Attachment_H,_List_of_GFP.pdf
PDF 22 KB Posted
- Solicitation number
- NNG17621139R
About this file
Attachment H, List of GFP
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT H
LIST OF GOVERNMENT-FURNISHED PROPERTY
DATED JUNE 2017
RFP NNG17621139R
CONTRACT NUMBER TBD
Contract Number TBD Attachment H
GFP Non-Flight Hardware Delivery and Schedule ID No. Item Quantity Delivery Date GNF-1 WFC Focal Plane Assembly (FPA) Mass Model 1 8/1/21 GNF-2 WFC FPA Surrogate and associated GSE 1 10/1/20 GNF-3 WFC Focal Plane Electronics (FPE) Mass Model 1 8/1/21 GNF-4 IFC FPE Mass Model 1 8/1/21 GNF-5 IFC Simulator and associated GSE 1 7/1/21 GNF-6 Instrument Command and Data Handling (ICDH)
Simulator with associated cabling 1 6/1/21
GNF-7 Spacecraft simulator with associated cabling 1 6/1/21 GNF-8 WFIRST Optical Stimulus 1 1/1/22 GNF-9 IC Simulator 1 9/1//21
GNF-10 WFI T-bar 1 3/1/21 GNF-11 Science data workstations 2 30 days before flight WFC
FPA delivery GNF-12 Surrogate WFI labyrinth seal 1 12/1/2020
Detailed Item Descriptions for all GFP are found in Attachment C, Deliverable Items List and Schedule (DILS).
GFP Non-Flight Data Delivery and Schedule ID No. Item Quantity Delivery Date GM-1 Structural Finite Element Model (FEM) 1 • Preliminary: 15 days after contract award
• Update: 2 months prior to
WFI PDR
• Update: 3 months prior to
WFI CDR
• Final: 2 months after WFI
CDR
or
• at any significant design updates, or
• as requested to stay synchronized with the WOMA-level CAD and Analysis development
GM-2 Thermal Model 1 • Preliminary: 15 days after contract award
• Update: 2 months prior to
WFI PDR
• Update: 3 months prior to
WFI CDR
• Final: 2 months after WFI
CDR
GM-3 CAD Model 1 • Preliminary: 15 days after contract award
• Update: 2 months prior to
WFI PDR
• Update: 3 months prior to
WFI CDR
• Final: 2 months after WFI
CDR
or
• at any significant design updates, or
• as requested to stay synchronized with the WOMA-level CAD development
GM-4 Optical Models 1 Preliminary: 15 days after contract award Update: 2 months prior to WFI
PDR
Update: 3 months prior to WFI
CDR
Final: 2 months after WFI CDR
GM-5 GFP Information for WOMA ICD 1 Preliminary: 90 days before
WFI PDR
Final: 90 days before WFI CDR
GM-6 Pupil Mask Design Data 1 Preliminary: At Contract Award Update: WFI PDR Final: WFI CDR
ID No. Item Quantity Delivery Date GM-7 Reaction Wheel Disturbance Model 1 Preliminary: 15 days after contract award Update: 2 months prior to WFI
PDR
Update: 3 months prior to WFI
CDR
Final: 2 months after WFI CDR
Detailed Item Descriptions for all GFP are found in Attachment C, Deliverable Items List and Schedule (DILS).
GFP Flight Hardware Delivery and Schedule ID No. Item Quantity Delivery Date GF-1 Wide Field Channel (WFC) FPA 1 4/13/2022 GF-2 WFC FPE (WFPE) including any flight software 1 4/13/2022 GF-3 Harness between the WFC FPA and WFC FPE 18 4/13/2022 GF-4 Grism optical element 1 8/1/2021 GF-5 Engineering optical element 1 8/1/2021 GF-6 WFI Instrument Command and Data Handling (ICDH) box including any flight software 1 1/1/2022
GF-7 Integral Field Channel (IFC), including pre-integrated optical fibers to the RCS and the IFC FPA
1 6/28/2022
GF-8 IFC Electronics (IFCE) box 1 6/28/2022
GF-9 IFC FPE (IFPE) 1 6/28/2022
GF-10 Harness between the IFC FPA and IFC FPE 2 6/28/2022 GF-11 Harness between the IFPE and the WFPE 1 5/1/2022 GF-12 Harness between the WFPE and the WOMA
Connector Panel 1 12/29/2021
GF-13 Harness between the IFC mechanisms and the WOMA Connector Panel
1 12/29/2021
GF-14 Harnesses between FPE-controlled heaters and the
FPE MCU
1 12/29/2021
GF-15 Harnesses between the WOMA Connector panel and the ICDH
1 4/5/2022
GF-16 Harnesses between the WOMA Connector panel and the WCE
1 4/5/2022
GF-17 Harnesses between the WOMA Connector panel and the IFCE
1 4/5/2022
GF-18 Harness between the WFPE and the PCDH (SSR) 1 4/13/2022 GF-19 Harnesses between the WOMA Connector panel and the Spacecraft Avionics 1 4/13/2022
GF-20 Harnesses internal to WEM 1 5/1/2021 GF-21 Ground Straps 1 5/2/2021 GF-22 Guide Rails 1 9/24/2021 GF-23 Latches 4 sets 2/10/2021 GF-24 Temperature Sensors 16 12/1/2021 GF-25 Labyrinth seal 1 4/1/2022
Detailed Item Descriptions for all GFP are found in Attachment C, Deliverable Items List and Schedule (DILS).
File details come from the government source that posted it. Updated .