ATTACHMENT 2: RFQ NNA17599805Q-ACJ
MMARSS Statement of Work Page 1 of 21
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)
AMES RESEARCH CENTER (ARC)
STATEMENT OF WORK, REVISION 0, DATED 04/07/2017
FOR
MINOR MAINTENANCE, ALTERATION, AND REPAIR SUPPORT SERVICES
(MMARSS)
Document Change Log:
Revision Number Description of Change Date of Change
MMARSS Statement of Work Page 2 of 21
TABLE OF CONTENTS
1.0 GENERAL
1.1 DESCRIPTION OF SERVICES/INTRODUCTION
1.2 BACKGROUND/PURPOSE
1.3 SCOPE OF WORK
1.4 TYPE OF CONTRACT
1.5 GOVERNMENT OPTION UNDER BPA
2.0 PERFORMANCE DETAILS
2.1 PLACE OF PERFORMANCE
2.2 PERFORMANCE PERIOD
2.3 QUALITY CONTROL
2.4 PERFORMANCE ASSESSMENT
2.5 TRAINING, LICENSES, AND CERTIFICATIONS
2.6 INSURANCE
2.7 CONTRACTOR PERSONNEL
2.8 ON-SITE WORKING CONDITIONS, HOLIDAYS, AND OTHER CLOSURES
2.9 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT
2.10 SAFETY, HEALTH, AND ENVIRONMENT
2.11 SAFETY PLANS
2.12 SAFETY PROGRAMS
2.13 SITE SAFETY AND HEALTH OFFICER (SSHO)
2.14 PASSES AND BADGES
2.15 PHYSICAL SECURITY
2.16 BPA MANAGEMENT
3.0 DESCRIPTION OF CALLS AND ILLUSTRATIVE DELVERABLES
3.1 SERVICE CATEGORY 1 – Industrial Building Construction (General Contractors)
3.2 SERVICE CATEGORY 2 – Remediation Services
3.3 SERVICE CATEGORY 3 – Building and Property Specialty Trade Services
4.0 APPLICABLE PUBLICATIONS
4.1 NASA POLICY DIRECTIVES (NPDs) and NASA PROCEDURAL REQUIREMENTS (NPRs)
4.2 AMES POLICY DIRECTIVES (APDs) and AMES PROCEDURAL REQUIREMENTS (APRs)
4.3 DEPARTMENT OF LABOR PUBLICATION AND RESOURCES
4.4 SAFETY AND ENVIROMENTAL RESOURCES
4.5 MISCELLANEOUS PUBLICATIONS
5.0 CHANGES TO THE STATEMENT OF WORK
ADDENDUM A: PERFORMANCE ASSESSMENT CHECKLIST
MMARSS Statement of Work Page 3 of 21
1.0 GENERAL: This is a non-personal services contract to provide Minor Maintenance, Alteration, and Repair Support Services (MMARSS) for NASA-ARC. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Contractor personnel shall be fully trained in their area of expertise and have the level of experience to accomplish the requirement(s) without
Government supervision, oversight, or other means of intervention. The services included in this Statement of Work (SOW) are in support of NASA - ARC’s Facility Engineering and Real
Property Management Division (Code JC) (https://jc.arc.nasa.gov/index.html).
1.1 DESCRIPTION OF SERVICES/INTRODUCTION: The Contractor shall provide all management, supervision, personnel, equipment, supplies, facilities, transportation, tools, materials, and other items and services necessary to perform facility support services (NAICS 561210) as defined in this SOW. The Contractor is responsible for ensuring all personnel have appropriate experience to provide the required services.
Although this SOW describes a wide range of tasks, specific requirements shall be defined under individual Blanket Purchase Agreement (BPA) Calls and shall include the specific types of services and/or skills required to accomplish that specific effort.
1.2 BACKGROUND/PURPOSE: Located in the heart of California's Silicon Valley, ARC is one of ten NASA field centers. For more than 76 years, ARC has led NASA in conducting world-class research and development in aeronautics, exploration technology and science aligned with the center's core capabilities. ARC is responsible for implementing
Executive Order 13693, Planning for Federal Sustainability in the Next Decade, which mandates that, where life-cycle cost-effective, agencies promote building energy conservation, efficiency, and management by reducing agency building energy intensity and provide for clean, renewable electric energy and alternative energy. Many of ARC’s laboratories, buildings, and facilities are aging and require numerous repetitive minor maintenance, alterations, and repairs. The purpose of this acquisition is to establish multiple BPAs to ensure maintenance service requirements are addressed timely and cost-effectively in support of the Facility Engineering and Real Property Management
Division (Code JC).
1.3 SCOPE OF WORK: The selected Contractor(s) will provide Code JC with one or more of the following services in accordance with their relevant capabilities and commercial and/or business licenses: Industrial Building Construction (i.e., General Contract services); Remediation Services; and, Building and Property Specialty Trade Services
(i.e., flooring, painting, roofing, drywalling, plumbing, etc.).
1.4 TYPE OF CONTRACT: Firm Fixed Price (FFP) Calls shall be issued under the terms and conditions of this BPA. The terms identified in this BPA shall govern Calls placed against this BPA.
https://jc.arc.nasa.gov/index.html
MMARSS Statement of Work Page 4 of 21
1.5 GOVERNMENT OBLIGATION UNDER BPA: The Government does not guarantee any volume of purchases through this BPA. This BPA does not obligate any funds. The
Government is only obligated to the extent of any BPA Calls that are issued under the terms of the BPA.
2.0 PERFORMANCE DETAILS:
2.1 PLACE OF PERFORMANCE: The work to be performed under this BPA shall be on-site at
NASA – ARC located at Moffett Field, CA 94035-0001.
2.2 PERFORMANCE PERIOD: The period of performance shall be for five (5) years beginning on January 1, 2018 and ending on December 31, 2022. Individual BPA Calls shall have specific Periods of Performance identified.
2.3 QUALITY CONTROL: The Contractor shall develop and maintain internal effective quality control measures to ensure services are performed in accordance with this SOW, nationally recognized building codes, California Building Standards Codes (CBSC), Contractors State License Board (CSLB), applicable NASA Policy Directives (NPDs), applicable NASA Procedural Requirements (NPRs), and any other customary commercial quality standards and best practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
2.4 PERFORMANCE ASSESSMENT: The Government shall evaluate the Contractor’s performance and deliverables upon the completion of first BPA Call, and randomly thereafter. (Reference Addendum A – Performance Assessment Checklist). The assessment factors are primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the technical requirements.
Factors for each assessment shall include, at a minimum, the following:
2.4.1 Technical (quality of service);
2.4.2 Safety/Security (adherence to approved Safety Plan and NASA Safety Policies);
2.4.3 Schedule/timeliness (adherence to schedules, including the administrative aspects of performance);
2.4.4 Management or business relations (reasonable and cooperative behavior and commitment to customer satisfaction);
2.4.5 Other (as applicable) (e.g., ability to successfully respond to emergency situations, use of sustainable processes/materials, late or nonpayment to subcontractors, tax delinquency, failure to report in accordance with contract terms and conditions, terminations, suspension and debarments).
MMARSS Statement of Work Page 5 of 21
2.5 TRAINING, LICENSES, AND CERTIFICATIONS: The Contractor shall ensure all employees are trained and that worker skills, qualifications, certifications and experience are commensurate with the employees’ work assignment, consistent with aerospace/industry standards, and NASA requirements. The Contractor shall maintain all certifications and licenses required to conduct business (e.g., federal, state, or local contractor and business licenses) throughout the BPA performance period. The
Contractor shall submit verification of all licensing, certifications, and any specialized experience to the Contracting Officer’s Representative (COR) prior to the start of the
BPA performance period, upon request. All licenses and certificates shall be current, shall be kept current throughout the BPA performance period, and shall provide evidence of such documentation upon request by the Government.
2.6 INSURANCE: The Contractor is required to obtain insurance in accordance with FAR
Subpart 28.3, as applicable with sound business practice and within reasonable rates and premiums under the project circumstances.
2.7 CONTRACTOR PERSONNEL: The Contractor shall provide personnel that have the appropriate skill for that trade. The degree of skill of individuals shall be commensurate with that required for the work. All apprentices shall be supervised and have work checked by the applicable lead journeymen in their particular field. This requirement applies to all crafts.
2.8 ON-SITE WORKING CONDITIONS, HOLIDAYS, AND OTHER CLOSURES:
2.8.1 Moffett Field is classified as a hazardous waste site as defined in the
Comprehensive Environmental Response Compensation and Liability Act
(CERCLA). All Contractor personnel who work at this site must have completed a HAZCOM/hazardous waste site workers training class, as defined in
Occupational Safety and Health Administration (OSHA) regulations. The
Contractor shall provide or make available training courses for their employees in environmental compliance, hazardous materials, hazardous waste management, and emergency response in accordance with applicable laws.
2.8.2 The Government's normal (regular) working hours range from 0600 to 1730 hours (6:00 AM to 5:30 PM), Mondays through Fridays, except (a) Federal holidays and (b) other days specifically designated by the COR. Any necessary deviation from the normal operational hours shall be specified under the individual BPA Calls.
2.8.3 If the Contractor desires to perform work on Saturdays, Sundays, holidays, or outside the normal hours specified above, the Contractor must obtain approval from the COR. All requests will be granted provided that a justification is provided that does not interfere with or impact Government operations.
MMARSS Statement of Work Page 6 of 21
2.8.4 The performance of this BPA requires the Contractor employees of the Prime
Contractor or any Subcontractor to have access to NASA-ARC. NASA may close and deny Contractor access to NASA-ARC for a portion of a business day or longer in accordance with NFS 1852.242-72, Denied Access to NASA Facilities.
2.8.5 All contract personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. Contractor personnel will be required to obtain and wear badges in the performance of this service.
2.9 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT: Government furnished materials and/or equipment will be specified, if applicable, under the individual BPA
Calls.
2.10 SAFETY, HEALTH, AND ENVIRONMENT: Safety, health, and environmental procedures shall be in accordance with all applicable federal and state laws and regulations and with agency supplements, policies, and procedures. All CONTRACTORS SHALL FOLLOW
ALL REQUIREMENTS OF AMES PROCEDURAL REQUIREMENT (APR) 8715.1, CHAPTER
27, CONSTRUCTION SAFETY MANAGEMENT.
2.11 SAFETY PLANS: All Contractors and Subcontractors working at NASA-ARC shall submit for Government acceptance/approval a Site Specific Safety plan prior to starting work.
Work cannot proceed without an accepted Site Specific Safety plan and the following safety items in accordance with APR 8715.1:
2.11.1 Corporate Injury Illness Prevention Program (IIPP) which includes a supplemental Site Specific Safety Plan (Reference Chapter 27, paragraphs 27.5.1 and 27.5.2)
2.11.2 Activity Hazard Analysis (AH) or Job Hazard Analysis (JHA) (Reference Chapter
27, paragraph 27.5.3)
2.11.3 Confined Space Entry Plan (Reference Chapter 27, paragraph 27.5.4)
2.11.4 Excavation Plan (Chapter 27, paragraph 27.5.5)
2.11.5 Fall Protection Plan (Chapter 27, paragraph 27.5.6)
2.11.6 Crane Lift Plan and Crane Critical Lift Plan, if applicable (Chapter 27, paragraph
27.5.11)
2.12 SAFETY PROGRAMS: All Contractors and Subcontractors working at NASA-ARC shall implement and/or adhere to the following safety items in accordance with APR 8715.1:
2.12.1 Hearing Conservation Program (Chapter 29, paragraph 29.2.8)
2.12.2 Ames Asbestos Management Plan (Chapter 30, paragraph 30.2.8)
2.12.3 Ames Lead Management Plan (Chapter 35, paragraphs 35.1.4 and 35.1.5)
MMARSS Statement of Work Page 7 of 21
2.12.4 Fall Protection Program (Chapter 40, paragraphs 40.1.8 and 40.2.6)
2.12.5 NASA Occupational Safety and Health Programs (NPR 8715.1A)
2.13 SITE SAFETY AND HEALTH OFFICER (SSHO): APR 8715.1, Chapter 27, requires all
Contractors to comply with the following:
2.13.1 Paragraph 27.1.7 (g), Construction Contractors shall “designate a Site Safety and
Health Officer (SSHO) with assurance responsibility for safe work procedures and authority to correct unsafe conditions. See the Personnel and
Qualifications section of this chapter for additional information.”
2.13.2 Paragraph 27.1.7 (h), Construction Contractors shall “ensure the SSHO is onsite at all times when work is being conducted. This includes when Subcontractors are performing work onsite.”
2.13.3 Paragraph 27.4.1 (a – h), the SSHO shall:
2.13.3.1 Be a Competent or Qualified Person as per 27.4.2 of this section.
2.13.3.2 Have completed the thirty (30) hour OSHA 510 – Standards for
Construction Industry or equivalent course.
2.13.3.3 Have additional specialized safety training to effectively recognize and correct additional site specific hazards such as Fall Protection
Competent Person, Scaffolding Competent Person and other required training that OSHA 30 hour training does not cover.
2.13.3.4 Maintain SSHO competency through twenty-four (24) hours of formal safety and health related coursework every four (4) years.
2.13.3.5 Have a minimum of one (1) year safety related work experience.
2.13.3.6 For small, short duration construction contracts, both the Contracting
Officer and the Ames Safety, Health and Medical Services Division may modify requirements:
2.13.3.6.1 The minimum requirement in this instance will be OSHA
10 hour training along with any other required specialized safety training and experience.
2.13.3.6.2 May be a tradesman, but will have the position of
authority as indicated in this section 27.1.8.
2.14 PASSES AND BADGES: All Contractor employees requiring on-site access to Moffett
Field and/or NASA-ARC shall obtain the required employee passes or badges and comply with FAR 52.204-9, Personal Identity Verification of Contractor Personnel and APR
1620.1, Chapter 504, Identification Badges and Passes.
2.15 PHYSICAL SECURITY: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the
MMARSS Statement of Work Page 8 of 21 close of each work period, government facilities, equipment, and materials shall be secured.
2.16 BPA MANAGEMENT: The following individuals will be responsible for managing the
BPA.
2.16.1 Contracting Officer’s Representatives (CORs):
2.16.1.1 Mr. Patrick Jacquemet, Facilities Management Specialist
COR (Primary)
Code JCM
Office Phone: 650-604-4747
Mobile Phone: 650-208-0314
Email Address: patrick.d.jacquemet@nasa.gov
2.16.1.2 Mr. Lorin Belanger, Facilities Operations Specialist
COR (Alternate)
Code JCM
Office Phone: 650-604-1662
Mobile Phone: 650-208-0318
Email Address: lorin.d.belanger@nasa.gov
2.16.2 Contracting Officer/Contract Administrator:
2.16.2.1 Ms. Caroline J. Brown
Contracting Officer
Code JAC
Office Phone: 650-604-5788
Email Address: caroline.j.brown@nasa.gov
3.0 DESCRIPTION OF CALLS AND ILLUSTRATIVE DELIVERABLES: The Contractor shall provide minor
Facility Support Services and associated deliverables specified under individual BPA Calls. The work performed may include new work, additions, alterations, maintenance, and repairs. This
SOW provides a broad range of requirements and illustrative tasks associated with the performance of Service Category 1, Service Category 2, and Service Category 3 as detailed in this subsection. The Contractor shall only be eligible to perform those services for which the
Government has deemed the Contractor to be qualified and as established by the Contractor’s
BPA.
3.1 SERVICE CATEGORY 1 - Industrial Building Construction (General Contractors):
This service category is applicable to licensed General Contractors primarily responsible for the construction (including new work, additions, alterations, maintenance, and repairs) of industrial buildings (except warehouses). The construction of selected additional structures, whose production processes are similar to those for industrial mailto:patrick.d.jacquemet@nasa.gov mailto:lorin.d.belanger@nasa.gov mailto:caroline.j.brown@nasa.gov
MMARSS Statement of Work Page 9 of 21 buildings (e.g., incinerators, cement plants, blast furnaces, and similar non-building structures), is included in this service category. Included in this service category are industrial building general contractors.
Illustrative Deliverables:
Assembly plant minor construction
Machine shop minor construction
Furnace, industrial plant minor construction
Cement plant minor construction
Chemical plant (except petrochemical) minor construction
Factory minor construction
Waste disposal plant (except sewage treatment) minor construction
3.2 SERVICE CATEGORY 2 - Remediation Services:
This service category comprises licensed Contractors primarily engaged in one or more of the following: (1) remediation and cleanup of contaminated buildings, soil, or ground water; (2) demolition, soil remediation, waste water treatment, hazardous material removal, contouring land, and revegetation; and (3) asbestos, lead paint, and other toxic material abatement.
Asbestos abatement/removal services
Lead paint abatement/removal services
Lead paint removal contractors
Oil spill cleanup services
Site remediation services
Soil remediation services
Toxic material abatement/removal services
3.3 SERVICE CATEGORY 3 - Building and Property Specialty Trade Services:
3.3.1 Poured Concrete Foundation and Structure Contractors:
This service subcategory comprises licensed Contractors primarily engaged in pouring and finishing concrete foundations and structural elements. This industry also includes establishments performing grout and shotcrete work.
Concrete pouring and finishing
Gunite contractors
Concrete pumping (i.e., placement)
Mud-jacking contractors
Concrete work (except paving)
Shotcrete contractors
Footing and foundation concrete contractors
MMARSS Statement of Work Page 10 of 21
3.3.2 Structural Steel and Precast Concrete Contractors:
This service subcategory comprises licensed Contractors primarily engaged in (1) erecting and assembling structural parts made from steel or precast concrete
(e.g., steel beams, structural steel components, and similar products of precast concrete) and/or (2) assembling and installing other steel construction products
(e.g., steel rods, bars, rebar, mesh, and cages) to reinforce poured-in-place concrete.
Concrete product (e.g., structural precast, structural pre-stressed) installation
Rebar contractors
Erecting structural steel
Reinforcing steel contractors
Placing and tying reinforcing rod at a construction site
Structural steel contractors
Precast concrete panel, slab, or form installation
3.3.3 Framing Contractors:
structural framing and sheathing using materials other than structural steel or concrete.
Building framing (except structural steel)
Post frame contractors
Foundation, building, wood, contractors
Steel framing contractors
Framing contractors
Wood frame component (e.g., truss) fabrication on site
3.3.4 Masonry Contractors:
masonry work, stone setting, brick laying, and other stone work.
Block laying
Marble, granite, and slate, exterior, contractors
Brick laying
Masonry pointing, cleaning, or caulking
Concrete block laying
Stucco contractors
Foundation (e.g., brick, block, stone), building, contractors
MMARSS Statement of Work Page 11 of 21
3.3.5 Glass and Glazing Contractors:
This service subcategory comprises licensed Contractors primarily engaged in installing glass panes in prepared openings (i.e., glazing work) and other glass work for buildings.
Decorative glass and mirror installation
Glazing contractors
Glass cladding installation
Stained glass installation
Glass coating and tinting (except automotive) contractors
Window pane or sheet installation
Glass installation (except automotive) contractors
3.3.6 Roofing Contractors:
roofing. This industry also includes establishments treating roofs (i.e., spraying, painting, or coating) and installing skylights.
Painting, spraying, or coating, roof
Sheet metal roofing installation
Shake and shingle, roof, installation
Skylight installation
Clay tile roofing, installation
PVC roofing, installation
Built up roofing, installation
3.3.7 Siding Contractors:
installing siding of wood, aluminum, vinyl, or other exterior finish material
(except brick, stone, stucco, or curtain wall). This industry also includes establishments installing gutters and downspouts.
Downspout, gutter, and gutter guard installation
Siding (e.g., vinyl, wood, aluminum) installation
Fascia and soffit installation
3.3.8 Other Foundation, Structure, and Building Exterior Contractors:
building foundation and structure trades work (except poured concrete, structural steel, precast concrete, framing, masonry, glass, glazing, roofing, and siding).
MMARSS Statement of Work Page 12 of 21
Curtain wall, metal, installation
Forms for poured concrete, erecting, and dismantling
Decorative steel and wrought iron work installation
Ornamental metal work installation
Fire escape installation
Welding, on site, contractors
3.3.9 Electrical Contractors and Other Wiring Installation Contractors:
installing and servicing electrical wiring and equipment.
Airport runway lighting contractors
Fiber optic cable (except transmission line) contractors
Alarm system (e.g., fire, burglar), electric, installation only
Highway, street, and bridge lighting and electrical signal installation
Audio equipment (except automotive) installation contractors
Home automation system installation
Cable splicing, electrical or fiber optic
Lighting system installation
Cable television hookup contractors
Telecommunications equipment and wiring (except transmission line) installation contractors
Computer and network cable installation
Traffic signal installation
Environmental control system installation
3.3.10 Plumbing, Heating, and Air Conditioning Contractors:
installing and servicing plumbing, heating, and air-conditioning equipment.
Plumbing services
Cooling tower installation
Heating, ventilation, and air-conditioning (HVAC) contractors
Duct work (e.g., cooling, dust collection, exhaust, heating, ventilation) installation
Lawn sprinkler system installation
Fire sprinkler system installation
Mechanical contractors
Fireplace, natural gas, installation
Refrigeration system (e.g., commercial, industrial, scientific) installation
MMARSS Statement of Work Page 13 of 21
Furnace installation
Sewer hook-up and connection, building
3.3.11 Other Building Equipment Contractors:
installing or servicing building equipment (except electrical, plumbing, heating, cooling, or ventilation equipment). The repair and maintenance of miscellaneous building equipment is included in this industry.
Automated and revolving door installation
Lightning protection equipment (e.g., lightning rod) installation
Boiler and pipe insulation installation
Machine rigging
Commercial-type door installation
Millwrights
Conveyor system installation
Overhead door, commercial- or industrial-type, installation
Dismantling large-scale machinery and equipment
Revolving door installation
Elevator installation
Satellite dish, household-type, installation
Escalator installation
Vacuum cleaning system, built-in, installation
Gasoline pump, service station, installation
3.3.12 Drywall and Insulation:
drywall, plaster work, and building insulation work. Plaster work includes applying plain or ornamental plaster, and installation of lath to receive plaster.
The work performed may include new work, additions, alterations, maintenance, and repairs. Establishments primarily engaged in providing firestop services are included in this industry.
Acoustical ceiling tile and panel installation
Lathing contractors
Drop ceiling installation
Plastering (i.e., ornamental, plain) contractors
Drywall contractors
Soundproofing contractors
Firestop contractors
Fresco (i.e., decorative plaster finishing) contractors
Taping and finishing drywall
MMARSS Statement of Work Page 14 of 21
Gypsum board installation
Wall cavity and attic space insulation installation
3.3.13 Painting and Wall Covering Contractors:
interior or exterior painting or interior wall covering.
Bridge painting
Paperhanging or removal contractors
Interior/exterior building painting
Wind tunnel painting contractors
Paint and wallpaper stripping
Wallpaper hanging and removal contractors
3.3.14 Flooring Contractors:
the installation of resilient floor tile, carpeting, linoleum, and hardwood flooring.
Carpet, installation only
Resilient floor tile or sheet (e.g., linoleum, rubber, vinyl), installation only
Floor laying, scraping, finishing, and refinishing
Resurfacing hardwood flooring
Hardwood flooring, installation only
Vinyl flooring contractors
3.3.15 Tile and Terrazzo Contractors:
setting and installing ceramic tile, stone (interior only), and mosaic and/or mixing marble particles and cement to make terrazzo at the job site.
Illustrative Descriptions:
Ceramic tile installation
Mosaic work
Mantel, marble or stone, installation
Stone flooring installation
Marble, granite, and slate, interior installation contractors
Tile (except resilient) laying and setting
3.3.16 Finish Carpentry Contractors:
finish carpentry work.
MMARSS Statement of Work Page 15 of 21
Built-in wood cabinets constructed on site
Molding or trim, wood or plastic, installation
Counter top, residential-type, installation
Paneling installation
Door and window frame construction
Prefabricated kitchen and bath cabinet, residential-type, installation
Garage door, residential-type, installation
Joinery contractors
Millwork installation
Window and door, residential-type, of any material, prefabricated, installation
3.3.17 Other Building Finishing Contractors:
building finishing trade work (except drywall, plaster, and insulation work;
painting and wall covering work; flooring work; tile and terrazzo work; and finish carpentry work).
Bath tub refinishing on site
Fabricating metal cabinets or countertops on site
Closet organizer system installation
Modular furniture system attachment and installation
Concrete coating, glazing, or sealing
Trade show exhibit installation and dismantling
Countertop and cabinet, metal (except residential-type), installation
Waterproofing contractors
Drapery fixture (e.g., hardware, rods, tracks) installation
Window shade and blind installation
3.3.18 Site Preparation Contractors:
site preparation activities, such as excavating and grading, demolition of buildings and other structures, and septic system installation. Earth moving and land clearing for all types of sites (e.g., building, non-building) is included in this industry. Establishments primarily engaged in construction equipment rental with operator (except cranes) are also included.
Building demolition
Foundation digging (i.e., excavation)
Concrete breaking and cutting for demolition
Foundation drilling contractors
MMARSS Statement of Work Page 16 of 21
Cutting new rights of way
Grading construction sites
Demolition, building and structure
Line slashing or cutting (except maintenance)
Dewatering contractors
Septic system contractors
Dirt moving for construction
Trenching (except underwater)
Equipment rental (except crane), construction, with operator
Underground tank (except hazardous) removal
Excavating, earthmoving, or land clearing contractors
Wrecking, building or other structure
3.3.19 All Other Specialty Trade Contractors:
specialized trades (except foundation, structure, and building exterior contractors; building equipment contractors; building finishing contractors; and site preparation contractors).
Billboard erection
Outdoor swimming pool construction
Cleaning building interiors during and immediately after construction
Paver, brick (e.g., driveway, patio, sidewalk), installation
Crane rental with operator
Paving, residential and commercial driveway and parking lot
Driveway paving or sealing
Sandblasting building exteriors
Fence installation
Scaffold erecting and dismantling
Interlocking brick and block installation
Steeplejack work
Manufactured (mobile) home, set up and tie-down
4.0 APPLICABLE PUBLICATIONS:
4.1 NASA POLICY DIRECTIVES (NPDs) and NASA PROCEDURAL REQUIREMENTS (NPRs): NPDs and NPRs are available at NASA Online Directives Information System (NODIS) http://nodis3.gsfc.nasa.gov/Rpt_current_directives.cfm
NPD 8500.1C, NASA Environmental Management
NPR 8530.1B, NASA Sustainable Acquisition
NPR 8590.1A, Environmental Compliance and Restoration Program
NPR 8715.1A, NASA Occupational Safety and Health Programs
NPR 8715.3C, NASA General Safety Program Requirements http://nodis3.gsfc.nasa.gov/Rpt_current_directives.cfm
MMARSS Statement of Work Page 17 of 21
4.2 AMES POLICY DIRECTIVES (APDs) and AMES PROCEDURAL REQUIREMENTS (APRs):
(Due to sensitive and non-public information, certain APDs and APRs are not available online and will be provided upon award of a blanket purchase agreement.)
APR 1620.1, Security Procedural Requirements
Chapter 504, Identification Badges and Passes
APR 8715.1, Ames Health and Safety Manual:
Chapter 1, Ames Safety and Health Policy
Chapter 2, Safety and Health Responsibilities
Chapter 3, Health Unit
Chapter 4, Mishap and Close Call Reporting and Investigating/Contingency Plan
Chapter 5, Smoking Policy
Chapter 6, Work Alone
Chapter 7, Ames Radiation Safety Guide
Chapter 10, Pressure Systems Safety
Chapter 11, Electrical Safety
Chapter 12, Explosives Safety
Chapter 13, Chemical Hygiene Program
Chapter 17, Lifting Devices and Equipment
Chapter 20, Fire Protection
Chapter 24, Chemical Hazard Communication Plan
Chapter 26, Confined Space Entry
Chapter 27, Construction Safety Management
Chapter 28, Respiratory Protection
Chapter 30, Asbestos Management Plan
Chapter 31, Lockout/Tagout
Chapter 33, Personal Protective Equipment (PPE)
Chapter 35, Lead Management Plan
Chapter 38, OSHA Regulated Chemicals
Chapter 40, Fall Protection Program
Chapter 41, Animals in the Workplace
Chapter 42, Safety Lanes, Barricades, Hazard Labeling and Posting
Chapter 43, Office Safety
Chapter 44, Compressed Gas Cylinder Safety
Chapter 48, Portable Hand and Power Tools
Chapter 52, Biosafety
Chapter 57, Facility Safety Management Plan
Chapter 58, Alarm Systems for Detection of Hazardous Atmospheres in Facilities
APD 8829.1, Construction Permit https://jc.arc.nasa.gov/Directives/APD8829.1.pdf
APR 8829.1, Construction Permit Process https://jc.arc.nasa.gov/Directives/APR8829.1.pdf https://jc.arc.nasa.gov/Directives/APD8829.1.pdf https://jc.arc.nasa.gov/Directives/APR8829.1.pdf
MMARSS Statement of Work Page 18 of 21
4.3 DEPARTMENT OF LABOR PUBLICATIONS AND RESOURCES:
Compliance Assistance – Government Contracts https://www.dol.gov/whd/govcontracts/
Davis-Bacon Compliance Guide https://www.dol.gov/compliance/guide/dbra.htm
Service Contract Act (SCA) Compliance Principles https://www.dol.gov/whd/recovery/pwrb/Tab18.pdf
4.4 SAFETY AND ENIVIRONMENTAL RESOURCES:
Occupational Safety and Health Administration (OSHA) https://www.osha.gov/
OSHA Laws and Regulations https://www.osha.gov/law-regs.html
OSHA Training Courses, Materials, and Resources https://www.osha.gov/dte/
Office of Federal Procurement Policy Green Acquisition initiatives at https://www.whitehouse.gov/omb/procurement_index_green
Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade (Replaces EO 13423, Strengthening Federal Environmental, Energy, and Transportation Management and EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance) at https://www.whitehouse.gov/the-press-office/2015/03/19/executive-order-planning-federal-sustainability-next-decade
Biobased – https://www.biopreferred.gov/ or https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#
Energy-efficient – https://www.energystar.gov/products
EPA’s Non-ozone-depleting – https://www.epa.gov/ozone-layer-protection
EPA’s Pollution Prevention Program – https://www.epa.gov/p2/
EPA’s Priority Chemical Program – https://www.epa.gov/osw/hazard/wastemin/priority.htm
EPA’s Recycled content – https://www.epa.gov/epawaste/
EPA’s Safer Choice – https://www2.epa.gov/saferchoice
EPA’s Significant New Alternative Policy (SNAP) – https://www.epa.gov/ozone/snap/
EPA’s Water Sense Program – https://www.epa.gov/WaterSense/
EPA’s Environmentally Preferable and Nontoxic or Less Toxic Alternatives – https://www.epa.gov/epp/
Federal Energy Management Program (FEMP) products – https://www1.eere.energy.gov/femp/procurement/eep_requirements.html
Green Procurement Compilation – https://sftool.gov/greenprocurement
Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings – https://www.epa.gov/oaintrnt/projects/buildings_mou.htm
Sustainable Facilities Tool, U.S. General Services Administration – https://sftool.gov
Water-efficient – https://www.epa.gov/watersense/ https://www.dol.gov/whd/govcontracts/ https://www.dol.gov/compliance/guide/dbra.htm https://www.dol.gov/whd/recovery/pwrb/Tab18.pdf https://www.osha.gov/ https://www.osha.gov/law-regs.html https://www.osha.gov/dte/ https://www.whitehouse.gov/omb/procurement_index_green https://www.whitehouse.gov/the-press-office/2015/03/19/executive-order-planning-federal-sustainability-next-decade https://www.whitehouse.gov/the-press-office/2015/03/19/executive-order-planning-federal-sustainability-next-decade https://www.biopreferred.gov/ https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml https://www.energystar.gov/products https://www.epa.gov/ozone-layer-protection https://www.epa.gov/p2/ https://www.epa.gov/osw/hazard/wastemin/priority.htm https://www.epa.gov/epawaste/ https://www2.epa.gov/saferchoice https://www.epa.gov/ozone/snap/ https://www.epa.gov/WaterSense/ https://www.epa.gov/epp/ https://www1.eere.energy.gov/femp/procurement/eep_requirements.html https://sftool.gov/greenprocurement https://www.epa.gov/oaintrnt/projects/buildings_mou.htm https://sftool.gov/ https://www.epa.gov/watersense/
MMARSS Statement of Work Page 19 of 21
4.5 MISCELLANEOUS PUBLICATIONS:
NASA – ARC Campus and Building Locator -http://historicproperties.arc.nasa.gov/map_bldglocator/bldglocator.html
5.0 CHANGES TO THE STATEMENT OF WORK: Only the Contracting Officer (CO) is authorized to make changes to this Statement of Work. No other Government or non-Government official may alter this Statement of Work. The contractor is to report any attempts to alter this contract to the CO. In the event the contractor effects any such changes at the direction of any person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. The contractor may also be required by the CO to undo any such unauthorized changes at no additional expense to the Government.
http://historicproperties.arc.nasa.gov/map_bldglocator/bldglocator.html
MMARSS Statement of Work Page 20 of 21
Addendum A: Performance Assessment Checklist
BPA Number:
Call Number:
Call Purpose:
Date Prepared:
Project Name:
Checklist Prepared By (Name/Org Code):
Adjective Rating Adjective Rating Description
Exceptional (E) Performance meets contractual requirements and exceeds many of the Government’s expectations. The contractual performance of the factor being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good (VG) Performance meets contractual requirements and exceeds some of the Government’s expectations. The contractual performance of the factor being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory (S) Performance meets contractual requirements. The contractual performance of the factor being assessed reflects some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (M) Performance does not meet some contractual requirements. The contractual performance of the factor being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory (U) Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the factor being assessed reflects serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Not Applicable (N/A) Used if the ratings are not going to be applied to a particular area for assessment.
MMARSS Statement of Work Page 21 of 21
Answer the following questions by placing an X in the appropriate column.
Comments shall be provided for all “No” responses.
Assessment Factor YES NO Adjective Rating Comments
E VG S M U N/A
1. TECHNICAL/QUALITY: Did the Contractor complete the Service Request in accordance with the technical requirements of the Call?
2. SAFETY/SECURITY: Did the Contractor maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
3. SCHEDULE/TIMELINESS: Did the Contractor complete the Service Request within the schedule and/or period of performance designated in the Call?
4. MANAGEMENT: Did the Contractor’s Management and/or Supervisory Personnel conduct business in a reasonable and cooperative manner?
5. BUSINESS RELATIONS: Did the Contractor’s personnel demonstrate a commitment to customer satisfaction?
6. OTHER (as applicable): (e.g., ability to successfully respond to emergency situations, use of sustainable processes/materials, late or nonpayment to subcontractors, tax delinquency, failure to report in accordance with contract terms and conditions, terminations, suspension and debarments?).