About this file
This is a technical drawing set prepared by Mott MacDonald for the Ocean County Board of Commissioners in New Jersey, detailing the Northern Recycling Center Concrete Floor Topping project located in Lakewood, Ocean County, New Jersey. The project encompasses concrete floor topping work at the Northern Recycling Center (601 New Hampshire Avenue, Lakewood, NJ) and push wall removal work at the Southern Recycling Center (226 Haywood Road, Stafford Township, NJ). The scope of work includes: applying a 2-inch minimum metallic-aggregate concrete floor topping over approximately 7,900 square feet in the Single Stream Building's tipping room; full-depth concrete pad removal and replacement in multiple areas totaling approximately 932 square feet; removal of 14 linear feet of 15-foot-high concrete push wall at the Southern facility; asphalt patching and transitions totaling approximately 283 square feet; and T-hanger foundation repair at the Ocean County Airport. The drawings indicate that work must be coordinated around facility operating hours (4:00 AM to 11:00 PM weekdays) with a two-week advance notice requirement. Full-depth concrete work is scheduled for a five-day shutdown beginning Friday afternoon at 3:00 PM with facility reopening by Wednesday, while floor topping work is scheduled for a separate weekend with operations resuming Monday morning at 6:00 AM.
The project requires adherence to specific construction sequences and safety protocols, including flame detection camera management, fire watch procedures for welding activities, and water management during sawcutting operations. The contractor is responsible for all site coordination with the facility operator (Atlantic Coast Recycling), temporary facilities (power, water, sanitary), debris removal, and restoration of disturbed areas. Surface preparation for floor topping requires shot blasting or hydrodemolition to achieve ICRI CSP 7 or greater surface preparation standards, followed by epoxy bonding agent application and curing compound. The drawings indicate estimated fill volumes of 49 cubic yards for standard 2-inch coverage and an additional 20 cubic yards for areas worn deeper than 2 inches, with the contractor responsible for procuring sufficient material based on field experience and the approximately 5-foot by 5-foot grid survey data provided. All work must comply with OSHA regulations and all applicable codes and standards, with the most rigorous requirement applying where discrepancies exist.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
TITLE SHEET & DRAWING INDEX
DAVID HEBER
24GE05650400
DWH
JJK
As Shown 0
G-1001
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\G-100 - COVER SHEET.DWG
SAVE DATE/TIME: 4/6/2026 5:24:24 PM
NJ PROFESSIONAL ENGINEER LIC. No.
REFERENCE: LAKEHURST QUADRANGLE
PROJECT LOCATION
601 NEW HAMPSHIRE AVE.
LAKEWOOD, NJ
KEY MAP
SCALE 1" = 4000'
OCEAN COUNTY BOARD OF COMMISSIONERS
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NEW JERSEY
OCEAN COUNTY BOARD OF COMMISSIONERS
FRANK SADEGHI, DIRECTOR
JENNIFIER BACCHIONE, DEPUTY DIRECTOR
ROBERT S. ARACE, COMMISSIONER
SAM ELLENBOGEN, COMMISSIONER
RAY GORMLEY, COMMISSIONER
COUNTY ADMINISTRATOR
MICHAEL J. FIURE
DRAWING INDEX
SHEET DWG. NO. TITLE
1 G-100 TITLE SHEET & DRAWING INDEX
2 G-101 NRC OVERALL SITE PLAN
3 C-101 NRC DEMOLITION PLAN
4 C-102 SRC PUSH WALL REMOVAL PLAN
5 C-201 NRC NEW WORK PLAN
6 C-202 SINGLE STREAM BUILDING FLOOR TOPPING GRADING & CUT/FILL
7 C-501 CONSTRUCTION DETAILS
8 C-502 T-HANGER FOUNDATION REPAIR
D D
S
S
SINGLE STREAM BUILDING
TRAILER
CANOPY
CANOPY
BLDG. #68G
BLDG. #68C
COMMINGLED BUILDING
BLDG. #68F
S
S
S
EXISITING RM 58.28±
EXISTING INVERT 48.53±
S
S
MACADAM
MACADAM
CONCRETE
CONCRETE
MACADAM
MACADAM
MACADAM
MACADAM
MACADAM
MACADAM
BLDG.
#68D
BLDG.
#95
CONCRETE
CONCRETE
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
SIDEWALK
STONE
CO
NC
RE
TE
GEN.
CANOPY OVER GLASS CLEANUP AREA
RAMP
FIRE PUMP ROOM
MEN'S ROOM
TIPPING FLOOR
PROCESSING ROOM
TIPPING FLOOR
PROCESSING ROOM
AVAILABLE 2,400 SF
LAYDOWN AREA
FOR CONTRACTOR
ACCESS SITE FROM
TOWBIN AVENUE
GATE LOCKED. ACCESS SITE
FROM TOWBIN AVENUE.
GRASS
MACADAM
SCALE: 1" = 30'
60300
NRC OVERALL SITE PLAN
DAVID HEBER
24GE05650400
DWH
JJK
1" = 30' 0
G-1012
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\G-101 NRC OVERALL SITE PLAN.DWG
SAVE DATE/TIME: 4/22/2026 11:09:03 AM
NJ PROFESSIONAL ENGINEER LIC. No.
SCALE: 1" = 30'
NRC OVERALL SITE PLAN A
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
EXISTING SANITARY SEWER PIPE
EXISTING WATER PIPE
EXISTING ELECTRICAL CONDUIT
EXISTING STORMWATER PIPE
EXISTING NATURAL GAS LINE
EXISTING COMMUNICATIONS CONDUIT
EXISTING SANITARY FORCE MAIN
LEGEND
ENLARGEMENT BOUNDARY
LAYDOWN AREA BOUNDARY
1. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE REGULATIONS AND GUIDELINES SET FORTH BY ALL AGENCIES HAVING JURISDICTION OVER THE WORK. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) RULES AND REGULATIONS.
2. WORK SHALL BE PERFORMED AT TWO DIFFERENT SITES, THE NORTHERN RECYCLING CENTER (NRC) AND THE SOUTHERN
RECYCLING CENTER (SRC).
3. THE NORTHERN RECYCLING CENTER IS LOCATED AT 601 NEW HAMPSHIRE AVENUE, LAKEWOOD, NEW JERSEY. IT IS ONLY ACCESSIBLE FROM TOWBIN AVENUE. THE GATES ON NEW HAMPSHIRE AVENUE ARE LOCKED. THE FACILITY IS BEING
OPERATED BY ATLANTIC COAST RECYCLING.
4. THE SOUTHERN TRANSFER STATION IS LOCATED AT THE SOUTHERN RECYCLING CENTER, 226 HAYWOOD ROAD, STAFFORD TOWNSHIP, NEW JERSEY. THE PUSH WALL REMOVAL WORK IS LOCATED AT THE SOUTHERN TRANSFER
STATION.
5. NORMAL OPERATING HOURS AT THE NORTHERN RECYCLING FACILITY ARE 4:00 AM - 11:00 PM ON WEEKDAYS. IT IS IMPERATIVE THAT THE CONTRACTOR PROVIDE AN ALLOWANCE IN HIS BID FOR COORDINATION WITH THE EXISTING
OPERATIONS.
6. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL COORDINATION NECESSARY IS PERFORMED TO MINIMIZE INTERFERENCE WITH THE OPERATIONS AT THE RECYCLING FACILITIES BEFORE BEGINNING WORK. A TWO WEEK NOTICE WILL BE REQUIRED BEFORE THE START OF ANY WORK AT THE FACILITIES. THE CONTRACTOR IS PERMITTED TO WORK DURING OPERATING HOURS AS LONG AS WORK WILL NOT RESULT IN OPERATING DOWNTIME AS DETERMINED BY THE
ENGINEER, THE OPERATOR (ATLANTIC COAST RECYCLING), OR THE OWNER.
7. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTING INFRASTRUCTURE OR EQUIPMENT, THAT WAS
MEANT TO REMAIN, AND REPAIRS SHALL BE MADE SOLELY AT THE CONTRACTOR'S EXPENSE.
8. THE MEANS AND METHODS OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ITEMS LEFT ON-SITE. ANY THEFT OR VANDALISM OF ITEMS ON SITE
SHALL BE REPLACED OR REPAIRED AT THE CONTRACTOR'S SOLE EXPENSE.
10. CONTRACTOR IS TO DISPOSE ALL TRASH GENERATED AS A RESULT OF CONSTRUCTION OFFSITE AT THEIR OWN EXPENSE.
11. TEMPORARY POWER, WATER, SANITARY, AND LIKE FACILITIES CAN BE PROVIDED ONLY AT THE NORTHERN RECYCLING
FACILITY WITH THE EXCEPTION OF WELDING.
12. THE APPROVAL OF SUBMITTALS BY THE ENGINEER SHALL NOT BE CONSTRUED AS A COMPLETE CHECK, BUT WILL INDICATE ONLY THAT THE GENERAL METHOD OF CONSTRUCTION, MATERIALS, DETAILING AND OTHER INFORMATION ARE SATISFACTORY. APPROVAL WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR ANY ERROR, WHICH MAY EXIST IN HIS SUBMITTALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIMENSIONS, DETAILS, AND
SATISFACTORY CONSTRUCTION OF ALL WORK.
13. SUBMITTALS SHALL BE IN COMPLIANCE WITH CONTRACT REQUIREMENTS AND ACTUAL FIELD CONDITIONS. INCOMPLETE SUBMITTALS WILL NOT BE REVIEWED BY THE ENGINEER AND WILL BE RETURNED TO THE CONTRACTOR. REPRODUCED CONTRACT DRAWINGS WILL NOT BE ACCEPTED AS SHOP DRAWINGS. FIELD VERIFY CONSTRUCTION AND INSTALLATION
REQUIREMENTS PRIOR TO SUBMITTAL PREPARATION AND SUBMISSION.
14. DETAILS ON THE DRAWINGS ARE SHOWN AT SPECIFIC LOCATIONS AND ARE INTENDED TO SHOW GENERAL REQUIREMENTS THROUGHOUT. DETAILS NOTED "TYP." IMPLY ALL CONDITIONS TREATED SIMILARLY.
15. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF
THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED ON THE DRAWINGS.
16. THE CONTRACTOR MUST FULLY FAMILIARIZE HIMSELF OF THE CONDITIONS RELATING TO THE CONSTRUCTION AND LABOR UNDER WHICH THE WORK WILL BE PERFORMED AND COMPARE THE DRAWINGS AND SPECIFICATIONS WITH THE WORK IN PLACE. FAILURE TO DO SO WILL NOT RELIEVE CONTRACTOR OF HIS OBLIGATION TO FURNISH ALL LABOR AND MATERIAL NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK FOR THE CONSIDERATION SET FORTH IN HIS BID. EACH CONTRACTOR / SUBCONTRACTOR, IN THE PROCESS OF CARRYING OUT OF HIS WORK, SHALL EMPLOY SUCH CONSTRUCTION METHODS OR MEANS THAT WILL NOT
CAUSE ANY INTERRUPTIONS OR INTERFERENCE WITHIN THE WORK OF ANY OTHER TRADES.
17. ALL CONSTRUCTION AND OTHER MATERIALS SHALL BE STORED AT THE DESIGNATED STORAGE AREA AS DESIGNATED BY THE OWNER AND ON COMPLETION OF WORK OR AS DEEMED NECESSARY ALL CONCRETE WASHOUT, SURPLUS, REFUSE, OR DEBRIS MATERIAL SHALL BE REMOVED AND LEGALLY DISPOSED OF OFF SITE AT NO ADDITIONAL COST TO THE
OWNER.
18. SHOULD DISCREPANCIES OCCUR BETWEEN CONTRACT DRAWINGS, SPECIFICATIONS, AND APPLICABLE CODES, STANDARDS, RULES, REGULATIONS, LAWS, ETC., THE MOST RIGOROUS REQUIREMENT SHALL APPLY.
19. PLANS ARE MEANT TO BE PRINTED IN COLOR.
GENERAL NOTES
WORK AREA
ENLARGEMENTSC-101
A
C-201
A
S
'-0
CONCRETE PAD
CONCRETE PAD
(UNDER CANOPY)
29'-0"
SHIPPING CONTAINER
ON CONCRETE PAD
SINGLE STREAM BUILDING
TIPPING ROOM
(CONCRETE FLOOR)
COMMINGLED BUILDING
PROCESSING ROOM
MACADAM
CONCRETE
MACADAM
MACADAM
CONCRETE BIN BLOCK WALL
STEEL FRAME SET IN
CONCRETE FROM PRIOR PIT
DRUM FEEDER
MOVABLE CONCRETE WALL
MOVABLE CONCRETE WALL
CONCRETE BIN BLOCK WALL
CONC.
BLOCK
CONC.
BLOCK
BOLLARD, TYP.
AREA TO BE PREPARED FOR
CONCRETE FLOOR TOPPING
(7,900 SF)
10'-0"
10'-0"
43'-9"
20'-9"
23'-0"
'-5
'-9
'-0
'-0
25'-6"
'-2
31'-0"
'-0
REMOVE THE ASPHALT AND
BASE MATERIAL TO CONSTRUCT
CONCRETE PAD (144 SF)
REMOVE THE ASPHALT AND
BASE MATERIAL TO CONSTRUCT
CONCRETE PAD (188 SF)
REMOVE CONCRETE PAD
TO CONSTRUCT NEW
CONCRETE PAD (600 SF)
REMOVE 2' WIDE STRIP OF
ASPHALT TO CONSTRUCT AN
ASPHALT TRANSITION BETWEEN
CONCRETE AND EXISTING
ASPHALT(185 SF)
REMOVE THE ASPHALT TO
CONSTRUCT ASPHALT PATCH
(TRANSITION) (98 SF)
REMOVE THE ASPHALT AND
BASE MATERIAL TO CONSTRUCT
CONCRETE PAVEMENT (522 SF)
3' -6
109'-10"
3' -0
SCALE: 1" = 10'
20100
NRC DEMOLITION PLAN
DAVID HEBER
24GE05650400
DWH
JJK
1" = 10' 0
C-1013
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-101 NRC DEMO PLAN.DWG
SAVE DATE/TIME: 4/22/2026 11:17:22 AM
NJ PROFESSIONAL ENGINEER LIC. No.
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
SCALE: 1" = 10'
NRC DEMOLITION PLAN A
1. ANY WELDING OR ACTIVITY THAT WILL GENERATE A SPARK OR FLAME IS
PROHIBITED UNTIL THE CONTRACTOR CLEARS THE AREA OF COMBUSTIBLES
AND PROVIDES A PERSON WITH A FIRE EXTINGUISHER TO STANDBY ON A
FIRE WATCH WHILE THE WORK IS BEING PERFORMED. AFTER THE WORK IS
PERFORMED, THE AREA SHALL BE INSPECTED TO ENSURE THAT THERE IS
NO EVIDENCE OF A FIRE.
2. THE SINGLE STREAM BUILDING'S TIPPING FLOOR IS EQUIPPED WITH FLAME
DETECTION CAMERAS. THE CAMERAS SHOULD BE TURNED OFF, THE FIRE
ALARM COMPANY SHALL BE NOTIFIED OF THE WORK, AND THE SYSTEM
SHOULD BE PUT IN "TEST" PRIOR TO ANY WORK THAT GENERATES SPARKS
OR FLAMES.
3. CONTRACTOR TO SAW CUT CONCRETE AND ASPHALT AT LIMITS OF
REMOVAL. ANY WATER USED DURING SAW CUTTING OR GRINDING
ACTIVITIES MUST BE CONTROLLED SO THAT IT DOES NOT ENTER CONVEYOR
PIT. WATER MUST BE VACUUMED AND PASS THROUGH FILTRATION SYSTEM
BEFORE BEING DISCHARGED INTO CATCH BASINS.
CONSTRUCTION SEQUENCE
DEMOLITION NOTES:
1. THE CONTRACTOR SHALL PROVIDE SUFFICIENT LABOR AND EQUIPMENT TO
PERFORM THE WORK IN THE PROVIDED CONSTRUCTION SEQUENCE. THE
CONTRACTOR MUST SHARE THE ANTICIPATED LIST OF MANPOWER AND
EQUIPMENT AND HAVE THE REQUIRED MATERIALS ONSITE PRIOR TO
STARTING DEMOLITION WORK.
FULL-DEPTH CONCRETE WORK: INCLUDES SINGLE STREAM TIPPING FLOOR
CONCRETE PADS AND COMMINGLED BUILDING CONCRETE PAVEMENT
1. IT IS EXPECTED THAT THE CONTRACTOR MAKE ALL REQUIRED SAW CUTS IN
THE FLOOR ON A WEEKEND PRIOR TO REMOVING CONCRETE AND ASPHALT.
THE CUTTING SHALL BE PERFORMED DURING OFF HOURS (SATURDAY OR
SUNDAY). THE RECYCLABLE MATERIAL WILL BE MOVED BY THE FACILITY'S
OPERATOR TO ACCOMMODATE THE CUTTING OPERATION.
2. FOR THE FULL-DEPTH CONCRETE WORK, THE RECYCLING PLANT SHALL NOT
BE OUT OF SERVICE FOR ANYMORE THAN FIVE DAYS. THE FIVE-DAY
SHUTDOWN SHALL BEGIN ON A FRIDAY AFTERNOON AT 3:00, AND THE
REMOVAL WORK SHALL IMMEDIATELY COMMENCE.
3. IT IS EXPECTED THAT REINFORCEMENT MATS WILL BE PREFABRICATED
PRIOR TO THE SHUTDOWN SO THAT THEY CAN BE PLACED ON THE FIRST
DAY. DOWELS INTO EXISTING CONCRETE ARE ALSO TO BE INSTALLED ON
THE FIRST DAY. CONCRETE SHALL BE POURED ON THE SECOND DAY. THE
THIRD, FOURTH, AND FIFTH DAYS ARE RESERVED FOR CURING.
4. ASPHALT PATCHES SHALL BE INSTALLED ON THIRD, FOURTH, OR FIFTH DAY.
FULL-DEPTH CONCRETE WORK SEQUENCE
DAY ACTION
WEEKEND 1 SAWCUT CONCRETE AND ASPHALT INTO
MANAGEABLE BLOCKS
PRIOR TO WEEKEND 2 PREFABRICATE STEEL MATS
WEEKEND 2 - DAY 1
(FRIDAY AFTER 3:00 PM)
REMOVE CONCRETE; DOWEL EXISTING
CONCRETE AND INSTALL REBAR
WEEKEND 2 - DAY 2
(SATURDAY)
POUR CONCRETE
WEEKEND 2 - DAY 3-5
(SUNDAY, MONDAY,
TUESDAY)
FLOOR REMAINS CLOSED
ALLOWING CONCRETE TO CURE
INSTALL ASPHALT PATCH
DAY 6 (WEDNESDAY) FLOOR REOPENS
CONCRETE FLOOR TOPPING WORK
1. THE TIPPING FLOOR SHALL BE TURNED OVER TO THE CONTRACTOR AT 3:00
PM ON A FRIDAY AND THE RECYCLING OPERATIONS WILL BEGIN AT 6:00 AM
ON THE NEXT MONDAY.
2. SAWCUT AND MILL CONCRETE ALONG PERIMETER OF FLOOR TOPPING AREA
TO A DEPTH OF AT LEAST 2" SO THAT THAT FINISHED FLOOR ELEVATION
AFTER TOPPING MATCHES THE ADJACENT EXISTING CONCRETE. THE 2"
MILLING MUST BE MAINTAINED FOR AT LEAST A 2' WIDTH ALONG PERIMETER.
3. USE SHOT BLASTING OR HYDRODEMOLITION TO OBTAIN A SURFACE FREE
OF CONTAMINATION WITH AN ICRI CSP 7 OR GREATER, THEN CLEAN THE
SURFACE REMOVING ALL LOOSE CONCRETE, DIRT, AND DEBRIS.
4. APPLY AN EPOXY BONDING AGENT TO THE CLEANED SURFACE.
5. INSTALL A 2" MIN. THICK FLOOR TOPPING OF METALLIC-AGGREGATE FLOOR
TOPPING.
6. APPLY CURING COMPOUND.
7. INSTALLATION SEQUENCE MAY VARY BASED ON MANUFACTURER'S
SPECIFICATIONS.
CONCRETE FLOOR TOPPING WORK SEQUENCE
DAY ACTION
WEEKEND 3 - DAY 1
(FRIDAY AFTER 3:00 PM)
SURFACE PREPARATION WORK
WEEKEND 3 - DAY 2
(SATURDAY)
INSTALL CEMENTITIOUS METALLIC FLOOR
TOPPING
WEEKEND 3 - DAY 3
(SUNDAY)
CONCRETE FLOOR TOPPING TO CURE
WEEKEND 3 - DAY 4
(MONDAY)
FLOOR REOPENS
LEGEND
AREA TO BE PREPARED FOR
CONCRETE FLOOR TOPPING
REMOVE FULL-DEPTH REINFORCED
CONCRETE PAD AND ASPHALT
PAVEMENT (ASSUME 12" THICK)
SAWCUT CONCRETE A MIN. OF 4" FROM
EDGE TO REMOVE WORN EDGES
52'-0'
'-6
'-0
" H
IG
H
PU
SH
W
AL
L
'-0
OP
EN
IN
G
C-102
B
'-0
'-0
" H
IG
H
PU
SH
W
AL
L
15'-0" HIGH PUSH WALL
'-0
DO
OR
OP
EN
IN
G
18'-0"
DOOR
OPENING, TYP.
5'-0" HIGH PUSH WALL
52'-0'
5'-0" HIGH PUSH WALL
25'-0'
15'-0" HIGH PUSH WALL
REMOVE 14 LF (MEASURED HORIZONTALLY) OF
15'-0" HIGH CONCRETE PUSH WALL. SEE
SECTION B ON THIS SHEET FOR EXISTING
DIMENSIONS AND REINFORCEMENT. SEE P-1
ON THIS SHEET FOR PHOTOGRAPH OF THE
EXISTING CONDITIONS.
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 7
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
SRC PUSH WALL REMOVAL PLAN
DAVID HEBER
24GE05650400
DWH
JJK
As Shown 0
C-1024
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-102, C-501.DWG
SAVE DATE/TIME: 4/7/2026 11:26:53 AM
NJ PROFESSIONAL ENGINEER LIC. No.
1'-6"
5'-6"
1'-6" 2'-0"2'-0"
'-0
C O
N C
R
ET
E
PU
SH
W
AL
L
4' -0
1'
-6
2"x6" KEY
(TYP)
T/C EL. 73.33
SEE PLAN
SP
LI
C E
LE
N
G
TH
(T
YP
A
LL
P U
SH
W
AL
LS
VERT C.J.
(TYP LINES 5&9)
#7 @ 12 X 10'-0" T.U.L. ADD'L
CENTERED BETWEEN CONTINUOUS
BARS AND ABOVE FOUNDATION WALL
#7@12 T&B EW
#9@12 VEF
#5@12 HEF
NTS
SECTION B
C-102
EXISTING PUSH WALL
SCALE: 1" = 20'
FLOOR PLAN A
C-102
STAFFORD TRANSFER STATION
5' -0
NTS
PHOTOGRAPH P-1
C-102
EXISTING PUSH WALL
SAWCUT AT LIMIT
OF REMOVAL, TYP.
GENERAL NOTES:
1. THE STAFFORD TRANSFER STATION IS LOCATED AT 226 HAYWOOD ROAD,
STAFFORD TOWNSHIP, NJ.
DEMOLITION NOTES:
1. CONCRETE PUSH WALL SHALL BE SAWCUT AT LIMITS OF REMOVAL.
2. THE BASE OF THE WALL SHALL BE JACKHAMMERED DOWN TO 3" BELOW
FINISHED FLOOR TO CUT THE REBAR 3" BELOW FLOOR. AREA TO BE
PATCHED WITH CONCRETE TO PROVIDE A SMOOTH TRANSITION WITH THE
ADJACENT FLOOR. A CONCRETE BONDING AGENT IS TO BE USED IN THE
REPAIR.
3. THE EDGES OF ANY EXPOSED REBAR SHALL BE GROUND SMOOTH AND
PAINTED WITH GALVANIZED PAINT.
14'-0" TO BE REMOVED
S
'-0
9' -0
JN
T
JN
T
C J
JNT
CONCRETE PAD
CONCRETE PAD
(UNDER CANOPY)
29'-0"
14'-6" 14'-6"
C J
SHIPPING CONTAINER
ON CONCRETE PAD
SINGLE STREAM BUILDING
TIPPING ROOM
(CONCRETE FLOOR)
COMMINGLED BUILDING
PROCESSING ROOM
MACADAM
MACADAM
MACADAM
CONCRETE BIN BLOCK WALL
STEEL FRAME SET IN
CONCRETE FROM PRIOR PIT
DRUM FEEDER
MOVABLE CONCRETE WALL
MOVABLE CONCRETE WALL
CONCRETE BIN BLOCK WALL
CONC.
BLOCK
CONC.
BLOCK
BOLLARD, TYP.
C-501
D-3
CONCRETE PAVEMENT, GRADES AND
ELEVATIONS TO BE ESTABLISHED IN
THE FIELD WITH ENGINEER.
10'-0"
10'-0"
43'-9"
20'-9"
11'-6"
'-5
'-9
'-0
'-0
25'-6"
'-2
3' -6
109'-10"
3' -0
C J
C J
JN
T
JN
T
JNT
JNT
2' WIDE X 8" THICK ASPHALT
PATCH TO MATCH GRADES OF
EXISTING ASPHALT TO NEW
CONCRETE PAVEMENT, TYP.
AREA TO RECEIVE 2" MIN. CONCRETE
FLOOR TOPPING. SEE SHEET C-202
FOR FINISHED FLOOR ELEVATIONS.
JNT
JNT
JNT
JNTJN
T
JN
T
JN
T
SCALE: 1" = 10'
20100
NRC NEW WORK PLAN
DAVID HEBER
24GE05650400
DWH
JJK
1" = 10' 0
C-2015
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-201 NRC NEW WORK PLAN.DWG
SAVE DATE/TIME: 4/7/2026 11:28:52 AM
NJ PROFESSIONAL ENGINEER LIC. No.
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
SCALE: 1" = 10'
NRC NEW WORK PLAN A
LEGEND
AREA TO RECEIVE 2" MIN.
FLOOR TOPPING
CONCRETE PAD
ASPHALT PATCH (8" THICK)
CONSTRUCTION JOINT
C-501
D-4
CONTRACTION JOINT
C-501
D-5
CJ
JNT
CONCRETE PAVEMENT
C-501
D-3
C-501
D-2
EDGE OR PILE OF
RECYCLABLES
BOLLARD (TYP.)
DRUM FEEDER
WALL
LARGE SECTION OF EXPOSED REBAR
WALL
WALL
WALL
WALL
6" ± DEPRESSION
.556.6
56.356.456.556.6
.7 56 .7
56.7
56.0
56.156.256.356.4
.1
56.2
56.3
56.4
56.5
56.6
56.7
56.4
56.4
56.5
56.5
56.6
56.6
56.7
56.5
56.5
56.6
56.4
56.4
56.5
56.5
56.6
.6
55.7
55.8
55.9
56.0
56.1
56.2
56.3
56.4
56.5
56.6
55.3
55.4
55.5
55.6
55.7
55.8
.8
.9
.0
.1
56.
56.3
.2
56.3
56.4
INTERIOR BUILDING LINE
54.8 555.4
54.8
55.2
55.2 355.2
55.6
55.9
56.2
55.3
55.6
55.8 055.9
556.2
56.3 656.4
856.4
56.3
56.2
56.1
55.8
55.6 456.0
55.6
55.4
55.4
55.3
55.4 055.4
655.5
55.6
55.8 356.1
56.3
56.4
56.4 256.4
56.4
56.7
56.3
56.5
56.5
56.5
56.6
56.6
56.5 0 56.4
56.3
56.1
55.9
55.9
56.1 856.3
056.3
56.4
56.5
56.5
56.3 8 56.2
9 56.0 8 55.9
55.9
56.0 456.3
56.4
55.8 656.2
256.3 056.3
56.3
56.6
56.4 1 56.3
56.1
8 56.1
55.8 3 55.7
55.5
55.7
55.4 555.5
55.3
55.0
55.2 355.4
55.5
55.5
55.7
56.0
56.2
56.4
56.5 7 56.6
56.6 6 56.6
56.6
56.6
56.6
56.6 9 56.6
4 56.6 1 56.6
3 56.6
56.4
56.4
56.4
56.4
56.5 156.5
56.2
56.0 5 55.9
55.9
56.0
2 56.3 1 56.3
56.3
56.3
56.4
56.4
56.7
56.6 856.6
56.6
956.6 656.7
56.7
056.5
56.3 556.2
856.2
56.2
56.3
56.5
56.7 6 56.7
56.7 3 56.7
56.7
56.7 256.6
956.7
56.7
56.7
56.7 0 56.6
56.7
56.7
56.7
56.7
56.7
56.7
56.6
56.6 456.6
56.6
56.6
56.6
856.6
56.6 6 56.6
56.6
56.6
5 56.6
56.6 856.6
56.7
56.7
56.6
56.6
56.6
56.6
56.6
56.6
56.6
56.4
56.4
56.6 2 56.6
56.5 3 56.4
56.5
56.4 256.4
56.4
56.4
756.5
56.6 056.6
456.6
56.4
56.5
56.4
56.5
56.6
56.6
56.6
56.6
56.6
56.6
56.6 2 56.5
6 56.5 4 56.4
56.4
56.5 056.5
56.6
56.6
856.6
56.7
56.6
56.6
56.5
56.5
56.4
56.5 256.5
56.6
56.6
556.6
56.7
56.7
56.6 9 56.7
0 56.6
56.6
56.6
56.5
56.5
56.5
56.3 956.4
156.4
56.3
56.2
56.3
56.3
56.4
56.4
56.4
56.6
56.4
56.5
56.3
56.3 656.4
56.3
56.3 9 56.4
56.4
56.4
56.3 456.4
156.3 556.3
456.3 856.4
56.5
456.5 756.6
56.6
56.4
56.3 2 56.1
56.3
56.5 1 56.4
55.9
56.3
56.0 5 56.0
56.2
56.2
56.3
56.3 4 56.3
56.2
56.1 6 56.1
56.2
56.3
56.3 2 56.3
7 56.4
56.3
56.2 056.2
56.6 356.5
956.6
56.6
56.4 556.4
56.4
56.4
56.4
56.4 756.4
56.4
56.5 1 56.5
56.5
5 56.5
56.4
56.4 256.4
0.00 56.4
56.5
56.6
56.4
56.2
56.3
56.3 456.2
56.2
056.1
56.1
56.5
56.7
56.0
56.1
56.2
56.3
56.4
56.5
56.6
56.0
56.1
56.2
56.3
56.4
56.5
56.6
56.65
56.65
56.65
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
SCALE: 1" = 5'
SURVEY NOTES:
1. TOPOGRAPHIC INFORMATION SHOWN HEREON WAS OBTAINED IN THE FIELD
BY MOTT MACDONALD ON NOVEMBER 22, 2025.
2. THE HORIZONTAL COORDINATE SYSTEM IS THE NEW JERSEY STATE PLANE
COORDINATE SYSTEM (NAD83) AND VERTICAL DATUM IS THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD88);
CUT FILL MAP
THE COLOR BANDING SHOW BELOW IS A COMPARISON OF THE EXISTING FLOOR
ELEVATIONS AND 2" BELOW FINISHED FLOOR ELEVATIONS.
7" - 8"
6" - 7"
5" - 6"
4" - 5"
3" - 4"
2" - 3"
1" - 2"
0" - 1"
1" - 0"
8" - 9"
DEPTH ABOVE FINISHED FLOOR
ELEVATION LESS 2"
(DEPTH OF FLOOR TO BE GROUND
DOWN TO ALLOW FOR 2" FLOOR
TOPPING)
2" - 1"
3" - 2"
SINGLE STREAM BUILDING
FLOOR TOPPING GRADING & CUT/FILL
DAVID HEBER
24GE05650400
DWH
JJK
1" = 5' 0
C-2026
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-901 CUT FILL MAP.DWG
SAVE DATE/TIME: 4/6/2026 4:05:04 PM
NJ PROFESSIONAL ENGINEER LIC. No.
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 7
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
FILL VOLUMES:
49 CY THE VOLUME OF FLOOR TOPPING NEEDED TO APPLY 2" LAYER
OVER THE ENTIRE 7,880 SF AREA.
20 CY THE VOLUME OF FLOOR TOPPING NEED TO FILL IN THE AREAS
OF THE FLOOR THAT ARE WORN DEEPER THAN 2".
FILL VOLUMES PROVIDED ARE A DIRECT OUTPUT FROM THE COMPARISON OF
TWO SURFACES GENERATED IN AUTOCAD. CONTRACTOR SHALL PURCHASE
MATERIAL BASED ON THEIR EXPERIENCE OF HOW MUCH IS REQUIRED FOR
THE FILL VOLUMES PROVIDED ALONG WITH AN UNDERSTANDING THAT THE
FLOOR WAS SURVEYED ON APPROXIMATELY A 5' X 5' GRID. CONTRACTOR
SHALL PROVIDE ENOUGH MATERIAL TO MEET THE FINISHED PROPOSED
FINISHED FLOOR ELEVATIONS.
AREA OF NEW,
FULL-DEPTH CONCRETE
(600 SF) AREA OF NEW,
FULL-DEPTH CONCRETE
(188 SF)
AREA OF NEW,
FULL-DEPTH CONCRETE
(144 SF)
SCALE: 1" = 5'
FLOOR TOPPING GRADING & CUT/FILL
56.65
LEGEND
PROPOSED
CONTOUR
DEPTH BELOW FINISHED
FLOOR ELEVATION LESS 2"
4 ± 0.375"
3"
8"
3/4" DIA. DOWEL, 2'-6" LONG,
SPACED AT 12" EITHER ONE
PIECE OR THREADED SPLIT
TYPE DOWEL MAY BE USED PAINT AND OIL ONE
END OF DOWEL
REINFORCING STEEL IS NOT
CARRIED THROUGH JOINT
JOINT SEALANT
TRANSVERSE
4"
8"
NO. 5 DEFORMED STEEL TIE
BARS 2'-6" LONG AND SPACED
2'-6" ON CENTERS
REINFORCING STEEL IS NOT
CARRIED THROUGH JOINTJOINT SEALANT
TIED LONGITUDINAL
3" MAX. 3" MAX.
3" MAX.
3" MAX.
REINFORCING
STEEL
REINFORCING
STEEL
T
8"
5,000 PSI CONCRETE
PAVEMENT
3"
8" DGA BASE COURSE
COMPACTED TO 95%
MODIFIED PROCTOR
#4 REBAR @ 12" O.C. E. W.
JOINTS AS
SHOWN ON PLAN
COMPACTED
SUBGRADE
W W
D
CONSTRUCTION
JOINT
PAVEMENT
SURFACE
PAVEMENT
SURFACE
POURED
JOINT
SEALER
BACKER
MATERIAL
BUTTED
JOINT
W = WIDTH OF SEALANT RESERVOIR (SEE TABLE)
D = DEPTH OF SEALANT (1.5 x W)
T = DEPTH OF INITIAL SAWCUT OR INSERT TYPE JOINT
FORMER (CONTRACTION JOINT)
a. 1/4 SLAB THICKNESS
JOINT
SPACING
FT.
WIDTH IN.
MIN. MAX.
1/2 5/8<25
3/4 7/825-50
1.0 1-1/8>50
TABLE
NOTE: TOP OF SEALANT WILL BE 1/8 IN.
BELOW TOP OF PAVEMENT.
D
T POURED JOINT
SEALER
JOINT BOTTOM
BACKER MATERIAL
INITIAL SAWCUT
(1/8") OR INSERT
CRACK
CONTRACTION
JOINT5,000 PSI CONCRETE PAVEMENT
FINISHED FLOOR ELEVATION TO BE
2" LOWER THAN ELEVATIONS
SHOWN ON GRADING PLAN TO
ALLOW FOR 2" FLOOR TOPPING,
TYP. #4 REBAR @ 12" O.C. E. W.
JOINTS AS SHOWN ON PLAN
REPAIR 40 MIL GEOMEMBRANE
LINER; IF DISTURBED, REPLACE
AS REQUIRED.
4" EXISTING LAYER OF SAND
BELOW CONCRETE TO BE
PRESERVED
2" CLEAR
2" CLEAR
T
8"
3/4" DIA. DOWELS SPACED AT 30". EITHER
ONE PIECE OR A THREADED SPLIT TYPE
DOWEL MAY BE USED. DOWELS TO
EMBED 6" INTO EXISTING CONCRETE
FLOOR AND 2'-6" INTO NEW SLAB, TYP.
EXISTING CONCRETE
PAVEMENT
JOINT SEALANT
NEW CONCRETE PAVEMENT
REINFORCING
STEEL
3/4" DIA. DOWELS SPACED AT 30". EITHER
ONE PIECE OR A THREADED SPLIT TYPE
DOWEL MAY BE USED. DOWELS TO
EMBED 6" INTO EXISTING CONCRETE
FLOOR AND 2'-6" INTO NEW SLAB, TYP.
EXISTING
CONCRETE PAD
FILL JOINT WITH ASPHALTIC
LIQUID JOINT SEALER
NEW CONCRETE PAVEMENT SHALL BE 2"
LOWER THAN EXISTING CONCRETE TO
ALLOW FOR 2" FLOOR TOPPING.
REINFORCING
STEEL
H
AL
F
TH
IC
KN
ES
S
3"
SAWCUT EXISTING CONCRETE
(AT LEAST 4" FROM EDGE TO
REMOVE WORN EDGES)
FILL ANY VOIDS BELOW EXISTING
SLAP WITH CONCRETE
CONCRETE PAD
CONCRETE PAVEMENT
SAWCUT EXISTING CONCRETE
(AT LEAST 4" FROM EDGE TO
REMOVE WORN EDGES)
FILL ANY VOIDS BELOW EXISTING
SLAP WITH CONCRETE
H
AL
F
TH
IC
KN
ES
S
3"
2"
CONCRETE FLOOR TOPPING TO BE
CONSTRUCTED ON SEPARATE WEEKEND.
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
CONSTRUCTION DETAILS
DAVID HEBER
24GE05650400
DWH
JJK
As Shown 0
C-5017
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-102, C-501.DWG
SAVE DATE/TIME: 4/22/2026 10:56:29 AM
NJ PROFESSIONAL ENGINEER LIC. No.
NTS
CONTRACTION JOINTS D-5
C-501
NTS
CONCRETE PAVEMENT SECTION D-3
C-501
NTS
JOINT SEALANT DETAIL D-1
C-501
NTS
CONCRETE PAD SECTION D-2
C-501
NTS
CONCRETE JOINT D-4
C-501
NOTES:
1. USE A CONSTRUCTION JOINT (DETAIL D-3 ON THIS SHEET) WHEN ABUTTING THE EXISTING
CONCRETE PAD, TYP.
2. 2" FLOOR TOPPING TO BE CONSTRUCTED ABOVE CONCRETE PAD ON SEPARATE WEEKEND.
CONTRACTOR TO SHORE UP
BUILDING BEFORE
DISCONNECTING COLUMN OF
T-HANGER.
24" Ø MIN.
DRILL AND ANCHOR GALVANIZED ANCHOR
BOLTS, DIAMETER AND QUANTITY TO
MATCH EXISTING. USE HILTI HIT HY 200
AND 8" EMBEDMENT. BOLTS TO BE A
MINIMUM OF 3" FROM EDGE OF CONCRETE.
USE NON-SHRINK GROUT AS NEEDED TO
ADJUST COLUMN SO THAT T-HANGER
DOOR CLOSES CORRECTLY WITHOUT GAP
ALONG SIDE OF DOOR.
(8) #4 TIES, FIRST TWO AT
TOP TO BE 3" OC, EQUALLY
SPACE REMAINDER
(6) VERTICAL #6
REBAR EQUALLY
SPACED
6" OF 3/4"
CRUSHED STONE
TOP OF PIER TO BE SET TO
MATCH ELEVATION OF OTHER
PIERS THAT HAVEN'T SETTLED
GRASS OR CONCRETE
SIDEWALK T-HANGER CONCRETE FLOOR
5,000 PSI CONCRETE
SAW CUT T-HANGER CONCRETE
FLOOR AS NEEDED TO FIT
FORMWORK (SONOTUBE OR EQUAL).
INSTALL 1/2" EXPANSION JOINT
BETWEEN PIER AND FLOOR.
3" CLR (TYP.)
RevStatus
Drawing Number
Scale at ANSI D
Eng check
Approved
Coordination
Dwg check
Drawn
Designed Title
Security
Client
App’dCh’k’dDescriptionDrawnDateRev
Project Number TotalB/O
© Mott MacDonald
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
www.mottmacamericas.com
Date
111 Wood Avenue South Iselin, NJ 18830 United States of America Certificate No. 24GA28016600
T +1 (800) 832 3272 F +1 (973) 376 1072
OCEAN COUNTY BOARD OF
COMMISSIONERS
101 HOOPER AVENUE
TOMS RIVER, NJ 08753
507111580-001 8
NORTHERN RECYCLING CENTER
CONCRETE FLOOR TOPPING
LAKEWOOD, OCEAN COUNTY, NJ
STDAPR
T-HANGER FOUNDATION REPAIR
DAVID HEBER
24GE05650400
DWH
JJK
As Shown 0
C-5028
C:\PWWORKING\HMM\ENVIRONMENTAL\HEB74888\DMS52585\C-502 T HANGER REPAIR.DWG
SAVE DATE/TIME: 4/28/2026 2:09:03 PM
NJ PROFESSIONAL ENGINEER LIC. No.
SCALE: 1" = 200'
LOCATION MAP A
C-102
OCEAN COUNTY AIRPORT
GENERAL NOTES:
1. THE OCEAN COUNTY AIRPORT IS LOCATED AT 101 AIRPORT ROAD, BAYVILLE, NJ.
DEMOLITION NOTES:
1. CONTRACTOR TO PROVIDE TEMPORARY SHORING FOR BUILDING COLUMN BEFORE
DISCONNECTING COLUMN ANCHORAGE.
2. CONTRACTOR TO REMOVE EXISTING CONCRETE PIER. DEPTH IS NOT KNOWN AND
DIAMETER IS ~9".
3. DISTURBED LAWN AREAS TO BE RESTORED WITH TOPSOIL AND SEED.
SCALE: 1" = 200'
4002000
REPAIR THE FOUNDATION AT
THE SOUTHEAST CORNER OF
THIS T-HANGER AS DESCRIBED
IN NOTES, PHOTOS, AND
DETAILS ON THIS SHEET.
SCALE: 1" = 200'
EXTERIOR A
C-102
SOUTHEAST CORNER
SCALE: 1" = 200'
INTERIOR B
C-102
SOUTHEAST CORNER
SCALE: 1" = 200'
COLUMN/CEILING FRAMING C
C-102
SCALE: 1" = 200'
DISPLACED PIER D
C-102
SOUTHEAST CORNER
SCALE: 1" = 200'
(DIFFERENT COLUMN) E
C-102
COLUMN CONNECTION
~9" Ø CONCRETE PIER HAS
SETTLED A FEW INCHES
AND HAS DISPLACED.
CLEARER PHOTO OF
COLUMN CONNECTION.
THIS COLUMN IS LOCATED
AT OTHER END OF DOOR.
GAP BETWEEN HANGER
DOOR AND COLUMN.
DOOR OF HANGER DOES
NOT CLOSE PROPERLY
DUE TO MOVEMENT OF
PIER (FOUNDATION)
DOOR OF HANGER
TEMPORARILY REMOVE
WALL PANEL TO ACCESS
FOUNDATION BOLT(S)
REMOVE SECTION OF WALL
PANEL TO ACCESS
FOUNDATION BOLT(S).
REINSTALL WALL PANEL AT
END OF WORK.
EXCAVATE TO REMOVE
CONCRETE PIER AND
INSTALL NEW FOUNDATION.
THIS SIDE OF HANGER
OPENS (HANGER DOOR)
CONTRACTOR TO SHORE
CORNER OF BUILDING TO
SUPPORT IT DURING THE
REMOVAL AND REPLACEMENT
OF THE PIER FOUNDATION.
SAWCUT CONCRETE AND
ASPHALT AND REMOVE. REPLACE
WITH 3' X 8' CONCRETE SIDEWALK.
SEE D-2 ON THIS SHEET.
3' WIDE
8' LONG
NOTES:
1. NEW SIDEWALK TO BE A 3' WIDE X 8' LONG SECTION.
2. CONTRACTOR TO SUPPORT WELDED WIRE MESH ON "CHAIRS" - BRICK, STONE OR
CONSTRUCTION DEBRIS ARE NOT ACCEPTABLE. WHERE PROPOSED CONCRETE PAVEMENT
ABUTS MASONRY STRUCTURES CONTRACTOR IS TO INSTALL EXPANSION JOINTS.
4" 4"
COMPACTED SUBRADE
6"
TOP SOIL
NTS
SIDEWALK DETAIL D-2
C-502
CUT CONTROL JOINT AT HALF THE
LENGTH (4') AND FILL WITH JOINT
SEALER AS MANUFACTURED BY
SIKA CORP. OR EQUAL.
4" THICK SIDEWALK TO
BE 5,000 PSI CONCRETE
W4xW4, 4x4 WWM
EXPANSION JOINT WHERE
SIDEWALK IS INSTALLED
ADJACENT EXISTING
CONCRETE, TYP.
COMPACTED 3/4"
CRUSHED STONE
NTS
FOUNDATION REPAIR D-1
C-502
THIS SIDE OF HANGER
OPENS (HANGER DOOR) THIS SIDE OF HANGER
OPENS (HANGER DOOR)
| Sheets and Views |
| C-101 |
File details come from the government source that posted it. Updated .