N6945026R0007_SectionF.pdf

PDF 624 KB Posted

Attached to
Base Operations Support (BOS) Services at Naval Air Station (NAS) Jacksonville, FL and Outlying Areas
Solicitation number
N6945026R0007
Issued by

About this file

This document is a comprehensive Deliverables section (Section F) for a federal contract (N6945026R0007) covering multiple utility and facility management services across various domains including management and administration, facility investment, utilities management, electrical, water, compressed air, transportation, and environmental services. The deliverables matrix details specific reporting requirements, submission dates, distribution lists, and frequencies for each service area, with most reports to be submitted to the Contracting Officer (KO) and Contracting Officer's Representative (COR).

Key reporting requirements include monthly and annual submissions such as condition reports, maintenance schedules, inspection results, preventive maintenance program plans, equipment certification documents, training documentation, safety plans, and environmental compliance reports. Submission timelines vary but typically range from within 2-30 calendar days after contract start, month-end, or upon request. Most deliverables require 1-3 copies distributed to specific government representatives, with frequencies ranging from weekly and monthly to annually or as specified. The comprehensive nature of the document suggests a complex, multi-faceted service contract covering infrastructure maintenance and operational reporting across multiple technical domains.

View the file

Other files

File Type Posted
N6945026R0007-0004.pdf PDF
J-0200000-23 ELINs_0004.xlsx XLSX spreadsheet
N6945026R0007_SectionJ_0003.pdf PDF
N6945026R0007_SectionC_0003.pdf PDF
N6945026R0007-0003.pdf PDF
JA-1_N6945026R0007_Summary of Changes_0003.pdf PDF
JL-1_N6945026R0007_Labor Hours Spreadsheet_0003.xlsx XLSX spreadsheet
JL-8_N6945026R0007_GPI Responses_0003.pdf PDF
J-0200000-02 CBA-2014-6756_0003.pdf PDF
J-1502000-03 Asset Inventory_0003.xlsx XLSX spreadsheet
J-0200000-02 CBA-2020-719_0003.pdf PDF
J-0200000-02-05_FL20260202_Duval_Bldg_0003.pdf PDF
N6945026R0007-0002.pdf PDF
N6945026R0007-0001.pdf PDF
JL-7_N6945026R0007_Site Visit Sign-In Sheets_0001.pdf PDF
JL-4_N6945026R0007_SECNAV5512.pdf PDF
JM-1_N6945026R0007_Corporate Experience.docx DOCX document
JM-2_N6945026R0007_PPQ.doc DOC document
J-0200000-07 Fire Warden Report.pdf PDF
J-0200000-09 Service Provider Information (JAX).xlsx XLSX spreadsheet
J-0200000-11 Specification Information.xlsx XLSX spreadsheet
J-0200000-14 Maximo Direct Entry Procedures.docx DOCX document
J-1502000-04 Sample of Historical Work Order - DHA.pdf PDF
J-1601000-04 Meter Inventory.xlsx XLSX spreadsheet
J-1601000-08 Specification Attributes.xlsx XLSX spreadsheet
J-1601000-10 P603 Utilities Infrastructure Management Manual.pdf PDF
Solicitation - N6945026R0007.pdf PDF
JL-3_N6945026R0007_AMAG.xlsx XLSX spreadsheet
J-0200000-02-05_FL20250202_Duval_Bldg.pdf PDF
J-0200000-10 Asset Information.xlsx XLSX spreadsheet
J-0200000-18 NAS JAX SPCC Plan.pdf PDF
J-1502000-02 Sample of Historical Work - NAS Jacksonville.pdf PDF
J-1601000-03 Utility Real Property Point of Demarcation.pdf PDF
J-1602000-04 Electric Meter Schedule and Meter Data File.xlsx XLSX spreadsheet
J-1700000-02 Fleet Inventory.xlsx XLSX spreadsheet
J-1700000-08 Motor Equipment Utilization Record DD Form 1970.pdf PDF
J-1800000-03 NAS Jacksonville FRP.pdf PDF
J-1800000-05 Stormwater Pollution Prevention Plan.pdf PDF
J-1800000-09 NAS Jacksonville Final Issurance Permit.pdf PDF
J-1800000-10 101S Vent Cover Inspection Checklist.pdf PDF
N6945026R0007_SectionC.pdf PDF
JL-2_N6945026R0007_GPIF.xlsx XLSX spreadsheet
J-0200000-02 CBA-2017-6756.pdf PDF
J-0200000-02 CBA-2005-3001.pdf PDF
J-0200000-05 Sample Problem Resolution Matrix.pdf PDF
J-0200000-07 Fire Extinguisher Inspection.docx DOCX document
J-0200000-12 Characteristic Meter Readings Information.xlsx XLSX spreadsheet
J-0200000-22 Non-Recurring Work Status.xlsx XLSX spreadsheet
J-0200000-23 ELINs.xlsx XLSX spreadsheet
J-1501000-03 Facility Description.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section F – 0200000

Management and Administration

N6945027R0007

Section F 0200000

Deliveries or Performance

DELIVERABLES

Annex/

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.2.1.2

N/A Request to Work

Outside

Government’s

Regular Working

Hours

At least seven calendar days prior to requested day.

KO and COR 2 As required

0200000/

2.3.1

N/A Sign-in Sheets and

Minutes for

Review and

Comments

Within two working days

KO, COR and all attendees

2 As

Required

0200000/

2.3.1

N/A Sign-in Sheets and

Minutes Final

Revision

Within two working days

KO, COR and all attendees

2+ As

Required

0200000/

2.3.3

N/A Partnering agreement, problem resolution ladder matrix and risk register

Before work commences and as requested by the KO.

KO and COR 2 As specified

0200000/

2.3.4

N/A Permits and

Licenses

Before work commences and as requested by the KO.

KO and COR 2 As specified

0200000/

2.3.5

N/A Certificate of

Insurance

Within 15 calendar days prior to contract start.

KO and COR 2 As specified

0200000/

2.3.5.1

N/A Written Notice of cancellation or material change in policy coverage

At least 30 calendar days prior to cancellation or material change in policy coverage

KO and COR 2 As required

0200000/

2.3.10

N/A Phase-In Plan Within 5 days of award

KO and COR 1 As

Required

0200000/

2.3.10

N/A Phase-out Plan 120 days prior to contract completion date

KO and COR 1 As

Required

0200000/

2.4.2

N/A Fire

Extinguishers/Fire

Warden Reports

By the end of each month

Utilities

Commodity

Manager

1 Monthly

02000000/

2.6.1

N/A Plans of Action and Milestones

(POA&Ms)

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO, COR, and

Command

Security

Manager

3 As required

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.6.1

N/A Cybersecurity

Incident

Immediately upon discovery during regular working hours and by

0800 the following work day for discoveries after regular working hours

KO, COR, and

Command

Security

Manager

3 As required

0200000/

2.6.4

N/A Scheduling and

Work Status

Updates

Weekly, within two hours of the inquiry during regular working hours, and by

08:00 the following work day for inquiries after regular working hours

KO and COR 2 As

Specified

0200000/

2.6.5

N/A Notification of any

Difficulty in

Scheduling Work

By the end of each workday

KO and COR 2 As required

0200000/

2.6.6

N/A Status of

Deliverables

Within 30 minutes of the inquiry during regular working hours, and by

0800 the following work day for inquiries after regular working hours

KO and COR 2 As required

0200000/

2.6.7

N/A Service

Interruptions

At least five working days in advance

KO and COR 2 As required

0200000/

2.6.8.2

N/A Sample Pipe

Delimited Flat-File

Within 30 calendar days prior to contract start.

KO or a representative designated by the KO

1 As required to demonstrat e the ability to properly format the flat-file

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

02000000/

2.6.8.3

N/A List of Personnel requiring access to

Government’s

Maximo

Within 45 calendar days prior to contract start.

KO and COR 2 As specified

0200000/

2.6.9.1

N/A Quality

Management Plan

Within 15 calendar days prior to contract start.

KO and COR 2 As specified

0200000/

2.6.9.1

N/A Revised Quality

Management Plan

Within seven calendar days of changes.

KO and COR 2 As specified

0200000/

2.6.9.2

N/A QC Inspection File Within five calendar days of completion/ termination of the contract.

KO and COR 2 As specified

0200000/

2.6.9.3

N/A Contractor Quality

Inspection and

Surveillance

Report

First workday of each month.

KO and COR 2 Monthly

0200000/

2.6.10

N/A Property

Management Plan

Within 45 calendar days after award.

KO and COR 2 As specified

0200000/

2.7.1

N/A List of Key

Personnel and

Qualifications

Within 15 calendar days prior to contract start

KO and COR 2 As specified

0200000/

2.7.1

N/A Organizational

Chart

Within 15 calendar days prior to contract start

KO and COR 2 As specified

0200000/

2.7.2.6

N/A Proof of Legal

Residency

Prior to be admitted to site of work.

KO and COR 2 As specified

0200000/

2.7.2.6

N/A Proof of United

States of America

Citizenship

Prior to be admitted to site of work.

KO and COR 2 As specified

0200000/

2.8.1

N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 2 As

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.8.8

N/A OF-306

Declaration for

Federal

Employment and

Digital

Fingerprints

Prior to commencement of work

KO, COR, and

Security

Manager

3 As required

0200000/

2.8.9

N/A List of personnel requiring access to and the justification for their access to

Government IT, OT, and FRCS

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO, COR, and

Security

Manager

3 As required

0200000/

2.9.1.1

N/A Experience

Modification Rates

(EMR)

Upon request KO and COR 1 As required

0200000/

2.9.1.2

N/A OSHA Days Away

From Work, Restricted Duty, or

Job Transfer

(DART) Rates

Upon request KO and COR 1 As required

0200000/

2.9.2

N/A Accident

Prevention Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 2 As specified

0200000/

2.9.3

N/A Activity Hazard

Analysis

Together with the

Accident

Prevention Plan and within seven calendar days of and changes.

KO and COR 2 As specified

0200000/

2.9.4

N/A Compliance Plans, Programs, and

Procedures

Together with the

Accident

Prevention Plan and within seven calendar days of and changes.

KO and COR 2 As specified

0200000/

2.9.4.9

N/A Control of

Hazardous Energy

(lockout/tagout)

Within 30 calendar days after annual inspection.

KO and COR 2 Annually

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.9.6

J-0200000-05 NAVFAC

Contractor Incident

Reporting System

(CIRS)

Within five calendar days of accident.

KO and COR 2 As required

0200000/

2.9.6

J-0200000-05 Weight Handling

Equipment

Accident Report

Within 15 working days of accident.

KO and COR 2 As required

0200000/

2.9.6

J-0200000-05 Crane and Rigging

Gear Near Miss

Report

Within 15 working days of accident.

KO and COR 2 As required

0200000/

2.9.8

N/A Monthly On-Site

Labor Report

First workday of each month.

KO and COR 2 Monthly

0200000/

2.9.9

N/A OSHA Citations and Violations

Corrective Action

Report

Within 48 hours after receiving a citation.

KO and COR 2 As required

0200000/

2.9.10

N/A Safety Inspection and Monitoring

Report

Upon request. KO and COR 2 As required

0200000/

2.9.11

N/A Safety

Certifications

Within 15 calendar days prior to contract start and as old certifications, expire.

KO and COR 2 As specified

0200000/

2.10

N/A EMS Goals and

Policy

Measurement

Information

Upon request. KO and COR 2 As required

0200000/

2.10.1.1

N/A Water

Conservation Plan

Within 15 calendar days after award and for changes.

KO and COR 2 As specified

0200000/

2.10.2

N/A Environmental

Protection Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 2 As specified

0200000/

2.10.2.1

N/A Sampling Plan Prior to Sampling KO and COR 2 As required

0200000/

2.10.2.1

N/A Laboratory

Analysis

Upon Request KO and COR 2 As specified

0200000/

2.10.2.2

N/A List of Refrigerant

Recovery

Equipment

At start of contract, and as requested.

KO and COR 2 As required

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.10.2.2

N/A OTIS Database or

Representative

Software Data

Files

Quarterly and within five calendar days of completion/ termination of the contract.

KO and COR 2 As specified

0200000/

2.10.2.2

N/A Appliance

Disposal Records

Quarterly and within five calendar days of completion/ termination of the contract.

KO, COR and

Installation

Environmental

Department

3 As specified

0200000/

2.10.2.2

N/A Class I and II ODS

Report

Within 24 hours following delivery of refrigerant to

DLA

KO and COR 2 As required

0200000/

2.10.2.3

N/A Used Oil Sampling

Plan

Within 15 calendar days prior to contract start and within

15 calendar days after exercised option periods.

KO and COR 2 Annually

0200000/

2.10.2.3

N/A Used Oil Analysis Within 15 calendar days after exercised option periods.

KO and COR 2 Annually

0200000/

2.10.2.3

N/A Used Oil Disposal and Recycling

Summary

Within 15 calendar days after exercised option periods.

KO and COR 2 Annually

0200000/

2.10.2.4

J-0200000-05 Solid Waste

Management and

Recycling Reports

First workday of each month.

KO and COR 2 Monthly

0200000/

2.10.2.4

J-0200000-05 Summary Solid

Waste

Management and

Recycling Report

By October 10th KO and COR 2 Annually

0200000/

2.10.2.4

J-0200000-05 Solid Waste

Recycling Weight

Tickets

First workday of quarter with Solid

Waste

Management and

Recycling

Reports

KO and COR 2 Quarterly

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.10.2.6

N/A Waste Stream

Determination

Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.

KO and COR 2 As required

0200000/

2.10.2.8

N/A Fuel and hazardous substance spill notification

Within 15 minutes of discovery

Regional

Dispatch

Center

1 As required

0200000/

2.10.2.8

N/A Fuel and hazardous substance spill notification

As soon as possible but not more 24 hours of discovery

KO, COR,

Installation

Fire

Department, and Installation

Environmental

Division

4 As required

02000000/

2.10.2.8

N/A Fuel and hazardous substance spill report

Within 48 hours of discovery

KO, COR, and

Installation

Environmental

Division

3 As required

0200000/

2.10.2.9

N/A Emergency

Planning and

Community Right-

To-Know Act

(EPCRA) Report

Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.

KO, COR, and

Installation

Environmental

Division

2 As specified

0200000/

2.10.2.9

J-0200000-17 Contractor

Hazardous

Material Inventory

Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO, COR, and

Installation

Environmental

Division

2 Annually

0200000/

2.10.2.14

N/A Asbestos

Containing

Material (ACM)

Verbally notify the KO and COR within one hour and follow-up with written

Notification within 24 hours

KO and COR 2 As specified

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.10.2.15

N/A Hazardous Air

Pollutants Semi-annual Reports

At intervals of

160 to 200 calendar days

KO, COR, and

Installation

Environmental

Division

6 Semi-annually

0200000/

2.10.2.15

N/A Hazardous Air

Pollutants Monthly

Data

First workday of each month.

KO, COR,

Installation

Environmental

Division

3 Monthly

0200000/

2.10.2.16

N/A Dewatering Plan Within 14 calendar days prior to dewatering activity

KO and COR 2 As required

0200000/

2.10.2.18

N/A Fuel Storage Tank

Approval Request

Within 14 working days prior to fuel storage tank acceptance.

KO, COR and

Installation

Environmental

Division

3 As required

0200000/

2.10.2.18

N/A Fuel Storage Tank

Inspection and

Maintenance Files

Upon request, and within five calendar days of completion/ termination of the contract.

KO and COR 2 As required

0200000/

2.10.3

N/A Sustainable

Procurement and

Practices Plan

Within 15 calendar days prior to contract start and within

15 calendar days after exercised option periods.

KO and COR 2 Annually

0200000/

2.10.3

N/A Sustainable

Delivery of

Services Report

Within five calendar days after each contract period.

KO and COR 2 Annually

0200000/

2.10.3.2

N/A Recovered

Material

Certification

As specified KO and COR 2 When a product containing recovered materials is equal to or better than the original and could be used.

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.11

N/A Mission Essential

Contractor

Services Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 2 As

Required

0200000/

2.11

N/A Mission

Critical/Mission

Essential Personnel

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and COR 2 As specified

0200000/

2.12

N/A Technical Library

Table of Contents

Within 15 calendar days after contract start and within seven calendar days of changes

KO and COR 2 As specified

0200000/

2.14.1

N/A Recurring Work

Modification

Proposals

Within five calendar days following Request for Proposal

(RFP)

KO 1 As required

0200000/

2.14.2

N/A Notification to the

Government for

Work Above the

Recurring Work

Limitations and

Rough Order of

Magnitude

Within two hours of identification

KO and COR 1 As required

0200000/

2.14.3

N/A Notification to the

Government when total orders exceed

75% of Section B

Within two days of initial notification

KO and COR 1 As required

0200000/

2.15.1.1

N/A Notification of

FedMall Catalog

Upload

Prior to each period of performance

KO and COR 1 As required

0200000/

2.15.1.1

N/A Non-Recurring

Work Quantities

Ordered via

FedMall

By the fifth day of the following month

KO and COR 1 Monthly

020000/

2.15.2.1

N/A Non-Recurring

Work Proposals

Within five working days following receipt of request for

Proposal (RFP)

KO 1 As required

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

0200000/

2.15.4

N/A Non-Recurring

Work Status

Last workday of the week

KO and COR 1 Weekly

Section F – 1501000

Facility Management

N6945026R0007

Spec Item

Form

Attachment

Number Deliverable Title

Date (s) of

Submission

Distribution

Frequency

Original/

Copies

Number of Copies

(including original)

1501000/

3.1

N/A MAXIMO Flat File As specified COR/RC

C/FMD

1 As required

1501000/

3.1.3

N/A Weekly MAXIMO

Work Order Report

By 0900 the first workday of each week

COR/KO,

PWO,

DPWO, &

FMD

5 Weekly

1501000/

3.2.1

N/A MAXIMO Asset

Changes Report

By COB the third workday of each month

COR/KO

& FMD

3 Monthly

1501000/

3.3

N/A Monthly Project

Updates

By COB the third workday of each month

COR/KO

& FEAD

3 Monthly

1501000/

3.3.1.5

N/A ISSA

Recommended

Changes

Within 30 days of request

COR/KO 2 As required

Section F – 1502000

Facility Investment

Section F 1502000

Form

Attachment

Number

Deliverable Title

Date (s) of

Submission

Distribution

Frequency

Original

Copies

(including original)

1502000/

2.2.1

N/A Certification and

Training

Within 30 calendar days after award and within four hours of request

KO/COR 1 Once for initial submittal, then as requested

1502000/

3.1

N/A Summary

Completion of

Completed

E/U/R Work

Orders

By the First working day of each month

KO/COR 1 Monthly

1502000/

3.1.2

N/A Summary tracking and completion report of

Unaccompanied

Housing E/U/R

By the First working day of each month

KO/COR/F

MD

1 Monthly

1502000/

3.2

N/A Preventive

Maintenance

Program Plan

Within 30 calendar days after contract award

KO/COR 1 Annually

1502000/

3.2

N/A PM Work

Schedule

Five working days prior to the beginning of each month

KO/COR 1 Monthly

1502000/

3.5

N/A

Inspection, Testing, and

Certification

Program Summary

Report

First workday of each month

KO/COR 1 Monthly

1502000/

3.5.2

Certification of

Load Test and

Condition

Inspection Form

First workday of each month

KO/COR 1 Monthly

1502000/

3.5.5

Inspection and

Test Report for

Vertical

Transportation

Equipment

First workday of each month

KO/COR 1 Monthly

3.2.6 N/A SRL Report Five working

days following accomplishment of annual inspection

KO/COR 1 As

Specified

3.2.12 N/A Monthly Data Log

Reports

By the First working day of each month.

KO/COR 1 Monthly

3.2.13 N/A Monthly Data Log

Reports

By the First working day of each month.

KO/COR 1 Monthly

3.3.2 N/A Auxiliary

Generator Log

By the First working day of each month

KO/COR 1 Monthly

3.3.2 N/A Auxiliary

Generator Test

Results

Within 10 calendar days after completing the test

KO/COR 1 Monthly

3.3.3.2 N/A Boiler Water

Testing and

Treatment Program

Within 30 calendar days after contract award

KO/COR 1 Annually

Section F 1502000

(including original)

3.3.3.2 N/A Boiler Water

Testing and Treatment Report

By the First working day of each month

KO/COR 1 Monthly

3.3.4 N/A Fire Pump Run

request form.

As Required KO/COR 1 As

Required

3.3.4 N/A RDC Fire Alarm

Weekly Response

First workday of each week

KO/COR 1 Weekly

3.3.4 N/A Certificate of

Inspection

As required KO/COR 1 As

Required

3.3.6.3 N/A HVAC Water

Testing and

Treatment Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.3.6.3 N/A HVAC Water

Testing and Treatment Report

By the First working day of each month

KO/COR 1 Monthly

3.3.6.4 N/A Condenser Tube

Inspection

Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.3.9 N/A Maintenance

Control Program per ASME 17.1

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4 N/A Inspection, Testing, and

Certification Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4 N/A Inspection, Testing, and

Certification

Program Summary Report

By the First working day of each month

KO/COR 1 Monthly

3.4 N/A Inspection, Testing

and Certification

Schedule and

Equipment Certifications

By the First working day of each month

KO/COR 1 Monthly

3.4.3 N/A Ground Point

Inspection and

Testing Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.3 N/A Ground Point

Inspection and Testing Results

By the First working day of each month

Section F 1502000

(including original)

3.4.4 N/A Self-Retracting

Lifeline Certification

As required KO/COR 4 As

Required

3.4.4 N/A Horizontal Lifeline

Inspection and

Certification Report

As required KO/COR 4 As

Required

3.4.5 N/A Vertical

Transportation

Equipment

Inspection, Testing and Certification Results

By the First working day of each month

KO/COR 1 Monthly

3.5 N/A Other Recurring

Services Program

Summary Report

By the First working day of each month

KO/COR 1 Monthly

3.5.1 N/A Exhaust Hood and

Duct Systems

Cleaning Schedule

Within 30 calendar days after contract award

KO/COR 1 Annually

3.5.3 N/A Grease and Grit

Trap Maintenance

Schedule

Within 30 calendar days after contract award

KO/COR 1 Annually

3.5.3 N/A Grease and Grit

Trap Treatment

Report

By the First working day of each month

KO/COR 1 Monthly

3.5.4 N/A Lighting Systems

Maintenance and

Repair Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.5.4 N/A Lighting Systems

Maintenance and

Repair Schedule

By the 25th of each month for the following month

KO/COR 1 Monthly

3.5.5 N/A Lint Trap

Maintenance and

Repair Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.5.6 N/A Oily Water

Separators Report

By the First working day of

3.5.7 N/A Process Water

Testing and

Treatment Program

Within 30 calendar days after contract award

Section F 1502000

(including original)

3.5.8 N/A Septic Systems

Maintenance

Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.5.8 N/A Septic Systems

Maintenance

Schedule

Within 30 calendar days after contract award

KO/COR 1 Annually

3.2.10 N/A Marina Pier

Maintenance

Completion and

Inspection Report

Within 15 calendar days of completion

KO/COR 1 As required

Facility Investment - DHA

Section F 1502000

(including original)

2.2 N/A Proof of all

certification, training, and licensing

Within 30 calendar days prior to start of contract performance and within four hours of request

KO/COR 1 Once for initial submittal, then as requested

3.1 N/A Work Order

Summary Report

By the First working day of each month

*Format for the monthly work order report as follows:*

Spec

Item

Description

Quantity

Annual

Quantity

Year

To Date

Current Month Remaining

3.1

Emergency, Urgent, and

Routine (E/U/R)

Work Orders

3.1.1 Emergency

3.1.2 Urgent Work Orders 1458

3.1.3

Routine

Labor

Annual Maximum

Year to Date Current Month Remaining

Spec

Item

Description

Quantity

Annual

Quantity

J

A

N

F

E

B

M

A

R

A

P

R

M

A

Y

J

U

N

J

U

L

A

U

G

S

E

P

O

C

T

N

O

V

D

E

C

Total

3.1.1 Emergency

3.1.2 Urgent Work

Orders

3.1.3 Routine Work

Orders

Labor

Annual Maximum

J

A

N

F

E

B

M

A

R

A

P

R

M

A

Y

J

U

N

J

U

L

A

U

G

S

E

P

O

C

T

N

O

V

D

E

C

Remaining

3.1.1 N/A Emergency Service

Orders

By the 10th of each month for the following month

KO/COR 1 Monthly

3.1.2 N/A Urgent Service

Orders

By the 10th of each month for the following month

KO/COR 1 Monthly

3.1.3 N/A Routine Service

Orders

By the 10th of each month for the following month

KO/COR 1 Monthly

3.2 N/A Preventive

Maintenance

Program Plan

Within 30 calendar days prior to start of contract performance

KO/COR 1 Annually

3.2 N/A Monthly PM Work

Schedule

Five working days prior to the beginning of each month

KO/COR 1 Monthly

3.2.1.2 N/A HVAC Water

Testing and

Treatment Program

Within 30 calendar days prior to start of contract performance

KO/COR 1 Annually

3.2.1.2 N/A HVAC Water

Testing and

Treatment Report

By the First working day of each month

KO/COR 1 Monthly

3.2.2.1 N/A Boiler Water

Testing and

Treatment Program

Within 30 calendar days prior to start of contract performance

KO/COR 1 Annually

3.2.2.1 N/A Boiler Water

Testing and Treatment Report

By the First working day of each month

KO/COR 1 Monthly

3.2.3 N/A Duress and

intrusion alarm test results

Within one (1) week of completing test

KO/COR 1 As

Specified

3.2.5 N/A Emergency

Generator Log

By the First working day of each month

KO/COR 1 Monthly

3.2.5 N/A Emergency

Generator Load Bank Results

Within 10 Days of completing test

KO/COR 1 As

Specified

3.2.8 N/A Fire Protection

Systems

Maintenance Report

By the First working day of

3.2.12 N/A Nurse Call Station

and Infant Alarms Checklist

Within 5 Days of completion

KO/COR 1 Annually

3.3 N/A Inspection, Testing, and Certification

Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.3 N/A Inspection, Testing, and Certification

Program Summary Report

By the First working day of each month

KO/COR 1 Monthly

3.3 N/A Inspection, Testing

and Certification

Schedule and

Equipment

Certifications

By the First working day of each month

KO/COR 1 Monthly

3.3.1 N/A Boiler and UPV

Inspection, Testing and Certification

Results

By the First working day of each month

KO/COR 1 Monthly

3.3.2 N/A Backflow

Prevention Device

Inspection, Testing and Certification

Results

By the First working day of each month

KO/COR 1 Monthly

3.3.3 N/A Vertical

Transportation

Equipment

Inspection, Testing and Certification

Results

By the First working day of each month

KO/COR 1 Monthly

3.4 N/A Other Recurring

Services Program

Summary Report

By the First working day of each month

KO/COR 1 Monthly

3.4.1 N/A Lighting Systems

Maintenance and

Repair Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.1 N/A Lighting Systems

Maintenance and

Repair Schedule

By the 25th of each month for the following month

KO/COR 1 Monthly

3.4.2 N/A Grease and Grit

Trap Maintenance

Schedule

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.2 N/A Grease and Grit

Trap Treatment Report

By the First working day of

3.4.3 N/A Exhaust Hood and

Duct Systems

Cleaning Schedule

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.4 N/A HVAC Systems

Visual and Audible

Check Program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.4 N/A HVAC Systems

Visual and Audible

Check Report

By the First working day of each month

KO/COR 1 Monthly

3.4.5 N/A Electrical

Receptacles program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.5 N/A Electrical

Receptacles Report

Within 3 Days of Inspection

KO/COR 1 As Specified

3.4.6 N/A Medical Gas

Systems program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.6 N/A Medical Gas

Systems Report

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.7 N/A Electrical

Transformers, Breakers and Switches program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.7 N/A Electrical

Transformers, Breakers and Switches Report

Within 3 Days of

Inspection

KO/COR 1 As

Specified

3.4.8 N/A Medical Gas

Systems program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.7 N/A Medical Gas

Systems Report

Within 3 Days of

Inspection

KO/COR 1 As

Specified

3.4.8 N/A PA Systems

program

Within 30 calendar days after contract award

KO/COR 1 Annually

3.4.8 N/A PA Systems Report Within 30

calendar days after contract award

KO/COR 1 As

Specified

3.4.9 N/A Crawlspace

Inspection

Schedule

Within 30 calendar days after contract award

KO/COR 1 As

Specified

3.4.9 N/A Crawlspace

Inspections

Within 3 Days of

Inspection

KO/COR 1 As

Specified

3.5 N/A Other Recurring

Services

Program Summary Report

By the first working day of

Section F – 1503040

Other (Training Pools)

Section F 1503040

(including original)

2.2.1 N/A Certification and

Training

Within 30 calendar days after award and within four hours of request

KO/COR 1 Once for initial submittal, then as requested

3.1.1 N/A Water Analysis

Reports

By the First working day of each month

KO/COR 1 Monthly

3.3 N/A Preventive

Maintenance

Program Plan

Within 30 calendar days after contract award

KO/COR 1 Annually

3.3 N/A Monthly PM

Schedule and PM

Maintenance and

Repair Status

Within Five working days prior to the beginning of each month

Section F – 1601000

Utilities Management

Section F 1601000

(includi ng original

000/

3.1

N/A Utility

Infrastructure

Condition Assessment

Within 3 days following the end of the month

KO/COR 1 As

Required

000/

3.1

N/A Fire Warden

Report

As Specified UEM

Commodity

Manager/KO

1 Monthly

000/

3.1

N/A Fire

Extinguisher inspection logs

As Specified UEM

Commodity

Manager/KO

1 Annually

000/

3.1.1

N/A Notification of utility assets not included in the listing

As Specified KO/COR 1 As

Required

000/ 3.1.1

N/A MAXIMO Asset Changes Report

By COB the third workday of each month

COR/KO &

FMD

1 As Required

000/

3.1.1

N/A Meter Readings

Report

Within one calendar day of meter reading date

UEM

Commodity

Manager/KO

1 Monthly

3.1.1 N/A Re-read Meter Within 1 day of

request

UEM

Commodity

Manager/

KO

1 As

Required

000 /

3.2.4

N/A Excavation Permit Upon issuance Utilities

Branch

Head/COR and KO

1 As

Section F – 1602000

Electrical

Section F 1602000

(including original)

2.2.1 N/A Certification and

Training

Thirty calendar days before making splices or terminations

KO/COR 1 As required

3 N/A Standard Operating

Procedures (SOP)

Within thirty days after contract start and annually thereafter

KO/COR 1 As required

3 N/A Monitoring

Schedules

Within 30 days after contract start and monthly thereafter

KO/COR 1 Monthly

3.1 N/A Condition Report 1st working day

each week

KO/COR 1 Weekly

3.1.1 N/A Operating Records, Logs, Reports and

Procedures

Upon request KO/COR 1 As requested

3.1.1 N/A Annual Manhole

Report

Within five days after inspections are completed.

KO/COR 1 Annually

3.1.1 N/A Outage Report Within 3 days

after the end of the month

KO/COR 1 Monthly

3.1.1 N/A Status and

Configuration Report

Within four hours of request.

KO/COR 1 As requested

3.2 N/A Preventive

Maintenance

Program (PM)

30 days after contract start

KO/COR 4 Annually and any time a change is made to the schedule

3.2 N/A Monthly IMP

schedule

By the 25th day of each month

KO/COR 4 Monthly

3.2.2 N/A Exercise switch

schedule

30 days after contract start and annually thereafter

KO/COR 1 As

Required

3.2.2 N/A SF-6

Switch maintenance schedule

30 days after contract start and annually thereafter

Required

3.2.4 N/A Manholes, Splice

Cabinets and

Transformers

Inspection Schedule

30 days after contract start and annually thereafter

Section F 1602000

(including original)

3.2.4 N/A Manholes, Splice

Cabinets and

Transformers Inspection Report

Within 5 working days of inspection completion

KO/COR 1 As

Required

3.2.5 N/A Scheduled outage

Plan

15 days after contract start and annually thereafter

Section F – 1604000

Wastewater

Section F 1604000

(including original)

2.4 N/A Production and

Consumption Report

Within 2 working days of monthly meter reading day

KO/COR 1 Monthly

3 N/A Road Closure

Request

Five working days prior to service commencing

KO/COR 1 As

Required

3.1 N/A Standard Operating

Procedures

60 days of contract start and annually thereafter

KO/COR 1 As

Required

3.1.1 N/A Laboratory

Analysis of

Wastewater Effluent

Within 2 working days of receipt from Laboratory

KO/COR 1 As

Specified

3.1.2 N/A MOR/DMR MOR by the 5th of

each month and

DMR by the 18th of each month

KO/COR 1 Monthly

3.1.3 N/A Schedule of

Operator Attendance

By the First working day of each month

KO/COR 1 Monthly

3.1.5 N/A Operating Records, Logs, Reports

By the First working day of each month

KO/COR 1 Monthly

3.1.5 N/A Condition Report Weekly KO/COR 1 Weekly

3.1.5 N/A Annual Manhole

Report

Within 5 days after inspections are completed

KO/COR 1 As

Required

3.1.5 N/A Monthly Outage

Report

By the First working day of each month

KO/COR 1 Monthly

3.2 N/A Preventive

Maintenance Program (PM)

Within 30 days following contract award

KO/COR 1 As

Required

3.2.3 N/A Sanitary manhole

Inspection

Schedule

30 days after contract award

KO/COR 1 As

Required

3.2.3 N/A Sanitary manhole

condition Report

Within five working days of inspection

KO/COR 1 As

Required

3.3.1 N/A Scheduled outage

Plan

15 days after contract award

Section F – 1605000

Steam

Section F 1605000

(including original)

2.5 N/A Production and

Consumption

Report

Within 2 working days of monthly meter reading day

KO/COR 1 Monthly

3.1 N/A Standard Operating

procedures

60 days of contract start and annually thereafter

KO/COR 1 As

Required

3.1.2 N/A Plant Boiler

Combustion Limits and Efficiencies

Within 3 days of the end of the previous Month

KO/COR 1 Monthly

3.1.4 N/A Boiler Water

Testing and Treatment Program

Within 30 days following contract award

KO/COR 1 As

Required

3.1.6 N/A Operating Records, Logs and Reports

Within 3 days following the end of the month

KO/COR 1 Monthly

3.1.6 N/A Daily operating

logs

Upon Request KO/COR 1 As Required

3.1.6 N/A Condition Report 1st working day

each week

KO/COR 1 Weekly

3.1.7 N/A Outage Report Within 3 days

after the end of the month

KO/COR 1 Monthly

3.2 N/A Preventive

Maintenance Program

Within 30 days following contract award

KO/COR 1 As

Required

3.3 N/A Inspection, Testing, and

Certification

Program

Within 30 days after contract start and updates submitted as needed thereafter

KO/COR 1 As

Required

3.4.1 N/A Scheduled outage

plan/service disruption

Submitted within

15 days of contract start

KO/COR 1 As

Required

3.4.2 N/A Meter Calibration

Schedule

Within 30 days after contract start

KO/COR 1 As

Required

3.4.3 N/A Pits and Manholes

Inspection

Schedule

Within 30 days after contract award and annually thereafter

Section F – 1605000

Steam

3.4.4 N/A Boiler Burner

Evaluation

By April 30th KO/COR 1 Annually

Section F – 1606000

Water

Section F 1606000

(including original)

2.2.1 N/A Proof of all

Certification, Training, and

Licensing Requirements

Within 30 days following award

KO/COR 1 Once.

Update as changes occur.

3.1 N/A Standard Operating

Procedures

15 days after award and 5 days after changes

KO/COR 1 As required

3.1 N/A Notification of

Unsafe Conditions

Report

Within 24 hours of occurrence

KO/COR 1 As

Specified

3.1.1 N/A Laboratory

Analysis

Within 4 hours of request

KO/COR 1 Upon

Request

3.1.3 N/A Operating Records, Logs, and Reports

3 days following the end of the month

KO/COR 1 Monthly

3.1.3 N/A Monthly Outage

Report

1st work day of each month

KO/COR 1 Monthly

3.1.3 N/A Condition Report 1st working day of

each weekly

KO/COR 1 Weekly

3.1.3 N/A Production and

Consumption

Report

Within 2 working days of monthly meter reading date

KO/COR 1 Monthly

3.2 N/A Preventive

Maintenance

Program (PM)

Within 30 calendar days following contract award

KO/COR 1 As specified

3.2 N/A Monthly IMP

Schedule and IMP

Maintenance and

Repair Status Report

3 days following the end of the month

KO/COR 1 Monthly

3.2.1 N/A Scheduled Outage

Plan/Service

Disruption Plan

Within 30 calendar days following contract award

KO/COR 1 Once.

Update as changes occur.

3.2.1 N/A Specific Outage or

Service Disruption

Plan

At least five working days in advance of the planned outage

KO/COR 1 As specified

3.2.2 N/A Meter Calibration

Schedule

30 days after contract award

3.2.3 N/A Monthly Cathodic

Protection

Inspection/Test Schedule

Within 30 days following award

KO/COR 1 Annually and as changes occur

Section F 1606000

(includin g original)

3.2.3 N/A Annual Cathodic

Protection

Calibration Schedule

30 days after contract start

KO/COR 1 Annually

3.2.3 N/A Cathodic

Protection Test

Results

End of each month

KO, COR

and

Cathodic

Protection

System

Manufactu rer

1 Monthly

3.2.3 N/A Cathodic

Protection System

Report

Upon completion of annual calibration

KO/COR 1 Annually

3.3.1 N/A Backflow

Prevention Device

Testing and

Certification

Coordination

Five working days prior to backflow prevention devices being ready for testing and certification

KO/COR 1 As specified

3.3.1 N/A Backflow

Prevention Device

Certification and

Repair or

Replacement Report

Last day of each month

KO/COR 1 Monthly

3.3.1 N/A Backflow

Certification and

Maintenance Forms

Five days after completion specified

Section F – 1608000

Compressed Air

Section F 1608000

(including original)

2.2.1 N/A Proof of all

Certification, Training, and

Licensing Requirements

Within 30 days following award

KO/COR 1 Once.

Update as changes occur.

3.1 N/A Standard Operating

procedures

Within 30 days of contract start and annually thereafter

KO/COR 1 As

Required

3.1 N/A Outage Request At least five

working days in advance of the planned outage

KO/COR 1 As

Required

3.1.3 N/A Daily Operating

Logs

Upon Request KO/COR 1 As

Required

3.1.3 N/A Outage Report Within 3 days

after the end of the month

KO/COR 1 Monthly

3.1.3 N/A Condition Report 1st working day

each week

KO/COR 1 Weekly

3.1.3 N/A Production Report Within 3 days

after the end of the month

KO/COR 1 Monthly

3.2 N/A Preventive

Maintenance Program

Within 30 days following contract award

KO/COR 1 As

Required

3.2 N/A Monthly IMP

Schedule and IMP

Maintenance and

Repair Status

Report

3 days following the end of the month

KO/COR 1 Monthly

3.2 N/A OEM Semi-annual

and Annual Servicing Report

Within 30 days after completion of the servicing

KO/COR 1 As

Required

3.3 N/A UPV Inspection, Testing, and

Certification

Program

Within 30 days after contract start and updates submitted as needed thereafter

KO/COR 1 As

Required

3.4.1 N/A Scheduled outage

plan/service disruption plan

Within 30 calendar days of contract start

Section F – 1608000

Compressed Air

3.4.2 N/A Meter Calibration

Schedule

Within 30 days after contract start and annually thereafter

Section F – 1700000

Transportation

Section F 1700000

(including original)

2.3.2 N/A Permits and

Licenses

Before work commences and within four hours of request

KO/COR 1 As specified

2.3.4.4 N/A Temporary

Suspension of

Downtime

Accumulation

Within two hours of notice to the

Contractor that the material delays will cause the downtime standard to be missed

KO/COR 1 As

Required

2.4 N/A BSVE Availability

Report

By the first working day of each week

KO/COR 1 Weekly

3.2.1 N/A Customer

Comment Cards

By the first working day of each week

KO/COR 1 Weekly

3.2.3 N/A GSA Mileage and

Fuel Usage Report

By the first working day of each month

KO/COR 1 Monthly

3.3 N/A Annual

Maintenance Schedules

Within 30 calendar days of contract award

KO/COR 1 Annually

3.3 N/A Monthly

Maintenance

Schedules

By the first working day of each month

KO/COR 1 Monthly

3.3.2 N/A PM/Certification

Schedule

By the 25th calendar day of the previous month for PM’s due the following month.

KO/COR 1 Monthly

3.3.2 N/A Maintenance

Inspection

Specification and Record

By the first working day of each month

KO/COR 1 Monthly

3.3.2 N/A Schedule for

Testing and

Certification

As Required KO/COR 1 Annually and as required after repairs

3.3.2 N/A Personnel Testing

and Certification

Qualifications

Before work commences and within four hours of request

Section F 1700000

(including original)

3.3.3 N/A Preventive

Maintenance Schedule

Within 30 calendar days of contract award

KO/COR 1 Annually

3.3.4 Vehicle Accident

Report

As Required KO/COR 1 As

Section F – 1800000

Environmental

Section F 1800000

Attachmen t Number

Deliverable

Title

(including original)

2.2.1 N/A Training Plan Within 15

calendar days after contract award

KO/COR

and IEPD

1 Annually

2.2.1 N/A Training

Documentation

Within 15 calendar days after contract Award, new employee training and refresher training

KO/COR

and IEPD

1 As Specified

2.4.3 N/A Spill Response

Training

Within 15 working days after contract start

KO/COR

and IEPD

1 As Specified

2.4.3 N/A Spill Response

Roster and

Qualifications

Within 15 working days after contract start

KO/COR

and IEPD

3 As Specified

2.5.1 N/A Spill

Prevention, Control and

Countermeasur e (SPCC)

Training

Documentation

In

October, Upon request and at the end of the contract

KO/COR

and IEPD

3 Annually

3.1 N/A Spill response, containment, and cleanup

equipment inventory

Within 15 calendar days after contract start

KO/COR

and IEPD

1 As Specified

3.1.3 N/A Site Health &

Safety Plans

(SHSP)

Within 15 working days after contract start

KO/COR/S

pill

Manager and IEPD

1 As Specified

3.1.3 N/A Spill Response

report

As Required KO/COR/S pill

Manager and IEPD

1 As Specified

Section F – 1800000

Environmental

3.2 N/A Pit, trench, tank

cleaning, ventilation duct inspection program and schedule

Within 15 working days after contract start

KO/COR

and IEPD

1 As Specified

3.2.2 N/A Ventilation Duct

Inspections results

As Required KO/COR/F

RCSE POC

and IEPD

1 As Specified

File details come from the government source that posted it. Updated .