ATTACHMENT I
LIST OF GOVERNMENT-FURNISHED PROPERTY
DATED JUNE 2017
RFP NNG17621139R
CONTRACT TBD
Contract TBD
Attachment I
GFP Non-Flight Hardware Delivery and Schedule
ID No. Description Quantity Delivery Date
GNF-1 WFC Focal Plane Assembly (FPA) Mass Model 1 6/1/21
GNF-2 WFC FPA Surrogate and associated GSE 1 11/1/21
GNF-3 WFC Focal Plane Electronics (FPE) Mass Model 1 1/1/21
GNF-4 IFC FPE Mass Model 1 1/1/21
GNF-5 IFC Surrogate and associated GSE 1 6/1/21
GNF-6 Non-Flight Instrument Carrier (IC)-side Latches 1 3/1/21
GNF-7 Instrument Command and Data Handling (ICDH)
Simulator w/associated cabling
1 TBD
GNF-8 Spacecraft simulator w/associated cabling 1 7/3/21
GNF-9 WFIRST Optical Stimulus 1 11/1/21
GNF-10 IC Simulator 1 8/1//21
GNF-11 WFI T-bar 1 3/1/21
GNF-12 WFI to Spacecraft surrogate harness 1 2/1/22
GNF-13 Science data workstations 2 TBD
GNF-14 Surrogate of the Optical Telescope Assembly
(OTA) side of the WFI labyrinth seal
1 TBD
GFP Non-Flight Data Delivery and Schedule
ID No. Item Quantity Delivery Date
GM-1 Structural Finite Element Model (FEM) 1 TBD
GM-2 Thermal Model 1 Preliminary: 2 weeks ACA.
Updates as required.
Prior to major reviews.
After Observatory thermal balance.
GM-3 CAD Model 1 TBD
GM-4 Optical Models 1 TBD
Contract TBD
Attachment I
GFP Flight Hardware Delivery and Schedule
ID No. Item Quantity Delivery Date
GF-1 Wide Field Channel (WFC) FPA 1 4/13/2022
GF-2 WFC FPE (WFPE) including any flight software 1 4/13/2022
GF-3 Harness between the WFC FPA and WFC FPE 1 4/13/2022
GF-4 Grism optical element 1 5/1/2021
GF-5 Engineering optical element 1 5/1/2021
GF-6 Electronics and flight software in the WFI
Instrument Command and Data Handling (ICDH) box
1 2/1/2022
GF-7 Integral Field Channel (IFC), including pre-integrated optical fibers to the RCS and IFC FPA
1 5/1/2022
GF-8 IFC FPE (IFPE), including flight software, if any 1 5/1/2022
GF-9 Harness between the IFC FPA and IFC FPE 1 5/1/2022
GF-10 Harness between the IFCE and the WFPE 1 5/1/2022
GF-11 Harness between the FPEs and the Connector
Bracket
1 5/1/2022
GF-12 Harness between the IFC and the WOMA
Harness Bracket
1 5/1/2022
GF-13 Harnesses from the Connector Brackets to the
WOMA harness bracket
1 5/1/2022
GF-14 Robotic Servicing Interface Plate (RSIP) for the
A-Latch engagement mechanism
1 TBD
GF-15 Guide Rails 1 8/1/2021
GF-16 Latches (set of 3) 1 8/1/2021