JOIST-DRD-10A-WBS_(Baseline_A).docx

DOCX document 38 KB Posted

Attached to
Joint Operations and Integrated Systems Technology (JOIST) Federal contract opportunity
Solicitation number
NNJ17580323R
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

Attachment J-02 DRD-10A

View the file

Other files for this federal contract opportunity

Other files attached to Joint Operations and Integrated Systems Technology (JOIST), newest first.
File Type Posted
JOIST_Source_Selection_Statement_with_signature_scrubbed.pdf PDF
FRFP_Questions_Round_1.pdf PDF
Attachment_L-03_-_Strategic_Projects_TO_Am_1.docx DOCX document
Attachment_L-07_CF_EPM_Template_Am_1.xlsx XLSX spreadsheet
Section_M_Am_1.docx DOCX document
Attachment_L-01_Standard_Labor_Categories.docx DOCX document
JOIST-DRD-02_Total_Compensation_Plan.docx DOCX document
JOIST-DRD-18_Montly_Performance_Report_FFP_IDIQ.docx DOCX document
Section_A.docx DOCX document
Attachment_L-03_-_Strategic_Projects_TO.docx DOCX document
Section_F.docx DOCX document
Section_L.docx DOCX document
Attachment_J-04A_-_GFCS_-_Baseline_A.pdf PDF
Attachment_J-14_-_Government_Property_Management_Plan.docx DOCX document
Attachment_J-07_-_List_of_Applicable_Documents.docx DOCX document
JOIST-DRD-07-Government_Property_Management_Plan_(PMP).docx DOCX document
Attachment_L-07_IDIQ_EPM_Template.xlsx XLSX spreadsheet
JOIST-DRD-14-Equipment_Replacement_(ER)_Plan.docx DOCX document
Attachment_J-17_-_WBS.docx DOCX document
Section_C.docx DOCX document
Document_Change_Log_(DRFP_to_FRFP).pdf PDF
JOIST-DRD-11-Reports_Required_for_Logistics.docx DOCX document
Attachment_L-07_CF_EPM_Template.xlsx XLSX spreadsheet
Attachment_L-09_SF1408.pdf PDF
Attachment_J-03_Standard_Labor_Categories.docx DOCX document
Section_K.docx DOCX document
JOIST-DRD-15-Status_Reports_and_Reviews.docx DOCX document
Attachment_J-06_-_List_of_Government-Provided_Facilities.docx DOCX document
Attachment_J-01_-_Data_Requirements_List.docx DOCX document
Section_G.docx DOCX document
Section_M.docx DOCX document
JOIST-DRD-08-Safety_and_Health_Plan_and_Reports.docx DOCX document
Attachment_J-12_-_Organizational_Conflict_of_Interest_(OCI)_Mitigation_Plan.docx DOCX document
JOIST-DRD-17IDIQ-Montly_Cost_Reporting_(NF533_and_Supplemental_Requirements)_-_IDIQ.docx DOCX document
Attachment_L-09_Survey_Acct_System.docx DOCX document
Attachment_L-02_-_Government_Resource_Estimate.pdf PDF
Section_B.docx DOCX document
Attachment_J-15_-_Safety_and_Health_Plan.docx DOCX document
JOIST-DRD-05_Contractor_Organizational_Conflict_of_Interest_(OCI)_Mitigation_Plan.docx DOCX document
Attachment_L-04_Past_Performance_Questionnaire.docx DOCX document
JOIST-DRD-16-Reprocurement_Data_Package.docx DOCX document
JOIST-DRD-17A-Montly_Cost_Reporting_(NF533_and_Supplemental_Requirements)_-_Baseline_A.docx DOCX document
Attachment_J-05_List_of_Government_Property.docx DOCX document
Attachment_J-10_-_Management_and_Staffing_Plan.docx DOCX document
Attachment_L-08_Small_Business_Subcontracting_Tables.docx DOCX document
Attachment_L-06_Past_Performance_Consent_Letter.docx DOCX document
Attachment_J-16_-_DRCOP.docx DOCX document
DRFP_Questions_Round_2_10-24.pdf PDF
DRFP_Questions_Round_1.pdf PDF
Attachment_L-07_CF_EPM_Template_09-19.xlsx XLSX spreadsheet
Show all 50

Joint Operations and Integrated Systems Technology (JOIST) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JSC DATA REQUIREMENTS DESCRIPTION (DRD)

(Based on JSC –STD-123. See work page for instructions.)

1. DRD Title
2. Date of current version
3. DRL Line Item No.
RFP / Contract No.
Work Breakdown Structure (Baseline A)
10/26/2016
10A
NNJ17580323R

5. Use (Define need for, intended use of, and/or anticipated results of data)

6. DRD Category: (check one)

To organize the tasks to be accomplished in this contract in a service-oriented structure. The WBS and dictionary shall provide the framework for structuring the program implementation plans, establishing and tracking budgets, preparing schedules, developing work force and material estimates, preparing work authorization documents, and reporting contract performance.
☐Technical

☒Administrative

☐S&MA

6. References

7. Interrelationships (e.g., with other DRDs) (Optional)

DRD-17A Monthly Cost Reporting (533 and Supplemental Requirements) – Baseline A

8. PREPARATION INFORMATION:

The Contractor shall prepare the data delivery as follows:

8a. DATA TYPE:

☒ Type 1 – Written approval ☐Type 2 – Mandatory Submittal ☐Type 3 – Submittal Upon Request

8b. SCOPE:

The Contractor Work Breakdown Structure (WBS) shall encompass all the services required to achieve all the requirements of this contract. The WBS shall subdivide the work to be accomplished into elements that serve as the basis for detailed planning and control, and in addition, permit collection of cost and schedule data for each element.

8c. CONTENT:

The WBS shall graphically depict the WBS tree. After contract award, the Government will provide guidance on the WBS structure. A Contractor WBS element may represent a task, a service, an identifiable product, a set of data, or a budget function. The WBS structure shall include elements listed in the Baseline A: NASA Aircraft Management Information System (NAMIS) Services portion of the Statement of Work (SOW) with additional levels as required by the Contractor. Lower levels of detail, which the Contractor uses for its own management purposes, shall be compatible with NASA requirements and be accessible by NASA. The relationship between the WBS and the Contractor’s internal organizations and processes shall also be provided.

The WBS shall map to the Flight Operations Directorate (FOD) WBS without requiring allocation.

At a minimum, the following items have to be tracked by the Contractor in order to be reported to NASA:

Project IdentifierThese items can be tracked using the WBS or other systems available to the Contractor.

8d. FORMAT:

The WBS shall be in a graphical format. Electronic format of all submissions shall be compatible with IRD provided desktop standard applications. Organizational format of the supporting documentation shall be the Contractor’s format.

8e. DISTRIBUTION:

(i) BR/Contracting Officer

(ii) CA/Contracting Officer’s Representative

(iii) CC/Technical POC

8f.SUBMISSION:
(i)Initial – Start of phase-in.
(ii)Final – 15 calendar days prior to contract start.
(iii)Approval – Contract start.
(iv)Frequency – As required.

JSC Form 2341 (Rev October 19, 2011) (MS Word 2007) (Previous editions are obsolete.)

NNJ17580323R Attachment J-02 – DRD-10A-1

File details come from the government source that posted it. Updated .