NM NP MULTI PMS(1)_CAVE_C6_Final_Report.pdf
PDF 4 MB Posted
- Attached to
- NM NP MULTI PMS(1), Pavement Preservation New Mexico Federal contract opportunity
- Solicitation number
- 69056724R000026
About this file
This is a Federal Highway Administration Road Inventory Program (RIP) report from August 2017 providing a comprehensive assessment of paved roads and parking areas at Carlsbad Caverns National Park. The report documents pavement conditions using both automated Data Collection Vehicle (DCV) measurements and manual ratings, presenting detailed analyses of surface distresses, roughness, rutting, and overall pavement condition ratings (PCR).
The report contains extensive technical data including GPS coordinates, surface condition ratings, distress measurements, and PCR calculations for 7.04 miles of paved roads and 378,074 square feet of parking areas within the park. Key sections cover pavement assessment methodologies, condition rating formulas, and detailed maps showing route locations and conditions. The pavement evaluation uses a 0-100 scale, with ratings categorized as Excellent (95-100), Good (85-94), Fair (61-84), or Poor (≤60). The report includes extensive appendices detailing the rating methodologies, distress measurement procedures, and deliverables provided. This technical assessment supports the Federal Highway Administration's pavement management system for prioritizing maintenance and rehabilitation activities across National Park Service properties.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAVE
Cycle 6
Federal Highway Administration Eastern Federal Lands Highway Division Road Inventory Program (RIP)
Prepared By:
Road Inventory and Condition Assessment of Paved Routes Carlsbad Caverns National Park
Report Date: 2017
Final Report in New Mexico
Guymon
Lubbock
Midland
Roswell
El Paso
Amarillo
CarlsbadLas Cruces
Albuquerque
Santa Fe
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community Esri, DeLorme, GEBCO, NOAA NGDC, and other contributors ±
Carlsbad Caverns National Park
Table of Contents
4 - 1 4 - 2 4 - 4 4 - 5
SECTION PAGE NO.
1. INTRODUCTION 1 - 1
2. PARK ROUTE INVENTORY
2 - 1
3.
3 - 1
4.
APPENDIX
8 - 1
Route ID Report, Subcomponent Report, and Changes Report (As Applicable)
PAVED PARKING AREA CONDITION RATING SHEETS
Paved Parking Area Pages
PARK SUMMARY INFORMATION
Parkwide Paved Route Condition Summary
PARK ROUTE LOCATION MAPS
Route Location Key Map Route Location Area Map(s) Route Condition Key Map – PCR Mile by Mile Route Condition Area Map(s) – PCR Mile by Mile
PAVED ROAD CONDITION RATING SHEETS
Paved Road Pages 5 - 1
6 - 1
5.
6.
7. ROAD MILEPOST INFORMATION
Road Milepost Information and Logs 7 - 1
8.
Appendix A: Methodology for Determining Condition Ratings with the Data Collection Vehicle (DCV)
8 - 5
Appendix B: Methodology for Determining Condition Ratings Using Manual Rating Procedures Appendix C: Description of Cycle 6 Deliverables 8 - 29
8 - 20
Appendix D: Glossary of Terms and Abbreviations 8 - 33
Improvements to the RIP Index Equations and Determination of PCR 8 - 1 Description of the Rating System 8 - 2 Explanation of the Condition Descriptions 8 - 3 Description of Pavement Treatment Types 8 - 4
Explanation of Condition Descriptions Route-Level Condition Summary Reports for Data Collection Vehicle, Manually Rated, and Parking Area Routes (As Applicable)
3 - 2 3 - 3
Section 1 Introduction
1-1
Introduction
The Federal Highway Administration’s (FHWA), Road Inventory Program (RIP) inventories all roads and parking areas in the National Park System, and performs condition inspections on all paved roads and parking areas for the National Park Service (NPS). This report contains the results of the Cycle 6 condition assessment of paved roads and parking lots for this park unit. This assessment was done using an automated, state-of-the-art pavement inspection vehicle as well as manual ratings. This information represents the condition of the paved assets at the time of the inspection. The pavement management system utilized by FHWA and the NPS uses these assessments to estimate future conditions and help prioritize pavement maintenance and rehabilitation projects. Further information about RIP data and its role in managing paved roads and bridges can be obtained by contacting the NPS Regional Transportation Program Manager.
A History of the Road Inventory Program:
The FHWA, in the mid-1970s, was charged with the task of identifying surface condition deficiencies and corrective priorities on NPS roads and parkways. Additionally, FHWA was tasked with establishing an integrated maintenance features inventory, locating features such as culverts, guardrails, and signs, among others, along NPS roads and parkways. As a result, in 1976 the NPS and FHWA entered into a Memorandum of Agreement (MOA) which established the RIP. This MOA was revised in 1980 to update RIP data collection standards and develop a long-range program to improve and maintain NPS roads to designated condition standards and establish a pavement management program.
The FHWA completed the initial phase of inventory in the early 1980s. As a result of this effort, each NPS unit included in the collection received a RIP Report known as the “Brown Book” which contained information that was inventoried during this first RIP phase. In the 1990s, a cyclical program was developed, and since then five cycles of collection have been completed. Cycle 6 is currently in progress.
A summary of the RIP collection cycles is shown in the table below.
Cycle Years Parks Collected
Cycle 1 1994 - 1997 44 Large Parks
Cycle 2 1997 - 2001 79 Large Parks 5 Small Parks
Cycle 3 2001 - 2004 All Large Parks All Small Parks
Cycle 4 2006 - 2010 86 Large Parks Several Small Parks
Cycle 5 2010 - 2014 All Large Parks (Only functional class 1, 2, 7, and new/modified routes collected) All Small Parks (all roads and parking areas collected)
Cycle 6 2014 – 2020 (±) All roads and parking areas collected at all Parks Additional partial collections of functional class 1, 2, and 7 roads at Large Parks Cycle 6 is expected to last 6 years
Note: Large Parks have ≥ 10 Paved Miles; Small Parks have < 10 Paved Miles
1-2
Since 1984, the Road Inventory Program has been funded through the Federal Lands Highway Park Roads and Parkways (PRP) Program. Currently, coordination of the RIP with Federal Lands Highway (FLH) is under the NPS Washington Headquarters Park Facility Management Division. The FLH Washington office coordinates policy and prepares national reports and needs assessment studies for Congress.
In 1998, the Transportation Equity Act for the 21st Century (TEA-21) amended Title 23 U.S.C., and inserted Section 204(a)(6) requiring the FHWA and NPS, to develop by rule, a Pavement Management System (PMS) applied to park roads and parkways serving the National Park System.
In 2012, the Moving Ahead for Progress in the 21st Century Act (MAP-21) amended Title 23 U.S.C., and under Section 203(c)(1-2) stated that the National Park Service in cooperation with the DOT/FHWA, shall maintain a comprehensive national inventory of their transportation facilities, with the goal of quantifying transportation infrastructure needs within the National Park System.
A History of the Pavement Management System:
In 2005, the FHWA began implementing the use of a pavement management system to assist the NPS in prioritizing Pavement Maintenance and Rehabilitation activities. The system used by FHWA is the Highway Pavement Management Application (HPMA), which has the ability to store inventory and condition data from RIP and forecast future performance using prediction models. Outputs include performance and condition reports at the National, Regional, Park, or Route level. Regional prioritized lists and optimizations have been produced for most regions, and the Service’s overall roadway Deferred Maintenance is calculated via the HPMA.
Overview of Cycle 6:
Cycle 6 launched in the spring of 2014 and will again comprise all NPS park units that are served by paved roads and/or parking areas. For Cycle 6, all paved roads (approximately 5,700 miles) and parking areas will be collected in all parks at least once, while the primary routes (functional class 1, 2, and 7 roads) at Large Parks will have additional collections. These multiple collections will provide updated condition data on a majority of the NPS’s primary road network and help build a better pavement management system, allowing for more accurate pavement performance prediction models.
FLH is responsible for the accuracy of all data presented in this report. Any questions or comments concerning the contents of this report should be directed to the national RIP Coordinator located in Sterling, Virginia.
Respectfully, FHWA RIP Team
FHWA/Central Federal Lands 12300 West Dakota Ave Lakewood, CO 80228
FHWA/Eastern Federal Lands 21400 Ridgetop Circle Sterling, VA 20166 ( ) 4 4- (720) 963-3556
Section 2 Park Route Inventory
Section 3 Park Summary Information
3-1
3-2
3-3
3-4
Section 4 Park Route Location Maps
ROUTE LOCATION MAP
Key Map
Carlsbad Caverns National Park
±0 5 10
Miles
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
NPS Collected Routes
4-1
Area Map 1
Carlsbad Caverns National Park
±0 0.5 1
Miles
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Note: Unique colors are used to differentiate roads
Rte. 0905
Rte. 0200
Rte. 0904
Rte. 0909 Rte. 0908 Rte. 0903
Rte. 0010ZZ
Rte. 0902
Rt e.
01 Rte. 0900
Rte. 0911 Rte. 0916
Rte. 0910 Rte. 0402
Rte. 0917
4-2
Area Map 2
Carlsbad Caverns National Park
±0 1 2
Miles
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Note: Unique colors are used to differentiate roads
Rte. 0914
Rte. 0915
Rte. 0010ZZ
4-3
ROUTE CONDITION MAP
PCR - MILE BY MILE
Key Map
Carlsbad Caverns National Park
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
±0 5 10
Miles
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed
Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
4-4
Area Map 1
Carlsbad Caverns National Park
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
±0 0.5 1
Miles
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed
Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0010ZZ
Rte. 0200
Rte. 0402
4-5
Area Map 2
Carlsbad Caverns National Park
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
±0 1 2
Miles
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Only Data Collection Vehicle and Manually Rated Roads are displayed
Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0010ZZ
4-6
Section 5 Paved Road Condition Rating Sheets
Surface Type:
Inspection Date:
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Route Summary
Paved Width (ft) Lane Width (ft)
Rte. 0010ZZ
Carlsbad Caverns National Park
ROUTE 0010ZZ: WALNUT CANYON ENTRANCE ROADS
Summary Route
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
3/21/2017 7.04
ASPHALT
24.9 10.7
Note: The weighted average summary PCR value is calculated from only the sections of road where the PCR was collected. The overall PCR for the summary route may not reflect individual subcomponent ratings.
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
5-1
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Longitudinal Crack Index
Distress Index Values
Route Summary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Carlsbad Caverns National Park
ROUTE 0010AZ: WALNUT CANYON ENTRANCE ROAD
2 2
1 2 3 4 1 1 1 1
3/21/2017 6.98
ASPHALT
10.6
24.3
24.9
23.7 10.3
24.1 10.8
24.6 10.6
100100100100100100 100100100100100100
Subcomponent of Route CAVE-0010ZZ Data Collection Vehicle (DCV) Rating
5-2
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Longitudinal Crack Index
Distress Index Values
Route Summary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Rte. 0010AZ
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Carlsbad Caverns National Park
ROUTE 0010AZ: WALNUT CANYON ENTRANCE ROAD
2 2
0.98
3/21/2017 6.98
ASPHALT
10.6
26.4 10.3
26.9 10.5
100100100 100100100
Subcomponent of Route CAVE-0010ZZ
5-3
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Longitudinal Crack Index
Distress Index Values
Route Summary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Rte. 0010BZ
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Carlsbad Caverns National Park
ROUTE 0010BZ: VC TURN AROUND
1 1
0.06
3/21/2017 0.06
ASPHALT
17.5 17.5
17.5 17.5
N/A
N/A
N/A
N/A
100100 100100
Subcomponent of Route CAVE-0010ZZ
5-4
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Longitudinal Crack Index
Distress Index Values
Route Summary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Rte. 0200
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Carlsbad Caverns National Park
ROUTE 0200: AMPHITHEATER ROAD
2 2
0.73
3/21/2017 0.73
ASPHALT
19.2 10.2
19.2 10.2
N/A
N/A
N/A
N/A
100100
5-5
Paved Length (Miles):
Number of Lanes Lane & Width Information
Pavement Condition Rating (PCR) Roadway Condition Information
Longitudinal Crack Index
Distress Index Values
Route Summary Section Length (MI) Beginning Section MP
Surface Condition Rating (SCR)
Transverse Cracking Index Patching Index Rutting Index International Roughness Index (IRI)
Paved Width (ft) Lane Width (ft)
Roughness Condition Index (RCI)
Alligator Crack Index Structural Crack Index
Rte. 0402
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Carlsbad Caverns National Park
ROUTE 0402: PERMIAN DRIVE
2 2
0.13
3/21/2017 0.13
ASPHALT
19.3 9.7
19.3 9.7
N/A
N/A
N/A
N/A
100100 100100
5-6
Section 6 Paved Parking Area Condition Rating Sheets
User AccessInspection Date FMSS Number Surface Type
Curb Reveal (Inches)Area (Sq. Ft.) Lane Miles (11' Widths) Curb Recommendation
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
FROM END OF ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD )
TO PARKING
Note: Parking area consists of multiple surface types: 1 part Asphalt at 149,476 square feet; 1 part Concrete at 1,555 square feet.
2/26/2017
151,031
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
2.6
15524 PUBLIC ASPHALT
DO NOTHING
6-1
ROUTE 0900: VISITOR CENTER EAST PARKING LOT
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0900
± 0 280 560
Feet
Rte. 0
Rte. 0
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
FROM ROUTE 0010ZZ (WALNUT CANYON ENTRANCE ROADS) AT MP 6.76 ON LEFT
TO ROUTE 0902 (VISITOR CENTER EMPLOYEE PARKING)
Note: Parking area consists of multiple surface types: 1 part Asphalt at 133,474 square feet; 1 part Concrete at 161 square feet.
2/27/2017
133,635
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
2.301
15550 PUBLIC ASPHALT
DO NOTHING
6-2
ROUTE 0901: VISITOR CENTER WEST PARKING LOT
Manual Rating
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0010AZ
Rte. 0902
± 0 310 620
Feet
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
FROM ROUTE 0901 (VISITOR CENTER WEST PARKING LOT)
TO PARKING
Note: Parking area consists of multiple surface types: 1 part Asphalt at 9,429 square feet;
1 part Concrete at 441 square feet.
2/27/2017
9,870
CONCRETE
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.17
91860 NONPUBLIC ASPHALT
DO NOTHING
6-3
ROUTE 0902: VISITOR CENTER EMPLOYEE PARKING
Manual Rating
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0901
Rte. 0902
± 0 130 260
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
Manual Rating
FROM ROUTE 0200 ( ROAD) AT MP 0.55 ON LEFT
2/27/2017
17,417
STONE
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.3
91862 PUBLIC ASPHALT
DO NOTHING
6-4
ROUTE 0903: AMPHITHEATER HANDICAPPED PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0903
Rte. 0909
Rte. 0908
± 0 160 320
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
FROM ROUTE 0200 ( ROAD) AT MP 0.18 ON RIGHT
TO
Note: Parking area consists of multiple surface types: 1 part Asphalt at 21,893 square feet;
1 part Concrete at 859 square feet.
2/27/2017
22,752
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.392
91663 NONPUBLIC ASPHALT
NOT APPLICABLE
6-5
ROUTE 0904: MAINTENANCE AREA
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0904
Rte. 0911
± 0 140 280
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
FROM ROUTE 0907 (BONEYARD PARKING AREA)
TO PARKING
2/27/2017
5,886
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.101
91707 NONPUBLIC CONCRETE
NOT APPLICABLE
6-6
ROUTE 0905: MAINTENANCE PARKING AREA
Manual Rating
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0905
± 0 50 100
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
Manual Rating
ADJACENT TO ROUTE 0200 ( ROAD) AT MP 0.46 ON LEFT
2/27/2017
STONE
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.011
91809 NONPUBLIC ASPHALT
DO NOTHING
6-7
ROUTE 0908: LAW ENFORCEMENT PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0908
± 0 10 20
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
ADJACENT TO ROUTE 0200 ( ROAD) AT MP 0.47 ON RIGHT
2/27/2017
2,010
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.035
91811 NONPUBLIC ASPHALT
NOT APPLICABLE
6-8
ROUTE 0909: ADMIN EMPLOYEE PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0909
± 0 30 60
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.08 ON RIGHT
TO PARKING
2/27/2017
5,919
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.102
91818 NONPUBLIC ASPHALT
DO NOTHING
6-9
ROUTE 0910: EAST SIXPLEX AREA
Manual Rating
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0910
± 0 60 120
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
Manual Rating
FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.05 ON LEFT
2/27/2017
6,823
CONCRETE
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.117
91821 NONPUBLIC ASPHALT
LIGHT REPAIR
6-10
ROUTE 0911: REAR ADMINISTRATIVE PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0911
Rte. 0904
± 0 120 240
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
FROM ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 3.47 ON LEFT
TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 3.50 ON LEFT
2/26/2017
12,483
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.215
91825 PUBLIC ASPHALT
DO NOTHING
6-11
ROUTE 0914: INDIAN ROCK SHELTER PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0914
± 0 80 160
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
ADJACENT TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 1.80 ON RIGHT
2/26/2017
3,162
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.054
91826 PUBLIC ASPHALT
DO NOTHING
6-12
ROUTE 0915: PICNIC PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
± 0 100 200
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
FROM ROUTE 0402 (PERMIAN DRIVE) AT MP 0.13 ON RIGHT
TO PARKING
2/27/2017
2,379
CONCRETE
PREVENTIVE MAINTENANCE GOOD / 90
NO CURB AND GUTTER
0.041
238731 NONPUBLIC ASPHALT
DO NOTHING
6-13
ROUTE 0916: PERMIAN DRIVE HOUSING OVERFLOW PARKING
Manual Rating
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0916
± 0 30 60
Curb & Gutter TypeCurb Type
Condition Rating / PCRPavement Recommendation
NOT APPLICABLE
Manual Rating
ADJACENT TO ROUTE 0010 Z (WALNUT CANYON ENTRANCE ROAD ) AT MP 5.47 ON RIGHT
2/26/2017
4,069
NO CURB
PREVENTIVE MAINTENANCE GOOD / 90
CONCRETE
0.07
N/A PUBLIC ASPHALT
DO NOTHING
6-14
ROUTE 0917: WALNUT CANYON VISTA TRAIL EXHIBIT PARKING
Carlsbad Caverns National Park
Route Condition Legend – Pavement Condition Rating (PCR)
See Appendix for definitions and formulas Fair (61- 84) Good (85 - 94)Poor (0 - 60) Excellent (95 - 100) Not Rated
Rte. 0917
± 0 160 320
Section 7 Road Milepost Information
Road Milepost Information
This report section contains road milepost information for all paved roads in the park that were collected with the Data Collection Vehicle (DCV). The milepost data is obtained from the DCV by using a distance measuring instrument (DMI) that is calibrated to record mileage to the nearest thousandth of a mile. Park roads that were manually rated did not have milepost data collected, and thus are not included in this report section.
For Cycle 6, the information presented in this section differs from previous RIP cycles in that it does not contain the roadside features inventories for the paved park roads. Some examples of the features previously collected are signs, culverts/drop inlets, guardrails, curbing, pullouts, etc. If the park was collected in a previous RIP cycle, then the latest features data can be obtained by referencing the following:
Where to find the latest Features Inventories for NPS Parks:
For Small Parks (parks with less than 10 miles of paved roads):
o Refer to Cycle 5 data (collected 2010 - 2014) Features were reported in Section 9 of the Cycle 5 RIP report Video of features can be viewed using the PathViewVO program and Cycle 5 data
For Large Parks (parks with more than 10 miles of paved roads):
o Refer to Cycle 4 data (collected 2006 - 2009)
Features were reported in Section 9 of the Cycle 4 RIP report Video of features can be viewed using the VisiData program and Cycle 4 data o Note: Features inventories were updated in Large Parks in Cycle 5 only on a route by route basis if the route was new or modified in Cycle 5. If this is the case for a particular route, then features for the route can be obtained using the PathViewVO program and Cycle 5 data (same as above for Small parks).
Milepost Events Verified in Cycle 6 In Cycle 6, the following events were collected and reported in Section 7 of this report:
Intersections with roads and parking areas All bridges and culverts with BIP Numbers (bridge inspection program numbers) Mile Marker Signs One-Way travel directions Overpasses Tunnels Low Water Crossings (LWCR) Surface type changes Construction areas where no pavement condition data was obtained
7-1
GPS Mileage Matching
A consistent survey milepost and constant route length as recorded by the Data Collection Vehicle (DCV) is a challenge to maintain from one collection cycle to the next. The challenge is due to many factors such as driver characteristics, DMI calibration, tire pressure etc. After Cycle 4 (~2010), a decision was made to hold constant the length of roads so long as there was no physical change from reconstruction projects or realignments that would result in a change to the length of a road. Consequently, the “GPS Mileage Match” was implemented to specify which cycle the route length is being matched. Route mileages and GPS are matched to a previous collection whenever there is no physical change to a route alignment. The route mileage and GPS is not matched to previous cycles whenever it is determined that a road length and GPS needs to be updated. When this happens the GPS and length is updated to the cycle that displays the change, and that collection cycle is used as the matching cycle in subsequent collections of the road. Thus, the Cycle 6 GIS could be either the survey length collected in Cycle 4, Cycle 5, or Cycle 6 and therefore, may not match the survey milepost displayed in the latest Cycle 6 DCV video which is viewable in PathView VO.
The features inventories and road logs collected on NPS routes contain mileposts that are determined from the corresponding cycle that the GPS is matched to. Therefore, the mileposts contained in the Cycle 4 or 5 features inventories or the Cycle 6 road logs may not exactly match the survey milepost collected in the latest Cycle 6 video of the road.
Locating Mile Marker Signs
For routes that have mile marker signs along them, the milepost reported by RIP will most likely not line up exactly with the sign located in the field. This could be happening for many reasons, most likely due to either the error falling within the acceptable calibration range of the vehicle, or the level of accuracy that the mile marker signs were placed in the field.
Because mile marker signs are important features in many project plans and location descriptions, RIP is reporting locations of mile marker signs in three ways in Cycle 6:
1. Mileposts from Cycle 6 GIS: the official RIP milepost taken from the features inventories and the matching GPS/mileage cycle as described above. This is the milepost that should be used on project plans and when finding locations in the field
2. Mileposts from Cycle 6 Video: milepost shown to help locate the mile marker sign in the latest PathView VO video.
3. Latitude / Longitude: a constant way of locating a mile marker sign so long as the park has not moved the sign
The mileposts from Cycle 6 Video and GIS should be nearly the same, but on longer roads it has been observed that the Video milepost deviates more from the official GIS milepost that comes from the matching cycle.
7-2
7-3
7-4
7-5
7-6
Section 8 Appendix
Improvements to the RIP Index Equations and Determination of PCR a problem with data acquisition (i.e. the RIP “van”), but with the way the collected data was processed.
8-1
Description of the Rating System
“Distress Identification Manual for the Long-Term Pavement Performance Program”, Publication No. FHWA-RD 03-031, June 2003, “Distress Identification Manual for the NPS Road Inventory Program, Cycle 6, 2014-2020” “Distress Identification Manual for the Long-Term Pavement Performance Program”
This “Distress Identification Manual for the NPS Road Inventory Program, Cycle 6, 2014- 2020” will be used as a reference re
8-2
Explanation of the Condition Descriptions
Pa ve m en t C on di tio n R at in g
Pavement Age
Condition Categories and Treatments
Reconstruction
POOR/Heavy Rehabilitation
GOOD/Preventive Maintenance GOOD/PreventiveGOOD/P i MMMaintMainiMaiM i tenatena EXCELLENT/Localized Repairs Only
FAIR/Light Rehabilitation
8-3
Description of Pavement Treatment Types
Preventive Maintenance
Light Rehabilitation (L3R)
Heavy Rehabilitation (H3R) –
Reconstruction (4R)
8-4
Appendix A
Methodology for Determining Condition Ratings with the Data Collection Vehicle (DCV)
8-5
Surface Distresses Identified by the Data Collection Vehicle
Surface Condition Rating – SCR
Roughness Condition Index - RCI
Roughness is measured by FHWA’s DCV and reported as International Roughness Index (IRI) in
Pavement Condition Rating - PCR
Asphalt PCR Concrete PCR
8-6 a “new”
POOR FAIR – EXCELLENT
Note: As a result of a unique combination of measured surface distresses and IRI, index values occasionally compute to less than 0 or greater than 100. In this instance, an index value less than 0 defaults to 0. Index values greater than 100 defaults to 100. For all indices, a higher value indicates a better road condition, and a lower value indicates a poorer road condition.
8-7
ASPHALT-SURFACED PAVEMENT DISTRESS TYPES WITH RUTTING AND ROUGHNESS
Distress Type Units Of Measure Converted To
Defined Severity Levels?
Measured By
Roughness is measured on concrete roadways, but surface distresses and rutting are not measured.
For concrete, PCR = RCI
Table 1. Distress summary
8-8
Alligator Cracking
Description:
Severity Levels:
LOW
MEDIUM
HIGH
ALLIGATOR CRACKING SEVERITY LEVELS
CRACK
SEVERITY
CRACK PATTERN
LOW MED HIGH
CRACK
WIDTH
Table 2. Alligator Crack Severity Levels
8-9
Longitudinal Cracking
Severity Levels:
LOW
MEDIUM
HIGH
Transverse Cracking
Description:
Severity Levels:
LOW
MEDIUM
HIGH
8-10
Patching and Potholes
Severity Levels:
RUTTING
Description:
Severity Levels:
LOW
MEDIUM
HIGH
8-11
ROUGHNESS
Severity Levels:
IRI DESCRIPTIONS
Type of Road Typical IRI (in/mile)
Table 3. International Roughness Index
Roughness Collection Parameters
8-12
Index Formulas
Note: All index formulas listed below contain MAE applicable to 0.02 mile (105.6 feet) interval.
Alligator Crack Index
AC_INDEX –
Where:
Longitudinal Crack Index
LC_INDEX –
Where:
8-13
Structural Crack Index
SC_INDEX
Transverse Crack Index
TC_INDEX –
Where:
Patching Index
PATCH_INDEX –
8-14
Rutting Index
RUT_INDEX –
Where:
(total number of ruts within each severity in both wheelpaths) 20 × 100 only only
Roughness Condition Index (Asphalt)
RCI
Where:
Roughness Condition Index (Concrete)
RCI
8-15
Surface Condition Rating Index
SCR
Note: The modified SCR equation above combines AC_INDEX and LC_INDEX, and considers that a single AC/LC index value of the Structural Crack Index (SC_INDEX). The lowest of the four computed index values (SC_INDEX, TC_INDEX, PATCH_INDEX, or RUT_INDEX) becomes the SCR.
8-16
Cameras
CAMERA SPECIFICATIONS
Pavement Imaging and Rutting
8-17
THREE-DIMENSIONAL
PAVEMENT SURFACE AND TRANSVERSE PROFILE
DATA ACQUISITION SYSTEM
Surface Image Specifications
Rutting Specifications
Distance Measuring Instrument (DMI) up to 60 mph. The DMI is connected to the hub of the rear wheel on the driver’s side, and is
8-18
Roughness (IRI)
IRI SPECIFICATIONS
GPS & Inertial Systems
GPS SPECIFICATIONS
8-19
Appendix B
Methodology for Determining Condition Ratings Using Manual Rating Procedures
8-20
Description of Manual Rating Methods
8-21
Visual Inspection Method for Manually Rating Secondary Roads
Rating Section Lengths
Rating Criteria
8-22
Distress Measurement Method for Manually Rating Primary Roads
Rating Section Lengths
Manual Distress Measurements
Alligator Cracking
Longitudinal Cracking
Transverse Cracking
8-23
Patching and Potholes
Rutting
Roughness
Index Formulas for Distress Measurement Method:
Alligator Crack Index for Manual Rating:
AC_INDEX –
Where:
Longitudinal Crack Index for Manual Rating:
LC_INDEX –
Where:
Transverse Crack Index for Manual Rating:
TC_INDEX –
8-24
Patching Index for Manual Rating:
PATCH_INDEX –
Where:
%PATCHING
Rutting Index for Manual Rating:
RUT_INDEX –
Where:
%RUTTING
8-25
Method for Manually Rating Paved Parking Areas and Non-Linear Roads
Rating Criteria:
Asphalt Parking Distress Types
Concrete Parking Distress Types
8-26
Curb Inspection and Treatments
Curb Reveal
Curb Recommendations
8-27
GPS for Manually Rated Roads and Parking
Trees and buildings create “satellite shadows”, limiting the areas where you can reliably collect
TRIMBLE 6000 SERIES GeoXT GPS SPECIFICATIONS Trimble Maxwell™ 6 GNSS chipset
8-28
Appendix C
Description of Cycle 6 Deliverables
8-29
Interim Report Delivery
8-30
Final Report Delivery
Condition Photos:
Data Video:
GPS on All Rated Routes:
Geodatabase – Background and Metadata:
r and spatial data via ESRI’s ArcGIS Suite of geodatabase and can be accessed via ESRI’s ArcCatalog.
Report (RIP Report and Route ID):
8-31
Partial DCV Collections providing additional “snapshots in time” of park pavement conditions. This improved HMPA modeling
8-32
Appendix D
Glossary of Terms and Abbreviations
8-33
Glossary of Terms and Abbreviations
TERM OR ABBREVIATION DESCRIPTION OR DEFINITION
8-34
| CAVE Cycle 6 Final Report |
| Section 1 – Introduction |
| Section 2 - Park Route Inventory |
| Section 3 - Park Summary Information |
| Section 4 - Park Route Location Maps |
| Section 5 - Paved Road Condition Rating Sheets |
| Section 6 - Paved Parking Area Condition Rating Sheets |
| Section 7 - Road Milepost Information |
| Section 8 - Appendix |
File details come from the government source that posted it. Updated .