distance of the existing pipe, roughly 15’ above the pipe’s invert. The far side of the pipe is roughly 30’ above the invert. The intent is to install the 100’ pipe and backfill according to specification (slope 1V : 1.5H) until there is a 20’ road bed (traveled way + shoulders). The roadway excavation is to ensure the road is tied in appropriately.
Furthermore, according to FP-14 section 602, “Determine final location, skew, length, elevations, and grade according to Section 152. Do not order culvert material until the CO has accepted the final structure size, length, and alignment.” Staking, per Section 152, is incidental to pay item 60201.
Question 5: Can on-site material be used for the keyed riprap?
Answer 5: On-site material, disturbed during fire suppression activities, may be used for the unclassified borrow and/or riprap.
General Questions and Answers
Question 6: I am simply looking for a little clarification as to what type of Geogrid is desired for use on this RFP. There are callouts for Stabilization Geogrid Type I and II, and there are references to Table 714-6 which provides value requirements for Uniaxial Reinforcement Geogrids/Geotextiles, not Stabilization Geogrids.
There is only one Type of Stabilization Geogrid in the FP-14 Spec Book (Table 714-4) but there are notes to use a Type II, Biaxial Geogrid for the Roadway Excavation/Deep Patch work on MP 7.0 & MP 7.6. The notes also state that the Geogrid shall meet Table 714-6 which is again a Table that shoes values for Uniaxial Reinforcement Geogrids/Geotextiles.
We stock Geogrid’s that will meet all types in the FP-14 Spec Book – I just want to confirm that I am quoting the correct one based on the notes and details. I have attached a PDF copy of the spec section for your reference.
Answer 6: The intent is for the use of Reinforcement Geotextile and Geogrid. Which is section 714.04.
The attached 714 supplemental is now made a part of the 90 RD seed task order. All geogrid will conform to FP-14 Table 714-6 Type II Geogrid.
Additionally, while both Type I and Type II are called out on the Individual site drawings sheets, however for streamline purposes, all sites will be Type II.
Question 7: Is there a new SF-1442 for the base IDIQ? The old SF-1442 states a due date of 7/3/2023.
Answer 7: There is not a new SF-1442 for the IDIQ. The updated RFP submittal date was announced in
Amendment 01 and 02. Please ensure you acknowledge the amendments in your proposal.
714 - Geosynthetic Material
714.04 Reinforcement Geotextile and Geogrid. Table 714-6.
(2) The specified minimum strenght is in both the axial and bi-axial directions.
(6) The minimum aperture size for the biaxial grid is 1 inch.
Remove and replace note (2) and add note (6) on to Table 714-6:
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
R06
PACIFIC NORTHWEST REGION
Purcell Creek Culvert
Replacement
GIFFORD PINCHOT
NATIONAL FOREST
COWLITZ VALLEY RANGER
DISTRICT
CLEARING & GRUBBING
09/28/2021
I.KRUTAK
S.ROCKEY
1 16
DISPOSAL AREA TYPICAL
SECTION VIEW
OUTSLOPE - 5% MIN. AWAY FROM ROADWAY
1V:1.5H 1V:1.5H
NOTES:
1. LAYER PLACE MATERIAL BY SPREADING IN MAXIMUM 4" LIFTS AND COMPACT WITH EQUIPMENT.
2. SEED AND MULCH OVER ALL DISTURBED AREAS AND ENSURE WATER WILL DRAIN.
3. DISPOSAL AREA LIMITS TO BE FLAGGED BY THE CO.
4. MAINTAIN MINIMUM 5' DISTANCE FROM DOWNHILL SLOPES ON ALL SIDES
5. DISPOSAL MATERIAL MAY ALSO BE PLACED AGAINST CUT BANKS AS APPROVED BY CO.
CLEARING AND GRUBBING DETAILS
TYPICAL SECTION
BOTTOM OF BACKSLOPE
BRUSHING LIMITS
CLEAR AND GRUB
ALL TREES
' M
AX
NOTES:
1. ALL TREES WITHIN THE CLEARING AND GRUBBING LIMITS TO BE REMOVED, EXCEPT WITHIN STAKED TREE LIMITS.
2. GRUB STUMPS WITHIN "D" ABOVE AND HAUL TO DESIGNATED DISPOSAL AREAS OR AS NOTED ON THE WORK DESCRIPTIONS.
3. CUT ALL VEGETATION TO A MAXIMUM HEIGHT OF 6 INCHES ABOVE THE GROUND SURFACE.
4. ROADS MECHANICALLY BRUSHED MAY REQUIRE MANUAL SCATTERING OF CUT MATERIAL BEYOND THE BRUSHING LIMITS.
8'"D"8'
MATERIAL SOURCES NOTES:
1. PRIOR TO DEVELOPING AND PRODUCING MATERIAL, OTHER THAN UNCLASSIFIED
BORROW, THE PURCHASER MUST SUBMIT A QUARRY PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL.
2. THE MATERIAL SOURCES THAT ARE MADE AVAILABLE BY THE GOVERNMENT FOR
UNCLASSIFIED BORROW MAY REQUIRE SOME SORTING/MIXING/SCREENING
AND/OR MECHANICAL SEPARATION OF MATERIALS TO MEET THE REQUIREMENTS
OF SUBSECTION 704.06 OF THE FP-14 SPECIFICATIONS.
3. ALL MATERIAL SOURCES SHALL BE CERTIFIED WEED FREE. A WEED FREE
CERTIFICATION SHOULD ACCOMPANY EACH MATERIAL USED OR SUBMITTED.
DISPOSAL NOTES:
1. DISPOSE OF EXCESS OR UNSUITABLE MATERIAL AT DESIGNATED DISPOSAL
AREA. PLACE MATERIAL IN LAYERS.
2. HAULING AND DISPOSAL OF EXCESS OR UNSUITABLE MATERIAL IS INCIDENTAL
TO ASSOCIATED WORK.
TRAFFIC CONTROL NOTES:
1. SUBMIT A TEMPORARY TRAFFIC CONTROL PLAN TO THE CONTRACTING OFFICER
FOR APPROVAL AT LEAST 30 DAYS PRIOR TO INTENDED USE.
2. PROVIDE TEMPORARY TRAFFIC CONTROL IN ACCORDANCE WITH THE MOST
RECENT EDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES
SEEDING NOTES:
1. SEED AND MULCH ALL DISTURBED SOIL THAT IS NOT WITHIN ANY TRAVELED
WAY OR STREAM CHANNEL, UNLESS OTHERWISE NOTED
ROCK BLASTING NOTES:
1. SUBMIT GENERAL BLASTING PLAN FOR ACCEPTANCE TO CONTRACTING
OFFICER AT LEAST 14 DAYS BEFORE DRILLING OPERATIONS BEGIN.
GRADING NOTES:
1. PROTECT EXISTING UNDERGROUND AND ABOVE GROUND STRUCTURES TO
REMAIN, UNLESS OTHERWISE NOTED.
I.KRUTAK
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C