About this file

This document is a Base Operating Support (BOS) Cat Call Request form for a federal contract with the reference number N69450-25-R-0000. The form outlines procedures for submitting and processing work orders, with a category of call ranging from $0 to $5,000. The process involves several key steps: the government requester selects the activity and category, completes a Statement of Work, and submits it to BOS Work Control. The contractor then reviews the scope within two working days, electronically signs the form, and returns it to the Contracting Officer. If there are discrepancies between the requesting activity and the contractor's category of call, the contractor must provide a basis for their position. The closeout procedures include a final inspection by the COR/PAR and signing off on the work order completion.

View the file

Other files

File Type Posted
N6945025R0003-0007.pdf PDF
JL-1_Labor_Hours_Spreadsheet_0007.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0007.xlsx XLSX spreadsheet
JL-11_N6945025R0003_GPI Responses_0007.pdf PDF
J-0200000-17_ELINs_0006.xlsx XLSX spreadsheet
N6945025R0003-0006.pdf PDF
J-1606000-07 Historical Water Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003_SectionJ_0005.pdf PDF
J-0200000-02-01_N6945025R0003 CBA-2025-439_0005.pdf PDF
N6945025R0003_SectionC_0005.pdf PDF
N6945025R0003-0005.pdf PDF
J-1502000-24 FRCS Roles and Responsiblities_0005.xlsx XLSX spreadsheet
J-0200000-02-02_N6945025R0003 CBA-2025-440_0005.pdf PDF
JL-11_N6945025R0003_GPI Responses_0005.pdf PDF
J-1503010-05 Custodial Inventory_0005.xlsx XLSX spreadsheet
J-1502000 (MCSF-BI) Facility Investment_0005.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0005.xlsx XLSX spreadsheet
J-1502000 Facility Asset Inventories_0005.xlsx XLSX spreadsheet
J-0600000-04 Historical Port Ops Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003-0004.pdf PDF
N6945025R0003-0003.pdf PDF
JL-9_N6945025R0003_Site_Visit_Brief_0002.pdf PDF
JL-10_N6945025R0003_Site_Visit_Sign-In_Sheets_0002.pdf PDF
N6945025R0003-0002.pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE_0001.pdf PDF
N6945025R0003-0001.pdf PDF
J-1503050-09 (MCSF-BI) Paved Roadways and Lots Map.pdf PDF
JL-6_N6945025R0003_MBOS SITE VISIT Directions.pdf PDF
J-0200000-22 NAVFACINST 11230.1.pdf PDF
JM-2_N6945025R0003_Historical_Small_Business_Utilization.docx DOCX document
J-1502000-07 (MCSF-BI) Compressed Air Systems.pdf PDF
J-0200000-07 Utility Asset Condition Report.xlsx XLSX spreadsheet
J-0600000-03 Maps and Locations.pdf PDF
J-1502000-23 FRCS Cybersecurity Program.pdf PDF
J-1503030-04 (MCSF-BI) Solid Waste and Recycle Containers.pdf PDF
J-1800000-06 Mayport SWPPP.pdf PDF
N6945025R0003_SectionF.pdf PDF
N6945025R0003_2015-4539 (Rev.-28).pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE.pdf PDF
J-1502000-19 NAVSTA Cross Connection Control Program.pdf PDF
N6945025R0003_SectionC.pdf PDF
J-0200000-04 Partnering Agreement.pdf PDF
J-1503050-07 (MCSF-BI) Shoreline Cleanup Map.pdf PDF
J-1502000-08 (MCSF-BI) Crane and Railroad Inventory.pdf PDF
JM-1_N6945025R0003_Corporate_Experience.docx DOCX document
J-0200000-20 USMCmaxUserGuide.docx DOCX document
J-1800000-12 (MCSF-BI) Stormwater System Map.pdf PDF
J-1502000-21 (MCSF-BI) Lighting Systems.pdf PDF
J-1601000-05-01 Service Desk Guide for Reporting Utility System Outages.pdf PDF
J-1502000-23 (MCSF-BI) Lift Stations.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N69450-25-R-0000

Government Representative / Date

Contractor signature below represents agreement of scope and call category

Government Representative / Date

Contractor Representative / Date

Work Order # :

Contracting Officer / Date

Approved

Disapproved

BOS CAT CALL REQUEST

BOS CAT CALL PROCEDURES

1: Government requester selects REQUESTING ACTIVITY; CATEGORY OF CALL; Completes the STATEMENT OF WORK;

signs the form electronically; and submits the form to BOS Work Control.

2: BOS Work Control creates the work order in MAXIMO/DMLSS; enters WORK ORDER # on the form. Within two working days, contractor reviews scope, requested category and electronically signs the form and email to the Contracting Officer. In cases where there is a difference between the requesting activity and the contractors category of call, the Contractor shall include the basis of their position to the Contracting Officer for review.

STATEMENT OF WORK

Acceptance of Completed Work

BOS CAT CALL CLOSEOUT PROCEDURES

1: BOS request final inspection of work to COR/PAR 2: FSC ET/REQUESTING ACTIVITY/BOS QC perform final inspection 3: COR/PAR signs the form to close the work order john.r.anderson9 Highlight

Work Order #:
Date 2:
Group8: Choice1
CUSTOMER: [N6945025R0000 MCSF]
STATEMENT OF WORK:
CONTRACTOR CATEGORY: [Category 1 $2,501-$5,000 Two Weeks]
Dropdown2: [Category I - $0 - $5,000]

File details come from the government source that posted it. Updated .