N6945025R0003_SectionF.pdf
PDF 271 KB Posted
- Solicitation number
- N6945025R0003
About this file
This document is a comprehensive Section F deliverables matrix for a multiple-section federal contract (N6945025R0003) covering facility management, environmental services, utilities, and support services at Marine Corps Support Facility Blount Island (MCSF-BI). The detailed tables outline over 200 specific deliverables across multiple contract sections, specifying submission dates, recipients, and reporting frequencies for various operational requirements.
Key sections include Management and Administration, Port Operations, Facility Management, Facility Investment, Custodial Services, Pest Control, Integrated Solid Waste Management, Base Support Vehicles and Equipment, Environmental Management, and Utilities Management. Each section provides granular requirements such as monthly maintenance reports, safety inspections, equipment logs, training documentation, environmental monitoring, waste management protocols, and compliance reporting. Deliverables must be submitted to Contracting Officers (KO), Contracting Officer Representatives (COR), and various specialized offices, with submission timeframes ranging from immediate notification to quarterly or annual reporting.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
N6945025R0003
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission To
Frequency
0200000/ 2.2.1.2
N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
As required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
As Required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes Final Revision
Within two working days
KO, COR
and all attendees
As Required
0200000/ 2.3.3
N/A Partnering agreement, problem resolution ladder and risk register
Before work commences and as requested by the KO.
KO and
COR
As specified
0200000/ 2.3.4
N/A Permits and Licenses
Before work commences and as requested by the KO.
KO and
COR
As specified
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days prior to contract start.
KO and
COR
As specified
0200000/ 2.3.5.1
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
As required
0200000 2.3.10
N/A Phase-In Plan Within 5 days of award
KO and
COR
As required
0200000 2.3.10
N/A Phase-out Plan 120 days prior to contract completion date
KO and
COR
As required
0200000/ 2.6.1
N/A Plans of Action and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
As required
Form Attachment
Number Deliverable Title
2.6.1
N/A Cybersecurity Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
As required
0200000/ 2.6.4
N/A Scheduling and Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
As Specified
0200000/ 2.6.4
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR Monthly
0200000/ 2.6.5
N/A Notification of any Difficulty in Scheduling Work
By the end of each workday
KO and
COR
As required
0200000/ 2.6.6
N/A Status of Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
As required
0200000/ 2.6.7
N/A Service Interruptions
At least five working days in advance
KO and
COR
Form Attachment
Number Deliverable Title
2.6.8.2, 2.6.9.2
N/A Sample Pipe Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
As required to demonstrat e the ability to properly format the flat-file 0200000/
2.6.8.3 N/A List of personnel
requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
As specified
0200000/ 2.6.9.2
J-0200000-19 USMCmax Pipe Delimited Flat-File
By the end of each workday
KO or a representat ive designated by the KO
Daily
0200000/ 2.6.10.1
N/A Quality Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
As specified
0200000/ 2.6.10.1
N/A Revised Quality Management Plan
Within seven calendar days of changes.
KO and
COR
As specified
0200000/ 2.6.10.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
As specified
0200000/ 2.6.10.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO and
COR
Monthly
0200000/ 2.6.11
N/A Property Management Plan
Within 45 calendar days after award.
KO and
COR
As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
As specified
0200000/ 2.7.1
N/A Organizational Chart
Within 15 calendar days prior to contract start
KO and
COR
As specified
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO and
COR
As specified
0200000/ 2.7.2.6
N/A Proof of United States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
specified
Form Attachment
Number Deliverable Title
2.8.1
N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As required
0200000/ 2.8.8
N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
As required
0200000/ 2.8.9
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
As required
0200000/ 2.9.2
N/A Accident Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/ 2.9.3
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
As specified
0200000/ 2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
As specified
0200000/ 2.9.4.7
N/A Control of Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
Annually
0200000/ 2.9.6
J-0200000-07 NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
As required
0200000/ 2.9.6
J-0200000-07 Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and
COR
As required
0200000/ 2.9.6
J-0200000-07 Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
Form Attachment
Number Deliverable Title
2.9.8
N/A Monthly On-Site Labor Report
First work day of each month.
KO and
COR
Monthly
0200000/ 2.9.9
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
As required
0200000/ 2.9.10
N/A Safety Inspection and Monitoring Report
Upon request. KO and
COR
As required
0200000/ 2.9.11
N/A Safety Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
As specified
0200000/ 2.10
N/A Integrated Environmental Management Plan
Within 15 calendar days after award and for changes.
KO and
COR
As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
As specified
0200000/ 2.10.2
N/A Environmental Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to Sampling KO and
COR
As required
0200000/ 2.10.2.1
N/A Laboratory Analysis
Upon Request KO and
COR
As specified
0200000/ 2.10.2.2
N/A Class I and II ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
As required
0200000/ 2.10.2.3
J-0200000-07 Solid Waste Management and Recycling Reports with receipts
First work day of each month.
KO and
COR
Quarterly
0200000/ 2.10.2.3
J-0200000-07 Summary Solid Waste Management and Recycling Report
By October 10th KO and
COR
Annually
Form Attachment
Number Deliverable Title
2.10.2.5
N/A Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
As required
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
COR
As required
0200000/ 2.10.2.8
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
As specified
0200000/ 2.10.2.8
J-0200000-07 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
Annually
0200000/ 2.10.2.12
N/A Asbestos Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
As specified
0200000/ 2.10.2.13
N/A Lead-Based Paint Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO, COR
and
MCSF-BI
IEPM
Form Attachment
Number Deliverable Title
0200000 2.10.2.17
N/A Dewatering Plan Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/ 2.10.2.18
N/A Title V documentation submittals
First workday of each month
KO, COR,
Installation Environme ntal Division, Monthly
0200000/ 2.10.2.18
N/A Hazardous Air Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environme ntal Division, City, State, and EPA
Semi-annually
0200000/ 2.10.2.18
N/A Hazardous Air Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environme ntal Division
Monthly
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
Annually
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
Annually
0200000/ 2.10.3.2
N/A Recovered Material Certification
As specified KO and
COR
When a product containing recovered materials is equal to or better than the original and could be used.
0200000/ 2.11
N/A Mission Essential Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
Required
Form Attachment
Number Deliverable Title
2.11
N/A Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/ 2.14.1
Recurring Work Modification Proposals
Within five calendar days following Request for Proposal
(RFP)
KO As required
0200000/ 2.14.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
As required
0200000/ 2.15.1.1
N/A Notification of FedMall Catalog Upload
Prior to each period of performance
KO and
COR
As required
0200000/ 2.15.1.1
N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
Monthly
0200000/ 2.15.1.1
N/A Notification to the Government when total orders exceed 75% of Section B
Within two days of initial notification
KO and
COR
Monthly
0200000/ 2.15.2.1
N/A Non-Recurring Work Proposals
Within two calendar days following Request for Proposal
(RFP)
KO As required
0200000/ 2.15.3
J-0200000-07 Non-Recurring Work Status
Last workday of the week
KO and
Weekly
Section F – 0600000 Port Operations
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 0600000/
2.2.1 N/A Certification, Training and Licenses
Within 15 days after award or as requested by the KO
KO and COR Once for initial submittal, then as requested
0600000/ 3.1
N/A Summary of Completed and Pending Port Ops Service Work Orders
5 day of following month
Port Ops WF Equipment, KO and COR
Monthly
0600000/ 3.2.2
N/A Report of Out of Service Equipment and status of repairs
5 day of following month
Port Ops WF Equipment, KO and COR
Monthly
0600000/ 3.2.3
N/A Report of Safety and Structural Repairs
Within two hours of identification
Port Ops WF Equipment, KO and COR
As required
0600000/ 3.2.4
J-020000-07 Berthing Services Report
5 day of following month
Port Ops, KO and COR
Monthly
Section F – 0600000 Port Operations
Deliverables Form Preparation Instructions
Deliverable Title: 0600000/2.2.1, 3.1, 3.2.2, 3.2.3 and 3.2.4, Port Operations Reports
Form Attachment No.: N/A
Government Approval Required: ___ Yes _X__ No
Media: _____ Hard Copy _X__ Electronic ___ Direct System Input
Instructions:
1. List shall be prepared using Microsoft Office software.
2. Submit to KO with copies to others specified.
Section F – 1501000 (MCSF-BI) Facility Management
Form Attachmen t Number Deliverable Title
Date (s) of Submission To Frequency
1501000/ 3.1
N/A USMC Maximo Pipe-Delimited Flat File
As specified KO, COR, RCC &
FMD
As required
1501000/ 3.2.1
N/A USMC Maximo Asset Changes Report
By COB the third workday of each month
KO, COR
& FMD
Monthly
1501000/ 3.3
N/A Technical Library Inventory
30 days after contract start and annually thereafter
KO, COR
& FMD
Section F – 1501000 (MCSF-BI)
Deliverable Title: Technical Library Inventory
Form Attachment No.: J-1501000-05
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic ___ Direct System Input
Instructions:
a. The report shall be prepared using Microsoft Office 365 Word software.
b. Listing of inventory items, description and date of item.
Submit a copy of the summary report via email to the KO for Government review and comment.
Section F – 1501000
Form Attachmen t Number Deliverable Title
Date (s) of Submission To Frequency
1501000/ 3.1
N/A NAVFAC Maximo Pipe-Delimited Flat File
As specified KO, COR, RCC &
FMD
As required
1501000/ 3.2.1
N/A NAVFAC Maximo Asset Changes Report
By COB the third workday of each month
KO, COR
& FMD
Monthly
1501000/ 3.3
N/A Technical Library Inventory
30 days after contract start and annually thereafter
KO, COR
& FMD
Section F – 1501000
Deliverable Title: Technical Library Inventory
Form Attachment No.: J-1501000-05
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic ___ Direct System Input
Instructions:
a. The report shall be prepared using Microsoft Office 365 Word software.
b. Listing of inventory items, description and date of item.
Submit a copy of the summary report via email to the KO for Government review and comment.
Section F - 1502000 (MCSF-BI) Facility Investment
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1502000/ 2.2.1
N/A Certification & Training
Within 30 calendar days after award & within four hours of request
KO &
COR
Once for initial submittal, then as requested 1502000/
3.1 N/A E/U/R Work Order
Summary Report By the First working day of each month
KO &
COR
Monthly
1502000/ 3.2
N/A Project Work Order Summary Completion Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.3
N/A Preventive Maintenance Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.3
N/A Monthly PM Work Schedule
Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/ 3.3.1
N/A Auxiliary Generator Log
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.3.1
N/A Auxiliary Generator Test Results
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/ 3.3.5
N/A Fire Protection Deficiency Report
Daily upon identification
KO &
COR
Daily as required
1502000/ 3.3.5
N/A Fire Protection Maintenance Report
Upon completion of repairs
KO &
COR
Daily as required
1502000/ 3.4
N/A Integrated Maintenance Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.4
N/A Monthly IMP Schedule & IMP Maintenance & Repair Status
Within Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/ 3.4.1
N/A Blast, Paint and Drying System Inspection, Maintenance and Repair Status
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.4.2.3
N/A Boiler Water Testing & Treatment Program
Within 30 calendar days after contract award
KO &
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1502000/ 3.4.2.3
N/A Boiler Water Testing & Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.4.4.3
N/A HVAC Water Testing & Treatment Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.4.3.3
N/A HVAC Water Testing & Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.4.3.5
N/A Condenser Tube Inspection Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.5
N/A Inspection, Testing, & Certification Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.5
N/A Inspection, Testing, & Certification Program Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5
N/A Inspection, Testing & Certification Schedule & Equipment Certifications
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.1
N/A Notification of Backflow Prevention Device is ready for testing & certification
Five working day advance of Backflow Prevention Device being ready for testing & certification
KO &
COR
As Required
1502000/ 3.5.1
N/A Repot of Backflow Prevention Device Inspection, Certification and Incidental Repairs
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.2
N/A Notification of Boilers &/or UPVs are ready for testing & certification
Five Working Days in Advance of Boilers &/or UPVs being ready for testing & certification
KO &
COR
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1502000/ 3.5.3
N/A Notification of crane & railroad trackage is ready for testing & certification
Five working day advance of crane & railroad trackage being ready for testing & certification
KO &
COR
As Required
1502000/ 3.5.4
N/A Notification of fire doors ready for testing & certification
Five Working Days in Advance of doors being ready for testing & certification
KO &
COR
As Required
1502000/ 3.5.4
N/A Rolling, Sliding, and Overhead Fire Doors Inspection, Testing & Certification Documentation
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.5
N/A Notification of VTE is ready for testing & certification
Five Working Days in Advance of VTE being ready for testing & certification
KO &
COR
As Required
1502000/ 3.5.5
N/A Vertical Transportation Equipment Inspection, Testing & Certification Results
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.6
N/A Other Recurring Services Program Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.6.1
N/A Lighting Systems Program
Within 15 days after contract start
KO &
COR
Annually
1502000/ 3.6.2
N/A Corrosion Control Program
Within 15 days after contract start
KO &
COR
Annually
1502000/ 3.6.3
N/A Roof Maintenance Program
Within 15 days after contract start
KO &
COR
Annually
1502000/ 3.6.4
N/A Lift Station Maintenance Program
Within 15 days after contract start
KO &
COR
Annually
1502000/ 3.6.4
N/A Lift Station Maintenance Inspection Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.6.6
N/A Holding Tank Pumping & Cleaning Program
Within 15 days after contract start
KO &
COR
Annually
1502000/ 3,6,7
N/A OWS report stating repairs performed and gallons of oil removed from each separator.
By the First working day of each month
KO &
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1502000/ 3,6,8
N/A Key Inventory
MFR
Within 15 days after contract start
KO, COR,
FMD &
PSO
Annually
1502000/ 3.6.9
N/A Monthly DDC Maintenance Schedule
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.6.9
N/A Report of DDC in override or bypass mode
By 0900 daily KO, COR, MCSF-BI
CIO
Daily
1502000/ 3.6.9
N/A Report of DDC Access Violations & Intrusions
By 0900 daily KO, COR, MCSF-BI
CIO
Daily
1502000/ 3.6.10
N/A Fuel Storage Tank Incident Report
Within 30 minutes of discovery
KO &
COR
As required
1502000/ 3.6.10
N/A Fuel Storage Tank and Berm Inspection Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.6.9
N/A Fuel Storage Tank and Berm Deficiency Spreadsheet
By the First working day of each month
KO &
Section F - 1502000
Form Attachment
Number Deliverable Title
1502000/
2.2.2 N/A Certification and
Training Within 30 calendar days after award and within four hours of request
KO &
COR
Once for initial submittal, then as requested 1502000/
3.1 N/A E/U/R Work
Order Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.1
High Visibility E/U/R Work Order Report
By 1400 each day KO &
COR
Daily
1502000/ 3.2
N/A Project Order Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.3
N/A Preventive Maintenance Program Plan
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.3
N/A Monthly PM Work Schedule
Five working days prior to the beginning of each month
KO &
COR
Monthly
1502000/ 3.3.2
N/A Auxiliary Generator Log
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.3.2
N/A Auxiliary Generator Test Results
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/ 3.3.6
N/A Fire Protection Inspection, Testing and Certification Documentation
Within 10 calendar days after completing the test
KO &
COR
Monthly
1502000/ 3.4
N/A Inspection, Testing, and Certification Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.4
N/A Inspection, Testing, and Certification Program Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.4
N/A Inspection, Testing and Certification Schedule and Equipment Certifications
By the First working day of each month
KO &
Form Attachment
Number Deliverable Title
3.4.1 N/A Notification of
Backflow Prevention Devices ready for testing and certification
Five Working Days in Advance of being ready for testing and certification
KO &
COR
As Required
1502000/ 3.4.1
N/A Backflow Prevention Device Inspection, Testing and Certification Program Summary Report
Five Working Days in Advance of being ready for testing and certification
KO &
COR
As Required
1502000/ 3.4.1
N/A Backflow Prevention Device Monthly and Cumulative Inventory and Certification Status Report
Last day of each month
KO &
3.4.1
N/A Cross Connection Discovery Report
Five Working Last day of each month
KO &
COR
As Required
1502000/ 3.4.1
FDEP Form 62-555.900
F.A.C.
Annual Cross Connection Control Program Reports
By 15 Feb of each year for the period ending 31 Dec of the previous year
KO &
COR
Annually, As
Specified
1502000/ 3.4.2
N/A Notification of Boilers and/or UPVs ready for testing and certification
Five Working Days in being ready for testing and certification
KO &
COR
As Required
1502000/ 3.4.3
N/A Ground Point Inspection and Testing Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.4.3
N/A Ground Point Inspection and Testing Results
Within two working days following completed test
KO &
COR
Monthly
1502000/ 3.4.4
N/A Notification of VTE ready for testing and certification
Five Working Days in Advance of being ready for testing and certification
KO &
COR
As Required
1502000/ 3.4.4
N/A Submission of Vertical Transportation Equipment Test Report
By the first working day of each month
KO &
Form Attachment
Number Deliverable Title
3.4.5 J-0200000-07 Certification of
Load Test and Condition Record
Within two working days following completed test
KO &
COR
Monthly
1502000/ 3.5
N/A Other Recurring Services Program Summary Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.2
N/A Boiler Water Testing and Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.4.1
N/A Monthly FRCS Maintenance Schedule
By the First working day of each month
KO, COR,
NSA CIO
Monthly
1502000/ 3.5.4.2
N/A Report of FRCS in override or bypass mode
By 0900 daily KO, COR, NSA CIO
Daily
1502000/ 3.5.4.2
N/A Report of FRCS Access Violations & Intrusions
By 0900 daily KO, COR, NSA CIO
Daily
1502000/ 3.5.5
N/A Notification of Fuel Storage Tank Sensor Failure or Leaking Tank/Piping
Within 30 Minutes of Discovery
KO &
COR/
IEMP
As Required
1502000/ 3.5.5
N/A Monthly Tank and Berm Inspections, and Annual Sensor Tests, Repairs and Modifications
Maintain Hard Copies and submit Monthly Inspections Electronically buy the 1st day of the month, and annually by January 15 for the previous year.
KO &
COR/
IEMP
As Required
1502000/ 3.5.5
N/A Fuel Storage Tanks and Berms Deficiency Spreadsheet
Within 48 Hours of Completing Inspection.
KO &
COR/
IEPM
As Required
1502000/ 3.5.6
N/A Grease and Grit Trap Maintenance Schedule
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.5.6
N/A Grease and Grit Trap Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.8
N/A HVAC Water Testing and Treatment Program
Within 30 calendar days after contract award
KO &
Form Attachment
Number Deliverable Title
3.5.8 N/A HVAC Water
Testing and Treatment Report
By the First working day of each month
KO &
COR
Monthly
1502000/ 3.5.9
N/A Condenser Tube Inspection Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/ 3.5.10
N/A Lint Trap Maintenance and Repair Program
Within 30 calendar days after contract award
KO &
COR
Annually
1502000/
N/A CAT Call Summary Reports
By the first day of the following week and by the first day of each month
KO &
COR
Weekly and
Section F - 1503010 (MCSF-BI) Custodial
Spec Item
Form Number Deliverable Title
Date (s) of Submission To Frequency
1503010/ 2.2.1
N/A Pathogen Training Certificates
Upon Request
KO & COR Upon Request
1503010/ 3.1
N/A Annual Work Schedule
1 each year KO & COR Within 15 days after award and annually thereafter 1503010/
3.1 N/A Monthly Work
Plan First work day of each month
KO & COR Monthly
1503010/ 3.2
N/A Custodial Service Order Report
First work day of each month
KO &COR Monthly
Section F - 1503020 (MCSF-BI) Pest Control
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503020/ 2.2.1
N/A Copy of State Certification for Contractor Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO, COR
& PMC
As required
1503020/ 2.3.1
N/A Copy of Local/State Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO &
COR
1 per state
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits.
KO &
COR
As required
1503020/ 2.3.4
N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO &
COR
As required
1503020/ 2.3.5
N/A Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)
With Contractor’s Work Plan.
Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO, COR
& PMC
1 for each pesticide per pest as required
1503020/
N/A Contractor's Work Plan
Within 15 calendar days after award and Within seven calendar days of changes.
KO &
COR
1 per proposal
1503020/
N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO &
COR
As required
1503020/ 3, 4
N/A Five-year Termite Treatment Warranties
10 days following the treatment.
KO &
COR
As required
1503020/ 3, 4
N/A Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)
10 working days after inspection completed.
KO &
As required
Section F - 1503020 (MCSF-BI) Pest Control
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503020/ 3, 4
N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
Installation Preventive Medicine Dept, KO
& COR
As required
1503020/ 3, 4
N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/ 3, 4
N/A Stored Product Pest Survey (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/ 3, 4
N/A Pharaoh Ant Treatment: Floor Plan Diagram (per the appropriate Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO &
COR
As required
1503020/ 3, 4
N/A Tick Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
Installation Preventive Medicine Dept, KO
& COR
As required
1503020/ 3, 4
N/A Mole Cricket Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO &
COR
As required
1503020/ 3.2
N/A Summary of Completed Pest Control Service Orders
By the 15th of the following month
KO &
COR
Monthly
1503020/ 3.3
N/A Pest Management Reporting; Report of Pest Management Operations
Electronically once per month by the 15th of the following month (Example: July data must be submitted by August 15).
KO, COR
& PMC
Section F - 1503030 (MCSF-BI) Integrated Solid Waste Management
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503030/ 2.2.1
N/A FPOW Solid Waste Operator Training
Before work commences and within four hours of KO request
KO &
COR
As Specified
1503030/ 2.3.1
N/A Recycling Revenue Receipts
With Monthly Invoice, by the 15th of October of each calendar year, and within four hours of KO request
KO, COR
and
QRP
Manager
Monthly, Annually and as Specified
1503030/ 2.3.2
N/A Weight Tickets With Monthly Invoice, by the 15th of October of each calendar year, and within four hours of KO request
KO, COR Monthly, Annually and as Specified
1503030/ 2.3.2
N/A Weight of Solid Waste
By the 15th of October of each calendar year and within four hours of KO request
KO &
COR
As Specified
1503030/ 2.3.3
N/A Permits and Licenses
Within 15 calendar days after contract award
KO &
COR
15 days after award and Annually
1503030/ 3.1
N/A Solid Waste Collection Schedule
Within 15 calendar days after contract award
KO &
COR
15 days after award and Annually
1503030/ 3.1
N/A Changes to the solid waste collection schedule
As Required KO &
COR
As Required
1503030/ 3.3
N/A Recommended changes to the size and location of solid waste containers
As Identified KO &
COR
Section F - 1503040 Other (Training Pools)
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503040/ 2.2.1
N/A Certification and Training
Within 30 calendar days after award and within four hours of request
COR and
KO
Once for initial submittal, then as requested 1503040/
2.4 N/A Operating Records, Logs, and Reports By the First working day of each month
COR and
KO
Monthly
1503040/ 3.2
N/A Preventive Maintenance (PM) Program Plan
Within 30 calendar days after contract award
COR and
KO
Annually
1503040/ 3.2
N/A Monthly PM Schedule and PM Maintenance and Repair Status
Within Five working days prior to the beginning of each month
COR and
KO
Monthly
1503040/ 3.3
N/A Water Consumption Report
By 08:00 of the following working day
COR and
KO
Daily
1503040/ 3.3
N/A Water Analysis Reports
By the First working day of each month
COR and
KO
Section F - 1503050 (MCSF-BI) Grounds Maintenance and Landscaping
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503050/ 2.2.1
N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO &
COR
Annually and as required by Section H – Special Contract Requirements
, FAC
5252.237- Substitutions of Key Personnel
(JUN 1994)
1503050/ 2.3.1.1
N/A Business Licensing Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO &
COR
As required
1503050/ 2.3.1.4
N/A Contractor’s Work Plan/Planned Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO,
COR,
PMC
Annually for each pesticide/herb icide, as required.
1503050/ 2.3.1.5
J-1503020-11
(MCSF-BI)
Pest Management Operations Report
Electronically by the 15th of the following month (Example: July data must be submitted by August 15) on the format approved by PMC.
KO,
COR,
PPMC
Monthly
1503050/ 2.3.2
N/A Permits Within 15 calendar days prior to start of work.
KO &
COR
As required
1503050/ 2.3.9.1
Water Conservation Plan
Within 15 calendar days prior to start of work.
KO &
COR
Annually and five calendar days prior to implementing changes to the schedule
1503050/
J-1503050-05 Weight Tickets and Recycling Report Form
With each invoice
KO &
Section F - 1503050 (MCSF-BI) Grounds Maintenance and Landscaping
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1503050/
N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
Prior to bringing on-board installation and prior to use
KO &
COR
As Specified
1503050/
N/A Work Schedules Within 15 calendar days prior to contract start.
KO &
COR
Annually and five calendar days prior to implementing any changes to the schedule
1503050/ 3.1.1.3
N/A Soil Analysis test results and proposed fertilizer
Within 15 days after receipt of the test results by the Contractor
KO &
COR
As Specified
1503050/ 3.1.1.3
N/A Top Dressing and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO &
COR
Annually and five calendar days prior to implementing changes to the schedule
1503050/ 3.1.1.4
N/A Notification of Inoperable Irrigation System Components
Within 24 hours of discovery
KO &
COR
As Specified
1503050/ 3.3
N/A Notification of obstructions in subsurface drain lines
Within 24 hours KO &
COR
As Required
1503050/ 3.3
N/A Notification of missing or damaged yard drain covers and grates
Immediately KO &
COR
As Required
1503050/ 3.3
N/A Storm Drainage Systems Maintenance Schedule
15 days after award
KO &
COR
As Specified
1503050/ 3.5
N/A Grounds Maintenance Service Order Summary of Completion Report
By the fifth day of each month
KO &
Section F - 1601000 Utilities Management
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1601000/ 3.1.1
N/A Meter Readings Within 3 days of the scheduled meter reading date
KO, COR
& UEM
Monthly
1601000/ 3.1.1
N/A Meter Re-readings Within 1 day of request
KO &
COR &
UEM
As Required
1601000/ 3.1.2
N/A General Service Disruption/Outage Plan
15 days after contract award and as changes occur
KO &
COR
As Specified
1601000/ 3.1.2
N/A Specific Service Disruption/Outage Plan
At least 10 days in advance of the scheduled outage
KO &
COR
As Required
1601000/ 3.1.3
N/A Excavation Permit Documentation
At least 10 days in advance of the scheduled work start
KO &
COR
As Required
1601000/ 3.2.1
N/A Asset Description Change Report
Within five days of discovery
KO, COR
& FMD
As Required
1601000/ 3.2.1
N/A Notification of utility assets not included in the listing
As Specified KO &
COR
As Required
1601000/ 3.2.2
N/A Utility Infrastructure Condition Assessment
Within 3 days following the end of the month
KO &
COR
As Required
1601000/ 3.3
N/A Report of FRCS in bypass mode
Within 24 hours of identification
KO &
COR
As Required
1601000/ 3.4
J-0200000-09 Maximo Pipe Delimited Flat File
Daily by COB KO, COR, RCC &
FMD
Section F - 1602000 Electrical
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1602000 2.2.1
N/A Certification and Training
Thirty calendar days before making splices or terminations
KO &
COR
As required
1602000/
N/A Standard Operating Procedures (SOP)
Within thirty days after contract start, after any SOP change, and annually thereafter
KO &
COR
As Required
1602000/
N/A Monitoring Schedules
Within 30 days after contract start and monthly thereafter
KO &
COR
Monthly
1602000/
N/A List of Critical Spare Parts
Within thirty days after contract award, after any change and annually thereafter
KO &
COR
As required
1602000/ 3.1
J-0200000-07 Condition Report 1st working day each week
KO &
COR
Weekly
1602000/ 3.1
J-0200000-07 Non-Recurring Work Status Report
1st working day each week
KO &
COR
Weekly
1606000/ 3.2
N/A Summary of Completed E/U/R work
Within 3 days after the end of the month
KO &
1602000/ 3.3
N/A Preventive Maintenance (PM) Program Plan
15 days after contract start
KO &
COR
Annually and any time a change is made to the schedule 1602000/
3.3 N/A Monthly PM
schedule and unaccomplished maintenance report
By the 25th day of each month
KO &
COR
Monthly
1602000/ 3.4
N/A Leak Report Within 30 minutes of identification
KO, COR
& EV
As required
1602000/ 3.4.1
N/A Exercise switch schedule
30 days after contract start and annually thereafter
KO &
COR
As required
1602000/ 3.4.2
N/A SF-6
Switch maintenance schedule
30 days after contract start and annually thereafter
KO &
COR
Section F - 1602000 Electrical
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1602000/ 3.4.4
N/A Manholes, Splice Cabinets and Transformers Inspection Schedule
30 days after contract start and annually thereafter
KO &
COR
As required
1602000/ 3.4.4
N/A Manholes, Splice Cabinets and Transformers Inspection Report
Within 5 working days of inspection completion
KO &
COR
As required
1602000/ 3.4.5
N/A Operating Records, Logs, Reports and Procedures
Upon request KO &
COR
As requested
1602000/ 3.4.5
N/A Unplanned Outage Report
Within 3 days after the end of the month
KO &
COR
As required
1602000/ 3.4.5
N/A Status and Configuration Report
Within four hours of request.
KO &
COR
As requested
1602000/ 3.4.5
N/A Operational Configuration Review
Six months after contract start and within five days of the end of the semi-annual reporting period
KO &
COR
Semi-annual
1602000/ 3.4.5
N/A Ships Utility Connection Report
Within five days after the end of each billing cycle
KO &
Section F - 1606000 Water
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1606000/
2.2.2 N/A Proof of all
Certification, Training, and Licensing Requirements
Within 30 days following award
KO &
COR
Once.
Update as changes occur.
1606000/
N/A Critical Spare Parts Inventory
Within 30 days following award
KO &
COR
Once, Update if the requiremen ts change.
1606000/ 3.1, 3.1.3
N/A Standard Operating Procedures
15 days after award and 5 days after changes
KO &
COR
As required
1606000/ 3.1
N/A Notification of Unsafe Conditions Report
Within 24 hours of occurrence
KO &
COR
As Specified
1606000/ 3.1
N/A Semi-Annual Operational Configuration Review
3 days following the end of the performance period
KO &
COR
Semi- Annually
1606000/ 3.1.1
N/A Boil Water Notice Prior to putting water back in service following repair or exceedance
KO &
COR
As Required
1606000/ 3.1.1
N/A Notification of out of compliance water sampling
Immediately upon confirmation
KO, COR,
IEPD and
UEM
As Required
1606000/ 3.1.1
N/A Laboratory Analysis
Within 4 hours of request
KO &
COR
Upon Request
1606000/ 3.1.3
N/A Operating Records, Logs, and Reports
3 days following the end of the month
KO &
3.1.3 N/A Monthly
Unplanned Outage Report
Within 3 days after the end of the month
KO &
COR
Monthly
1606000/ 3.1.3
N/A Condition Report Weekly KO &
COR
Weekly
1606000/ 3.1.3
N/A Non-Recurring Work Status Report
Weekly KO &
COR
Weekly
1606000/ 3.2
N/A Summary of Completed E/U/R work
Within 3 days after the end of the month
KO &
1606000/ 3.3
N/A Preventive Maintenance (PM) Plan
Within 15 days following award
KO &
COR
Section F - 1606000 Water
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1606000/
3.3 N/A Monthly PM
Schedule and PM Maintenance and Repair Status Report
3 days following the end of the month
KO &
COR
Monthly
1606000/ 3.3
N/A Meter Calibration Schedule
30 days after contract award
KO &
COR
Annually
1606000/ 3.4
N/A Inspection, Testing and Certification Program and Schedule for Fire Hydrants
Within 30 days following award
KO &
COR
Specified
3.4
N/A Inspection, Testing and Certification Summary Report for Fire Hydrants
Within 30 days following award
KO &
COR
3/4
N/A Notification of Ready for Testing and Certification of Fire Hydrants
5 working days prior to testing
KO, COR
& UEM
As Specified
1606000/ 3.4
N/A Report of Fire Hydrant Failed Flow Test.
Within two hours of identification
KO, COR,
UEM &
Fire Dept
Section F - 1700000 Base Support Vehicles and Equipment
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1700000/
2.3.2 N/A Permits and
Licenses Before work commences and within four hours of request
KO, COR
& TR
Manager
As specified
1700000/ 2.3.4.4
N/A Temporary Suspension of Downtime Accumulation
Within two hours of notice to the Contractor that the material delays will cause the downtime standard to be missed
KO, COR
& TR
Manager
As Required
1700000/ 3.1
N/A Monthly Crane Lift Report
By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/ 3.1.2
N/A Fuel Report By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/ 3.2.1
N/A Dispatcher’s Log Made available upon request
KO, COR
& TR
Manager
As Required
1700000/ 3.3.1, 3.3.1.3
N/A Monthly Maintenance Schedules
By the first working day of each month
KO, COR
& TR
Manager
Monthly
1700000/ 3.3.1, 3.3.1.4
Vehicle Accident Report
As Required KO, COR
& TR
Manager
As Required
1700000/ 3.3.1.2, 3.3.5
N/A PM, Certification and Testing Schedules
By the 25th calendar day of the previous month for PM’s due the following month.
KO, COR
& TR
Manager
Monthly
1700000/ 3.3.1.2
N/A Maintenance Inspection Specification and Record
By the first working day of each month
KO, COR
& Gov’t
Certifying Official
As Required
1700000/ 3.3.1.2
N/A Personnel Testing and Certification Qualifications
Before work commences and within four hours of request
KO, COR
& TR
Manager
As Required
170000/ 3.3.1.4
N/A Priority 1 Non- Recurring Work Status and NTVE Report
Daily KO, COR
& TR
Manager
Section F - 1700000 Base Support Vehicles and Equipment
Deliverable Title: Fuel Delivery and Fuel Accountability Reports
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Excel software.
Prepare a report, by USN registration number, for each unit of NAVSTA Mayport transportation equipment reporting the following data:
a. USN registration number and Alpha Code
b. Activity to which assigned
c. Gallons of fuel used and type of fuel
Report shall also include the fuel delivered to utility and facility generators including the amount of fuel used and type of fuel.
Prepare report monthly with quarterly and annual total/summary of data. Contractor must obtain current hour/mileage readings on equipment.
Submit a copy of the summary report via email to COR and Transportation Branch Head for Government review and comment.
Section F – 1800000 (MCSF-BI) Environmental
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1800000/
2.2.1 N/A Training Plan 15 days after
award/ Annually
KO & COR Annually
1800000/ 2.4.1
N/A Training Documentation
15 days after award/ Annually in October
KO, COR,
Installation Environmental Office
As Specified
1800000/ 2.4.3
N/A Leader and Team Members
15 days after award/ Annually
KO, COR,
Installation Environmental Office
As Specified
1800000/
N/A Out of Compliance Notification and Recommendation
As Specified KO, COR, Installation Environmental Office
As Specified
1800000/ 3.1
N/A Sampling Plan 15 days after award/ Annually
KO, COR,
Installation Environmental Office
As Specified
1800000/ 3.1.1
N/A Sample Collection Logs/Results
Within 48 hours of receipt of results
KO, COR,
Installation Environmental Office
As Required
1800000/ 3.1.2
N/A Field Testing Sample Results
Within 48 hours of receipt of results
KO, COR,
Installation Environmental Office
As Required
1800000/ 3.1.3
N/A Laboratory Services Reports
Within 48 hours of receipt of results
KO, COR,
Installation Environmental Office
As Required
1800000/ 3.2.2
J-0200000-05 Used Oil Disposal and Recycling Summary Report
10 days after the end of the reporting period
KO, COR,
Installation Environmental Office
Annually
1800000/ 3.2.2
N/A Used oil sampling plan
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/ 3.2.2
N/A Used oil analysis As Specified KO & COR As required
1800000/ 3.2.2
N/A Used Oil Bill of Lading
By December
31st
KO, COR &
Installation
Environmental Office
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1800000/
3.3 N/A HM Control and
Management Program
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/ 3.3.1.1
N/A Regulated Substance Spill
Within 30 minutes
KO, COR &
Installation
Environmental Office
As Required
1800000/ 3.3.1.3
N/A Hazardous Accumulation Site Inspections
First working day of the following week
KO, COR,
Installation
Environmental Office
Weekly
1800000/ 3.3.1.3
N/A Oral Notification of Condition Which May Endanger Health or the Environment
Immediately KO, COR & Installation
Environmental Office
As Required
1800000/ 3.3.1.3
N/A Documentation, including investigation, root cause analysis, and corrective action(s), of any reportable incident.
Within Five working days
KO, COR &
Installation
Environmental Office
As Required
1800000/ 3.3.1.3
N/A Waste Identification Document (WID)
Within Five working days
KO & COR As Required
1800000/ 3.3.3
J-1800000-10 Hazardous Waste Disposal Report including Waste Profile Records
First working day of the following month
KO, COR,
Installation
Environmental Office
Monthly
1800000/ 3.3.4
N/A Sludge Sample Analysis
As Specified KO, COR, Installation
Environmental Office
As Required
1800000/ 3.4.1
N/A Initial Spill Assessment Report
Within 15 minutes upon arrival onsite
KO, COR &
Installation
Environmental Office
As Required
1800000/ 3.4.3
N/A Spill Response Report
Upon completion of clean up operations
KO, COR &
Installation
Environmental
As Required
Form Attachment
Number Deliverable Title Date (s) of
Submission To Frequency 1800000/
3.5 N/A Best Management
Practices Report As Specified KO, COR &
Installation Environmental
Office
Quarterly
1800000/ 3.5
N/A Outfall Visual Monitoring Report
As Specified KO, COR & Installation
Environmental Office
Quarterly
1800000/ 3.5
N/A Stormwater Training Data
As Specified KO, COR & Installation
Environmental Office
Quarterly
1800000/ 3.6
N/A Fuel storage tank Inspection
Within 24 hours of
Inspection or 15 minutes upon leak identificatio n
KO, COR &
Installation
Environmental Office
Monthly
1800000/ 3.6
N/A Tank sensors inspection
By December 31st and within 30 minutes of discovery of sensor failure or leak
KO, COR &
Installation
Environmental Office
Annually
1800000/ 3.6
N/A Secondary containment Logs and Inventory Reports
Each Monday for the previous week
KO, COR &
Installation
Environmental Office
Weekly
1800000/ 3.6
N/A Tank and Secondary Containment repair report
Within 15 minutes
KO, COR &
Installation
Environmental
Section F – 1800000
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1800000/ 2.2.1
N/A Training Plan 15 days after award/ Annually
KO & COR Annually
1800000/ 2.2.1, 2.4.1
N/A Training Documentation
15 days after award/ Annually
KO, COR &
IEPD
As Specified
1800000/ 2.4.3
N/A Spill Response Leader and Team Members Nominations/ Qualifications
15 days after award/ Annually
KO, COR &
IEPD
As Specified
1800000/
N/A Out of Compliance Notification and Recommendations
As Specified KO, COR &
IEPD
As Specified
1800000/ 3.1
Spill Response Equipment Inspection and Inventory
15 days after award/ Annually
KO, COR &
IEPD
Annually
1800000/ 3.1, 3.1.1
Initial Spill Notification
Immediately upon identification of spill
COR,
Environmental Division, RDC
& FIC
As Required
1800000/ 3.1, 3.13
Spill Assessment Report
Within 30 minutes of arrival onsite during regular working; one hour of start of next work day for after hours
KO, COR,
IEPD & FIC
As Specified
1800000/ 3.1.3
J-0200000-07 Final Spill Clean Up Report
Within 5 days of completing spill response
KO, COR &
IEPD
As Specified
1800000/ 3.2.1
N/A Used Oil Accumulation and Collection Inspection Report
Within 48 hours of completing inspection
KO, COR &
IEPD
Annually
1800000/ 3.2.2
Bill of Landing or Manifest
Used Oil Shipment Report
At the time of shipment with return manifest within 30 days of shipment.
KO, COR &
IEPD
Section F – 1800000
Form Attachment
Number Deliverable Title Date (s) of Submission To Frequency
1800000/ 3.2.2
N/A Used oil sampling plan
Within 15 calendar days prior to contract start.
KO & COR As required
1800000/ 3.2.2
N/A Used oil analysis As Specified KO & COR As required
1800000/ 3.2.2
J-0200000-07 Used Oil Disposal and Recycling Summary Report
10 days after the end of the reporting period
KO, COR &
IEPD
Annually
1800000/ 3.3
N/A Best Management Practices and
POA&M
Monthly inspections by the 10th of the following month.
Quarterly inspections by the 10th of the first month in the next quarter
KO, COR,
IEPD & Water
Compliance Manager
Monthly and Quarterly
1800000/ 3.3
N/A Storm Water Deficiency POAM and Cost Estimate
10 days after the end of the reporting period
KO, COR,
IEPD & Water
Compliance Manager
Quarterly
1800000/ 3.3
N/A Storm Water Monitoring Report and Sample Analysis
10 days after the end of the reporting period
KO, COR,
IEPD & Water
Compliance Manager
Quarterly
1800000/ 3.3
N/A Storm Water Training Report
10 days after the end of the reporting period
KO, COR,
IEPD & Water
Compliance Manager
Quarterly
File details come from the government source that posted it. Updated .