This is Appendix E to a federal contract solicitation establishing requirements for support equipment installation and demolition work at Pittsburgh Air National Guard Base, Building 110. The work is governed by CSN NPT501, with an effective date of March 19, 2026, and is assigned contract number FA860426RB011.

The appendix specifies installation of three primary support equipment items: twenty-four (24) flow-through racks constructed of steel with rust-resistant coating and lockable casters; six hundred fifty (650) plastic storage bins measuring 23.5" x 15.5" x 12" in weather-resistant polyurethane; and eleven (11) steel pipe racks with powder coat or painted finish. Equipment location and configuration requirements are detailed on Air Force Drawings NPT501-01 and NPT501-02. Concurrent with installation, the contractor must perform extensive demolition work including removal of a modular office (walls, ceiling, flooring, electrical components), existing pallet racks, and non-load bearing walls, followed by floor and wall repairs to match surrounding areas. All fire safety and suppression components must be removed and reinstalled in accordance with on-base fire personnel. Quality assurance requirements include system inspections and two functional load tests: gravity flow-through racks loaded to capacity for 24 hours and pipe racks loaded to capacity for 24 hours, with any permanent deformation constituting test failure. All work must be completed in accordance with the cover purchase description and referenced Air Force drawings.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

FOR

SUPPORT EQUIPMENT AND DEMO OF EXISTING EQUIPMENT

AT

PITTSBURGH, PENNSYLVANIA

BUILDING 110

CSN NPT501

DATE: March 19, 2026

PREPARED BY:

Josh Payne

JOSH PAYNE

PROJECT ENGINEER

AFLCMC/EZPAE

James Rowland

JAMES ROWLAND

REVIEWER

AFLCMC/EZPAE

FA860426RB011

Attachment 6

Table Of Contents

1. GENERAL SCOPE

2. APPLICABLE DOCUMENTS

3. REQUIREMENTS

3.1 SYSTEM DESCRIPTION

3.2. CHARACTERISTICS

3.2.1. CONFIGURATION REQUIREMENTS

3.2.2. STRUCTURE AND INSTALLATION

3.2.3. DEMO AND REMOVAL

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTIONS

4.2. TESTS

Pittsburgh ANGB – Appendix E – Page 1

1. GENERAL SCOPE

This appendix establishes the minimum performance, design fabrication, installation and test requirements for the support equipment and services listed in section 3.1. All equipment and services shall be installed and conducted at Pittsburgh ANGB, building

110. The work shall be completed in accordance with this appendix, the Cover PD and Air Force (AF) Drawings NPT501-01 and NPT501-02.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

3. REQUIREMENTS

3.1 SYSTEM DESCRIPTION

The following components shall be installed or carried out as specified below.

3.2. CHARACTERISTICS

Support equipment shall conform to the following requirements.

3.2.1. CONFIGURATION REQUIREMENTS

Support equipment shall be located and configured as shown on AF Drawing NPT501- 01 or as outlined below.

3.2.2. STRUCTURE AND INSTALLATION

• Flow Through Rack o Twenty four (24) provided and located as shown on AF drawing NPT501-

01, in building 110.

o Same brand, color and material.

o Made of steel and be painted with rust resistant coating.

o 4 Lockable casters capable of supporting the total weight capacity as shown on AF drawing NPT501-01.

o Interface with plastic bins.

• Plastic Bins o Six Hundred Fifty (650) plastic storage containers shall be delivered to building 110 on Pittsburgh ANGB.

o Dimensions: 23.5” long x 15.5” wide x 12” height.

o Material: weather resistant polyurethane.

o Interface with the gravity flow through racks.

• Pipe Rack o Eleven (11) pipe racks shall be delivered and assembled in building 110 on Pittsburgh ANGB.

o Material: steel.

Pittsburgh ANGB – Appendix E – Page 2 o Powder coat or painted finish.

o Color: as specified by COTR.

3.2.3. DEMO AND REMOVAL

• Modular Office o Modular office of dimensions as shown on AF Drawing NPT501-02.

o Remove all physical components including but limited to the walls, ceiling, and flooring.

o Remove or relocate the electrical components such as outlets and lights.

o Remove and reinstall all necessary fire safety and fire suppression components in accordance with on base fire personnel.

o Remove all debris and clean work area to prepare work area for mission duties.

o Ensure all wall and floor damage caused by the offices or removal is patched and repaired to match surrounding area.

• Pallet Racks o Removal of existing pallet racks detailed in AF Drawing NPT501-02.

• Walls o Removal of existing non-load bearing walls as detailed in AF Drawing

NPT501-02.

o Floor and walls where non-load bearing wall to be sanded flush to their surroundings if needed.

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTIONS

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the cover purchase description. These inspections shall be completed as part of the systems checkout test and again as a part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test

No. Description

Result

1. A functional test where the Gravity Flow through rack is loaded to capacity and left for 24 hours. Any sign of permanent deformation will fail the test.

☐ Pass ☐ Fail

Pittsburgh ANGB – Appendix E – Page 3

2. A functional test where the Pipe rack is loaded to capacity and left for 24 hours. Any sign of permanent deformation will fail the test.

☐ Pass ☐ Fail

DATE: March 19, 2026
1. GENERAL SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
3.1 SYSTEM DESCRIPTION
3.2. CHARACTERISTICS
3.2.1. CONFIGURATION REQUIREMENTS
3.2.2. STRUCTURE AND INSTALLATION
3.2.3. DEMO AND REMOVAL
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
4.2. TESTS