NM NP MULTI PMS(1)_CAVE_C6_Final_Report.pdf

PDF 4 MB Posted

Attached to
NM NP MULTI PMS(1), Pavement Preservation New Mexico Federal contract opportunity
Solicitation number
69056724R000026
Issued by
Department of Transportation Federal Highway Administration

About this file

This is a Federal Highway Administration Road Inventory Program (RIP) report from August 2017 providing a comprehensive assessment of paved roads and parking areas at Carlsbad Caverns National Park. The report documents pavement conditions using both automated Data Collection Vehicle (DCV) measurements and manual ratings, presenting detailed analyses of surface distresses, roughness, rutting, and overall pavement condition ratings (PCR).

The report contains extensive technical data including GPS coordinates, surface condition ratings, distress measurements, and PCR calculations for 7.04 miles of paved roads and 378,074 square feet of parking areas within the park. Key sections cover pavement assessment methodologies, condition rating formulas, and detailed maps showing route locations and conditions. The pavement evaluation uses a 0-100 scale, with ratings categorized as Excellent (95-100), Good (85-94), Fair (61-84), or Poor (≤60). The report includes extensive appendices detailing the rating methodologies, distress measurement procedures, and deliverables provided. This technical assessment supports the Federal Highway Administration's pavement management system for prioritizing maintenance and rehabilitation activities across National Park Service properties.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAVE

Cycle 6

Federal Highway Administration Eastern Federal Lands Highway Division Road Inventory Program (RIP)

Prepared By:

Road Inventory and Condition Assessment of Paved Routes Carlsbad Caverns National Park

Report Date: 2017

Final Report in New Mexico

Guymon

Lubbock

Midland

Roswell

El Paso

Amarillo

CarlsbadLas Cruces

Albuquerque

Santa Fe

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community Esri, DeLorme, GEBCO, NOAA NGDC, and other contributors ±

Carlsbad Caverns National Park

Table of Contents

4 - 1 4 - 2 4 - 4 4 - 5

SECTION PAGE NO.

1. INTRODUCTION 1 - 1

2. PARK ROUTE INVENTORY

2 - 1

3.

3 - 1

4.

APPENDIX

8 - 1

Route ID Report, Subcomponent Report, and Changes Report (As Applicable)

PAVED PARKING AREA CONDITION RATING SHEETS

Paved Parking Area Pages

PARK SUMMARY INFORMATION

Parkwide Paved Route Condition Summary

PARK ROUTE LOCATION MAPS

Route Location Key Map Route Location Area Map(s) Route Condition Key Map – PCR Mile by Mile Route Condition Area Map(s) – PCR Mile by Mile

PAVED ROAD CONDITION RATING SHEETS

Paved Road Pages 5 - 1

6 - 1

5.

6.

7. ROAD MILEPOST INFORMATION

Road Milepost Information and Logs 7 - 1

8.

Appendix A: Methodology for Determining Condition Ratings with the Data Collection Vehicle (DCV)

8 - 5

Appendix B: Methodology for Determining Condition Ratings Using Manual Rating Procedures Appendix C: Description of Cycle 6 Deliverables 8 - 29

8 - 20

Appendix D: Glossary of Terms and Abbreviations 8 - 33

Improvements to the RIP Index Equations and Determination of PCR 8 - 1 Description of the Rating System 8 - 2 Explanation of the Condition Descriptions 8 - 3 Description of Pavement Treatment Types 8 - 4

Explanation of Condition Descriptions Route-Level Condition Summary Reports for Data Collection Vehicle, Manually Rated, and Parking Area Routes (As Applicable)

3 - 2 3 - 3

Section 1 Introduction

1-1

Introduction

The Federal Highway Administration’s (FHWA), Road Inventory Program (RIP) inventories all roads and parking areas in the National Park System, and performs condition inspections on all paved roads and parking areas for the National Park Service (NPS). This report contains the results of the Cycle 6 condition assessment of paved roads and parking lots for this park unit. This assessment was done using an automated, state-of-the-art pavement inspection vehicle as well as manual ratings. This information represents the condition of the paved assets at the time of the inspection. The pavement management system utilized by FHWA and the NPS uses these assessments to estimate future conditions and help prioritize pavement maintenance and rehabilitation projects. Further information about RIP data and its role in managing paved roads and bridges can be obtained by contacting the NPS Regional Transportation Program Manager.

A History of the Road Inventory Program:

The FHWA, in the mid-1970s, was charged with the task of identifying surface condition deficiencies and corrective priorities on NPS roads and parkways. Additionally, FHWA was tasked with establishing an integrated maintenance features inventory, locating features such as culverts, guardrails, and signs, among others, along NPS roads and parkways. As a result, in 1976 the NPS and FHWA entered into a Memorandum of Agreement (MOA) which established the RIP. This MOA was revised in 1980 to update RIP data collection standards and develop a long-range program to improve and maintain NPS roads to designated condition standards and establish a pavement management program.

The FHWA completed the initial phase of inventory in the early 1980s. As a result of this effort, each NPS unit included in the collection received a RIP Report known as the “Brown Book” which contained information that was inventoried during this first RIP phase. In the 1990s, a cyclical program was developed, and since then five cycles of collection have been completed. Cycle 6 is currently in progress.

A summary of the RIP collection cycles is shown in the table below.

Cycle Years Parks Collected

Cycle 1 1994 - 1997 44 Large Parks

Cycle 2 1997 - 2001 79 Large Parks 5 Small Parks

Cycle 3 2001 - 2004 All Large Parks All Small Parks

Cycle 4 2006 - 2010 86 Large Parks Several Small Parks

Cycle 5 2010 - 2014 All Large Parks (Only functional class 1, 2, 7, and new/modified routes collected) All Small Parks (all roads and parking areas collected)

Cycle 6 2014 – 2020 (±) All roads and parking areas collected at all Parks Additional partial collections of functional class 1, 2, and 7 roads at Large Parks Cycle 6 is expected to last 6 years

Note: Large Parks have ≥ 10 Paved Miles; Small Parks have < 10 Paved Miles

1-2

Since 1984, the Road Inventory Program has been funded through the Federal Lands Highway Park Roads and Parkways (PRP) Program. Currently, coordination of the RIP with Federal Lands Highway (FLH) is under the NPS Washington Headquarters Park Facility Management Division. The FLH Washington office coordinates policy and prepares national reports and needs assessment studies for Congress.

In 1998, the Transportation Equity Act for the 21st Century (TEA-21) amended Title 23 U.S.C., and inserted Section 204(a)(6) requiring the FHWA and NPS, to develop by rule, a Pavement Management System (PMS) applied to park roads and parkways serving the National Park System.

In 2012, the Moving Ahead for Progress in the 21st Century Act (MAP-21) amended Title 23 U.S.C., and under Section 203(c)(1-2) stated that the National Park Service in cooperation with the DOT/FHWA, shall maintain a comprehensive national inventory of their transportation facilities, with the goal of quantifying transportation infrastructure needs within the National Park System.

A History of the Pavement Management System:

In 2005, the FHWA began implementing the use of a pavement management system to assist the NPS in prioritizing Pavement Maintenance and Rehabilitation activities. The system used by FHWA is the Highway Pavement Management Application (HPMA), which has the ability to store inventory and condition data from RIP and forecast future performance using prediction models. Outputs include performance and condition reports at the National, Regional, Park, or Route level. Regional prioritized lists and optimizations have been produced for most regions, and the Service’s overall roadway Deferred Maintenance is calculated via the HPMA.

Overview of Cycle 6:

Cycle 6 launched in the spring of 2014 and will again comprise all NPS park units that are served by paved roads and/or parking areas. For Cycle 6, all paved roads (approximately 5,700 miles) and parking areas will be collected in all parks at least once, while the primary routes (functional class 1, 2, and 7 roads) at Large Parks will have additional collections. These multiple collections will provide updated condition data on a majority of the NPS’s primary road network and help build a better pavement management system, allowing for more accurate pavement performance prediction models.

FLH is responsible for the accuracy of all data presented in this report. Any questions or comments concerning the contents of this report should be directed to the national RIP Coordinator located in Sterling, Virginia.

Respectfully, FHWA RIP Team

FHWA/Central Federal Lands 12300 West Dakota Ave Lakewood, CO 80228

FHWA/Eastern Federal Lands 21400 Ridgetop Circle Sterling, VA 20166 ( ) 4 4- (720) 963-3556

Section 2 Park Route Inventory

Section 3 Park Summary Information

3-1

3-2

3-3

3-4

Section 4 Park Route Location Maps

ROUTE LOCATION MAP

Key Map

Carlsbad Caverns National Park

±0 5 10

Miles

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

NPS Collected Routes

4-1

Area Map 1

Carlsbad Caverns National Park

±0 0.5 1

Miles

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Note: Unique colors are used to differentiate roads

Rte. 0905

Rte. 0200

Rte. 0904

Rte. 0909 Rte. 0908 Rte. 0903

Rte. 0010ZZ

Rte. 0902

Rt e.

01 Rte. 0900

Rte. 0911 Rte. 0916

Rte. 0910 Rte. 0402

Rte. 0917

4-2

Area Map 2

Carlsbad Caverns National Park

±0 1 2

Miles

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Note: Unique colors are used to differentiate roads

Rte. 0914

Rte. 0915

Rte. 0010ZZ

4-3

ROUTE CONDITION MAP

PCR - MILE BY MILE

Key Map

Carlsbad Caverns National Park

Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community

±0 5 10

Miles

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed

Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

4-4

Area Map 1

Carlsbad Caverns National Park

Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community

±0 0.5 1

Miles

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed

Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0010ZZ

Rte. 0200

Rte. 0402

4-5

Area Map 2

Carlsbad Caverns National Park

Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community

±0 1 2

Miles

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed

Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0010ZZ

4-6

Section 5 Paved Road Condition Rating Sheets

Surface Type:

Inspection Date:

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Route Summary

Paved Width (ft) Lane Width (ft)

Rte. 0010ZZ

Carlsbad Caverns National Park

ROUTE 0010ZZ: WALNUT CANYON ENTRANCE ROADS

Summary Route

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

3/21/2017 7.04

ASPHALT

24.9 10.7

Note: The weighted average summary PCR value is calculated from only the sections of road where the PCR was collected. The overall PCR for the summary route may not reflect individual subcomponent ratings.

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

5-1

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Longitudinal Crack Index

Distress Index Values

Route Summary Section Length (MI) Beginning Section MP

Surface Condition Rating (SCR)

Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)

Paved Width (ft) Lane Width (ft)

Roughness Condition Index (RCI)

Alligator Crack Index Structural Crack Index

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Carlsbad Caverns National Park

ROUTE 0010AZ: WALNUT CANYON ENTRANCE ROAD

2 2

1 2 3 4 1 1 1 1

3/21/2017 6.98

ASPHALT

10.6

24.3

24.9

23.7 10.3

24.1 10.8

24.6 10.6

100100100100100100 100100100100100100

Subcomponent of Route CAVE-0010ZZ Data Collection Vehicle (DCV) Rating

5-2

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Longitudinal Crack Index

Distress Index Values

Route Summary Section Length (MI) Beginning Section MP

Surface Condition Rating (SCR)

Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)

Paved Width (ft) Lane Width (ft)

Roughness Condition Index (RCI)

Alligator Crack Index Structural Crack Index

Rte. 0010AZ

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Carlsbad Caverns National Park

ROUTE 0010AZ: WALNUT CANYON ENTRANCE ROAD

2 2

0.98

3/21/2017 6.98

ASPHALT

10.6

26.4 10.3

26.9 10.5

100100100 100100100

Subcomponent of Route CAVE-0010ZZ

5-3

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Longitudinal Crack Index

Distress Index Values

Route Summary Section Length (MI) Beginning Section MP

Surface Condition Rating (SCR)

Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)

Paved Width (ft) Lane Width (ft)

Roughness Condition Index (RCI)

Alligator Crack Index Structural Crack Index

Rte. 0010BZ

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Carlsbad Caverns National Park

ROUTE 0010BZ: VC TURN AROUND

1 1

0.06

3/21/2017 0.06

ASPHALT

17.5 17.5

17.5 17.5

N/A

N/A

N/A

N/A

100100 100100

Subcomponent of Route CAVE-0010ZZ

5-4

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Longitudinal Crack Index

Distress Index Values

Route Summary Section Length (MI) Beginning Section MP

Surface Condition Rating (SCR)

Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)

Paved Width (ft) Lane Width (ft)

Roughness Condition Index (RCI)

Alligator Crack Index Structural Crack Index

Rte. 0200

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Carlsbad Caverns National Park

ROUTE 0200: AMPHITHEATER ROAD

2 2

0.73

3/21/2017 0.73

ASPHALT

19.2 10.2

19.2 10.2

N/A

N/A

N/A

N/A

100100

5-5

Paved Length (Miles):

Number of Lanes Lane & Width Information

Pavement Condition Rating (PCR) Roadway Condition Information

Longitudinal Crack Index

Distress Index Values

Route Summary Section Length (MI) Beginning Section MP

Surface Condition Rating (SCR)

Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)

Paved Width (ft) Lane Width (ft)

Roughness Condition Index (RCI)

Alligator Crack Index Structural Crack Index

Rte. 0402

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Carlsbad Caverns National Park

ROUTE 0402: PERMIAN DRIVE

2 2

0.13

3/21/2017 0.13

ASPHALT

19.3 9.7

19.3 9.7

N/A

N/A

N/A

N/A

100100 100100

5-6

Section 6 Paved Parking Area Condition Rating Sheets

User AccessInspection Date FMSS Number Surface Type

Curb Reveal (Inches)Area (Sq. Ft.) Lane Miles (11' Widths) Curb Recommendation

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

FROM END OF ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD )

TO PARKING

Note: Parking area consists of multiple surface types: 1 part Asphalt at 149,476 square feet; 1 part Concrete at 1,555 square feet.

2/26/2017

151,031

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

2.6

15524 PUBLIC ASPHALT

DO NOTHING

6-1

ROUTE 0900: VISITOR CENTER EAST PARKING LOT

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0900

± 0 280 560

Feet

Rte. 0

Rte. 0

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

FROM ROUTE 0010ZZ (WALNUT CANYON ENTRANCE ROADS) AT MP 6.76 ON LEFT

TO ROUTE 0902 (VISITOR CENTER EMPLOYEE PARKING)

Note: Parking area consists of multiple surface types: 1 part Asphalt at 133,474 square feet; 1 part Concrete at 161 square feet.

2/27/2017

133,635

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

2.301

15550 PUBLIC ASPHALT

DO NOTHING

6-2

ROUTE 0901: VISITOR CENTER WEST PARKING LOT

Manual Rating

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0010AZ

Rte. 0902

± 0 310 620

Feet

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

FROM ROUTE 0901 (VISITOR CENTER WEST PARKING LOT)

TO PARKING

Note: Parking area consists of multiple surface types: 1 part Asphalt at 9,429 square feet;

1 part Concrete at 441 square feet.

2/27/2017

9,870

CONCRETE

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.17

91860 NONPUBLIC ASPHALT

DO NOTHING

6-3

ROUTE 0902: VISITOR CENTER EMPLOYEE PARKING

Manual Rating

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0901

Rte. 0902

± 0 130 260

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

Manual Rating

FROM ROUTE 0200 ( ROAD) AT MP 0.55 ON LEFT

2/27/2017

17,417

STONE

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.3

91862 PUBLIC ASPHALT

DO NOTHING

6-4

ROUTE 0903: AMPHITHEATER HANDICAPPED PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0903

Rte. 0909

Rte. 0908

± 0 160 320

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

FROM ROUTE 0200 ( ROAD) AT MP 0.18 ON RIGHT

TO

Note: Parking area consists of multiple surface types: 1 part Asphalt at 21,893 square feet;

1 part Concrete at 859 square feet.

2/27/2017

22,752

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.392

91663 NONPUBLIC ASPHALT

NOT APPLICABLE

6-5

ROUTE 0904: MAINTENANCE AREA

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0904

Rte. 0911

± 0 140 280

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

FROM ROUTE 0907 (BONEYARD PARKING AREA)

TO PARKING

2/27/2017

5,886

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.101

91707 NONPUBLIC CONCRETE

NOT APPLICABLE

6-6

ROUTE 0905: MAINTENANCE PARKING AREA

Manual Rating

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0905

± 0 50 100

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

Manual Rating

ADJACENT TO ROUTE 0200 ( ROAD) AT MP 0.46 ON LEFT

2/27/2017

STONE

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.011

91809 NONPUBLIC ASPHALT

DO NOTHING

6-7

ROUTE 0908: LAW ENFORCEMENT PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0908

± 0 10 20

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

ADJACENT TO ROUTE 0200 ( ROAD) AT MP 0.47 ON RIGHT

2/27/2017

2,010

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.035

91811 NONPUBLIC ASPHALT

NOT APPLICABLE

6-8

ROUTE 0909: ADMIN EMPLOYEE PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0909

± 0 30 60

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.08 ON RIGHT

TO PARKING

2/27/2017

5,919

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.102

91818 NONPUBLIC ASPHALT

DO NOTHING

6-9

ROUTE 0910: EAST SIXPLEX AREA

Manual Rating

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0910

± 0 60 120

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

Manual Rating

FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.05 ON LEFT

2/27/2017

6,823

CONCRETE

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.117

91821 NONPUBLIC ASPHALT

LIGHT REPAIR

6-10

ROUTE 0911: REAR ADMINISTRATIVE PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0911

Rte. 0904

± 0 120 240

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

FROM ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 3.47 ON LEFT

TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 3.50 ON LEFT

2/26/2017

12,483

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.215

91825 PUBLIC ASPHALT

DO NOTHING

6-11

ROUTE 0914: INDIAN ROCK SHELTER PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0914

± 0 80 160

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

ADJACENT TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 1.80 ON RIGHT

2/26/2017

3,162

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.054

91826 PUBLIC ASPHALT

DO NOTHING

6-12

ROUTE 0915: PICNIC PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

± 0 100 200

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.13 ON RIGHT

TO PARKING

2/27/2017

2,379

CONCRETE

PREVENTIVE MAINTENANCE GOOD / 90

NO CURB AND GUTTER

0.041

238731 NONPUBLIC ASPHALT

DO NOTHING

6-13

ROUTE 0916: PERMIAN DRIVE HOUSING OVERFLOW PARKING

Manual Rating

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0916

± 0 30 60

Curb & Gutter TypeCurb Type

Condition Rating / PCRPavement Recommendation

NOT APPLICABLE

Manual Rating

ADJACENT TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 5.47 ON RIGHT

2/26/2017

4,069

NO CURB

PREVENTIVE MAINTENANCE GOOD / 90

CONCRETE

0.07

N/A PUBLIC ASPHALT

DO NOTHING

6-14

ROUTE 0917: WALNUT CANYON VISTA TRAIL EXHIBIT PARKING

Carlsbad Caverns National Park

Route Condition Legend – Pavement Condition Rating (PCR)

See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated

Rte. 0917

± 0 160 320

Section 7 Road Milepost Information

Road Milepost Information

This report section contains road milepost information for all paved roads in the park that were collected with the Data Collection Vehicle (DCV). The milepost data is obtained from the DCV by using a distance measuring instrument (DMI) that is calibrated to record mileage to the nearest thousandth of a mile. Park roads that were manually rated did not have milepost data collected, and thus are not included in this report section.

For Cycle 6, the information presented in this section differs from previous RIP cycles in that it does not contain the roadside features inventories for the paved park roads. Some examples of the features previously collected are signs, culverts/drop inlets, guardrails, curbing, pullouts, etc. If the park was collected in a previous RIP cycle, then the latest features data can be obtained by referencing the following:

Where to find the latest Features Inventories for NPS Parks:

For Small Parks (parks with less than 10 miles of paved roads):

o Refer to Cycle 5 data (collected 2010 - 2014) Features were reported in Section 9 of the Cycle 5 RIP report Video of features can be viewed using the PathViewVO program and Cycle 5 data

For Large Parks (parks with more than 10 miles of paved roads):

o Refer to Cycle 4 data (collected 2006 - 2009)

Features were reported in Section 9 of the Cycle 4 RIP report Video of features can be viewed using the VisiData program and Cycle 4 data o Note: Features inventories were updated in Large Parks in Cycle 5 only on a route by route basis if the route was new or modified in Cycle 5. If this is the case for a particular route, then features for the route can be obtained using the PathViewVO program and Cycle 5 data (same as above for Small parks).

Milepost Events Verified in Cycle 6 In Cycle 6, the following events were collected and reported in Section 7 of this report:

Intersections with roads and parking areas All bridges and culverts with BIP Numbers (bridge inspection program numbers) Mile Marker Signs One-Way travel directions Overpasses Tunnels Low Water Crossings (LWCR) Surface type changes Construction areas where no pavement condition data was obtained

7-1

GPS Mileage Matching

A consistent survey milepost and constant route length as recorded by the Data Collection Vehicle (DCV) is a challenge to maintain from one collection cycle to the next. The challenge is due to many factors such as driver characteristics, DMI calibration, tire pressure etc. After Cycle 4 (~2010), a decision was made to hold constant the length of roads so long as there was no physical change from reconstruction projects or realignments that would result in a change to the length of a road. Consequently, the “GPS Mileage Match” was implemented to specify which cycle the route length is being matched. Route mileages and GPS are matched to a previous collection whenever there is no physical change to a route alignment. The route mileage and GPS is not matched to previous cycles whenever it is determined that a road length and GPS needs to be updated. When this happens the GPS and length is updated to the cycle that displays the change, and that collection cycle is used as the matching cycle in subsequent collections of the road. Thus, the Cycle 6 GIS could be either the survey length collected in Cycle 4, Cycle 5, or Cycle 6 and therefore, may not match the survey milepost displayed in the latest Cycle 6 DCV video which is viewable in PathView VO.

The features inventories and road logs collected on NPS routes contain mileposts that are determined from the corresponding cycle that the GPS is matched to. Therefore, the mileposts contained in the Cycle 4 or 5 features inventories or the Cycle 6 road logs may not exactly match the survey milepost collected in the latest Cycle 6 video of the road.

Locating Mile Marker Signs

For routes that have mile marker signs along them, the milepost reported by RIP will most likely not line up exactly with the sign located in the field. This could be happening for many reasons, most likely due to either the error falling within the acceptable calibration range of the vehicle, or the level of accuracy that the mile marker signs were placed in the field.

Because mile marker signs are important features in many project plans and location descriptions, RIP is reporting locations of mile marker signs in three ways in Cycle 6:

1. Mileposts from Cycle 6 GIS: the official RIP milepost taken from the features inventories and the matching GPS/mileage cycle as described above. This is the milepost that should be used on project plans and when finding locations in the field

2. Mileposts from Cycle 6 Video: milepost shown to help locate the mile marker sign in the latest PathView VO video.

3. Latitude / Longitude: a constant way of locating a mile marker sign so long as the park has not moved the sign

The mileposts from Cycle 6 Video and GIS should be nearly the same, but on longer roads it has been observed that the Video milepost deviates more from the official GIS milepost that comes from the matching cycle.

7-2

7-3

7-4

7-5

7-6

Section 8 Appendix

Improvements to the RIP Index Equations and Determination of PCR a problem with data acquisition (i.e. the RIP “van”), but with the way the collected data was processed.

8-1

Description of the Rating System

“Distress Identification Manual for the Long-Term Pavement Performance Program”, Publication No. FHWA-RD 03-031, June 2003, “Distress Identification Manual for the NPS Road Inventory Program, Cycle 6, 2014-2020” “Distress Identification Manual for the Long-Term Pavement Performance Program”

This “Distress Identification Manual for the NPS Road Inventory Program, Cycle 6, 2014- 2020” will be used as a reference re

8-2

Explanation of the Condition Descriptions

Pa ve m en t C on di tio n R at in g

Pavement Age

Condition Categories and Treatments

Reconstruction

POOR/Heavy Rehabilitation

GOOD/Preventive Maintenance GOOD/PreventiveGOOD/P i MMMaintMainiMaiM i tenatena EXCELLENT/Localized Repairs Only

FAIR/Light Rehabilitation

8-3

Description of Pavement Treatment Types

Preventive Maintenance

Light Rehabilitation (L3R)

Heavy Rehabilitation (H3R) –

Reconstruction (4R)

8-4

Appendix A

Methodology for Determining Condition Ratings with the Data Collection Vehicle (DCV)

8-5

Surface Distresses Identified by the Data Collection Vehicle

Surface Condition Rating – SCR

Roughness Condition Index - RCI

Roughness is measured by FHWA’s DCV and reported as International Roughness Index (IRI) in

Pavement Condition Rating - PCR

Asphalt PCR Concrete PCR

8-6 a “new”

POOR FAIR – EXCELLENT

Note: As a result of a unique combination of measured surface distresses and IRI, index values occasionally compute to less than 0 or greater than 100. In this instance, an index value less than 0 defaults to 0. Index values greater than 100 defaults to 100. For all indices, a higher value indicates a better road condition, and a lower value indicates a poorer road condition.

8-7

ASPHALT-SURFACED PAVEMENT DISTRESS TYPES WITH RUTTING AND ROUGHNESS

Distress Type Units Of Measure Converted To

Defined Severity Levels?

Measured By

Roughness is measured on concrete roadways, but surface distresses and rutting are not measured.

For concrete, PCR = RCI

Table 1. Distress summary

8-8

Alligator Cracking

Description:

Severity Levels:

LOW

MEDIUM

HIGH

ALLIGATOR CRACKING SEVERITY LEVELS

CRACK

SEVERITY

CRACK PATTERN

LOW MED HIGH

CRACK

WIDTH

Table 2. Alligator Crack Severity Levels

8-9

Longitudinal Cracking

Severity Levels:

LOW

MEDIUM

HIGH

Transverse Cracking

Description:

Severity Levels:

LOW

MEDIUM

HIGH

8-10

Patching and Potholes

Severity Levels:

RUTTING

Description:

Severity Levels:

LOW

MEDIUM

HIGH

8-11

ROUGHNESS

Severity Levels:

IRI DESCRIPTIONS

Type of Road Typical IRI (in/mile)

Table 3. International Roughness Index

Roughness Collection Parameters

8-12

Index Formulas

Note: All index formulas listed below contain MAE applicable to 0.02 mile (105.6 feet) interval.

Alligator Crack Index

AC_INDEX –

Where:

Longitudinal Crack Index

LC_INDEX –

Where:

8-13

Structural Crack Index

SC_INDEX

Transverse Crack Index

TC_INDEX –

Where:

Patching Index

PATCH_INDEX –

8-14

Rutting Index

RUT_INDEX –

Where:

(total number of ruts within each severity in both wheelpaths) 20 × 100 only only

Roughness Condition Index (Asphalt)

RCI

Where:

Roughness Condition Index (Concrete)

RCI

8-15

Surface Condition Rating Index

SCR

Note: The modified SCR equation above combines AC_INDEX and LC_INDEX, and considers that a single AC/LC index value of the Structural Crack Index (SC_INDEX). The lowest of the four computed index values (SC_INDEX, TC_INDEX, PATCH_INDEX, or RUT_INDEX) becomes the SCR.

8-16

Cameras

CAMERA SPECIFICATIONS

Pavement Imaging and Rutting

8-17

THREE-DIMENSIONAL

PAVEMENT SURFACE AND TRANSVERSE PROFILE

DATA ACQUISITION SYSTEM

Surface Image Specifications

Rutting Specifications

Distance Measuring Instrument (DMI) up to 60 mph. The DMI is connected to the hub of the rear wheel on the driver’s side, and is

8-18

Roughness (IRI)

IRI SPECIFICATIONS

GPS & Inertial Systems

GPS SPECIFICATIONS

8-19

Appendix B

Methodology for Determining Condition Ratings Using Manual Rating Procedures

8-20

Description of Manual Rating Methods

8-21

Visual Inspection Method for Manually Rating Secondary Roads

Rating Section Lengths

Rating Criteria

8-22

Distress Measurement Method for Manually Rating Primary Roads

Rating Section Lengths

Manual Distress Measurements

Alligator Cracking

Longitudinal Cracking

Transverse Cracking

8-23

Patching and Potholes

Rutting

Roughness

Index Formulas for Distress Measurement Method:

Alligator Crack Index for Manual Rating:

AC_INDEX –

Where:

Longitudinal Crack Index for Manual Rating:

LC_INDEX –

Where:

Transverse Crack Index for Manual Rating:

TC_INDEX –

8-24

Patching Index for Manual Rating:

PATCH_INDEX –

Where:

%PATCHING

Rutting Index for Manual Rating:

RUT_INDEX –

Where:

%RUTTING

8-25

Method for Manually Rating Paved Parking Areas and Non-Linear Roads

Rating Criteria:

Asphalt Parking Distress Types

Concrete Parking Distress Types

8-26

Curb Inspection and Treatments

Curb Reveal

Curb Recommendations

8-27

GPS for Manually Rated Roads and Parking

Trees and buildings create “satellite shadows”, limiting the areas where you can reliably collect

TRIMBLE 6000 SERIES GeoXT GPS SPECIFICATIONS Trimble Maxwell™ 6 GNSS chipset

8-28

Appendix C

Description of Cycle 6 Deliverables

8-29

Interim Report Delivery

8-30

Final Report Delivery

Condition Photos:

Data Video:

GPS on All Rated Routes:

Geodatabase – Background and Metadata:

r and spatial data via ESRI’s ArcGIS Suite of geodatabase and can be accessed via ESRI’s ArcCatalog.

Report (RIP Report and Route ID):

8-31

Partial DCV Collections providing additional “snapshots in time” of park pavement conditions. This improved HMPA modeling

8-32

Appendix D

Glossary of Terms and Abbreviations

8-33

Glossary of Terms and Abbreviations

TERM OR ABBREVIATION DESCRIPTION OR DEFINITION

8-34

CAVE Cycle 6 Final Report
Section 1 – Introduction
Section 2 - Park Route Inventory
Section 3 - Park Summary Information
Section 4 - Park Route Location Maps
Section 5 - Paved Road Condition Rating Sheets
Section 6 - Paved Parking Area Condition Rating Sheets
Section 7 - Road Milepost Information
Section 8 - Appendix

File details come from the government source that posted it. Updated .