About this file

This is a solicitation notice for base operations support services at multiple Navy facilities in Louisiana. The solicitation seeks services including facility management, facility investment, custodial, pest control, integrated solid waste management, grounds maintenance, electrical, natural gas, wastewater, and water. The procuring agency is Naval Facilities Engineering Command Southeast. The solicitation number is N69450-23-R-0014 and will utilize full and open competition set aside for small businesses. The contract type is indefinite-delivery, indefinite-quantity with both recurring and non-recurring work. The period of performance is one base year plus seven one-year options, not to exceed eight years total. Key dates include a site visit on January 24-25, 2023 and questions due by February 1, 2023. The estimated contract value was not provided.

View the file

Other files

File Type Posted
JL-2 N6945023R0014 GPI Responses_0002.xls XLS spreadsheet
N6945023R0014_ Section J_Inventories_0002.xlsx XLSX spreadsheet
DBA LA20230031_Caddo_0002.pdf PDF
DBA LA20230041_Orleans_0002.pdf PDF
DBA LA20230052_Plaquemines_0002.pdf PDF
N6945023R0014_SectionF_0002.pdf PDF
N6945023R0014_SectionC_0002.pdf PDF
N6945023R0014_0002.pdf PDF
N6945023R0014_J-0200000-13_ELINS_0002.xlsx XLSX spreadsheet
JL-6_N6945023R0014 SiteVisitBrief_0001.pdf PDF
JL-7_N6945023R0014 SiteVisitSign-InSheet_0001.pdf PDF
N6945023R0014_0001.pdf PDF
J-0200000-09_CHARACTERISTIC_METER READING_INFORMATION.xlsx XLSX spreadsheet
DBA LA20230031_Caddo.pdf PDF
N6945023R0014_J-0200000-13ELINS.xlsx XLSX spreadsheet
JL-2 _N6945023R0014 GPIF.xlsx XLSX spreadsheet
N6945023R0014_J-0200000-14_CAT_Call_Request.pdf PDF
N6945023R0014.pdf PDF
N6945023R0014_J-0200000-10 Energy Policy CNRSEINST 4101.1C.pdf PDF
J-0200000-06_ SERVICE PROVIDER_INFORMATION.xlsx XLSX spreadsheet
N6945023R0014_J-1503010-06_Floor Plans.pdf PDF
N6945023R0014_Section_J.pdf PDF
DBA LA20230041_Orleans.pdf PDF
N6945023R0014_ Section J_Inventories.xlsx XLSX spreadsheet
JL-5_N6945023R0014 SECNAV5512.pdf PDF
SCA WD 2015-5191.pdf PDF
JM-2_N6945023R0014 PPQ.doc DOC document
DBA LA20230052_Plaquemines.pdf PDF
J-0200000-08_ASSET_SPECIFICATION.xlsx XLSX spreadsheet
J-0200000-07_ASSET_INFORMATION.xlsx XLSX spreadsheet
JL-4_N6945023R0014 AMAG.xls XLS spreadsheet
JL-3_N6945023R0014 SiteVisitItinerary.pdf PDF
JL-1_N6945023R0014.xlsx XLSX spreadsheet
N6945023R0014_Section_C.pdf PDF
N6945023R0014_Section_F.pdf PDF
SCA WD 2015-5189.pdf PDF
JM-1 _N6945023R0014 Corporate Experience.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N69450-23-R-0014

Amendment 0002

SECTION J - 0200000

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

MANAGEMENT AND ADMINISTRATION

TABLE OF CONTENTS

ATTACHMENT

NUMBER ATTACHMENT TITLE

J-0200000-01 Definitions And Acronyms

J-0200000-02 Wage Determinations

J-0200000-03 Directives, Instructions, and References

J-0200000-04 Forms

J-0200000-05 NAVFAC Maximo Data Reporting

J-0200000-06 Service Provider Information

J-0200000-07 Asset Information

J-0200000-08 Specification Information

J-0200000-09 Characteristic Meter Reading Information

J-0200000-10 Commander, Navy Region Southeast Instruction 4101.1 (series)

J-0200000-11 General Environmental Requirements

J-0200000-12 Contractor Hazardous Material Inventory Log

J-0200000-13 Exhibit Line Item Numbers

J-2000000-14 CAT Call Request Form

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Definition Description

Assessment A general term referring to either a survey or inspection of a facility to determine condition.

Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.

Business Management

System (BMS)

A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.

Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

Component Inventory

Management Unit

(CIMU)

An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.

Confined Work Space A space that is large enough and so configured that a person may bodily enter a space

(such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.

Construction

Equipment

Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.

All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.

Contracting Officer

(KO)

That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.

Contractor

Representative

That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.

http://en.wikipedia.org/wiki/Vehicle http://en.wikipedia.org/wiki/Construction

Definition Description

Direct Material Costs Material requirements shall include a list of materials establishing the size, quality, number of units, and unit prices. The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

All indirect cost associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material cost since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.

Electronic Operation

And Maintenance And

Support Information

(eOMSI)

A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.

Generally it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.

Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.

Facility A building or structure designed and created to serve a particular function.

Definition Description

Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or

Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Government Furnished

Property (GFP)

Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Infrastructure Condition

Assessment Program

(ICAP)

A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.

Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.

Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.

Maintenance And

Repair

The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.

NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC

MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.

Performance

Assessment

A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Performance

Assessment

Representative (PAR)

That individual designated by the KO to be responsible for the monitoring of Contractor performance.

Definition Description

Pre-Expended Bin

Materials And Supplies

The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.

Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.

Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract

Property Management

Program

A Government program established for the purpose of reviewing and approving the

Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.

Quality Assurance

(QA)

The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.

Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.

R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as

"Means".

Real Property Inventory

Equipment (RPIE)

A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and VTEs). It is physically attached to, integrated into, and built in or on the property.

Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.

An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.

Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.

Unit Priced Labor

(UPL) Hour

The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as:

the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

Universal Equipment Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as:

Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc.

Acronym Title

ACO Administrative Contracting Officer

BW Biweekly

CDR Contract Discrepancy Report

CIA Controlled Industrial Area

CIMU Component Inventory Management Unit

CMMS Computerized Maintenance Management System

COR Contracting Officer Representative

COR Condition of Readiness

DBH Diameter at Breast Height

DCR Direct Condition Rating

DoD Department of Defense

DoN Department of Navy

DRMO Defense Reutilization Management Office

EPA Environmental Protection Agency

EPCRA Emergency Planning and Community Right-to-Know Act

FAR Federal Acquisition Regulation

RECURRING WORK Recurring Work

FIFRA Federal Insecticide, Fungicide, and Rodenticide Act

FSC Facility Support Contract

GIS Geospatial Information System

GFE Government-furnished Equipment

GFF Government-furnished Facilities

GFM Government-furnished Materials

HCA Head Contracting Agency

ICAP Infrastructure Condition Assessment Program

ICP Integrated Contingency Plan

NON-RECURRING WORK Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store

IPM Integrated Pest Management

IPMIS Integrated Pest Management Information System

IPMP Integrated Pest Management Plan

KO Contracting Officer

LAN Local Area Network

M Monthly

MAP Maintenance Action Plan

MDI Mission Dependency Index

MEP Mechanical, Electrical and Plumbing

MRI Mission Readiness Index

MSDS Material Safety Data Sheets

NAVFAC Naval Facilities Engineering Command

NMCI Navy Marine Corps Intranet

NOSC Navy-On-Scene Coordinator

PAP Performance Assessment Plan

PAR Performance Assessment Representative

PAW Performance Assessment Worksheet

PEO Program Executive Officer

PM Project Manager

Acronym Title

PM Planned Maintenance or Preventative Maintenance

PRCSP Permit Required Confined Space Program

PWS Performance Work Statement

PWO Public Works Officer

Q Quarterly

QC Quality Control

RPIE Real Property Inventory Equipment

RSL Remaining Service Life

SC Security Clearances

SM Semimonthly

SPAR Senior Performance Assessment Representative

TE Technical Exhibit

VIQ Variation in Quantity

WBS Work Breakdown Structure

ATTACHMENT J-0200000-02

Wage Determinations

Attachments J-0200000-02-01 Davis Bacon and J-0200000-02-02 Service Contract Wage Determinations are provided as a separate files.

ATTACHMENT J-0200000-03

DIRECTIVES, INSTRUCTIONS, AND REFERENCES

Reference Title

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements

P.L. 91-596 Occupational Safety and Health Act

CNRSEINST 4101.1 (series) Navy Region Southeast Energy Management Program

OPNAVINST 5090.1 (series) Environmental and Natural Resources Manual

OPNAVINST 5100.23 (series) Navy Occupational Safety and Health Program Manual

UFGS 01 35 26 Unified Facilities Guide Specifications

ATTACHMENT J-0200000-04

FORMS

1) Contract Significant Incident Report (CSIR)

2) Contractor Crane Operating Checklist For Critical Lifts

3) Crane And Rigging Gear Accident Report

4) Crane And Rigging Gear Near Miss Report

5) Solid Waste Management and Recycling Report

All forms are provided below.

Contractor Significant Incident Report (CSIR)

Initial Report Follow-up Report Final Report

Contractor Significant Incident Report (CSIR)

1. General Information

Contracting Activity:

Accident Classification:

Injury Fatality Environment Procedural Issues Lessons Learned

Illness Property Damage

Other_______________________________

Involving:

Confined Space Equip/Mrt Ver/Mat Handling (Heavy Construction Equip.) Hazardous Material

Crane and Rigging Equip/Mrt Ver/Mat Handling (Material Handling) Trenching/Excavation

Diving Equip/Mrt Ver/Mat Handling (Man-Lift/Elevated Platform) Waterfront/Marine Operations

Demolition/Renovation Fall from Ladder Fall from Scaffold Other___________________

Electrical Fall from Roof Fire

2. Personal Information

Name (Last, First, MI):

Age: Sex:

Job Title/Description:

Employed By:

Supervisor Name (Last, First, MI) & Title:

Was the person trained to perform this activity/task?

Yes No

What type of training was received (OJT, classroom, etc)?

Date of the most recent formal training and topics discussed?

3. Witness Information

Witness #1: Name (Last, First, MI):

Supervisor Name (Last, First, MI):

Witness #2: Name (Last, First, MI):

Supervisor Name (Last, First, MI):

Additional Witnesses:

4. Contract Information

Type of Contract:

A/E BOS CLEAN Construction Design Build FSCC FSSC

JOC RAC Service Other_______________________________

Contract Number & Title:

Industrial Group & Industrial Type:

Prime Contractor Name/Address/Phone & Fax

No:

Safety Manager (Last, First, MI):

Insurance Carrier:

Sub-Contractor Name/Address/Phone & FAX No:

Safety Manager (Last, First, MI):

Insurance Carrier:

5. Accident Description

Date of Accident:

Time of

Accident:

Exact Location of Accident:

Describe the accident in detail in your words: (Use the back of page if you need additional space)

(List any additional witnesses on a separate sheet and attach.)

Direct Cause(s) of Accident:

Indirect Cause(s) of Accident:

Action(s) taken to prevent re-occurrence or provide on-going corrective actions:

Corrective Action Beginning Date:

Anticipated Completion Date:

Personal Protective Equipment:

Available and used Available and not used Not Required

Not related to Mishap Wrong PPE for job

List PPE Used:

Type of Construction Equipment (Make, Model, Serial #, VIN#) Involved:

Was Hazardous Material Spilled/Released?

Please List Hazardous Material(s) Involved:

Who provided first aid or cleanup of mishap site?

Any blood-borne pathogen exposure, other than EMTs?

Yes

No

Who?

List OSHA and EM-385-1-1 standards that were violated:

Was site secured and witness statements taken immediately?

By Whom?

6. Injury Illness/Fatality Information

Severity of Injury/Illness:

Fatality Lost Workday Case Involving Days Away From Work

Temporary Disabillity Recordable Workday Case Involving Restricted Duty

Permanent Total Disability Other Recordable Case

Recordable First Aid Case

Permanent Partial Disability Non-Recordable Case No Injury

Estimated Days Lost:

Estimated Days

Hospitalized:

Estimated Days Restricted Duty:

List Primary Body Part

Affected:

List Other Body Part(s) Affected:

Nature of Injury/Illness for Primary Body Part (Examples: Amputation, Burn, Hernia):

Type of Accident (Examples: Fall same level, Lifting, Bitten, Exerted):

Source of Accident (Examples: Crane, Carbon Monoxide, Ladder, Welding Equipment):

7. Causal Factors (Explain answers on supplementary sheet)

Design – Design of facility, workplace, or equipment was a factor?

Inspection/Maintenance – Inspection & Maintenance procedures were a factor?

Persons Physical Condition – In your opinion, the physical condition of the person was a factor?

Operation Procedures – Operating procedures were a factor?

Job Practices – One or more job safety/health practices not being followed when the accident occurred contributed to the accident?

Human Factors – One or more human factors, such as a person’s size or strength contributed to the accident?

Environmental Factors – Heat, cold, dust, sun, glare, etc., contributed to the accident?

Chemical and Physical Agent Factors – Exposure to chemical agents, such as dust, fumes, mist, vapors, or physical agents such as noise, radiation, etc., contributed to the accident?

Office Factors – Office setting such as lifting office furniture, carrying, stooping, contributed to the accident?

Support Factors – Inappropriate tools/resources were provided to perform the task?

PPE – Improper selection, use or maintenance of PPE contributed to the accident?

Drugs/Alcohol – In your opinion, were drugs or alcohol a factor?

Job Hazard Analysis – The lack of an adequate (IAW-EM-385-1-

1 Sec 01.A) activity hazard analysis was a contributing factor.

Job Hazard Analysis – JHA was not site specific and/or did not address the type of work/operations performed when the mishap occurred.

Management – A lack of adequate supervision contributed to the accident.

Management – Inadequate information was provided at pre con meeting.

CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR) INSTRUCTIONS

Complete Sections Appropriate to Incident (Rev. 06/02).

NOTE: THE ATTACHED CSIR FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS OF THEIR

ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE CONTRACTING OFFICER WITHIN

THE REQUIRED TIMEFRAMES.

GENERAL. Complete a separate report for each person who was injured in the accident. A report needs to be completed for all

OSHA recordable accidents, property damage in excess of $2000.00 (This amount is for record purposes only. GOV is not required to enter property damage reports into FAIR database if it is less than $10,000.00.), WHE accidents, or near miss/high visibility mishaps. Please type or print legibly. Appropriate items shall be marked with an “X” in box(es), non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.

Mark the report:

INITIAL – If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.

FOLLOW-UP – If you are providing additional information on a report previously submitted.

FINAL – If you are providing a completed report and expect no changes.

SECTION 1 – GENERAL INFORMATION

CONTRACTING ACTIVITY/ROICC OFFICE - Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).

ACCIDENT CLASSIFICATION - INJURY/ILLNESS/FATALITY/PROPERTY DAMAGE/-PROCEDURAL ISSUES/-

ENVIRONMENTAL/LESSONS LEARNED/OTHER – Mark the appropriate block(s) if the incident resulted in any of these conditions.

INVOLVING - If the mishap involved any of the conditions listed under “Involving” mark the appropriate box(es). Specific questions associated with each of these conditions are available from the Contracting Officer to assist you in your investigation.

When these questions are used they shall be attached as part of this report.

SECTION 2 - PERSONAL INFORMATION

NAME - Enter last name, first name, middle initial of person involved.

AGE - Enter age.

SEX - Enter M for Male and F for Female.

JOB TITLE/DESCRIPTION - Enter the job title/description assigned to the injured person (e.g. carpenter, laborer, surveyor, etc.).

EMPLOYED BY - Enter employment company name of the person involved.

SUPERVISOR’S NAME & TITLE - Enter name and title of the immediate supervisor.

WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK? - For the purpose of this section “trained” means the person has been provided the necessary information (either formal and/or on-the-job (OJT) training) to competently perform the activity/task in a safe and healthful manner.

TYPE OF TRAINING - Indicate the specific type of training (classroom or on-the-job) that the injured person received before the accident happened.

DATE OF MOST RECENT FORMAL TRAINING/TOPICS DISCUSSED - Enter the month, day, and year of the last formal training completed that covered the activity/task being performed at the time of the accident. List topics that were discussed at the training identified above.

SECTION 3 - WITNESS INFORMATION

The following applies to Witness #1 and Witness #2:

WITNESS NAME - Enter last name, first name, middle initial of the witness.

JOB DESCRIPTION/TITLE - Enter the job title/description assigned to the witness (e.g. carpenter, laborer, surveyor, etc.).

EMPLOYED BY - Enter the name of the employment company of the witness.

SUPERVISORS NAME - Enter name of immediate supervisor of the witness.

ADDITIONAL WITNESSES - Provide same information, as above, for each witnesses. Use additional pages if necessary.

SECTION 4 - CONTRACTOR INFORMATION

TYPE OF CONTRACT - Mark appropriate box. A/E means architect/engineer. If “OTHER” is marked, specify type of contract on line provided.

CONTRACT NUMBER/TITLE - Enter complete contract number and tile of prime contract (e.g. N62477-85-C-0100, 184 Pearl

City Hsg. Revitalization).

CONSTRUCTION INDUSTRIAL GROUP AND INDUSTRIAL TYPE – This is the type of construction that will be done at this project.

1. First, you must choose the Industrial Group. You have 4 choices to choose from: (NOTE! Review of the Industrial Types below and knowing what the projects scope of work is will assist you in deciding what the Industrial Group should be.)

a. Buildings

b. Heavy Industrial

c. Infrastructure

d. Light Industrial

2. Once you have chosen the Industrial Group, you now select the Industrial Type. You have multiple choices under each Group, chose the one you feel fits the project most closely because on most projects there won’t be an exact match:

a. Buildings:

(1) Communications Ctr.

(2) Dormitory/Hotel

(3) High-rise Office

(4) Hospital

(5) Housing

(6) Laboratory

(7) Low-rise Office

(8) Maintenance Facility

(9) Parking Garage

(10) Physical Fitness Ctr.

(11) Restaurant/Nightclub

(12) School

(13) Warehouse

b. Heavy Industrial:

(1) Chemical Mfg.

(2) Electrical (Generating)

(3) Environmental

(4) Metals Refining/Processing

(5) Mining

(6) Natural Gas Processing

(7) Oil Exploration/Production

(8) Oil Refining

(9) Pulp and Paper

c. Infrastructure:

(1) Airport

(2) Electrical Distribution

(3) Flood Control

(4) Highway

(5) Marine Facilities

(6) Navigation

(7) Rail

(8) Tunneling

(9) Water/Wastewater

d. Light Industrial:

(1) Automotive Assembly/Mfg.

(2) Consumer Products Mfg.

(3) Foods

(4) Microelectronics Mfg.

(5) Office Products Mfg.

(6) Pharmaceuticals Mfg.

CONTRACTOR’S NAME/ADDRESS/PHONE NUMBER

(1) PRIME - Enter the exact name (title of firm), address, phone and fax numbers of the prime contractor.

(2) SUBCONTRACTOR - Enter the exact name, address, phone and fax numbers of any subcontractor involved in the accident.

SAFETY MANAGER’S NAME

(1) PRIME - Enter the name of the prime contractor safety manager.

(2) SUBCONTRACTOR - Enter the name of the subcontractors safety manager.

INSURANCE CARRIER

(1) PRIME - Enter the exact name/title of the prime’s insurance company. Policy number not required.

(2) SUBCONTRACTOR - Enter the exact name of the subcontractor’s insurance company. Policy number not required.

SECTION 5 - ACCIDENT DESCRIPTION

DATE OF ACCIDENT - Enter the month, day, and year of accident.

TIME OF ACCIDENT - Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).

EXACT LOCATION OF ACCIDENT - Enter facts needed to locate the accident scene (installation/project name, building/room number, street, direction and distance from closest landmark, etc.).

DESCRIBE THE ACCIDENT IN DETAIL. Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered.

NOTE! Review questions in Section 7 below before completing.

DIRECT CAUSE(S) - The direct cause is that single factor which most directly leads to the accident. See examples below.

INDIRECT CAUSE(S) - Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.

Examples for Direct and Indirect Cause:

1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.

Direct cause: Failure to provide fall protection at elevation

Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.

2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)

Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.

Indirect cause: Failure of employee to pay attention to driving (defensive driving).

ACTION(S) TAKEN TO PREVENT RE-OCCURRENCE OR PROVIDE ON-GOING CORRECTIVE ACTIONS. Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses.

Continue on back or additional sheets of paper if necessary to fully explain and attach to the complete report form.

CORRECTIVE ACTION DATES -

(1) Beginning - Enter the date when the corrective action(s) identified above will begin.

(2) Anticipated Completion - Enter the date when the corrective action(s) identified above will be completed.

PERSONAL PROTECTIVE EQUIPMENT (PPE) - Mark appropriate box(es) and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)

TYPE OF CONTRACTOR EQUIPMENT - Enter the Serial Number, Model Number and specific type of equipment involved in the mishap (e.g. dump truck (off highway), crane (rubber tire), pump truck (concrete), etc.).

WAS HAZARDOUS MATERIAL SPILLED/RELEASED? - Mark appropriate block and list name(s) of any reportable quantities of hazardous materials spilled/released during the mishap.

WHO PROVIDED FIRST AID OR CLEAN-UP OF MISHAP SITE? - List name(s) of individual(s) and employer, if known.

ANY BLOOD-BORNE PATHOGEN EXPOSURE, OTHER THAN EMT? - Mark appropriate block and list name(s) of individual(s) and employer, if known.

LIST OSHA AND/OR EM 385-1-1 STANDARDS THAT WERE VIOLATED. - Self explanatory.

WAS SITE SECURED AND WITNESS STATEMENT TAKEN IMMEDIATELY? - Mark appropriate block and list by whom.

SECTION 6 - INJURY/ILLNESS/FATALITY INFORMATION

SERVERITY OF INJURY/ILLNESS – Mark appropriate box.

ESTIMATED DAYS LOST - Enter the estimated number of workdays the person will lose from work. Update when final data is known.

ESTIMATED DAYS HOSPITALIZED - Enter the estimated number of workdays the person will be hospitalized. Update when final data is known.

ESTIMATED DAYS RESTRICTED DUTY - Enter the estimated number of workdays the person, as a result of the accident, will not be able to perform all of their regular duties. Update when final data is known.

BODY PART(S) AFFECTED - Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g.

arm: wrist: abdomen: single eye; jaw: both elbows: second finger: great toe: collar bone: kidney, etc.).

NATURE OF INJURY/ILLNESS FOR PRIMARY BODY PART - Enter the most appropriate nature of injury/illness (e.g.

amputation, back strain, dislocation, laceration, strain, asbestosis, food poisoning, heart conditions, etc.).

TYPE AND SOURCE OF INJURY/ILLNESS - Type and Source Codes are used to describe what caused the incident.

(1) TYPE Code stands for an “Action” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder.

Type Code: Fell different levels”.) Select the most appropriate Type of injury from the list below:

TYPE OF INJURY/ILLNESS

STRUCK

BY/AGAINST

CONTACTED

CONTACTED WITH (INJURED PERSON

MOVING)

CONTACTED BY (OBJECT WAS MOVING)

FELL, SLIPPED, TRIPPED

SAME LEVEL/DIFFERENT LEVEL/NO

FALL

EXERTED

LIFTED, STRAINED BY (SINGLE ACTION)

STRESSED BY (REPEATED ACTION)

CAUGHT

ON/IN/BETWEEN

EXPOSED

INHALED/INGESTED/ABSORBED/EXPOS

ED TO

PUNCTURED, LACERATED

PUNCTURED BY/CUT BY/STUNG

BY/BITTEN BY

TRAVELING IN

(2) SOURCE Code stands for an “object or substance.” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Source Code: “Ladder”.) Select the most appropriate Source of injury from the list below:

SOURCE OF INJURY/ILLNESS

Building or Working Area

Walking/Working Area

Stairs/Steps

Ladder

Furniture

Boiler/Pressure Vessel

Equipment Layout

Windows/Doors

Electricity

Dust, Vapor, Etc.

Dust (Silica, Coat, Etc.)

Fibers

Asbestos

Gases

Carbon Monoxide

Mist, Steam, Vapor, Fume

Welding Fumes

Particles (Unidentified)

Environment Condition

Temperature Extreme (Indoor)

Weather (Ice, Rain, Heat, etc.)

Fire, Flame, Smoke (Not Tobacco)

Noise

Radiation

Light

Ventilation

Tobacco Smoke

Stress (Emotional)

Confined Space

Chemical, Plastic, etc.

Dry Chemical - Corrosive

Dry Chemical - Toxic

Dry Chemical - Explosive

Dry Chemical - Flammable

Liquid Chemical - Corrosive

Liquid Chemical - Toxic

Liquid Chemical - Explosive

Liquid Chemical - Flammable

Plastic

Water

Medicine

Machine or Tool

Hand Tool (Powered: Saw, Grinder, etc.)

Hand Tool (Non Powered)

Mechanical Power Transmission Apparatus

Guard, Shield (Fixed, Moveable, Interlock)

Video Display Terminal

Pump, Compressor, Air Pressure Tool

Heating Equipment

Welding Equipment

Inanimate Object

Box, Barrel, etc.

Paper

Metal Item, Mineral

Needle

Glass

Scrap, Trash, Wood

Food

Clothing, Apparel, Shoes

Machine or Tool

Hand Tool (Powered: Saw, Grinder, etc.)

Hand Tool (Non Powered)

Mechanical Power Transmission Apparatus

Guard, Shield (Fixed, Moveable, Interlock)

Video Display Terminal

Pump, Compressor, Air Pressure Tool

Heating Equipment

Welding Equipment

Inanimate Object

Box, Barrel, etc.

Paper

Metal Item, Mineral

Needle

Glass

Scrap, Trash, Wood

Food

Clothing, Apparel, Shoes

Vehicle

As Driver of Privately Owned, Rental Vehicle.

As Passenger of Privately Owned, Rental Vehicle.

Driver of Government Vehicle

Passenger of Government Vehicle

Common Carrier (Airline, Bus, etc.)

Aircraft (Not Commercial)

Boat, Ship, Barge

Animate Object

Dog

Other Animal

Plant

Insect

Human (Violence)

Human (Communicable Disease)

Bacteria, Virus (Not Human Contact)

Material Handling Equipment

Earthmover (Tractor, Backhoe, etc.)

Conveyor (For Material and Equipment)

Elevator, Escalator, Personnel Hoist

Hoist, Sling Chain, Jack

Crane

Forklift

Hand truck , Dolly

Personal Protective Equipment

Protective Clothing, Shoes, Glasses, Goggles

Respirator, Mask

Diving Equipment

Safety Belt, Harness

Parachute

SECTION 7 - CAUSAL FACTORS

Review thoroughly. Answer each question by marking the appropriate block. NOTE! If any answer is yes, explain in section 5 above.

(1) DESIGN - Did inadequacies associated with the building or work site play a role? Would an improved design or layout of the equipment or facilities reduce the likelihood of similar accidents? Were the tools or other equipment designed and intended for the task at hand?

(2) INSPECTION/MAINTENANCE - Did inadequately or improperly maintained equipment, tools, workplace, etc., create or worsen any hazards that contributed to the accident? Would better equipment, facility, work site or work activity inspections have helped avoid the accident?

(3) PERSONS PHYSICAL CONDITION - Do you feel that the accident would probably not have occurred if the employee was in

“good” physical condition? If the person involved in the accident had been in better physical condition, would the accident have been less severe or avoided altogether? Was overexertion a factor?

(4) OPERATION PROCEDURES - Did lack of or inadequacy within established operating procedures contribute to the accident?

Did any aspect of the procedures introduce any hazard to, or increase the risk associated with the work process? Would establishment or improvement of operating procedures reduce the likelihood of similar accidents?

(5) JOB PRACTICES - Were any of the provision of the Safety and Health Requirements Manual (EM 385-1-1) violated? Was the task being accomplished in a manner which was not in compliance with an established job hazard analysis or activity hazard analysis? Did any established job practice (including EM 385-1-1) fail to adequately address the task or work process? Would better job practices improve the safety of the task?

(6) HUMAN FACTORS - Was the person under undue stress (either internal or external to the job)? Did the task tend toward overloading the capabilities of the person: i.e., did the job require tracking and reacting to many external inputs such as displays, alarms, or signals? Did the arrangement of the workplace tend to interfere with efficient task performance? Did the task require reach strengths, endurance, agility, etc., at or beyond the capabilities of the employee? Was the work environment ill-adapted to the person? Did the person need more training, experience, or practice in doing the task? Was the person inadequately rested to perform safely?

(7) ENVIRONMENTAL FACTORS - Did any factors such as moisture, humidity, rain, snow, sleet, hail, ice, fog, cold, heat, sun temperature changes, wind, tides, floods, currents, terrain; dust, mud, glare, pressure changes, lighting, etc., play a part in the accident?

(8) CHEMICAL AND PHYSICAL AGENT FACTORS - Did exposure to chemical agents (either single shift exposure or long-term exposure such as dusts, fibers, (asbestos, etc.), silica, gases (carbon, monoxide, chlorine, etc.), mists, steam, vapors, fumes, smoke, other particulates, liquid or dry chemicals that are corrosive, toxic, explosive or flammable, by-products of combustion or physical agents such as noise, ionizing radiation, non-ionizing radiation (UV radiation created during welding, etc.) contribute to the accident/incident?

(9) OFFICE FACTORS - Did the fact that the accident occurred in an office setting or to an office worker have a bearing on its cause? For example, office workers tend to have less experience and training in performing tasks such as lifting office furniture.

Did physical hazards within the office environment contribute to the hazard?

(10) SUPPORT FACTORS - Was the person using an improper tool for the job? Was inadequate time available or utilized to safely accomplish the task? Were less than adequate personnel resources (in terms of employee skills, number of workers, and adequate supervision) available to get the job done properly? Was funding available, utilized and adequate to provide proper tools, equipment, personnel, site preparation, etc.

(11) PERSONAL PROTECTIVE EQUIPMENT - Did the person fail to use appropriate personal protective equipment (gloves, eye protection, hard-toed shoes, respirator, etc) for the task or environment? Did protective equipment provided or worn fail to provide adequate protection from the hazard(s)? Did lack of or inadequate maintenance of protective gear contribute to the accident?

(12) DRUGS/ALCOHOL - Is there any reason to believe the person’s mental or physical capabilities, judgment, etc., were impaired or altered by the use of drugs or alcohol? Consider the effects of prescription medicine and over the counter medications as well as illicit drug use. Consider the effect of drug or alcohol induced “hangovers”.

(13) JOB/ACTIVITY HAZARD ANALYSIS - Was a written Job/Activity Analysis completed for the task being performed at the time of the accident? If one was made, did it address the hazard adequately or does it need to be updated? If none made, will one be made? These may also need to be addressed in the Corrective Actions Taken section. Mark the appropriate box. If one was made, attach a copy of the analysis to the report.

(14) MANAGEMENT - Did the lack of supervisor or management support play a part in the mishap? Mark the appropriate box.

SECTION - 8 OSHA INFORMATION - Complete this section if applicable

SECTION 9 - REPORT PREPARER

Providing a completed CSIR to the Contracting Officer is the PRIME CONTRACTOR’S RESPONSIBILITY. Enter the name, date of report, title, employer, phone number and signature of person completing the accident report and provide it to the Contracting

Officer, or his representative, responsible for oversight of that contractor activity. NOTE! If prepared by other than the Prime

Contractor, a person employed by the Prime Contractor must sign that they have reviewed and concur with the report and its findings

(e.g. company owner, project supervisor/foreman, Safety Officer, etc.).

ATTACHMENT "A"

CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO

1 Does the operator know the weight of the load to be lifted?

Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?

3 Is the crane level and on firm ground?

4 Are outriggers required?

5 If so, are outriggers fully extended and down, and the load off the wheels?

6 If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?

If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?

8 Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?

9 Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?

10 Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?

11 Is the lift swing path clear of obstructions?

If rotation of the load being lifted is hazardous, is tag line or restraint line being used?

13 Are personnel prevented from standing or passing under a suspended load?

14 Are personnel prevented from entering the load fall zone?

15 Is the crane operator's attention diverted?

16 Are proper signals being used at all times?

17 If radio communications are used is the frequency isolated to the crane team?

18 Do the operations ensure that side and tip loading is prohibited?

Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

20 If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in

NAVFAC P-307?

21 Is the lift a critical lift?

If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?

23 Is Attachment "A" current, filled out completely, and posted in the crane?

Contractor Name (Print Legibly):

Contractor Name (Signature):

Location: Date:

CRANE AND RIGGING GEAR ACCIDENT REPORT

Accident Category: Crane Accident Rigging Gear Accident

From:

UIC:

To: Navy Crane Center

Bldg. 491 NNSY

Portsmouth, VA 23709

Fax: 757-967-3808

Activity:

Report No:

Crane No:

Category:

Accident Date:

Time: hrs:

Category of Service: SPS GPS Crane Type:

Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical Non-

Crane Rigging Operation: Yes No

Location:

Weather:

Crane Capacity:

Hook Capacity:

Weight of Load on hook:

Fatality or Permanent Disability? Yes No

Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure Other: Specify

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS

ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date)

Certifying Official (Crane Accident Only):

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability? Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN? Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem? Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are…

This is the start of the file's text. The full file is on GovTribe.