Enclosure_3,_Thermal_Model.pdf

PDF 313 KB Posted

Attached to
NASA/GSFC WFIRST Project Wide Field Opto-Mechanical Assembly (WOMA) Effort
Solicitation number
NNG17621139R
Issued by

About this file

Enclosure 3, Thermal Model

View the file

Other files

File Type Posted
Signed_Selection_Statement.pdf PDF
Attachment_M,_Contractor_Proposed_Enhancements.pdf PDF
Attachment_E,_533_Attach_Core_Completion.pdf PDF
Enclosure_2,_IT_Security_Management_Plan_Template.pdf PDF
Enclosure_1,_QASP_Cost-Type_Contract_Template.pdf PDF
Attachment_C,_WFIRST-LIST-08125.pdf PDF
Attachment_A,_WFIRST-SOW-08124.pdf PDF
SF_33.pdf PDF
Attachment_F,_Small_Business_Subcontracting_Plan.pdf PDF
Final_RFP.pdf PDF
Attachment_H,_List_of_GFP.pdf PDF
Attachment_G,_OCI_Avoidance_Plan.pdf PDF
RFP_Cover_Letter.pdf PDF
Attachment_J,_IT_Security_Management_plan.pdf PDF
Attachment_I,_IT_Security_Applicable_Documents_List.pdf PDF
Attachment_K,_PIV_Attachment.pdf PDF
Attachment_D,_WFIRST-RQMT-05819_Released_Rev-.pdf PDF
Attachment_L,_QA_Plan.pdf PDF
Attachment_I,_List_of_GFP.pdf PDF
Attachment_E,_533_Attach_Core_Completion.pdf PDF
Attachment_H,_OCI_Avoidance_Plan.pdf PDF
Attachment_G,_Safety_and_Health_Plan.pdf PDF
Attachment_N,_Contractor_Proposed_Enhancements.pdf PDF
SF_33.pdf PDF
Enclosure_1,_QASP_Cost-Type_Contract_Template.pdf PDF
Attachment_M,_QA_Plan.pdf PDF
Attachment_L,_PIV_Attachment.pdf PDF
Attachment_A,_WFIRST-SOW-08124.pdf PDF
Enclosure_2,_IT_Security_Management_Plan_Template.pdf PDF
Attachment_F,_Small_Business_Subcontracting_Plan.pdf PDF
Final_DRFP_-_Sections_B-M.pdf PDF
Attachment_K,_IT_Security_Management_plan.pdf PDF
Attachment_J,_IT_Security_Applicable_Documents_List.pdf PDF
Signed_DRFP_Letter.pdf PDF
Attachment_D,_WFIRST-RQMT-05819_Released_Rev-.pdf PDF
Attachment_C,_WFIRST-LIST-08125.pdf PDF
Interested_Sources_in_WOMA_Procurement.pdf PDF
WFIRST-LIST-08125_clean.pdf PDF
WFIRST-SOW-08124_clean.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 3

SIMPLIFIED MODEL OF THE THERMAL

ENVIRONMENT AROUND THE COLD

SENSING MODULE

RFP NNG17621139R

CONTRACT NUMBER TBD

This model represents the thermal environment surrounding the WFI instrument:

• Most temperature controlled surfaces related to the telescope are represented as fixed boundary conditions.

• The Spacecraft top deck is also a boundary temperature.

• The Coronagraph instrument is also held as a set of boundary temperatures.

• The Solar Array/Sunshield, Outer Barrel Assembly, and Instrument Carrier temperatures vary as a function of sun angle.

• The Facility Cryo Radiator is also included. Two methods exist for providing cooling to the focal planes:

o Method A: connect the focal planes directly to the radiator via a vendor selected transport method.

o Method B: utilize the load curves provided in the Requirements Document. If this approach is selected, boundary conditions of either heat or temperature at the radiator interface are necessary to reflect the proper radiator temperatures for backloading

• This model will provide for field of view blockages and proper shading of an Instrument design with reasonable surrounding temperatures for calculating the effect of infrared backloading.

This model can be provided upon request. The model is in Thermal Desktop version 5.8 format.

File details come from the government source that posted it. Updated .